CN206934919U - A kind of cesspool of sewage disposal - Google Patents
A kind of cesspool of sewage disposal Download PDFInfo
- Publication number
- CN206934919U CN206934919U CN201720755292.9U CN201720755292U CN206934919U CN 206934919 U CN206934919 U CN 206934919U CN 201720755292 U CN201720755292 U CN 201720755292U CN 206934919 U CN206934919 U CN 206934919U
- Authority
- CN
- China
- Prior art keywords
- cesspool
- baffle
- pipe
- fixed
- sewage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of cesspool of sewage disposal,Including pond body,And it is arranged on the closure in pond body,And it is arranged on the first baffle in pond body,And it is arranged on the second baffle in pond body,Pond body is divided into the first cesspool by first baffle and second baffle,Second cesspool and the 3rd cesspool,The first fixed mount is provided with first cesspool,First fixed mount is provided with the first filter screen,The second fixed mount is provided with second cesspool,Second fixed mount is provided with the second filter screen,Third fixed frame is provided with 3rd cesspool,Third fixed frame is provided with the 3rd filter screen,First baffle is provided with the first overflow launder that the sewage being easy in the first cesspool is flowed into the second cesspool,The second baffle, which is provided with, is easy to sewage in the second cesspool to be flowed into the second overflow launder in the 3rd cesspool,The pond body is provided with water inlet pipe and outlet pipe.Good sewage processing effect, labor strength is reduced, the later stage is easy to clean.
Description
Technical field
It the utility model is related to a kind of cesspool of sewage disposal.
Background technology
In recent years, the pollutant leakage that chemical industry is triggered by a variety of causes causes circumferentially to descend water environment pollution, to ring
Border causes safely serious threat;Because all kinds of cesspools have larger pollution risk to periphery underground water in chemical project, and
Difficulty of governance is big after underground water pollution, the time is long, costly;So the setting to cesspool in chemical project is particularly important.
But existing cesspool is intended only as settlement of sewage use when in use, had when sewage is in cesspool a lot
Floating object, and oettIed sewage can be also transported in the sewage disposal device in later stage in cesspool, and these floating objects
Treatment effect of the later stage sewage disposal device to sewage can be then influenceed, What is more can also influence making for later stage sewage disposal device
Use the life-span.And have mud after sewage precipitates in cesspool and be deposited in cesspool inner bottom part, and existing cesspool is defeated
It is easy to together convey the sludge being deposited in cesspool when sending oettIed sewage, and then later stage sewage disposal effect can be influenceed
Fruit, this can all bring loss to user.
The content of the invention
The technical problems to be solved in the utility model be to provide it is a kind of simple in construction, using, it is easy for installation, it is simple to operate,
Good sewage processing effect, cost is low, reduces labor strength, and the later stage is easy to clean, applied widely, service life length, tool
There is the cesspool of the sewage disposal securely and reliably acted on.
To solve the above problems, the utility model adopts the following technical scheme that:
A kind of cesspool of sewage disposal, including pond body, and the closure being arranged in pond body, and be arranged in pond body
First baffle, and the second baffle being arranged in pond body, the pond body is divided into by first baffle and second baffle to be used for
The first cesspool, the second cesspool and the 3rd cesspool of sewage are deposited, the first fixed mount, institute are provided with first cesspool
State the first fixed mount and be provided with the first filter screen, the closure is provided with four the first screw rods, four the first screw rods extension
It is welded and fixed to the first cesspool, and with the first fixed mount, four first screw rods are provided with buffer board, and described second is dirty
The second fixed mount is provided with pond, second fixed mount is provided with the second filter screen, and the closure is provided with four the second spiral shells
Bar, four second screw rods are extended in the second cesspool, and are welded and fixed with the second fixed mount, in the 3rd cesspool
Provided with third fixed frame, the third fixed frame is provided with the 3rd filter screen, and the closure is provided with four the 3rd screw rods, described
Four the 3rd screw rods are extended in the 3rd cesspool, and are welded and fixed with third fixed frame, and the first baffle, which is provided with, to be easy to
Sewage in first cesspool is flowed into the first overflow launder in the second cesspool, and the second baffle, which is provided with, is easy to the second dirt
Sewage is flowed into the second overflow launder in the 3rd cesspool in pond, and the pond body is provided with water inlet pipe and outlet pipe, it is described go out
Water pipe is provided with the first valve.
