[go: up one dir, main page]

CN206738715U - Suitable for the new prefabricated mat piece of municipal pipeline - Google Patents

Suitable for the new prefabricated mat piece of municipal pipeline Download PDF

Info

Publication number
CN206738715U
CN206738715U CN201621244722.2U CN201621244722U CN206738715U CN 206738715 U CN206738715 U CN 206738715U CN 201621244722 U CN201621244722 U CN 201621244722U CN 206738715 U CN206738715 U CN 206738715U
Authority
CN
China
Prior art keywords
mat piece
shoulder pad
fixed column
tail end
end mat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621244722.2U
Other languages
Chinese (zh)
Inventor
徐新华
郁汉城
倪海华
黄炳华
高洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Jin Lei Municipal Engineering Co Ltd
Original Assignee
Nantong Jin Lei Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Jin Lei Municipal Engineering Co Ltd filed Critical Nantong Jin Lei Municipal Engineering Co Ltd
Priority to CN201621244722.2U priority Critical patent/CN206738715U/en
Application granted granted Critical
Publication of CN206738715U publication Critical patent/CN206738715U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of new prefabricated mat piece suitable for municipal pipeline, include head end mat piece and tail end mat piece, mat piece among one or more is provided between head end mat piece and tail end mat piece, the side of head end mat piece is provided with the first fixing hole, the side of middle mat piece is provided with the first fixed column, the opposite side of middle mat piece is provided with the second fixing hole, the side of tail end mat piece is provided with the second fixed column, it is all provided with head end mat piece, middle mat piece and tail end mat piece fluted, it is provided with shoulder pad in groove, inclinometer is also inlaid with the side wall of head end mat piece and tail end mat piece;It is easy to head end mat piece, middle mat piece to be fixedly connected with tail end mat piece by the first fixed column, the first fixing hole, the second fixed column and the second fixing hole, by the way that shoulder pad is removably mounted on groove, it is easy to shoulder pad to be adjusted, ensure that pipe laying prepares using inclinometer, laying quality is ensure that, reaches municipal pipe construction road paving, shorten construction period and ensure the purpose of construction quality.

