[go: up one dir, main page]

CN206800945U - Fit up universal stand, paving structure and house decoration package assembly - Google Patents

Fit up universal stand, paving structure and house decoration package assembly Download PDF

Info

Publication number
CN206800945U
CN206800945U CN201720578114.3U CN201720578114U CN206800945U CN 206800945 U CN206800945 U CN 206800945U CN 201720578114 U CN201720578114 U CN 201720578114U CN 206800945 U CN206800945 U CN 206800945U
Authority
CN
China
Prior art keywords
finishing
universal stand
finishing universal
outer rim
main material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720578114.3U
Other languages
Chinese (zh)
Inventor
张引强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yufei Architectural Decoration Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720578114.3U priority Critical patent/CN206800945U/en
Application granted granted Critical
Publication of CN206800945U publication Critical patent/CN206800945U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

One kind finishing universal stand, paving structure and house decoration package assembly, wherein, finishing universal stand includes:Multiple first beams, multiple second beams, first beam and second beam are arranged in a crossed manner;Around the outer rim of first beam and the second beam, the both ends of first beam, the both ends of second beam are connected with the outer rim;The outer rim, first beam and second beam surround finishing main material installation portion.Using finishing universal stand of the present utility model by wall, floor tile, floor heating, wall facing, furred ceiling and top surface facing, indoor and outdoor wall body decoration and reconstruction of existing building etc., existing building can be incubated and Decorative Construction is integrated, to building inner, external wall reducing energy consumption and decorative lamination integration construction, decoration construction efficiency greatly promotes;Worker's technology degree of dependence is reduced, finishing precision is improved, makes whole fitting-up construction standardization, modularization.