As preferable technical scheme, the buffer board is provided with guide sleeve, and the guide sleeve is set on the first screw rod,
The guide sleeve is provided with the fixing bolt for being used for fixed guide set and the first screw rod, and the closure is provided with and described first
Screw flight coordinates the first nut, the second nut coordinated with the second screw flight, the 3rd spiral shell coordinated with the 3rd screw flight
Mother, the outlet pipe connect setting with the 3rd cesspool, and the 3rd cesspool inwall is provided with gear mud component, the gear mud group
Part is fixed with outlet pipe, and the gear mud component is made up of locating ring, curved baffle and screen pack, and the screen pack is welded on arc
On baffle plate, the screen pack and curved baffle are welded and fixed with locating ring, and spiral shell is welded with the curved baffle inner side
Rasp bar, the outlet pipe is interior to be provided with two locating racks, is equipped with described two locating racks and consolidates with what the threaded rod was engaged
Fixed set, the threaded rod run through fixed cover side, described to be through to screw thread on the threaded rod of fixed cover side and be combined with nut, institute
State locating ring and the 3rd cesspool inwall coordinates, seal washer is provided with the locating ring and the 3rd cesspool inwall cooperation.
As preferable technical scheme, the buffer board is provided with through hole, the closure and pond body and first baffle
Coordinate to be equipped with sealing gasket with second baffle.
As preferable technical scheme, the closure both sides are arranged with two handles, handle and the closure weldering
Fixation is connect, the water inlet pipe connects setting with the first cesspool.
As preferable technical scheme, the pond body is provided with the first blow-off pipe, the second blow-off pipe and the 3rd blow-off pipe, institute
To state the first blow-off pipe and connect setting with the first cesspool, second blow-off pipe connects setting with the second cesspool, and the described 3rd
Blow-off pipe connects setting with the 3rd cesspool, and second is equipped with first blow-off pipe, the second blow-off pipe and the 3rd blow-off pipe
Valve.
As preferable technical scheme, the closure, which is provided with, is easy to the first screw rod, the second screw rod and the 3rd screw rod to wear
The groove crossed.
A kind of beneficial effect of the cesspool of sewage disposal of the utility model is:It is simple in construction, using, it is easy for installation,
Simple to operate, good sewage processing effect, cost is low, reduces labor strength, and the later stage is easy to clean, applied widely, uses
Long lifespan, have the function that safe and reliable.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only
It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work
Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of structural representation of the cesspool of sewage disposal of the utility model;
Fig. 2 is a kind of pond body cut-away view of the cesspool of sewage disposal of the utility model;
Fig. 3 is a kind of gear mud assembly assumption diagram of cesspool of sewage disposal of the utility model.