Description

Suitable for the new prefabricated mat piece of municipal pipeline
Technical field
It the utility model is related to municipal works field, and in particular to suitable for the new prefabricated mat piece of municipal pipeline.
Background technology
The step of traditional municipal pipeline construction be first grooving, then bottom land is carried out it is smooth, after completion bottom land is smooth One layer of mortar is poured thereon, finally lays municipal pipeline, in this way, waiting mortar hardening process, elongates whole construction period;Again Have, when progress bottom land is smooth, because construction period elongates, has the technical problem of infiltration, lead to not lay pipeline. Some simultaneously existing auxiliary laying stage properties can not ensure the proper angle of pipe laying, have impact on the laying quality of pipeline, Extend the laying time.
Utility model content
In order to solve the above technical problems, the utility model proposes the new prefabricated mat piece suitable for municipal pipeline, to protect Laying quality has been demonstrate,proved, reached municipal pipe construction road paving, shorten construction period and ensure the purpose of construction quality.
To reach above-mentioned purpose, the technical solution of the utility model is as follows:
A kind of new prefabricated mat piece suitable for municipal pipeline, include head end mat piece and tail end mat piece, the head end pad Mat piece among one or more is provided between part and tail end mat piece, the side of the head end mat piece is provided with the first fixing hole, described The side of middle mat piece is provided with the first fixed column, and first fixed column is adapted with first fixing hole, the middle pad The opposite side of part is provided with the second fixing hole, and the side of the tail end mat piece is provided with the second fixed column, second fixed column and One fixed column is adapted with second fixing hole;Be all provided with the head end mat piece, middle mat piece and tail end mat piece it is fluted, Shoulder pad is provided with the groove, the shoulder pad is removably mounted in the groove, and the shoulder pad is provided with and pipeline phase The cambered surface matched somebody with somebody, inclinometer is also inlaid with the side wall of the head end mat piece and tail end mat piece.
The utility model is adapted by the first fixed column with the first fixing hole, and the second fixed column is mutually fitted with the second fixing hole Match somebody with somebody, the first fixed column is adapted with the second fixing hole, is easy to head end mat piece, middle mat piece to be fixedly connected with tail end mat piece, is led to Cross and shoulder pad is removably mounted on groove, be easy to shoulder pad to be adjusted, to meet the pipe laying of different size, utilize angle Spend instrument and ensure that pipe laying prepares, ensure that laying quality, reach municipal pipe construction road paving, shorten construction period and ensure construction The purpose of quality.
As preferable, the shoulder pad includes the left shoulder pad being mutually adapted and right shoulder pad, the left shoulder pad and right shoulder pad Junction achieved a fixed connection by locating dowel and positioning hole.By the way that shoulder pad to be split into the left shoulder pad of mutual cooperation and right pad Shoulder, the convenient of installation is realized, also allow for carrying out secondary adjustment after pipeline is placed, improve laying efficiency.
As preferable, first fixed column and the middle mat piece are formed using integrated injection moulding technique productions.
As preferable, second fixed column and the tail end mat piece are formed using integrated injection moulding technique productions.It is logical Cross and the first fixed column and middle mat piece are subjected to integrated injection moulding technique productions, the second fixed column and tail end mat piece are subjected to one Change technique productions, avoid the first fixed column and the second fixed column from being broken in use, extend equipment uses the longevity Life, ensure that the safety of construction.
The utility model has the following advantages that:
1. the utility model is adapted by the first fixed column with the first fixing hole, the second fixed column and the second fixing hole phase Adaptation, the first fixed column are adapted with the second fixing hole, are easy to head end mat piece, middle mat piece to be fixedly connected with tail end mat piece, By the way that shoulder pad is removably mounted on groove, it is easy to shoulder pad to be adjusted, to meet the pipe laying of different size, utilizes Inclinometer ensures that pipe laying prepares, and ensure that laying quality, reaches municipal pipe construction road paving, shortening construction period and guarantee and applies The purpose of working medium amount.
2. the utility model by the way that shoulder pad to be split into the left shoulder pad of mutual cooperation and right shoulder pad, realizes the convenient of installation, Also allow for carrying out secondary adjustment after pipeline is placed, improve laying efficiency.
3. the utility model is consolidated by the way that the first fixed column and middle mat piece are carried out into integrated injection moulding technique productions by second Fixed column and tail end mat piece carry out integral process production, avoid the first fixed column and the second fixed column from breaking in use Split, extend the service life of equipment, ensure that the safety of construction.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art.
Fig. 1 is the structural representation of the disclosed new prefabricated mat piece suitable for municipal pipeline of the utility model embodiment;
Fig. 2 is the knot of the disclosed head end mat piece suitable for the new prefabricated mat piece of municipal pipeline of the utility model embodiment Structure schematic diagram;
Fig. 3 is the knot of the disclosed tail end mat piece suitable for the new prefabricated mat piece of municipal pipeline of the utility model embodiment Structure schematic diagram;
Fig. 4 is the knot of the disclosed mat piece middle suitable for the new prefabricated mat piece of municipal pipeline of the utility model embodiment Structure schematic diagram;
Corresponding component title of the numeral represented by with letter in figure:
