[go: up one dir, main page]

CN206859575U - A kind of flooring concrete sequence placing mould - Google Patents

A kind of flooring concrete sequence placing mould Download PDF

Info

Publication number
CN206859575U
CN206859575U CN201720709719.1U CN201720709719U CN206859575U CN 206859575 U CN206859575 U CN 206859575U CN 201720709719 U CN201720709719 U CN 201720709719U CN 206859575 U CN206859575 U CN 206859575U
Authority
CN
China
Prior art keywords
angle steel
support
side form
clamping block
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720709719.1U
Other languages
Chinese (zh)
Inventor
王刚
孟岩岩
许二猛
门贤君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201720709719.1U priority Critical patent/CN206859575U/en
Application granted granted Critical
Publication of CN206859575U publication Critical patent/CN206859575U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型公开了一种楼地面混凝土分仓浇筑模具,它涉及建筑施工技术领域。它包括支座竖向角钢、支座横向角钢、膨胀螺栓、槽钢侧模挡板、角钢卡固块、木楔子;所述支座竖向角钢与支座横向角钢焊接在一起,支座横向角钢的底部设有螺栓孔,螺栓孔处穿设有膨胀螺栓,支座横向角钢通过膨胀螺栓与待浇筑基层固定,角钢卡固块与支座竖向角钢的左侧底部焊接,角钢卡固块向上倾斜,槽钢侧模挡板安装在支座竖向角钢的左侧,角钢卡固块在槽钢侧模挡板的内部设置,角钢卡固块的底部与槽钢侧模挡板之间设有木楔子。本实用新型有益效果为:它是利用工具式固定支座,来固定楼地面混凝土分段浇筑的施工缝侧模,具有制作方便、安装方便牢固、便于周转的特点。

The utility model discloses a pouring mold for floor concrete in separate bins, which relates to the technical field of building construction. It includes support vertical angle steel, support transverse angle steel, expansion bolts, channel steel side form baffle, angle steel clamping block, wooden wedge; the support vertical angle steel and support transverse angle steel are welded together, and the support horizontal The bottom of the angle steel is provided with bolt holes, and the bolt holes are pierced with expansion bolts. The horizontal angle steel of the support is fixed with the base layer to be poured by the expansion bolts. The angle steel clamping block is welded to the left bottom of the vertical angle steel of the support. Tilt upward, the channel steel side form baffle is installed on the left side of the vertical angle steel of the support, the angle steel clamping block is set inside the channel steel side form baffle, and the bottom of the angle steel clamping block and the channel steel side form baffle Features wooden wedges. The beneficial effects of the utility model are: it uses a tool-type fixed support to fix the side formwork of the construction joint of the floor concrete section pouring, and has the characteristics of convenient manufacture, convenient and firm installation, and convenient turnover.

Description

一种楼地面混凝土分仓浇筑模具A concrete pouring mold for floor and floor concrete in separate bins

技术领域technical field

本实用新型涉及建筑施工技术领域,具体涉及一种楼地面混凝土分仓浇筑模具。The utility model relates to the technical field of building construction, in particular to a pouring mold for floor concrete in separate warehouses.

背景技术Background technique

装修时楼地面混凝土浇筑时,常因面积大而需分段浇筑,在留置施工段侧模模板时,常规做法是使用方木或槽钢,因无工具式固定方法,常出现侧模不顺直、固定不牢固等导致的接缝处不顺直等问题。When pouring concrete on the floor during decoration, it is often necessary to pour in sections due to the large area. When leaving the side formwork in the construction section, the conventional method is to use square wood or channel steel. Because there is no tool-type fixing method, the side formwork often does not fit smoothly. The seam is not straight and other problems caused by straightness and loose fixation.

