CN206658039U - A kind of lighting proof strip device being easily installed - Google Patents
A kind of lighting proof strip device being easily installed Download PDFInfo
- Publication number
- CN206658039U CN206658039U CN201720426184.7U CN201720426184U CN206658039U CN 206658039 U CN206658039 U CN 206658039U CN 201720426184 U CN201720426184 U CN 201720426184U CN 206658039 U CN206658039 U CN 206658039U
- Authority
- CN
- China
- Prior art keywords
- steel
- lightning protection
- plate base
- protection belt
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Non-Portable Lighting Devices Or Systems Thereof (AREA)
Abstract
一种便于安装的避雷带装置,包括连续设置的支架和安装在支架上的避雷带(4),所述支架包括钢板底座(1)、焊接在钢板底座中心的钢管立柱(2)、焊接在钢管立柱顶端的轴心线与钢管立柱轴心线相垂直的钢套圈(3),在钢板底座的中心或两边加工有安装螺孔;所述避雷带(4)穿过钢套圈安装于钢套圈内。本实用新型可批量化生产,安装简便,对安装工人技术要求低,安装稳固。
An easy-to-install lightning protection belt device, comprising a continuous support and a lightning protection belt (4) installed on the support, the support includes a steel plate base (1), a steel pipe column (2) welded in the center of the steel plate base, welded on The steel ferrule (3) whose axis line at the top of the steel pipe column is perpendicular to the axis line of the steel pipe column is processed with mounting screw holes in the center or both sides of the steel plate base; the lightning protection belt (4) passes through the steel ferrule and is installed on the Inside the steel ferrule. The utility model can be mass-produced, easy to install, low in technical requirements for installation workers, and stable in installation.
Description
技术领域technical field
本实用新型属于建筑物建筑防雷及接地系统中的避雷带结构技术领域。The utility model belongs to the technical field of lightning protection belt structures in building lightning protection and grounding systems.
背景技术Background technique
随着城市建设的快速发展,工程项目品质的不断提升,对建筑防雷及接地系统中的避雷带的技术要求也来越高。在建筑物的避雷带安装中,是将避雷带安装在连续设置的支架上,传统的避雷带支架采用镀锌圆钢制作成L型,在安装时采用冲击钻在墙体上钻孔,将L形支架的横臂栽植在孔中,然后采用砂浆填缝固定,采用焊接方式将避雷带连接在L型支架竖臂的顶部。这种结构的避雷带装置,其支架制作简单,所用材料成本较低,但支架稳定性不可靠,且避雷带与支架采用焊接连接,焊接工作量大,对焊接工人技术要求较高,必须要持证专业焊工才能进行,人工费较高,安装速度慢,且栽植支架的砂浆填缝固定方式也无法确保安装牢固性。With the rapid development of urban construction and the continuous improvement of the quality of engineering projects, the technical requirements for lightning protection belts in building lightning protection and grounding systems are also getting higher and higher. In the installation of the lightning protection belt of the building, the lightning protection belt is installed on the continuous support. The traditional lightning protection belt bracket is made of galvanized round steel into an L shape. When installing, the impact drill is used to drill holes on the wall. The cross arm of the L-shaped bracket is planted in the hole, and then fixed with mortar caulking, and the lightning protection belt is connected to the top of the vertical arm of the L-shaped bracket by welding. The lightning protection belt device with this structure is simple to manufacture and the material cost is low, but the stability of the support is not reliable, and the lightning protection belt and the bracket are connected by welding, the welding workload is large, and the welding workers have high technical requirements. Only certified professional welders can carry out, the labor cost is high, the installation speed is slow, and the mortar filling fixing method of the planting bracket cannot ensure the firmness of the installation.
发明内容Contents of the invention
本实用新型的目的是解决现有避雷带装置的不足,提供一种支架可批量化生产、安装简便、对安装工人技术要求低、且安装稳固的避雷带装置。The purpose of the utility model is to solve the shortcomings of the existing lightning protection belt device, and provide a lightning protection belt device which can be mass-produced with brackets, easy to install, has low technical requirements for installation workers, and is stable in installation.