Description

Fit up universal stand, paving structure and house decoration package assembly
Technical field
It the utility model is related to decoration technology field, and in particular to one kind finishing universal stand, paving structure and house decoration Package assembly.
Background technology
Existing finishing field, it is ensured that good decoration quality, rely on decoration worker's technology high, finishing low precision, simultaneously Efficiency is low.It for example, during the tiling of ground, need to first ensure ground level, be affixed on ground after mortar is then spread on ceramic tile Face.If decoration worker's misoperation, it is possible to cause all ceramic tiles to be in same plane after being bonded, influence attractive in appearance.Separately Outside, it is necessary to be affixed on ground again after each ceramic tile is spread into mortar during tiling, until being paved with ground, decoration worker operates Time is grown, and cost is high.Similar situation is also present in the installation of other finishing main materials, such as ground facing, top surface facing, wall Facial ornament surface construction etc..
Utility model content
The utility model solves the problems, such as it is that existing decoration efficiency is low, requires high to decoration worker.
To solve the above problems, the utility model provides a kind of finishing universal stand, including:Multiple first beams, multiple second Beam, first beam and second beam are arranged in a crossed manner;
Around the outer rim of first beam and the second beam, the both ends of first beam, the both ends of second beam and institute State outer rim connection;
The outer rim, first beam and second beam surround finishing main material installation portion.
Optionally, the outer rim is in quadrangle, and multiple first beams are spaced and be arranged in parallel in the first direction, multiple Second beam is spaced and be arranged in parallel in a second direction, and the first direction is perpendicular to the second direction.
Optionally, first beam and second beam are arranged in a crossed manner and formed after being connected respectively with the outer rim multiple Through hole, at least partly described through hole are provided with bottom plate, and the bottom plate is provided with least one sub-aperture.
Optionally, the through hole is rounded, square, rectangle, polygon, triangle, rhombus one of which, the son Hole is rounded, square, rectangle, polygon, triangle, rhombus one of which.
Optionally, first beam is provided with multiple along first direction extension and spaced first slot, institute The second beam is stated provided with multiple along second direction extension and spaced second slot.
Optionally, first beam and the part of the second beam juxtaposition are used for and treat that finishing portion is fixedly connected.
Optionally, the part of the juxtaposition is additionally provided with screwed hole, for installation bolt with by the finishing universal stand It is fixed on and treats in finishing portion.
Optionally, the outline of the outer rim is provided with slot or plug connector, for splicing different finishing universal stands.
Optionally, the cross section of first beam and second beam is U-shaped.
Optionally, the opening of first beam and second beam direction treats finishing portion.
The utility model also provides a kind of paving structure, including:Finishing universal stand described in multiple any of the above-described is adjacent Finishing universal stand in, the outer rim of one of them is provided with slot, and another outer rim is provided with plug connector, the slot and described Plug connector connects, and realizes the splicing of adjacent finishing universal stand.
Optionally, floor or ceramic tile or wall facing or furred ceiling facing are installed on the finishing main material installation portion.
The utility model also provides a kind of house decoration package assembly, including:
Treat finishing portion;
Finishing universal stand described in any of the above-described, the finishing universal stand, which is fixed on, described treats finishing portion;
Main material is fitted up, is installed on the finishing main material installation portion of the finishing universal stand.
Optionally, it is described to treat that finishing portion includes:Wall or ground or top surface.
Optionally, the finishing main material includes:Floor or ceramic tile or wooden facing, top surface facing.
Compared with prior art, the technical solution of the utility model has advantages below:
The utility model includes multiple first beams and multiple second beams, the first beam using finishing universal stand, finishing universal stand It is arranged in a crossed manner with the second beam and with outer rim surround finishing main material installation portion.And first beam and the second beam it is arranged in a crossed manner and respectively Multiple through holes are formed after being connected with outer rim.Decoration worker will fit up it is general be placed on it is to be installed repair portion, it can be wall to treat finishing portion Body or ground or top surface.Finishing main material is installed on the finishing main material installation portion of finishing universal stand.For example, in finishing main material peace Ceramic tile is installed in dress portion, poured into a mould in finishing main material installation portion support ceramic tile, then through hole between ceramic tile and ground mortar or its Its connecting material, after mortar or the solidification of other connecting materials, ceramic tile, decoration worker can be fixed without again by each ceramic tile Ground is affixed on again after spreading mortar, greatly improves the operating efficiency of decoration worker.
Brief description of the drawings
Fig. 1 is the top view of the utility model first embodiment finishing universal stand;
Fig. 2 is the stereogram of the utility model first embodiment finishing universal stand;
Fig. 3 is the utility model finishing universal stand and the installation site graph of a relation for treating finishing portion, simply illustrates to treat in figure Finishing portion and bolt;
Fig. 4 is the structural representation of installation and decoration main material on the utility model finishing universal stand, and fixation is also show in figure Fit up the fixed part of the plug connector of main material;
Fig. 5 is the side view for the plug connector that the utility model is used for immovable fixture main material;
Fig. 6 is the top view of the utility model second embodiment finishing universal stand.
Embodiment
It is understandable to enable above-mentioned purpose of the present utility model, feature and advantage to become apparent, below in conjunction with the accompanying drawings to this The specific embodiment of utility model is described in detail.