发明内容Contents of the invention

本实用新型的目的在于针对现有技术的缺陷和不足,提供一种结构简单、设计合理、使用方便的楼地面混凝土分仓浇筑模具,它是利用工具式固定支座,来固定楼地面混凝土分段浇筑的施工缝侧模,具有制作方便、安装方便牢固、便于周转的特点。The purpose of this utility model is to aim at the defects and deficiencies of the prior art, and provide a simple structure, reasonable design, and convenient use of floor concrete sub-concrete pouring mold, which uses a tool-type fixed support to fix the floor concrete sub-concrete The construction joint side form cast in sections has the characteristics of convenient manufacture, convenient installation and firmness, and easy turnover.

为了解决背景技术所存在的问题,本实用新型采用的技术方案为:它包括支座竖向角钢、支座横向角钢、膨胀螺栓、槽钢侧模挡板、角钢卡固块、木楔子;所述支座竖向角钢为5#角钢,支座横向角钢为5#角钢,支座竖向角钢与支座横向角钢焊接在一起,支座竖向角钢与支座横向角钢的一端相互重叠,支座横向角钢的另一端底部设有螺栓孔,螺栓孔处穿设有膨胀螺栓,支座横向角钢通过膨胀螺栓与待浇筑基层固定,角钢卡固块为8#短槽钢,角钢卡固块与支座竖向角钢的左侧底部焊接,角钢卡固块向上倾斜,槽钢侧模挡板为12#槽钢侧模挡板,槽钢侧模挡板上刷有脱模剂,槽钢侧模挡板安装在支座竖向角钢的左侧,槽钢侧模挡板和支座竖向角钢之间设有木楔子,角钢卡固块在槽钢侧模挡板的内部设置,角钢卡固块的底部与槽钢侧模挡板之间设有木楔子。In order to solve the existing problems in the background technology, the technical solution adopted by the utility model is as follows: it includes the vertical angle steel of the support, the transverse angle steel of the support, expansion bolts, channel steel side form baffles, angle steel clamping blocks, and wooden wedges; The vertical angle steel of the support is 5# angle steel, the horizontal angle steel of the support is 5# angle steel, the vertical angle steel of the support and the horizontal angle steel of the support are welded together, one end of the vertical angle steel of the support and the transverse angle steel of the support Bolt holes are provided at the bottom of the other end of the horizontal angle steel of the seat, and expansion bolts are pierced at the bolt holes, and the horizontal angle steel of the support is fixed to the base to be poured by expansion bolts. The left bottom of the vertical angle steel of the support is welded, and the clamping block of the angle steel is inclined upward. The formwork baffle is installed on the left side of the vertical angle steel of the support, and a wooden wedge is arranged between the channel steel side formwork baffle and the vertical angle steel of the support, and the angle steel clamping block is set inside the channel steel side formwork baffle, and the angle steel clip A wooden wedge is arranged between the bottom of the solid block and the channel steel side form baffle.

进一步的,所述槽钢侧模挡板的右侧焊接有两个支座竖向角钢,两个支座竖向角钢之间的距离为2000mm。Further, two support vertical angle steels are welded on the right side of the channel steel side form baffle, and the distance between the two support vertical angle steels is 2000mm.

进一步的,所述角钢卡固块向上倾斜角度为5°。Further, the upward inclination angle of the angle steel clamping block is 5°.

采用上述结构后,本实用新型有益效果为:它是利用工具式固定支座,来固定楼地面混凝土分段浇筑的施工缝侧模,具有制作方便、安装方便牢固、便于周转的特点。After adopting the above structure, the beneficial effect of the utility model is: it uses a tool-type fixed support to fix the construction joint side formwork of the floor concrete section pouring, and has the characteristics of convenient manufacture, convenient and firm installation, and easy turnover.

附图说明Description of drawings

图1为本实用新型的俯视图;Fig. 1 is the top view of the utility model;

图2为本实用新型的侧立面图。Fig. 2 is a side elevation view of the utility model.

附图标记说明:支座竖向角钢1、支座横向角钢2、膨胀螺栓3、槽钢侧模挡板4、角钢卡固块5、木楔子6。Explanation of reference numerals: support vertical angle steel 1, support horizontal angle steel 2, expansion bolt 3, channel steel side form baffle plate 4, angle steel clamping block 5, wooden wedge 6.