Embodiment
Refering to a kind of cesspool of sewage disposal shown in Fig. 1, Fig. 2 and Fig. 3, including pond body 1, and it is arranged on pond body 1
On closure 2, and the first baffle 3 being arranged in pond body 1, and the second baffle 4 being arranged in pond body 1, the pond body 1 be logical
Cross first baffle 3 and second baffle 4 is divided into the first cesspool 5, the second cesspool 6 and the 3rd cesspool for depositing sewage
7, first cesspool 5 is interior to be provided with the first fixed mount 8, and first fixed mount 8 is provided with the first filter screen (not shown), described
Closure 2 is provided with four the first screw rods 9, and four first screw rods 9 are extended in the first cesspool 5, and is fixed with first
Frame 8 is welded and fixed, and four first screw rods 9 are provided with buffer board 10, and the second fixed mount is provided with second cesspool 6
11, second fixed mount 11 is provided with the second filter screen (not shown), and the closure 2 is provided with four the second screw rods 12, institute
State four the second screw rods 12 to extend in the second cesspool 6, and be welded and fixed with the second fixed mount 11, the 3rd cesspool 7
Interior to be provided with third fixed frame 13, the third fixed frame 13 is provided with the 3rd filter screen (not shown), and the closure 2 is provided with four
Individual 3rd screw rod 14, four the 3rd screw rods 14 are extended in the 3rd cesspool 7, and are welded and fixed with third fixed frame 13,
The first baffle 3 is provided with the first overflow launder 15 that the sewage being easy in the first cesspool 5 is flowed into the second cesspool 6,
The second baffle 4, which is provided with, is easy to sewage in the second cesspool to be flowed into the second overflow launder 16 in the 3rd cesspool, described
Pond body 1 is provided with water inlet pipe 17 and outlet pipe 18, and the outlet pipe 18 is provided with the first valve 19.
A preferred embodiment in the utility model, the buffer board 10 are provided with guide sleeve 20, the guide sleeve 20
It is set on the first screw rod 9, the guide sleeve 20 is provided with the fixing bolt 21 for being used for fixed guide set 20 and the first screw rod 9,
The closure 2 is provided with coordinates the first nut 22 with the screw thread of the first screw rod 9, second coordinated with the screw thread of the second screw rod 12
Nut 23, the 3rd nut 24 coordinated with the screw thread of the 3rd screw rod 14, the outlet pipe 18 connect setting with the 3rd cesspool 7, institute
State the inwall of the 3rd cesspool 7 and be provided with gear mud component 25, the gear mud component 25 is fixed with outlet pipe 18, the gear mud component 25
It is made up of locating ring 26, curved baffle 27 and screen pack 28, the screen pack 28 is welded on curved baffle 27, the screen pack
28 and curved baffle 27 be welded and fixed with locating ring 26, be welded with threaded rod 29, institute at the inner side of curved baffle 27
State in outlet pipe 18 and be provided with two locating racks 30, be equipped with described two locating racks 30 and consolidate with what the threaded rod 29 was engaged
Surely 31 are covered, the threaded rod 29 runs through the side of fixed cover 31, described to be through to screw thread on the threaded rod 29 of the side of fixed cover 31 and match somebody with somebody
Conjunction has nut 32, and the locating ring 26 and the inwall of the 3rd cesspool 7 coordinate, and the locating ring 26 is matched somebody with somebody with the inwall of the 3rd cesspool 7
Seal washer 101 is provided with conjunction.
A preferred embodiment in the utility model, the buffer board 10 are provided with through hole (not shown), the sealing
Lid 2 coordinates with pond body 1 and first baffle 3 and second baffle 4 to be equipped with sealing gasket 102.
A preferred embodiment in the utility model, the both sides of closure 2 are arranged with two handles 201, described
Handle 201 and closure 2 are welded and fixed, and the water inlet pipe 17 connects setting with the first cesspool 5.
A preferred embodiment in the utility model, the pond body 1 are provided with the first blow-off pipe 110, the second blow-off pipe
111 and the 3rd blow-off pipe 112, first blow-off pipe 110 connects setting with the first cesspool 5, second blow-off pipe 111 with
The connection of second cesspool 6 is set, and the 3rd blow-off pipe 112 connects setting with the 3rd cesspool 7, first blow-off pipe 110,
The second valve 113 is equipped with second blow-off pipe 111 and the 3rd blow-off pipe 112.
A preferred embodiment in the utility model, the closure 2, which is provided with, is easy to the first screw rod 9, the second screw rod
12 and the 3rd groove 221 for passing through of screw rod 14.
Further, in the utility model, the filter screen installation site of the 3rd filter screen installation site the one the second, the second filter screen
Installation site is less than the first filter screen installation site, and the second overflow launder installation site is less than the first overflow launder installation site.
Further, the first cesspool, the second cesspool and the 3rd cesspool are provided with the utility model, and is being had
When body is used and manufactured, the number of cesspool can be set according to service condition, it is not limited to be mentioned in the utility model
Three cesspools, and the increase of cesspool can effectively increase the filter effect of sewage.
Further, in the utility model, the aperture of filter screen of the first filter screen is more than the second filter screen aperture of filter screen, the second filter
The aperture of filter screen of net is then set more than the aperture of filter screen of the 3rd filter screen.
Further, the closure is provided with coordinates the first nut with first screw flight, with the second screw rod spiral shell
The second nut that line coordinates, the 3rd nut coordinated with the 3rd screw flight, pass through the first set nut, the second nut and the
Three nuts, conveniently adjusted the first fixed mount for being arranged on the first screw rod bottom, be arranged on the second screw rod bottom second are fixed
Frame and be arranged on the 3rd screw rod bottom third fixed frame installation site, and also facilitate its dismounting and the later stage dimension
Shield.
Further, gear mud component can avoid outlet pipe when conveying sewage by the mud of cesspool inner bottom part together with dirt
Water is delivered in later stage sewage disposal device and influences later stage wastewater treatment efficiency, and by described blow-off pipe, can conveniently pair
The discharge of mud, it is also convenient for discharging sewage at cleaning sullage pond, in the utility model, curved baffle and screen pack coordinate
Semi-spherical shape is formed, and screen pack is then provided in the upper portion of this hemisphere, curved baffle is arranged on the lower half of hemisphere
Position, so that curved baffle can block the mud of cesspool inner bottom part, mud is avoided to be arranged together by outlet pipe connection sewage
Go out, and screen pack may also function as certain filtration, by described seal washer, can avoid sewage and mud directly from
Flowed into the gap that locating ring and cesspool inwall coordinate in outlet pipe.
Further, by described handle, the installation and removal of closure can be facilitated.
Further, the pond body is provided with the first blow-off pipe, the second blow-off pipe and the 3rd blow-off pipe, first blowdown
Pipe connects setting with the first cesspool, and second blow-off pipe connects setting with the second cesspool, the 3rd blow-off pipe and the
The connection of three cesspools is set, and is equipped with the second valve on first blow-off pipe, the second blow-off pipe and the 3rd blow-off pipe, by with
Upper structure setting, the first cesspool, the blowdown of the second cesspool and the 3rd cesspool and washing and cleaning operation can be facilitated, and in this reality
In new, also oblique bottom plate can be set in the inner bottom part of the first cesspool, the second cesspool and the 3rd cesspool,
The first cesspool, the second cesspool and mud in the 3rd cesspool and dirt is facilitated to be discharged at blow-off pipe.
A kind of cesspool of sewage disposal of the utility model has advantages below:In use, by water inlet pipe, by outside
Sewage is input in the first cesspool, and the buffer board by being set on four the first screw rods, can avoid entering at water inlet pipe
The sewage situation that is directly impinging on the first filter screen and causes the first filter screen to damage occur, and by the first described filter screen,
The floating object in sewage and large-scale particulate matter are may filter that, then can be to when being filtered floating object and large-scale particulate matter sewage
Flow into first cesspool of the first filter screen bottom, and precipitated in the first cesspool, and work as sewage in the first cesspool and exceed
During the first overflow launder, then it is flowed into by the first overflow launder in the second cesspool, and by being set in the second cesspool
Two filter screens, the medium-sized particulate matter in sewage is may filter that, then can be under the second filter screen when being filtered the sewage of medium-sized particulate matter
Flow into second cesspool in portion, and precipitated in the second cesspool, when the sewage in the second cesspool is more than the second overflow launder
When, then flowed into by the second overflow launder in the 3rd cesspool, and the 3rd Lv Ang by being set in the 3rd cesspool, can mistake
The small particle thing in sewage is filtered, when the sewage for the small particle thing being filtered in sewage then can be to the 3rd filter screen bottom
Flow into 3rd cesspool, and precipitated in the 3rd cesspool, and the sewage after being deposited in the 3rd cesspool then passes through water outlet
Pipe is discharged, and is transported in later stage sewage disposal device, by set gear mud component mud can be avoided to connect dirt by outlet pipe
Water is discharged together.Its is simple in construction, using, it is easy for installation, simple to operate, good sewage processing effect, cost is low, reduce worker's labor
Fatigue resistance, the later stage is easy to clean, applied widely, service life length, has the function that safe and reliable.