In the prior art, the installation and decoration main material on finishing portion is treated, for example, installing ceramic tile on the wall in house.If wall Body is uneven, and the ceramic tile installed is overall also uneven, influences attractive in appearance;To ensure installed ceramic tile generally in same As soon as plane, the installation level requirement to decoration worker is very high.In addition, it is necessary to which each ceramic tile is spread during tiling Wall is affixed on after mortar again, until being paved with whole wall, decoration worker's operating time is grown, and cost is high.Similar situation is also deposited It is the installation of other finishing main materials, such as the base material such as floor, plasterboard, woodwork plate.
First embodiment
With reference to figure 1 and Fig. 2, the utility model provides a kind of finishing universal stand 10, is waiting to fit up for lifting decoration worker The efficiency of installation and decoration main material in portion.Simultaneously, it is ensured that using finishing universal stand 10 of the present utility model on finishing portion is treated After installation and decoration main material, it is ensured that all finishing main materials are in same plane.Finishing universal stand 10 of the present utility model wraps Include:Multiple first beams 12, multiple second beams 13, the first beam 12 and the second beam 13 are arranged in a crossed manner;And around the first beam 12 and the The outer rim 11 of two beams 13, both ends, the both ends of the bearing of trend of the second beam 13 of the bearing of trend of the first beam 12 are connected with outer rim 11.
The shape of first beam 12 and the second beam 13 is not limited, in the present embodiment, the first beam 12 and the second beam 13 it is transversal Face is U-shaped, and towards treating finishing portion, the opening of the first beam 12 and the second beam 13 can also be for the opening of the first beam 12 and the second beam 13 Finishing portion is treated backwards.In other embodiments, the cross section of the first beam and the second beam is in quadrangle or circle.
Outer rim 11, the first beam 12 and the second beam 13 of finishing universal stand 10 surround finishing main material installation portion.Wherein, fit up Main material installation portion includes:It is total to by the part-structure of the part-structure of outer rim 11, the part-structure of the first beam 12 and the second beam 13 With the part surrounded, as shown in a-quadrant in Fig. 1 and B area;And only by the part-structure of the first beam 12 and the portion of the second beam 13 The separation structure part arranged in a crossed manner surrounded, as shown in C regions in Fig. 1.
It should be noted that finishing main material installation portion is not merely the part shown in a-quadrant in Fig. 1, B area and C regions, its The remaining region surrounded by outer rim 11, the first beam 12 and the second beam 13 can be finishing main material installation portion.Fit up main material installation Floor or ceramic tile or wall facing or other finishing materials such as wooden facing or top surface facing can be installed in portion.
With continued reference to Fig. 2 and Fig. 3, the first beam 12 and the second beam 13 are arranged in a crossed manner and formed after being connected respectively with outer rim 11 Multiple through holes 14.9 through holes 14, greater number of first beam, 12 and second beam, 13 arranged in a crossed manner and and outside are shown in Fig. 2 Frame 11 can form greater number of through hole 14 after connecting.Finishing universal stand 10 is fixed on by decoration worker treats finishing portion 60, treats Finishing portion 60 can be wall or ground or top surface.On finishing main material installation portion after installation and decoration main material 30, outer rim 11, the Main material 30 is fitted up in support jointly for one beam 12 and the second beam 13, or, the first beam 12 and the second beam 13 support finishing main material 30 jointly. For example, installing ceramic tile on finishing main material installation portion, then mortar is poured into a mould in the through hole 14 between ceramic tile and ground, treat that mortar coagulates After Gu, ceramic tile, decoration worker can be fixed without being affixed on ground again after each ceramic tile is spread into mortar again so that ceramic tile one Change construction, greatly improve the operating efficiency of decoration worker.
Furthermore it is also possible to using universal stand of the present utility model of fitting up by wall, floor tile, floor heating, wall facing, furred ceiling and top surface Facing, indoor and outdoor wall body decoration and reconstruction of existing building etc., can be incubated to existing building and Decorative Construction is integrated, to building Inner, external wall reducing energy consumption and decorative lamination integration construction, decoration construction efficiency greatly promote;Worker's technology degree of dependence is reduced, Finishing precision is improved, makes whole fitting-up construction standardization, modularization.
With reference to figure 1 and with reference to shown in Fig. 3, in the present embodiment, the part 17 of the first beam 12 and the juxtaposition of the second beam 13 is used In with treat that finishing portion 60 is fixedly connected.Screwed hole 17a is additionally provided with the region of part 17 of juxtaposition, treats also to set in finishing portion 60 Have and fit up the corresponding screwed hole (not shown) of screwed hole 17a on universal stand 10, will can be fitted up by bolt 50 general Frame 10, which is fixed on, to be treated in finishing portion 60.Shown in Fig. 3, it is the wall vertically extended in house to treat finishing portion 60, but should Treat the surface irregularity of finishing portion 60 so that treat that the opposed vertical direction of finishing portion 60 has tilted.
Now, as long as ensureing that all bolts 50 treated in finishing portion 60 that are installed on are parallel, and perpendicular to vertical direction, that After finishing universal stand 10 of the present utility model is connected with bolt 50, due to fitting up outer rim 11, the first beam 12 of universal stand 10 Same plane is in the second beam 13, then, finishing universal stand 10 just vertically extends.So as to general installed in fitting up Finishing main material on frame 10 is also at same perpendicular, it appears attractive in appearance.Similarly, for horizontally extending but relative level Direction is inclined to treat finishing portion 60, using finishing universal stand 10 of the present utility model it is also ensured that general installed in fitting up Finishing main material on frame 10 is in same level, it appears attractive in appearance.Installation level requirement to decoration worker is not high, and can carry High decoration efficiency.
It should be noted that the shape of outer rim 11 of the present utility model is not limited, can be quadrangle or triangle etc.. With reference to figure 1, in the present embodiment, outer rim 11 is square.Two the first beams 12 and two the second beams 13 are shown in Fig. 1, In other embodiments, can there are greater number of first beam and the second beam.Two the first beams 12 (X-direction in Fig. 1 in the first direction It is shown) it is spaced and be arranged in parallel, two the second beams 13 are spaced and be arranged in parallel (in Fig. 1 shown in Y-direction) in a second direction, and first Direction is perpendicular to second direction.
Wherein, with reference to figure 1 and Fig. 2, the first beam 12 and the second beam 13 is arranged in a crossed manner and shape after being connected respectively with outer rim 11 Into multiple through holes 14.The shape of through hole 14 is not limited, and in the present embodiment, through hole 14 is square, and the corresponding to through hole 14 The size all same of one beam 12, the second beam 13 and outer rim 11.In other embodiments, through hole 14 be circle, it is rectangle, polygon Shape, triangle, rhombus one of which., can be with installation and decoration main material 30, in Fig. 4 at through hole 14 in the present embodiment with reference to figure 4 Show to fit up and four finishing main materials 30 are mounted with universal stand 10, it is logical that finishing main material 30 covers four fitted up on universal stand 10 Hole 14, can be that all through holes 14 are covered by finishing main material 30.
It can be ceramic tile to fit up main material 30, but is not limited to ceramic tile, can also be other finishing materials.Existing ceramic tile is just Square, after through hole 14 is designed to square, institute's finishing main material 30 to be mounted can be matched, is realized quickly general in finishing Installation and decoration main material 30 on frame 10, and finishing universal stand 10 can support finishing main material 30 well.For example, the size rule of ceramic tile Lattice are 300mm × 300mm, 300mm × 450mm, 300mm × 600mm, 600mm × 600mm etc., then the length (figure of through hole 14 In 1 shown in L) it is 300mm;The ceramic tile of corresponding different dimensions, the quantity for the through hole 14 that ceramic tile is covered are also different.
For example, the dimensions of the ceramic tile of selection is 300mm × 300mm, then, each ceramic tile covers a through hole 14; If the dimensions of the ceramic tile of selection is 300mm × 600mm, then, each ceramic tile covers two through holes 14;If the ceramic tile of selection Dimensions be 600mm × 600mm, then, each ceramic tile covers four through holes 14.
In other embodiments, can according to ceramic tile to be mounted dimensions design through hole 14 length L, with The dimensions of ceramic tile matches.
With continued reference to 1, in the present embodiment, the first beam 12 is provided with multiple extend in a first direction and spaced first Slot 15, show that the first beam 12 corresponding to each through hole 14 is provided with two the first slots 15 in Fig. 1, in other embodiments may be used To there is greater number of first slot.Second beam 13 is provided with multiple extension and spaced second slots in a second direction Shown in 16, Fig. 1 it is each two the second slot 16s are provided with by corresponding second beam 13, can have in other embodiments more Second slot of multi-quantity.
With reference to figure 4, due to meeting installation and decoration main material 30 on finishing universal stand 10, adjacent two finishing main materials 30 are arranged on After fitting up universal stand 10, the first slot 15 and the second slot 16 are between two adjacent finishing main materials 30;With reference to figure 5, Fig. 5 institutes The plug connector 40 shown includes plug division 42 and fixed part 41, and the plug division 42 of plug connector 40 is inserted in the first slot 15 and second and inserted In groove 16, meanwhile, the fixed part 41 of plug connector 40 is covered in adjacent finishing main material 30, and finishing main material 30 is fixed on into dress Repair on universal stand 10.
The slot 15 of plug division 42 and first of plug connector 40 and the second slot 16 can be interference fits, it is ensured that grafting Portion 42 is inserted in after the first slot 15 and the second slot 16 when being acted on without external force and will not be pulled out easily;Main material 30 to be fitted up is with treating After finishing portion 60 is fixedly connected, such as in finishing main material 30 and the interior cast mortar of through hole 14 between finishing portion 60 is treated, mortar coagulates Main material 30 to be fitted up can be fixed on and be treated in finishing portion 60 after Gu, now, then by plug connector 40 from the first slot 15 and second Extracted in slot 16.
It should be noted that in the present embodiment, the material of finishing universal stand 10 is flexible material, can be that plastics can also be Metal, and other plastic materials.According to the size for treating finishing portion, can so intercept the finishing universal stand 10 of corresponding size with For installation and decoration main material so that finishing is more convenient.
Second embodiment
With reference to figure 6, the difference of the present embodiment and first embodiment is:All through holes are provided with bottom plate 20, Bottom plate 20 is provided with multiple sub-aperture 21, and sub-aperture 21 is rounded.In other embodiments, sub-aperture can be with square, rectangle, more Side shape, triangle, rhombus one of which.In addition, in other embodiments, bottom plate can be provided with only at partial through holes.In addition, A sub-aperture can be only set on each bottom plate.
3rd embodiment
With reference to figure 1, the outline for fitting up the outer rim 11 of universal stand 10 is provided with slot 18 or plug connector 19, for splicing not Same finishing universal stand 10.Specifically, the present embodiment also provides a kind of paving structure, including:Dress described in above-described embodiment Repair universal stand 10, in adjacent finishing universal stand 10, the outer rim 11 of one of them is provided with slot 18, and another outer rim 11 is set There is plug connector 19, slot 18 and plug connector 19 connect, and realize the splicing of adjacent finishing universal stand 10.By splicing varying number Finishing universal stand 10 meet the various sizes of decoration requirements for treating finishing portion.
Fourth embodiment
With reference to figure 3, the present embodiment also provides a kind of house decoration package assembly, including:
Treat finishing portion 60;
Finishing universal stand 10 described in above-described embodiment, finishing universal stand 10, which is fixed on, treats finishing portion 60;
Main material (not shown) is fitted up, is installed on the finishing main material installation portion of finishing universal stand 10.
Although the utility model discloses as above, the utility model is not limited to this.Any those skilled in the art, Do not depart from spirit and scope of the present utility model, can make various changes or modifications, therefore the scope of protection of the utility model It should be defined by claim limited range.

Claims (15)

1. one kind finishing universal stand, it is characterised in that including:
Multiple first beams, multiple second beams, first beam and second beam are arranged in a crossed manner;
Around the outer rim of first beam and the second beam, the both ends of first beam, second beam both ends with it is described outer Frame connects;
The outer rim, first beam and second beam surround finishing main material installation portion.
2. finishing universal stand as claimed in claim 1, it is characterised in that the outer rim is in quadrangle, and multiple described first Beam is spaced and be arranged in parallel in the first direction, and multiple second beams are spaced and be arranged in parallel in a second direction, the first party To perpendicular to the second direction.
3. finishing universal stand as claimed in claim 2, it is characterised in that first beam and second beam are arranged in a crossed manner simultaneously Multiple through holes are formed after being connected respectively with the outer rim, at least partly described through hole is provided with bottom plate, and the bottom plate is provided with At least one sub-aperture.
4. finishing universal stand as claimed in claim 3, it is characterised in that the through hole is rounded, square, rectangle, more Side shape, triangle, rhombus one of which, the sub-aperture is rounded, square, rectangle, polygon, triangle, rhombus wherein It is a kind of.
5. finishing universal stand as claimed in claim 3, it is characterised in that first beam is provided with multiple along the first party To extension and spaced first slot, second beam is provided with multiple along second direction extension and spaced Second slot.
6. finishing universal stand as claimed in claim 1, it is characterised in that first beam and the second beam juxtaposition Part is used for and treats that finishing portion is fixedly connected.
7. finishing universal stand as claimed in claim 6, it is characterised in that the part of the juxtaposition is additionally provided with screwed hole, For installation bolt finishing portion is treated so that the finishing universal stand to be fixed on.
8. finishing universal stand as claimed in claim 1, it is characterised in that the outline of the outer rim is provided with slot or grafting Part, for splicing different finishing universal stands.
9. finishing universal stand as claimed in claim 1, it is characterised in that the cross section of first beam and second beam is in It is U-shaped.
10. finishing universal stand as claimed in claim 9, it is characterised in that the opening court of first beam and second beam To treating finishing portion.
A kind of 11. paving structure, it is characterised in that including:Finishing universal stand described in multiple any one of claim 1-10, phase In adjacent finishing universal stand, the outer rim of one of them is provided with slot, and another outer rim is provided with plug connector, the slot and institute Plug connector connection is stated, realizes the splicing of adjacent finishing universal stand.
12. paving structure as claimed in claim 11, it is characterised in that it is described finishing main material installation portion on be provided with floor or Ceramic tile or wall facing or furred ceiling facing.
A kind of 13. house decoration package assembly, it is characterised in that including:
Treat finishing portion;
Finishing universal stand described in claim any one of 1-10, the finishing universal stand, which is fixed on, described treats finishing portion;
Main material is fitted up, is installed on the finishing main material installation portion of the finishing universal stand.
14. house decoration package assembly as claimed in claim 13, it is characterised in that described to treat that finishing portion includes:
Wall or ground or top surface.
15. house decoration package assembly as claimed in claim 13, it is characterised in that the finishing main material includes:
Floor or ceramic tile or wooden facing, top surface facing.
CN201720578114.3U 2017-05-23 2017-05-23 Fit up universal stand, paving structure and house decoration package assembly Expired - Fee Related CN206800945U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720578114.3U CN206800945U (en) 2017-05-23 2017-05-23 Fit up universal stand, paving structure and house decoration package assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720578114.3U CN206800945U (en) 2017-05-23 2017-05-23 Fit up universal stand, paving structure and house decoration package assembly