具体实施方式detailed description

下面结合附图,对本实用新型作进一步的说明。Below in conjunction with accompanying drawing, the utility model is described further.

为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及具体实施方式,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施方式仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solutions and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It should be understood that the specific embodiments described here are only used to explain the present utility model, and are not intended to limit the present utility model.

如图1和图2所示,本具体实施方式采用如下技术方案:它包括支座竖向角钢1、支座横向角钢2、膨胀螺栓3、槽钢侧模挡板4、角钢卡固块5、木楔子6;所述支座竖向角钢1为5#角钢,支座横向角钢2为5#角钢,支座竖向角钢1与支座横向角钢2焊接在一起,支座竖向角钢1与支座横向角钢2的一端相互重叠,支座横向角钢2的另一端底部设有螺栓孔,螺栓孔处穿设有膨胀螺栓3,支座横向角钢2通过膨胀螺栓3与待浇筑基层固定,角钢卡固块5为8#短槽钢,角钢卡固块5与支座竖向角钢1的左侧底部焊接,角钢卡固块5向上倾斜,槽钢侧模挡板4为12#槽钢侧模挡板,槽钢侧模挡板4上刷有脱模剂,槽钢侧模挡板4安装在支座竖向角钢1的左侧,槽钢侧模挡板4和支座竖向角钢1之间设有木楔子6,角钢卡固块5在槽钢侧模挡板4的内部设置,角钢卡固块5的底部与槽钢侧模挡板4之间设有木楔子6。As shown in Fig. 1 and Fig. 2, this specific embodiment adopts the following technical scheme: it includes support vertical angle steel 1, support transverse angle steel 2, expansion bolt 3, channel steel side form baffle plate 4, angle steel clamping block 5 , wooden wedge 6; the vertical angle steel 1 of the support is 5# angle steel, the horizontal angle steel 2 of the support is 5# angle steel, the vertical angle steel 1 of the support is welded together with the horizontal angle steel 2 of the support, the vertical angle steel 1 of the support One end of the transverse angle steel 2 of the support overlaps with each other, and a bolt hole is provided at the bottom of the other end of the transverse angle steel 2 of the support, and an expansion bolt 3 is pierced at the bolt hole, and the transverse angle steel 2 of the support is fixed to the base to be poured through the expansion bolt 3, The angle steel clamping block 5 is 8# short channel steel, the angle steel clamping block 5 is welded with the left bottom of the vertical angle steel 1 of the support, the angle steel clamping block 5 is inclined upward, and the channel steel side form baffle plate 4 is 12# channel steel Side form baffle, channel steel side form baffle 4 is brushed with release agent, channel steel side form baffle 4 is installed on the left side of support vertical angle steel 1, channel steel side form baffle 4 and support vertical Wooden wedges 6 are arranged between the angle steels 1 , and the angle steel clamping blocks 5 are arranged inside the channel steel side formwork baffles 4 , and wooden wedges 6 are arranged between the bottom of the angle steel clamping blocks 5 and the channel steel side formwork baffles 4 .

进一步的,所述槽钢侧模挡板4的右侧焊接有两个支座竖向角钢1,两个支座竖向角钢1之间的距离为2000mm。Further, two support vertical angle steels 1 are welded on the right side of the channel steel side form baffle plate 4, and the distance between the two support vertical angle steels 1 is 2000 mm.

进一步的,所述角钢卡固块5向上倾斜角度为5°。Further, the angle steel clamping block 5 is inclined upward at an angle of 5°.