1. 2. tail end mat piece of head end mat piece, the 3. middle fixed column of 4. first fixing hole of mat piece 5. first
6. 8. shoulder pad of the second 7. second fixed column of fixing hole, 81. left 82. right shoulder pad of shoulder pad
9. inclinometer 10. lays pipeline.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe.
The utility model provides the new prefabricated mat piece suitable for municipal pipeline, and its operation principle is fixed by first Post is adapted with the first fixing hole, and the second fixed column and the second fixing hole are adapted, and the first fixed column is mutually fitted with the second fixing hole Match somebody with somebody, be easy to head end mat piece, middle mat piece to be fixedly connected with tail end mat piece, by the way that shoulder pad is removably mounted on groove, It is easy to shoulder pad to be adjusted, to meet the pipe laying of different size, ensures that pipe laying prepares using inclinometer, ensure that paving If quality, reach municipal pipe construction road paving, shorten construction period and ensure the purpose of construction quality.
The utility model is described in further detail with reference to embodiment and embodiment.
As depicted in figs. 1 and 2, a kind of new prefabricated mat piece suitable for municipal pipeline, includes head end mat piece 1 and tail end Mat piece 2, mat piece 3 among one or more is provided between the head end mat piece and tail end mat piece, the side of the head end mat piece is set There is the first fixing hole 4, the side of the middle mat piece is provided with the first fixed column 5, and first fixed column is fixed with described first Hole is adapted, and the opposite side of the middle mat piece is provided with the second fixing hole 6, and the side of the tail end mat piece is provided with the second fixed column 7, second fixed column and the first fixed column are adapted with second fixing hole;The head end mat piece, middle mat piece and It is all provided with fluted in tail end mat piece, is provided with shoulder pad 8 in the groove, the shoulder pad is removably mounted in the groove, institute State shoulder pad and be provided with the cambered surface to match with pipeline, inclinometer 9 is also inlaid with the side wall of the head end mat piece and tail end mat piece.
The utility model is adapted by the first fixed column with the first fixing hole, and the second fixed column is mutually fitted with the second fixing hole Match somebody with somebody, the first fixed column is adapted with the second fixing hole, is easy to head end mat piece, middle mat piece to be fixedly connected with tail end mat piece, is led to Cross and shoulder pad is removably mounted on groove, be easy to shoulder pad to be adjusted, to meet the pipe laying of different size, utilize angle Spend instrument and ensure that pipe laying prepares, ensure that laying quality, reach municipal pipe construction road paving, shorten construction period and ensure construction The purpose of quality.
It is worth noting that, the shoulder pad includes the left shoulder pad 81 and right shoulder pad 82 being mutually adapted, the left shoulder pad and The junction of right shoulder pad is achieved a fixed connection by locating dowel and positioning hole.By the left shoulder pad that shoulder pad is split into mutual cooperation With right shoulder pad, the convenient of installation is realized, also allows for carrying out secondary adjustment after pipeline is placed, improves laying efficiency.
It is worth noting that, first fixed column and the middle mat piece are formed using integrated injection moulding technique productions.
It is worth noting that, second fixed column and the tail end mat piece are formed using integrated injection moulding technique productions. By the way that the first fixed column and middle mat piece are carried out into integrated injection moulding technique productions, the second fixed column and tail end mat piece are carried out one Body technique productions, avoid the first fixed column and the second fixed column from being broken in use, extend the use of equipment In the life-span, it ensure that the safety of construction.
Specifically used step of the present utility model is as follows:Again as depicted in figs. 1 and 2, during the use of reality, according to The length of pipeline 10 is laid, the quantity of middle mat piece 3, solid by the first fixed column 5, the first fixing hole 4, second corresponding to selection Head end mat piece 1, middle mat piece 3 and tail end mat piece 2 are fixedly connected sequentially by the fixing hole 6 of fixed column 7 and second, by left shoulder pad 81 Two Slideslips with right shoulder pad 82 respectively along groove from head end mat piece, until the cambered surface of left shoulder pad and right shoulder pad is close to laying pipe Road position, while the shoulder pad on the shoulder pad and middle mat piece in tail end mat piece is installed using this mode, and work Personnel can place shoulder pad according to the middle mat piece needed in position of time.Then pipeline is placed in mat piece, according to Inclinometer 9 adjusts the horizontal level of head end mat piece 1, tail end mat piece 2 and middle mat piece 3, ensure that the laying quality of pipeline.
By way of more than, the new prefabricated mat piece provided by the utility model suitable for municipal pipeline, pass through One fixed column is adapted with the first fixing hole, and the second fixed column and the second fixing hole are adapted, and the first fixed column is fixed with second Hole is adapted, and is easy to head end mat piece, middle mat piece to be fixedly connected with tail end mat piece, recessed by the way that shoulder pad is removably mounted to On groove, it is easy to shoulder pad to be adjusted, to meet the pipe laying of different size, ensures that pipe laying prepares using inclinometer, protect Laying quality has been demonstrate,proved, reached municipal pipe construction road paving, shorten construction period and ensure the purpose of construction quality.
Above-described is only the preferred reality of the new prefabricated mat piece disclosed in the utility model suitable for municipal pipeline Apply mode, it is noted that for the person of ordinary skill of the art, do not departing from the premise of the utility model creation design Under, various modifications and improvements can be made, these belong to the scope of protection of the utility model.