It is described above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to
In this, any change or replacement expected without creative work, should all cover within the scope of protection of the utility model.
Therefore, the scope of protection of the utility model should be determined by the scope of protection defined in the claims.
Claims (6)
- A kind of 1. cesspool of sewage disposal, it is characterised in that:Including pond body, and the closure being arranged in pond body, and set The first baffle in pond body is put, and the second baffle being arranged in pond body, the pond body pass through first baffle and second baffle It is divided into the first cesspool, the second cesspool and the 3rd cesspool for depositing sewage, the is provided with first cesspool One fixed mount, first fixed mount are provided with the first filter screen, and the closure is provided with four the first screw rods, described four One screw rod is extended in the first cesspool, and is welded and fixed with the first fixed mount, and four first screw rods are provided with buffer board, The second fixed mount is provided with second cesspool, second fixed mount is provided with the second filter screen, and the closure is provided with Four the second screw rods, four second screw rods are extended in the second cesspool, and are welded and fixed with the second fixed mount, and described Be provided with third fixed frame in three cesspools, the third fixed frame is provided with the 3rd filter screen, and the closure is provided with four the Three screw rods, four the 3rd screw rods are extended in the 3rd cesspool, and are welded and fixed with third fixed frame, the first baffle The first overflow launder that the sewage being easy in the first cesspool is flowed into the second cesspool is provided with, the second baffle is provided with It is easy to sewage in the second cesspool to be flowed into the second overflow launder in the 3rd cesspool, the pond body is provided with water inlet pipe and water outlet Pipe, the outlet pipe are provided with the first valve.
- 2. the cesspool of sewage disposal according to claim 1, it is characterised in that:The buffer board, which is provided with, to be oriented to Set, the guide sleeve are set on the first screw rod, and the guide sleeve is provided with the fixation for being used for fixed guide set and the first screw rod Bolt, the closure is provided with coordinates the first nut with first screw flight, second coordinated with the second screw flight Nut, the 3rd nut coordinated with the 3rd screw flight, the outlet pipe connect setting, the 3rd sewage with the 3rd cesspool Pond inwall be provided with gear mud component, it is described gear mud component fixed with outlet pipe, it is described keep off mud component by locating ring, curved baffle and Screen pack is formed, and the screen pack is welded on curved baffle, and the screen pack and curved baffle are welded and fixed with locating ring, Threaded rod is welded with the curved baffle inner side, two locating racks, described two locating racks are provided with the outlet pipe On be equipped with the fixed cover being engaged with the threaded rod, the threaded rod runs through fixed cover side, described to be through to fixed cover Screw thread is combined with nut on the threaded rod of side, and the locating ring and the 3rd cesspool inwall coordinate, the locating ring and the 3rd Seal washer is provided with cesspool inwall cooperation.
- 3. the cesspool of sewage disposal according to claim 1, it is characterised in that:The buffer board is provided with through hole, The closure coordinates to be equipped with sealing gasket with pond body and first baffle and second baffle.
- 4. the cesspool of sewage disposal according to claim 1, it is characterised in that:The closure both sides are arranged with Two handles, the handle and closure are welded and fixed, and the water inlet pipe connects setting with the first cesspool.