本实用新型的目的通过如下技术方案实现:The purpose of this utility model is achieved through the following technical solutions:
一种便于安装的避雷带装置,包括连续设置的支架和安装在支架上的避雷带,所述支架包括钢板底座、焊接在钢板底座中心的钢管立柱、焊接在钢管立柱顶端的轴心线与钢管立柱轴心线相垂直的钢套圈,在钢板底座的中心或两边加工有安装孔;所述避雷带穿过钢套圈安装于钢套圈内。An easy-to-install lightning protection belt device, comprising a continuously arranged bracket and a lightning protection belt installed on the bracket, the bracket includes a steel plate base, a steel pipe column welded to the center of the steel plate base, an axis line welded to the top of the steel pipe column and a steel pipe The steel ferrule perpendicular to the axis line of the column has installation holes processed in the center or both sides of the steel plate base; the lightning protection belt passes through the steel ferrule and is installed in the steel ferrule.
本实用新型支架用料简单,制作方便,可以工厂化批量生产。由于避雷带是直接套装在钢管套圈内,不需要焊接,安装操作简单,技术要求低,不再需要特殊工种工人操作,可大大降低人工成本和提高安装效率。支架底部为一块带安装孔的钢板底座,可以通过连接螺栓将钢板固定安装在墙体顶面,安装简便而稳固。The bracket of the utility model uses simple materials, is convenient to manufacture, and can be mass-produced in a factory. Because the lightning protection belt is directly set in the steel pipe ferrule, no welding is required, the installation operation is simple, the technical requirements are low, and no special workers are required to operate, which can greatly reduce labor costs and improve installation efficiency. The bottom of the bracket is a steel plate base with mounting holes, and the steel plate can be fixed on the top surface of the wall through connecting bolts, which is easy and stable to install.
附图说明Description of drawings
图1是本实用新型的安装示意图;Fig. 1 is the installation schematic diagram of the present utility model;
图2是图1的A-A截面图。Fig. 2 is an A-A sectional view of Fig. 1 .
具体实施方式detailed description
如图1、图2所示的便于安装的避雷带装置,包括连续设置的支架和安装在支架上的避雷带4,所述支架包括钢板底座1、焊接在钢板底座中心的钢管立柱2、焊接在钢管立柱顶端的轴心线与钢管立柱轴心线相垂直的钢套圈3,在钢板底座1的中心或两边加工有安装孔;所述避雷带4穿过钢套圈安装于钢套圈内。The lightning protection belt device that is easy to install as shown in Figure 1 and Figure 2 includes a continuous support and a lightning protection belt 4 installed on the support. The steel ferrule 3 whose axis line at the top of the steel pipe column is perpendicular to the axis line of the steel pipe column has mounting holes processed in the center or both sides of the steel plate base 1; the lightning protection belt 4 passes through the steel ferrule and is installed on the steel ferrule Inside.
本实施例采用一块6mm厚的钢板做底座,在底座中心加工安装孔并在孔内攻丝,在底座上焊接DN15的钢管做立柱,在立柱顶部横向焊接DN15的钢套圈作为穿入避雷带的支承圈。安装时在建筑物女儿墙6顶部安装部位钻孔预埋膨胀螺栓5,预埋膨胀螺栓可在装饰面完成之前弹线定位完成,不破坏安装部位的装饰面,将底座逐个旋装在预埋膨胀螺栓上,完成连续设置的支架的安装,最后将避雷带顺序穿过各个支架顶端的钢套圈即可。In this embodiment, a 6mm thick steel plate is used as the base, a mounting hole is processed in the center of the base and a thread is tapped in the hole, a DN15 steel pipe is welded on the base as a column, and a DN15 steel ferrule is transversely welded on the top of the column as a penetration lightning protection belt support ring. During installation, the pre-embedded expansion bolts 5 are drilled at the installation position on the top of the parapet wall 6 of the building. The pre-embedded expansion bolts can be snapped and positioned before the decorative surface is completed. On the expansion bolts, the installation of the continuously set brackets is completed, and finally the lightning protection belts are sequentially passed through the steel ferrules at the top of each bracket.
作为另一种实施方式,也可以将安装孔加工在钢板底座的两边,安装支架时对应安装孔在墙体顶面打孔,用膨胀螺栓将钢板底座安装在墙体顶面上。As another embodiment, the installation holes can also be processed on both sides of the steel plate base, and when the bracket is installed, the corresponding installation holes are punched on the top surface of the wall, and the steel plate base is installed on the top surface of the wall with expansion bolts.
本实用新型新型与现有技术相比,制作简单,安装方便快捷,支架稳定性和牢固性大幅提高,大幅降低了安装的技术要求和安装人工成本。Compared with the prior art, the utility model has the advantages of simple manufacture, convenient and fast installation, greatly improved support stability and firmness, and greatly reduced technical requirements for installation and labor costs for installation.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720426184.7U CN206658039U (en) | 2017-04-21 | 2017-04-21 | A kind of lighting proof strip device being easily installed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720426184.7U CN206658039U (en) | 2017-04-21 | 2017-04-21 | A kind of lighting proof strip device being easily installed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206658039U true CN206658039U (en) | 2017-11-21 |
Family
ID=60319551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720426184.7U Expired - Fee Related CN206658039U (en) | 2017-04-21 | 2017-04-21 | A kind of lighting proof strip device being easily installed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206658039U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109494674A (en) * | 2018-10-17 | 2019-03-19 | 国家电网有限公司 | Lighting proof strip device |
-
2017
- 2017-04-21 CN CN201720426184.7U patent/CN206658039U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109494674A (en) * | 2018-10-17 | 2019-03-19 | 国家电网有限公司 | Lighting proof strip device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631668A (en) | Connection construction method for composite keel double-layer decorative curtain wall | |
CN206658039U (en) | A kind of lighting proof strip device being easily installed | |
CN204212291U (en) | The ruggedized construction of large span, superelevation light composite wallboard body of wall | |
CN205369954U (en) | Positioner is assembled to truss steel pipe | |
CN202299020U (en) | A unit pottery pipe decoration curtain wall member | |
CN201028850Y (en) | A wall-mounted solar water heater mounting bracket | |
CN205791363U (en) | A kind of electrical engineering positioning installation apparatus | |
KR200473612Y1 (en) | deck plate with channel connection part | |
CN105298145A (en) | Vertical external sun-shading welding-free construction method of hidden-frame curtain wall | |
CN204879048U (en) | Novel pipeline support | |
CN206627136U (en) | Assembled Sensor Holder | |
CN203603384U (en) | Support system for fixing lightning-protection net to parapet wall decorative sheet | |
CN204493900U (en) | A kind of plastic draining pipe fixing device | |
CN205990738U (en) | Installation node between unpowered hood and exhaust passage | |
CN204960073U (en) | There is not horizontal fossil fragments curtain | |
CN205382641U (en) | Lightning -arrest support of taking of special white steel of verge tile | |
CN211499784U (en) | Pouring module device after secondary hole opening of floor slab | |
CN208518183U (en) | Assembled type pipe prefabricated components | |
CN205859372U (en) | Electromechanical pipeline casing support and electromechanical pipeline protection device | |
CN203374991U (en) | Steel structure electric line pipe and trunking hanging connecting piece | |
CN211889622U (en) | A riveting and welding platform for general laminated wall panels | |
CN206581398U (en) | A kind of attachment structure of 3D building modules Z-type keel wall and beam | |
CN105804356A (en) | Modulus-free assembled structural decorative board system and construction method thereof | |
CN207063174U (en) | A kind of exterior wall cladding of assembling type steel structure building and the attachment structure of girder steel | |
CN204781462U (en) | Anti wall fixing sub -assembly that splits |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171121 |