CN206646492U - Positioner for filling concrete pile cages - Google Patents
Positioner for filling concrete pile cages Download PDFInfo
- Publication number
- CN206646492U CN206646492U CN201720329782.2U CN201720329782U CN206646492U CN 206646492 U CN206646492 U CN 206646492U CN 201720329782 U CN201720329782 U CN 201720329782U CN 206646492 U CN206646492 U CN 206646492U
- Authority
- CN
- China
- Prior art keywords
- adjusting rod
- positioning seat
- positioner
- seat body
- adjusting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims 1
- 229910000831 Steel Inorganic materials 0.000 abstract description 23
- 239000010959 steel Substances 0.000 abstract description 23
- 230000002787 reinforcement Effects 0.000 abstract description 22
- 238000000034 method Methods 0.000 abstract description 4
- 210000003205 muscle Anatomy 0.000 description 3
- 238000009435 building construction Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of positioner for filling concrete pile cages, include abutment sleeve, at least two groups surround the symmetrically arranged positioning seat body of abutment sleeve, and it is arranged on the detent mechanism in positioning seat body, slideway is provided with positioning seat body, slide bottom is provided with the locating convex block that several equi-spaced aparts are set, detent mechanism includes fixed drag hook, adjusting slider, first adjusting rod, second adjusting rod, rotating shaft and handle, adjusting slider is arranged in slideway and can be with locating convex block location fit, fixed drag hook is arranged on adjusting slider front end and stretched into inside abutment sleeve, first adjusting rod both ends are rotatablely connected with one end of adjusting slider and the second adjusting rod respectively, the other end of second adjusting rod is connected with rotating shaft, handle is connected with rotating shaft and outside positioning seat body.Positioner of the present utility model for filling concrete pile cages, it is ensured that steel reinforcement cage is after hanging, and in concreting process, steel reinforcement cage does not shift, so as to improve pile quality.
Description
Technical field
Technical field of building construction is the utility model is related to, more particularly to a kind of for filling concrete pile cages
Positioner.
Background technology
When concrete structure is column or strip component, the center portion thereof point does not need arrangement of reinforcement, only in concrete structure
Configuration reinforcement under the face of part ingress of air.If this component is independent, first the steel bar preassembling of this component periphery setting
First make, be formed steel reinforcement cage.Generally the bar constructions of the pre-productions such as cast-in-situ bored pile, caisson, column steel
Muscle cage.In bridges and culverts or high-building construction, basis being may require as requested and is driven piles, method is to use to rush using machine
Hole and water mill drilling, and hole depth reaches design requirement, then transfers steel reinforcement cage to stake holes, is inserted into conduit progress concrete and pours
Note.Current Tall Building Foundation uses pile foundation more, and it is at most cast-in-place concrete pile to use;Concrete Grouting Pale mistake
Journey is first by drill hole of drilling machine, rear borehole cleaning;Steel reinforcement cage is hung, rear cast;After steel reinforcement cage is hung, in concrete placement, steel
Muscle cage location easily shifts, and causes bored pile piling quality to be unsatisfactory for design requirement.
Utility model content
For defect present in prior art or deficiency, the utility model innovatively proposes one kind and is used for concrete
The positioner of filling pile cage of reinforcement, the positioner ensures steel reinforcement cage after hanging, in concreting process, reinforcing bar
Cage does not shift, so as to improve pile quality.
What the technical solution of the utility model was realized in:
For the positioner of filling concrete pile cages, the positioner includes abutment sleeve, at least two groups
In the symmetrically arranged positioning seat body of abutment sleeve and the detent mechanism being arranged in positioning seat body, the positioning seat body
Slideway is provided with, the slide bottom is provided with the locating convex block that multiple equi-spaced aparts are set, and the detent mechanism includes fixing
Drag hook, adjusting slider, the first adjusting rod, the second adjusting rod, rotating shaft and handle, the adjusting slider is arranged in slideway and energy
It is enough to be arranged on adjusting slider front end with locating convex block location fit, the fixed drag hook and stretch into inside abutment sleeve, described the
One adjusting rod both ends respectively with one end of adjusting slider and the second adjusting rod be rotatablely connected, the other end of second adjusting rod with
Rotating shaft connects, and the handle is connected with rotating shaft and outside positioning seat body.
Preferably, the fixed drag hook includes gib head and is provided with externally threaded hook body, and the hook body is interior with being provided with
The adjusting slider threaded connection of screw thread.
Preferably, the external screw thread of described gib head one end is threadedly coupled with the internal thread of hook body one end.