- 5. the cesspool of sewage disposal according to claim 1, it is characterised in that:The pond body is provided with the first blowdown Pipe, the second blow-off pipe and the 3rd blow-off pipe, first blow-off pipe connect setting with the first cesspool, second blow-off pipe and The connection of second cesspool is set, and the 3rd blow-off pipe connects setting, first blow-off pipe, the second blowdown with the 3rd cesspool The second valve is equipped with pipe and the 3rd blow-off pipe.
- 6. the cesspool of sewage disposal according to claim 1, it is characterised in that:The closure, which is provided with, is easy to the The groove that one screw rod, the second screw rod and the 3rd screw rod pass through.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720755292.9U CN206934919U (en) | 2017-06-26 | 2017-06-26 | A kind of cesspool of sewage disposal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720755292.9U CN206934919U (en) | 2017-06-26 | 2017-06-26 | A kind of cesspool of sewage disposal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206934919U true CN206934919U (en) | 2018-01-30 |
Family
ID=61367196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720755292.9U Expired - Fee Related CN206934919U (en) | 2017-06-26 | 2017-06-26 | A kind of cesspool of sewage disposal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206934919U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108525394A (en) * | 2018-05-03 | 2018-09-14 | 齐艳华 | One kind watching water-based no dirt-discharging purifying method |
CN108889029A (en) * | 2018-07-07 | 2018-11-27 | 安徽润泓环保科技有限公司 | Sewage integrated treatment equipment |
-
2017
- 2017-06-26 CN CN201720755292.9U patent/CN206934919U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108525394A (en) * | 2018-05-03 | 2018-09-14 | 齐艳华 | One kind watching water-based no dirt-discharging purifying method |
CN108889029A (en) * | 2018-07-07 | 2018-11-27 | 安徽润泓环保科技有限公司 | Sewage integrated treatment equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206934919U (en) | A kind of cesspool of sewage disposal | |
CN108283838A (en) | Recirculated water filtration processing equipment | |
CN206934918U (en) | A kind of cesspool | |
CN210150831U (en) | Sewage filtering and recycling device | |
CN206635150U (en) | A kind of industrial wastewater pollution processing unit | |
CN202199207U (en) | Environment-friendly treatment equipment for industrial sewage | |
CN215516936U (en) | A separator that is used for sewage treatment sedimentation tank to subside fast | |
CN205948442U (en) | Dirty water sedimentation bucket of modified | |
CN205360751U (en) | Half self - cleaning basket filter | |
CN208980416U (en) | A kind of UASB anaerobism turbulent flow rising internal circulation apparatus | |
CN209685480U (en) | A kind of waste water filtering settler | |
CN209237584U (en) | Emission-control equipment is used in a kind of carbon fiber environmental protection processing | |
CN209138113U (en) | A kind of semi-automatic dressing plant's circulation aqueous suspension residue remove device | |
CN209081606U (en) | A kind of drainage of Environmental Safety | |
CN208815666U (en) | A kind of urban duct sewage well Accrete clearing device | |
CN206580652U (en) | A kind for the treatment of tank | |
CN207553274U (en) | A kind of angle general formula back-washing dirt separator | |
CN206408056U (en) | A kind of sanitary wastewater recycling equipment | |
CN105621722A (en) | Wastewater treatment method | |
CN217600491U (en) | Sewage collection tank with pretreatment function | |
CN208526035U (en) | A kind of buried automatic desilting sewage cycling treatment device | |
CN211688542U (en) | Waste liquid separating device | |
CN210021330U (en) | Waste water particle filtering device | |
CN208732685U (en) | A kind of Oil in Sewage Water water separation device | |
CN221964569U (en) | Air-water mixed backwash sand filter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180824 Address after: 330000, Twelfth level 1206, 312 Hongdu South Road, Nanchang, Jiangxi. Patentee after: Jiangxi clear water source development in science and technology Co.,Ltd. Address before: 311115 north side of old 104 National Road, South Bridge Road, Pingyao Town, Yuhang District, Hangzhou, Zhejiang Patentee before: HANGZHOU YIHAN ELECTRIC Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180130 |