使用方法如下:The method of use is as follows:

1、支座竖向角钢1与支座横向角钢2焊接;1. The vertical angle steel 1 of the support is welded with the horizontal angle steel 2 of the support;

2、将角钢卡固块5与支座竖向角钢1焊接,其中角钢卡固块5向上倾斜,便于固定支座的安装及拆除;2. Weld the angle steel clamping block 5 with the vertical angle steel 1 of the support, wherein the angle steel clamping block 5 is inclined upward to facilitate the installation and removal of the fixed support;

3、待浇筑基层上按所需分段位置弹控制线、沿控制线将焊接好的固定支座通过膨胀螺栓3固定在待浇筑基层上;3. On the base to be poured, the control line is played according to the required segmental position, and the welded fixed support is fixed on the base to be poured by expansion bolts 3 along the control line;

4、将槽钢侧模挡板4刷脱模剂,之后安装在支座竖向角钢1的侧面,通过木楔子6调平及固定牢固,即可浇筑混凝土;4. Brush the channel steel side formwork baffle 4 with release agent, then install it on the side of the vertical angle steel 1 of the support, level it and fix it firmly with the wooden wedge 6, and then pour concrete;

5、混凝土浇筑完毕拆除时,先拆除膨胀螺栓3,即可将本分仓浇筑模具拆除,拆除后进行清理,周转至下一施工缝处使用。5. When the concrete is poured and dismantled, the expansion bolt 3 is removed first, and then the pouring mold of this sub-bin can be removed. After the removal, it will be cleaned and transferred to the next construction joint for use.

本具体实施方式是利用工具式固定支座,来固定楼地面混凝土分段浇筑的施工缝侧模,具有制作方便、安装方便牢固、便于周转的特点。This specific embodiment is to use the tool-type fixed support to fix the construction joint side form of the floor concrete section pouring, which has the characteristics of convenient manufacture, convenient and firm installation, and convenient turnover.

以上所述,仅用以说明本实用新型的技术方案而非限制,本领域普通技术人员对本实用新型的技术方案所做的其它修改或者等同替换,只要不脱离本实用新型技术方案的精神和范围,均应涵盖在本实用新型的权利要求范围当中。The above is only used to illustrate the technical solution of the utility model without limitation, other modifications or equivalent replacements made by those skilled in the art to the technical solution of the utility model, as long as they do not depart from the spirit and scope of the technical solution of the utility model , should be covered in the scope of the claims of the present utility model.

Claims (3)

1.一种楼地面混凝土分仓浇筑模具,其特征在于包括支座竖向角钢、支座横向角钢、膨胀螺栓、槽钢侧模挡板、角钢卡固块、木楔子;所述支座竖向角钢为5#角钢,支座横向角钢为5#角钢,支座竖向角钢与支座横向角钢焊接在一起,支座竖向角钢与支座横向角钢的一端相互重叠,支座横向角钢的另一端底部设有螺栓孔,螺栓孔处穿设有膨胀螺栓,支座横向角钢通过膨胀螺栓与待浇筑基层固定,角钢卡固块为8#短槽钢,角钢卡固块与支座竖向角钢的左侧底部焊接,角钢卡固块向上倾斜,槽钢侧模挡板为12#槽钢侧模挡板,槽钢侧模挡板上刷有脱模剂,槽钢侧模挡板安装在支座竖向角钢的左侧,槽钢侧模挡板和支座竖向角钢之间设有木楔子,角钢卡固块在槽钢侧模挡板的内部设置,角钢卡固块的底部与槽钢侧模挡板之间设有木楔子。1. A concrete sub-bin pouring mold for the floor surface is characterized in that it comprises a vertical angle steel of a support, a transverse angle steel of a support, expansion bolts, a channel steel side form baffle plate, an angle steel clamping block, and a wooden wedge; The vertical angle steel of the support is 5# angle steel, and the horizontal angle steel of the support is 5# angle steel. Bolt holes are provided at the bottom of the other end, and expansion bolts are pierced through the bolt holes. The horizontal angle steel of the support is fixed to the base to be poured through expansion bolts. The angle steel clamping block is 8# short channel steel, and the angle steel clamping block is vertical to the support The left bottom of the angle steel is welded, the angle steel clamping block is inclined upward, the channel steel side form baffle is 12# channel steel side form baffle, the channel steel side form baffle is brushed with release agent, and the channel steel side form baffle is installed On the left side of the vertical angle steel of the support, a wooden wedge is arranged between the channel steel side form baffle plate and the vertical angle steel of the support, and the angle steel clamping block is set inside the channel steel side form baffle plate, and the bottom of the angle steel clamping block A wooden wedge is provided between the channel steel side form baffle. 2.根据权利要求1所述的一种楼地面混凝土分仓浇筑模具,其特征在于所述槽钢侧模挡板的右侧焊接有两个支座竖向角钢,两个支座竖向角钢之间的距离为2000mm。2. A kind of floor concrete sub-bin pouring mold according to claim 1, characterized in that the right side of the channel steel side form baffle is welded with two support vertical angle steels, and the two support vertical angle steels The distance between them is 2000mm. 3.根据权利要求1所述的一种楼地面混凝土分仓浇筑模具,其特征在于所述角钢卡固块向上倾斜角度为5°。3 . The floor concrete pouring mold according to claim 1 , wherein the upward inclination angle of the angle steel clamping block is 5°. 4 .
CN201720709719.1U 2017-06-17 2017-06-17 A kind of flooring concrete sequence placing mould Expired - Fee Related CN206859575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720709719.1U CN206859575U (en) 2017-06-17 2017-06-17 A kind of flooring concrete sequence placing mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720709719.1U CN206859575U (en) 2017-06-17 2017-06-17 A kind of flooring concrete sequence placing mould

