CN206706808U - Street lamp and traffic sign foundation structure - Google Patents

Street lamp and traffic sign foundation structure Download PDF

Info

Publication number
CN206706808U
CN206706808U CN201621410785.0U CN201621410785U CN206706808U CN 206706808 U CN206706808 U CN 206706808U CN 201621410785 U CN201621410785 U CN 201621410785U CN 206706808 U CN206706808 U CN 206706808U
Authority
CN
China
Prior art keywords
pile
precast pile
street lamp
cannulated sleeve
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621410785.0U
Other languages
Chinese (zh)
Inventor
徐志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JSTI Group Co Ltd
Original Assignee
JSTI Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JSTI Group Co Ltd filed Critical JSTI Group Co Ltd
Priority to CN201621410785.0U priority Critical patent/CN206706808U/en
Application granted granted Critical
Publication of CN206706808U publication Critical patent/CN206706808U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

It the utility model is related to a kind of street lamp and traffic sign foundation structure,Including precast pile,The prefabricated pile crown being connected with pile body lower end,Precast pile outer sheath is provided with cannulated sleeve,Cannulated sleeve upper end is provided with several grout holes,Cannulated sleeve is connected by several cross bars being uniformly arranged with precast pile,Every cross bar is each extended on the outside of cannulated sleeve,Precast pile upper end mounting flange,Pre-buried two Grouting Pipes in precast pile,Grouting Pipe upper end is concordant with ring flange upper end,Grouting Pipe lower end is stretched into prefabricated pile crown and extends to prefabricated pile head side-wall outer side,Pre-buried some foundation bolts in precast pile,Inside the lower end embedment precast pile of foundation bolt,Ring flange is stretched out on the top of foundation bolt,Prefabricated pile crown bottom connects earth brace,It is poor that this structure solves foundation structure resistance to capsizing,Not the problem of structural stability is not high and the easy leakage conductance of street lamp causes security incident.