Claims (4)

1. a kind of new prefabricated mat piece suitable for municipal pipeline, it is characterised in that include head end mat piece and tail end mat piece, institute State and mat piece among one or more is provided between head end mat piece and tail end mat piece, the side of the head end mat piece is provided with first and fixed Hole, the side of the middle mat piece are provided with the first fixed column, and first fixed column is adapted with first fixing hole, described The opposite side of middle mat piece is provided with the second fixing hole, and the side of the tail end mat piece is provided with the second fixed column, and described second fixes Post and the first fixed column are adapted with second fixing hole;It is all provided with the head end mat piece, middle mat piece and tail end mat piece It is fluted, shoulder pad is provided with the groove, the shoulder pad is removably mounted in the groove, and the shoulder pad is provided with and pipe The cambered surface that road matches, inclinometer is also inlaid with the side wall of the head end mat piece and tail end mat piece.
2. the new prefabricated mat piece according to claim 1 suitable for municipal pipeline, it is characterised in that the shoulder pad includes There are the left shoulder pad being mutually adapted and a right shoulder pad, the junction of the left shoulder pad and right shoulder pad is realized solid by locating dowel and positioning hole Fixed connection.
3. the new prefabricated mat piece according to claim 1 suitable for municipal pipeline, it is characterised in that described first fixes Post and the middle mat piece are formed using integrated injection moulding technique productions.
4. the new prefabricated mat piece according to claim 1 suitable for municipal pipeline, it is characterised in that described second fixes Post and the tail end mat piece are formed using integrated injection moulding technique productions.
CN201621244722.2U 2016-11-21 2016-11-21 Suitable for the new prefabricated mat piece of municipal pipeline Expired - Fee Related CN206738715U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621244722.2U CN206738715U (en) 2016-11-21 2016-11-21 Suitable for the new prefabricated mat piece of municipal pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621244722.2U CN206738715U (en) 2016-11-21 2016-11-21 Suitable for the new prefabricated mat piece of municipal pipeline

Publications (1)

Publication Number Publication Date
CN206738715U true CN206738715U (en) 2017-12-12

Family

ID=60554702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621244722.2U Expired - Fee Related CN206738715U (en) 2016-11-21 2016-11-21 Suitable for the new prefabricated mat piece of municipal pipeline

Country Status (1)

Country Link
CN (1) CN206738715U (en)

Similar Documents

Publication Publication Date Title
CN205479706U (en) Push pipe work jing ding advances structure
CN102889428B (en) Non-excavation correction method and apparatus of pipeline center line deviation after pipe-jacking construction
CN205976489U (en) Instrument formula that cast -in -place stair were used template of marking time
CN203891540U (en) Basalt fiber wire pole
CN106284999A (en) Assembled architecture haydite concrete batten of internal partition mounting process
CN103074828B (en) System and method for lifting sunken railway ballastless track bed by utilizing injection method
CN202007366U (en) Steep slope subgrade structure for high-speed railway
CN204252165U (en) Two-way artifical push pipe work well in turn
CN103758542B (en) Tunnel waterproofing board laying trolley
CN206738715U (en) Suitable for the new prefabricated mat piece of municipal pipeline
CN203795460U (en) Basic structure of ballasting tower crane
CN205116713U (en) Concrete wall post mould with water and electricity pipeline provided groove fetal membrane
CN205421322U (en) Pre -buried rag bolt crowd's positioning tool
CN206266985U (en) A kind of new automobile stone material pits rampway structure
CN202039867U (en) Auxiliary device for pavement of tunnel waterproof boards
CN110158424B (en) Concrete pouring template
CN203594453U (en) Reception base suitable for earth-pressure balanced type shield machine
CN208322203U (en) A kind of bar planting perforating device
CN205329515U (en) Manual portable highway marking device
CN205917547U (en) Rail foundation subsides back direction of height adjustment system
CN204552613U (en) A kind of horizontal jet grouting construction special drilling machine
CN204570443U (en) A kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance
CN206956484U (en) Cement concrete pavement layering disease repairing structure
CN209099797U (en) A kind of lossless reparation structure of building basement foig
CN203684106U (en) Hinge joint rebar structure based on pipeline conveying bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171212

Termination date: 20201121

CF01 Termination of patent right due to non-payment of annual fee