Publications (1)

Publication Number Publication Date
CN206859575U true CN206859575U (en) 2018-01-09

Family

ID=60826353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720709719.1U Expired - Fee Related CN206859575U (en) 2017-06-17 2017-06-17 A kind of flooring concrete sequence placing mould

Country Status (1)

Country Link
CN (1) CN206859575U (en)

Similar Documents

Publication Publication Date Title
CN206646813U (en) Template system for pouring concrete column
CN104989102B (en) A kind of improved concrete walls, column construction method
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN107060075A (en) A kind of supporting construction connected for fabricated construction beam slab and installation method
CN102518300B (en) Embedded conical bearing joint type steel structure support and construction method thereof
CN103967273B (en) Concrete form support device for floor slab pouring
CN205778910U (en) A kind of outer mould trolley of cut-and-cover tunnel lining cutting
CN107859223A (en) A kind of novel precast floor slab and the casting method of monoblock floor is built up by it
CN108908662A (en) Pre-cast hollow slab exempts from dabbing construction method and mold
CN103603494B (en) A kind of ultra-thin steel truss sloping core construction method and formwork structure
CN204456870U (en) For the formwork fastening clips tool of washroom concrete flanging
CN211007032U (en) Concrete bay window plastering-free construction structure
KR20130026833A (en) Mold to construct a concrete roadbed in railroad
CN202359511U (en) Subway tunnel ditch and track bed one-time pouring formwork structure
CN206859575U (en) A kind of flooring concrete sequence placing mould
CN203603462U (en) Post-cast strip beam plate formwork supporting structure
CN203821878U (en) Integral horizontal moving device for building with foundation
CN107859061A (en) A kind of construction method of box culvert primary concreting
CN210032590U (en) Anti-bank template device
CN203285056U (en) Stair formwork supporting base
CN206143956U (en) Wall connection structure
CN212002245U (en) A combined reinforcement device for aluminum formwork and wood formwork
CN109056527A (en) Anchor ceiling board construction method before anchorage
CN206737420U (en) A kind of concrete collar tie beam or the place's fixing templates that bear down on one
CN210738077U (en) Waterproof reverse-edge aluminum alloy hanging die

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100024 Guanzhuang Zhou Jiajing, Chaoyang District, Beijing

Patentee after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd.

Address before: 100024 Guanzhuang Zhou Jiajing, Chaoyang District, Beijing

Patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180109

Termination date: 20210617