Description

Street lamp and traffic sign foundation structure
Technical field
It the utility model is related to a kind of foundation structure, more particularly to a kind of street lamp and traffic sign foundation structure.
Background technology
At present, town road is in order to keep the city traffic capacity typically to set street lighting and traffic to guide facility.These Street lamp and traffic guiding facility height up to 10 ~ 20 meters, belong to vertical load is relatively small, moment of flexure produced by horizontal loading compared with Big structure, resistance to capsizing require high.
These street lamps and traffic sign facility basis typically use cast-in-situ steel reinforced concrete isolated footing at present, anti-to meet Topple requirement, basic pedestal foot is set in foundation bottom, for general buried depth at 3 ~ 4 meters, conventional form of construction work is in road After pavement structure is basically completed, carries out counter excavate of pattern foundation pit supporting structure and carry out pouring for armored concrete.This mode is not only constructed week Phase is long, excavation supporting is costly and road excavates and causes pavement structure to destroy repeatedly.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of street lamp and traffic sign foundation structure, is utilizing the road Lamp and traffic sign foundation structure solve that foundation structure resistance to capsizing is poor, structural stability is not high and the easy leakage conductance of street lamp causes The problem of security incident.
In order to solve the above-mentioned technical problem, street lamp and traffic sign foundation structure of the present utility model include precast pile, The prefabricated pile crown being connected with pile body lower end, precast pile outer sheath are provided with cannulated sleeve, and cannulated sleeve upper end is provided with several fillings Hole is starched, cannulated sleeve is connected by several cross bars being uniformly arranged with precast pile, and every cross bar each extends to cannulated sleeve Outside, precast pile upper end mounting flange, pre-buried two Grouting Pipes in precast pile, Grouting Pipe upper end on ring flange with holding level with both hands Together, Grouting Pipe lower end is stretched into prefabricated pile crown and extends to prefabricated pile head side-wall outer side, pre-buried some lower margins in precast pile Bolt, the lower end of foundation bolt are embedded to inside precast pile, and ring flange, prefabricated pile crown bottom connection are stretched out in the top of foundation bolt Earth brace.
The length that the cross bar is extended on the outside of cannulated sleeve is 20cm.
The foundation bolt radical is 4.
The prefabricated pile crown is tapered.
The a diameter of 50cm of precast pile.
Using this street lamp and traffic sign foundation structure, there is advantages below:
1st, existing monolithic reinforced concrete structure is optimized to precast reinforced concrete pile by the utility model, it is not necessary to is opened Dig present situation pavement of road, simple in construction, convenient for installation and maintenance and construction is simple, it is not necessary to the measure such as excavation supporting, can machinery Change and implement, substantially reduce construction period and operating expenses.
2nd, because precast pile outer sheath is provided with cannulated sleeve, cannulated sleeve upper end is provided with several grout holes, hollow sleeve Cylinder is connected by several cross bars being uniformly arranged with precast pile, pre-buried two Grouting Pipes, Grouting Pipe upper end in precast pile Concordant with ring flange upper end, Grouting Pipe lower end is stretched into prefabricated pile crown and extends to prefabricated pile head side-wall outer side, by hollow Resistance to plucking and overturn-preventing performance are strengthened in sleeve and in the slip casting of prefabricated pile crown both sides, is each extended to by cross bar outside cannulated sleeve Side, so add mass-type foundation structure and the snap-in force of ground.
3rd, because prefabricated pile crown bottom connects earth brace, it can so prevent street lamp electric leakage from causing the generation of security incident.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Fig. 1 is schematic diagram of the present utility model.
Wherein have:1. precast pile;2. prefabricated pile crown;3. cannulated sleeve;4. cross bar;5. grout hole;6. lower margin Bolt;7. Grouting Pipe;8. ring flange;9. earth brace.
Embodiment
The prefabricated pile crown that street lamp shown in Fig. 1 and traffic sign foundation structure include precast pile, is connected with pile body lower end, in advance Pile body outer sheath processed is provided with cannulated sleeve, cannulated sleeve upper end is provided with several grout holes, and cannulated sleeve is by being uniformly arranged Several cross bars are connected with precast pile, and every cross bar is each extended on the outside of cannulated sleeve, precast pile upper end mounting flange, Pre-buried two Grouting Pipes in precast pile, Grouting Pipe upper end is concordant with ring flange upper end, and Grouting Pipe lower end is stretched into prefabricated pile crown And extend to prefabricated pile head side-wall outer side, pre-buried some foundation bolts in precast pile, foundation bolt lower end embedment it is prefabricated Inside pile body, ring flange is stretched out on the top of foundation bolt, and prefabricated pile crown bottom connects earth brace.
The length that the cross bar is extended on the outside of cannulated sleeve is 20cm.
The foundation bolt radical is 4.
The prefabricated pile crown is tapered.
The a diameter of 50cm of precast pile.
Mass-type foundation structure is squeezed into ground during implementation, then the grout hole in cannulated sleeve upper end and Grouting Pipe upper end Grouting.Existing monolithic reinforced concrete structure is optimized to precast reinforced concrete pile by the utility model, it is not necessary to is excavated existing Shape pavement of road, simple in construction, convenient for installation and maintenance and construction is simple, it is not necessary to the measure such as excavation supporting, can mechanization reality Apply, substantially reduce construction period and operating expenses.Because precast pile outer sheath is provided with cannulated sleeve, cannulated sleeve upper end is provided with Several grout holes, cannulated sleeve are connected by several cross bars being uniformly arranged with precast pile, pre-buried two in precast pile Root Grouting Pipe, Grouting Pipe upper end is concordant with ring flange upper end, and Grouting Pipe lower end is stretched into prefabricated pile crown and extends to prefabricated pile crown Side-wall outer side, by strengthening resistance to plucking and overturn-preventing performance in cannulated sleeve and in the slip casting of prefabricated pile crown both sides, pass through cross bar Each extend on the outside of cannulated sleeve, so add mass-type foundation structure and the snap-in force of ground.Because prefabricated pile crown bottom connects Earth brace is connect, can so prevent street lamp electric leakage from causing the generation of security incident.
The technical characteristic for not having to describe in detail in the application is prior art.Above-described embodiment only illustrative the application Principle and its effect, not for limitation the application.Any person skilled in the art all can be in the essence without prejudice to the application God and under the scope of, to above-described embodiment carry out modifications and changes.Therefore, those of ordinary skill in the art is not taking off , should be by the right of the application from spirit disclosed herein and all equivalent modifications completed under technological thought or change It is required that covered.