Preferably, the handle outer surface be provided with can increasing friction force garment bag.
Compared with prior art, the beneficial effects of the utility model are:
The utility model discloses a kind of positioner for filling concrete pile cages, the device uses at least two
Group includes around the symmetrically arranged positioning seat body of abutment sleeve and the detent mechanism being arranged in positioning seat body, detent mechanism
Fixation drag hook, adjusting slider, the first adjusting rod, the second adjusting rod, rotating shaft and handle, gib head hook with gib head and hook body are put
On steel reinforcement cage, steel reinforcement cage hangs onto bottom, and while crane hook lifting, rotating handles, at least two groups are symmetrically fixed
After steel reinforcement cage is accurately positioned in stake position center by drag hook, concrete is poured into a mould;When concrete is poured into abutment sleeve height, stake
After lower concrete fixes steel reinforcement cage, fixed drag hook is unclamped.The positioner ensures steel reinforcement cage after hanging, coagulation
In native casting process, steel reinforcement cage does not shift, so as to improve pile quality.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model positioning seat body;
Reference:1st, abutment sleeve;2nd, positioning seat body;3rd, slideway;4th, locating convex block;5th, gib head;6th, hook body;7th, adjust
Sliding block;8th, the first adjusting rod;9th, the second adjusting rod;10th, rotating shaft;11st, handle;12nd, garment bag;13rd, steel reinforcement cage.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
As shown in figure 1 and 2, the utility model provides a kind of positioner for filling concrete pile cages,
The positioner include abutment sleeve 1, at least two groups around the symmetrically arranged positioning seat body 2 of abutment sleeve 1 and set
Detent mechanism in positioning seat body 2, slideway 3 is provided with the positioning seat body 2, the bottom of slideway 3 is provided with multiple etc.
Away from spaced locating convex block 4, the detent mechanism includes fixed drag hook, adjusting slider 7, the regulation of the first adjusting rod 8, second
Bar 9, rotating shaft 10 and handle 11, the fixed drag hook include gib head 5 and are provided with externally threaded hook body 6, the hook body 6 with
Female adjusting slider 7 is set to be threadedly coupled, the external screw thread of described one end of gib head 5 and the internal thread screw thread of the one end of hook body 6
Connection, the outer surface of handle 11 be provided with can increasing friction force garment bag 12, the adjusting slider 7 is arranged in slideway 3
And can be arranged on the front end of adjusting slider 7 with the location fit of locating convex block 4, the fixed drag hook and stretch into inside abutment sleeve 1,
The both ends of first adjusting rod 8 are rotatablely connected with one end of the adjusting rod 9 of adjusting slider 7 and second respectively, second adjusting rod 9
The other end be connected with rotating shaft 10, the handle 11 is connected with rotating shaft 10 and outside positioning seat body 2.
This is used for the positioner of filling concrete pile cages, is symmetrical arranged using at least two groups around abutment sleeve 1
Positioning seat body 2 and the detent mechanism that is arranged in positioning seat body 2, detent mechanism include consolidating with gib head 5 and hook body 6
Determine drag hook, adjusting slider 7, the first adjusting rod 8, the second adjusting rod 9, rotating shaft 10 and handle 11, gib head 5 and be hooked on steel reinforcement cage 13
On, steel reinforcement cage 13 hangs onto bottom, and while crane hook lifting, rotating handles 11, rotating shaft 10 drives the second adjusting rod 9,
Second adjusting rod 9 is rotatablely connected with the first adjusting rod 8, while drive adjusting slider 7 to be moved rearwards, and now, at least two groups are consolidated
Determine drag hook while tense backward, after steel reinforcement cage 13 is accurately positioned in into stake position center, pour into a mould concrete;Treat that concrete is poured into
During the height of abutment sleeve 1, after stake lower concrete fixes steel reinforcement cage, fixed drag hook is unclamped.The positioner ensures steel
Muscle cage is after hanging, and in concreting process, steel reinforcement cage does not shift, so as to improve pile quality.
The preferred embodiment of utility model is the foregoing is only, it is all in this reality not to limit the utility model
Within new spirit and principle, any modification, equivalent substitution and improvements made etc., it should be included in of the present utility model
Within protection domain.
Claims (4)
1. for filling concrete pile cages positioner, it is characterised in that the positioner include abutment sleeve,
At least two groups surround the symmetrically arranged positioning seat body of abutment sleeve and the detent mechanism being arranged in positioning seat body, described fixed
Slideway is provided with the pedestal of position, the slide bottom is provided with the locating convex block that multiple equi-spaced aparts are set, the detent mechanism
Cunning is arranged on including fixed drag hook, adjusting slider, the first adjusting rod, the second adjusting rod, rotating shaft and handle, the adjusting slider
In road and it can be arranged on adjusting slider front end with locating convex block location fit, the fixed drag hook and stretch into abutment sleeve
Portion, the first adjusting rod both ends are rotatablely connected with one end of adjusting slider and the second adjusting rod respectively, second adjusting rod
The other end be connected with rotating shaft, the handle is connected with rotating shaft and outside positioning seat body.
2. the positioner according to claim 1 for filling concrete pile cages, it is characterised in that:The fixation
Drag hook includes gib head and is provided with externally threaded hook body, and the hook body is with setting female adjusting slider to be threadedly coupled.
3. the positioner according to claim 2 for filling concrete pile cages, it is characterised in that:The gib head
The external screw thread of one end is threadedly coupled with the internal thread of hook body one end.
4. the positioner according to claim 3 for filling concrete pile cages, it is characterised in that:The handle
Outer surface be provided with can increasing friction force garment bag.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720329782.2U CN206646492U (en) | 2017-03-31 | 2017-03-31 | Positioner for filling concrete pile cages |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720329782.2U CN206646492U (en) | 2017-03-31 | 2017-03-31 | Positioner for filling concrete pile cages |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206646492U true CN206646492U (en) | 2017-11-17 |
Family
ID=60274179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720329782.2U Expired - Fee Related CN206646492U (en) | 2017-03-31 | 2017-03-31 | Positioner for filling concrete pile cages |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206646492U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110939129A (en) * | 2019-12-24 | 2020-03-31 | 中铁三局集团有限公司 | Bored pile reinforcement cage anti-migration device and its use method |
-
2017
- 2017-03-31 CN CN201720329782.2U patent/CN206646492U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110939129A (en) * | 2019-12-24 | 2020-03-31 | 中铁三局集团有限公司 | Bored pile reinforcement cage anti-migration device and its use method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013192B (en) | A kind of method of cofferdam construction after steel sheet-pile cofferdam elder generation multilayer inner support is integrally transferred | |
CN206495201U (en) | A kind of positioner of filling concrete pile cages | |
CN104895324B (en) | A kind of construction method of the huge plug-in type suspension column structure of reinforced concrete composite structure | |
CN109610446A (en) | A kind of borehole filling pile cage of reinforcement and anti-floating cage method | |
CN109083591A (en) | A kind of cast-in-situ bored pile pile body drilling and forming hole method integrated with pile cover | |
CN207934328U (en) | A kind of concrete lintel constructing structure | |
CN206646492U (en) | Positioner for filling concrete pile cages | |
CN206801190U (en) | Hydraulic High-speed electric power bar base rammer compacter | |
CN206189607U (en) | Rag bolt location structure | |
CN104153370A (en) | Bothway full-length vibrating construction method and device of drilling and press-grouting superfluid pile | |
CN103572760A (en) | Bored grouting pile whole pile length vibrating construction method and device | |
CN208717933U (en) | A kind of CFG pile foundation pile cover and pile body integrative construction device | |
CN206971210U (en) | A kind of long casing in pile foundation construction | |
CN206986727U (en) | A kind of device to be vibrated for bridge skew web plate | |
CN202530447U (en) | Bored cast-in-place pile structure formed by sinking double pipes and drawing inner pipe | |
CN207277312U (en) | A kind of compacting pile construction device | |
CN101936003B (en) | Device for preventing soil around X-shaped cast-in-place concrete pile from being brought out during lifting moulds | |
CN211621558U (en) | Bored concrete pile steel reinforcement cage elevation control mounting structure | |
CN206844101U (en) | A kind of suspention positioner of steel reinforcement cage | |
CN209384226U (en) | A kind of Manual hole pile digging device in shifting sand layers | |
CN105040671B (en) | A kind of dynamic compaction machinery and the composite foundation construction method using its realization | |
CN105544510A (en) | Pile forming method of cast-in-situ bored pile | |
CN107130982A (en) | Large Longitudinal Slope two serves as a contrast concrete construction equipment and construction method | |
CN204040499U (en) | Steel pipe column vertical locating device is inserted after contrary sequence method | |
CN207032224U (en) | A kind of device for controlling filling pile cage of reinforcement cage top absolute altitude |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171117 Termination date: 20200331 |