Publications (1)

Publication Number Publication Date
CN206800945U true CN206800945U (en) 2017-12-26

Family

ID=60741860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720578114.3U Expired - Fee Related CN206800945U (en) 2017-05-23 2017-05-23 Fit up universal stand, paving structure and house decoration package assembly

Country Status (1)

Country Link
CN (1) CN206800945U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952117A (en) * 2017-05-23 2018-12-07 张引强 Fit up universal stand, paving structure and house decoration package assembly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952117A (en) * 2017-05-23 2018-12-07 张引强 Fit up universal stand, paving structure and house decoration package assembly

Similar Documents

Publication Publication Date Title
EP3712345B1 (en) A raised floor supporting apparatus
CN108104401A (en) Basic ground assembly and installation method
CN206800945U (en) Fit up universal stand, paving structure and house decoration package assembly
KR200369507Y1 (en) The fabric of Living Room Conner
CN204059844U (en) Indoor wall, ground decoration keel frame
CN211229333U (en) Floor heat preservation device and floor heating assembly
CN108952117A (en) Fit up universal stand, paving structure and house decoration package assembly
EP1835832A1 (en) Floor drainage
CN207974457U (en) A kind of ground overhead system
KR20210048395A (en) Bathtub system
CN205742846U (en) The mounting assembly of decorative panel at corner
CN212836500U (en) Novel bearing leveling plate
KR20190002389U (en) Prefabricated panels for dry heating
CN208415810U (en) A kind of caisson type accomodation ground assembling mounting structure
CN210369728U (en) Dry type heating raised floor
KR200178339Y1 (en) Panel-heating of fabricated
CN217461316U (en) Outdoor overhead wood floor paving system
CN110552480B (en) Floor heating insulation board and floor heating system
GB2446131A (en) Method for making a substrate for a shower installation
CN1715578A (en) Dry hanging wall surface decoration structure of electromagnetic shield firous ceramic back lining and its construction mthod
CN105735340A (en) Road lamp concrete foundation positioning device
EP0890689A2 (en) Load-bearing structure particularly for indoor flooring or outdoor paving
CN205604617U (en) Decorate and use interior wallboard
KR102685088B1 (en) Finishing panel of a building where the exterior and insulation are integrally installed
KR20000012295A (en) Panel-heating offabricated

Legal Events

Date Code Title Description
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220310

Address after: 201306 room 3040, building 24, No. 2, Xincheng Road, Nicheng Town, Pudong New Area, Shanghai

Patentee after: Shanghai Yufei Architectural Decoration Engineering Co.,Ltd.

Address before: 201101 floor 2, building 1, Lane 859, Zhongyi Road, Minhang District, Shanghai

Patentee before: Zhang Yinqiang

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226