Claims (5)

1. a kind of street lamp and traffic sign foundation structure, it is characterised in that:It is connected including precast pile, with pile body lower end prefabricated Pile crown, precast pile outer sheath are provided with cannulated sleeve, and cannulated sleeve upper end is provided with several grout holes, and cannulated sleeve passes through uniform Several cross bars set are connected with precast pile, and every cross bar is each extended on the outside of cannulated sleeve, the connection of precast pile upper end Ring flange, pre-buried two Grouting Pipes in precast pile, Grouting Pipe upper end is concordant with ring flange upper end, and Grouting Pipe lower end is stretched into prefabricated Pile crown is interior and extends to prefabricated pile head side-wall outer side, and pre-buried some foundation bolts in precast pile, the lower end of foundation bolt is buried Enter inside precast pile, ring flange is stretched out on the top of foundation bolt, and prefabricated pile crown bottom connects earth brace.
2. according to the street lamp described in claim 1 and traffic sign foundation structure, it is characterised in that:The cross bar extends to hollow Length on the outside of sleeve is 20cm.
3. according to the street lamp described in claim 1 and traffic sign foundation structure, it is characterised in that:The foundation bolt radical is 4.
4. according to the street lamp described in claim 1 and traffic sign foundation structure, it is characterised in that:The prefabricated pile crown is in cone Shape.
5. according to the street lamp described in claim 1 and traffic sign foundation structure, it is characterised in that:The precast pile is a diameter of 50cm。
CN201621410785.0U 2016-12-21 2016-12-21 Street lamp and traffic sign foundation structure Active CN206706808U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621410785.0U CN206706808U (en) 2016-12-21 2016-12-21 Street lamp and traffic sign foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621410785.0U CN206706808U (en) 2016-12-21 2016-12-21 Street lamp and traffic sign foundation structure

Publications (1)

Publication Number Publication Date
CN206706808U true CN206706808U (en) 2017-12-05

Family

ID=60472400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621410785.0U Active CN206706808U (en) 2016-12-21 2016-12-21 Street lamp and traffic sign foundation structure

Country Status (1)

Country Link
CN (1) CN206706808U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482112A (en) * 2020-10-23 2022-05-13 茅金声 A method for realizing concrete piles supporting uprights

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482112A (en) * 2020-10-23 2022-05-13 茅金声 A method for realizing concrete piles supporting uprights

Similar Documents

Publication Publication Date Title
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN204419195U (en) A kind of supporting and protection structure pattern being applicable to tunnel portal section
WO2012149670A1 (en) Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts
CN207512752U (en) A kind of tall earth fill supporting construction
CN102162258B (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
CN205712137U (en) Foundation pit supporting construction
CN103696784A (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN2926319Y (en) Rooted foundation and anchored topped-push construction set apparatus
CN103104102B (en) Construction method for underground storey-addition reconstruction
CN105133575B (en) Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method
CN105220714A (en) Core compound prestress pile tube float Structure construction method filled with by built-in anchor cable
CN104652428B (en) A kind of piling strtucture of falling umbrella
CN206554091U (en) The foundation ditch temporary support structures of anti-Nearby Structure foundation deformation
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN105735383A (en) Partial underground obstacle removing construction method capable of reserving structural system
CN206706808U (en) Street lamp and traffic sign foundation structure
CN201991013U (en) High-piled tower footing structure of tower crane concrete-filled steel tube
CN204040041U (en) A kind of front close rear thin Double-row Piles Support system being provided with vertical anchor pole
CN206902783U (en) For reducing the adjustable reinforcement and rectification structure of house differential settlement
CN204551454U (en) A kind of piling strtucture of falling umbrella
CN204326080U (en) A kind of next-door neighbour's existing building pit maintenance soil structure
CN203383205U (en) Carrier pile and rammed bulb pile device thereof
CN103274329B (en) A kind of top draws jack for the construction method of pile-anchor retaining
CN213477808U (en) Structure is found fast to steel construction underground garage
CN207974834U (en) A kind of Tunnel Engineering pipe curtain support construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant