- CN206512704U CN206512704U CN201621438476.4U CN201621438476U CN206512704U CN 206512704 U CN206512704 U CN 206512704U CN 201621438476 U CN201621438476 U CN 201621438476U CN 206512704 U CN206512704 U CN 206512704U
- Authority
- CN
- China
- Prior art keywords
- outer tube
- repeatable
- construction equipment
- pile construction
- filling pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 239000000725 suspension Substances 0.000 claims abstract description 6
- 229910000677 High-carbon steel Inorganic materials 0.000 claims abstract description 4
- 238000003780 insertion Methods 0.000 claims abstract description 4
- 230000037431 insertion Effects 0.000 claims abstract description 4
- 239000003673 groundwater Substances 0.000 abstract description 4
- 239000013049 sediment Substances 0.000 abstract description 3
- 239000002689 soil Substances 0.000 description 8
- 238000012407 engineering method Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000004576 sand Substances 0.000 description 3
- 238000005056 compaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 238000007665 sagging Methods 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
It is repeatable with new screw filling pile construction equipment the utility model proposes one kind, including outer tube body (6) and inner prop cylinder (2), outer tube body (6) upper end is provided with outer tube neck ring (5) and enters concrete mouthful (3), and lower end is provided with helical blade (8);Inner prop cylinder (2) upper end is provided with suspension hook (1), and lower end is provided with drill bit (9).The outer tube body upper end, which is provided with outer tube connecting hole (4), the inner prop cylinder, is provided with inner prop connecting hole (10), and two ends insertion.The outer tube body (6), helical blade (8) and drill bit (9) are made using high-carbon steel;Helical blade (8) pitch is smaller, and screw thread is closeer.Advantage is, solve the collapse holes of the pile foundations such as rotary digging stake, sediment thickness, broken pile, level of ground water height can not pore-forming and concrete excess problem.
Description
Technical field
The utility model is related to technical field of civil engineering, and in particular to one kind is repeatable to use new screw filling pile construction
Equipment.
Background technology
At present, make pile foundation and mainly use country-level engineering method -- half screw bored concrete pile technology, but in actual use
During, find this is difficult the complicated geological structure of adaptation southwest, this area mountains and rivers, tributary many ground qualitative change into spiral shell section
Change big, formation strength is changed greatly, stratum is widely different because of frequently flood alluviation, and unlike North Plain, that is machine-made
Argillic horizon and without obvious supporting course, is very easy to, it is impossible to meet screw rod pile simultaneous techniques into spiral shell.But can not synchronously
Complete screw rod pile can not be made.
The soil structure in southwest major part river is back fill course, backfill rock ballast layer, argillic horizon, silty soil layer, powder
Layer of sand, middle layer of sand, slightly close boulder bed, in close sandy gravel, Compact sandy-pebble, severely-weathered shale, middle weathered shale, possess geology answer
The characteristics of miscellaneous and level of ground water is higher.In the prior art, screw rod pile technique possess have be not afraid of underground water, mud, drift sand, without heavy
Slag, without broken pile, noiseless, environmentally friendly advantage, but the complicated geological of southwest is difficult into spiral shell.
Utility model content
The purpose of this utility model is:For above-mentioned southwest complicated geology and level of ground water is higher so that half screw
Pile work method is irrigated into the problem of spiral shell is difficult, screw rod pile is unstable, the utility model provides a kind of repeat and irrigated with new screw
Pile driving construction equipment.
The technical solution adopted in the utility model is as follows:
One kind is repeatable to use new screw filling pile construction equipment, including outer tube body and inner prop cylinder, the outer tube pipe
Body upper end is provided with outer tube neck ring and enters concrete mouthful, and lower end is provided with helical blade;The inner prop cylinder upper end is provided with suspension hook, under
End is provided with drill bit.
Further, the outer tube body, helical blade and drill bit are made using high-carbon steel.
Further, the outer tube body upper end, which is provided with outer tube connecting hole, the inner prop cylinder, is provided with inner tube company
Connect hole, and two ends insertion.
Further, outer tube connecting hole and inner tube the connecting hole orifice position, size are consistent, and are placed with connection
Post.
Further, the connection column length is much larger than outer tube outer tube diameter.
Further, the outer tube body is tubular structure, and the outer tube outer tube diameter is between 400mm-850mm.
Further, the inner prop cylinder is cylinder, and the drill bit is set to taper.
Further, the inner prop cylinder external diameter is consistent with outer tube internal diameter of tube body.
In summary, by adopting the above-described technical solution, the beneficial effects of the utility model are:
Solve the collapse holes of pile foundation such as rotary digging stake, sediment thickness, broken pile, level of ground water height can not pore-forming and concrete excess difficulty
Topic.
Brief description of the drawings
Fig. 1 is the utility model stereogram;
Fig. 2 is the utility model profile;
Marked in figure:1- suspension hooks, 2- inner props, 3- enters concrete mouthful, 4- outer tube connecting holes, 5- outer tube neck rings, 6- straightways, 7-
Screw section, 8- screw blades, 9- drill bits, 10- inner tube connecting holes, 11- connecting poles.
Embodiment
All features disclosed in this specification, can be with any in addition to mutually exclusive feature and/or step
Mode is combined.
The utility model is elaborated with reference to Fig. 1, Fig. 2.
As shown in Figure 1 and Figure 2, it is stereogram of the present utility model and profile.This construction equipment, which mainly includes one kind, to be weighed
New screw filling pile construction equipment, including outer tube body 6 and inner prop cylinder 2 are multiplexed, the upper end of outer tube body 6 is provided with outer
Neck circle 5 and enter concrete mouthfuls 3, lower end is provided with helical blade 8;The upper end of inner prop cylinder 2 is provided with suspension hook 1, and lower end is provided with
Drill bit 9.The outer tube body 6, helical blade 8 and drill bit 9 are made using high-carbon steel.
The upper end of outer tube body 6 is provided with outer tube connecting hole 4, the inner prop cylinder 2 and is provided with inner tube connecting hole 10,
And two ends insertion, the pitch of helical blade 8 is smaller, and screw thread is closeer.
Actual use flow is as follows:
(1) inner prop 2 is arranged in outer tube 6, outer tube connecting hole 4 and inner tube connecting hole 10 is alignd, and by connecting pole 11
It is placed into outer tube connecting hole 4 and inner tube connecting hole 10;
(2) filling pile construction equipment is placed into specified location;
(3) power set are fixed on connecting pole 11, start power set, make to be rotated under construction equipment clockwise direction
Hole is shaped to designated depth;
(4) connecting pole 11 is extracted, inner prop 2 is extracted by suspension hook 1 using crane;
(5) connecting pole 11 is inserted to outer tube connecting hole 4, and power set is fixed on connecting pole 11;
(6) concrete is extruded from the bottom of outer tube 6 using the extruding of concrete machine, and rotate counterclockwise carries outer tube 6, keeps outer tube 6 and the soil body
Pressure differential, it is impossible to interrupt the output of concrete, persistently export concrete to form the stake of lower end screw-type;
(7) outer tube rises close to after the absolute altitude of weak soil bottom, is changed to not rotate from rotation and directly carries, until upper end stake pressure injection completion,
Form linear pattern stake and extract outer tube 6.
Wherein, the effect of outer tube neck ring 5 is main in limitation construction equipment submergence depth, it is to avoid it is excessively loose soil layer occur, causes
Construction equipment infinitely sagging situation.
This construction equipment strengthens power section, strengthens screw rod rigidity and strength of joint, improvement pile top, can be by the supporting course of stake
Close boulder bed, closely knit boulder bed or middle weathering rammell in being directly placed into.
In summary, screw rod soil compaction, squeeze gravel and piles set into rock engineering method and solve during former screw rod pile driving construction hardly enters
Close boulder bed, closely knit boulder bed, the problem of middle weathering lithosphere are cannot be introduced into, and solve close cobble during pile tube can not enter
Layer, closely knit boulder bed, severely-weathered rammell and the defect of middle weathering rammell.Due to screw rod soil compaction, squeeze gravel engineering method bored concrete pile
Cast-in-place concrete, and pile concrete and soil layer effective connection make frictional force increase and stake collateral resistance calculating sectional area
Increase, its collateral resistance, end resistance are better than pile tube with aobvious.Solve the collapse hole of pile foundation, sediment thickness, broken pile, the underground water such as rotary digging stake
Position it is high can not pore-forming and concrete excess problem.
Claims (8)
1. one kind is repeatable to use new screw filling pile construction equipment, including outer tube body (6) and inner prop cylinder (2), its feature
It is, outer tube body (6) upper end is provided with outer tube neck ring (5) and enters concrete mouthful (3), and lower end is provided with helical blade (8);Institute
State inner prop cylinder (2) upper end and be provided with suspension hook (1), lower end is provided with drill bit (9).
2. it is according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described outer
Pipe body (6), helical blade (8) and drill bit (9) are made using high-carbon steel;Helical blade (8) pitch is smaller, and screw thread is more
It is close.
3. it is according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described outer
Pipe body upper end, which is provided with outer tube connecting hole (4), the inner prop cylinder, is provided with inner tube connecting hole (10), and two ends insertion.
4. it is according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described outer
Pipe connecting hole (4) and inner tube connecting hole (10) position, size are consistent, and are placed with connecting pole (11).
5. one kind according to claim 1 or claim 4 is repeatable with new screw filling pile construction equipment, its feature
It is, connecting pole (11) length is much larger than outer tube body (6) external diameter.
6. it is according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described outer
Pipe body (6) is tubular structure, and the outer tube body (6) external diameter is between 400mm-850mm.
7. it is according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that in described
Post cylinder (2) is cylinder, and the drill bit (9) is set to taper.
8. it is according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that in described
Post cylinder (2) external diameter is consistent with outer tube body (6) internal diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621438476.4U CN206512704U (en) | 2016-12-26 | 2016-12-26 | One kind is repeatable to use new screw filling pile construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621438476.4U CN206512704U (en) | 2016-12-26 | 2016-12-26 | One kind is repeatable to use new screw filling pile construction equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206512704U true CN206512704U (en) | 2017-09-22 |
Family
ID=59863660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621438476.4U Expired - Fee Related CN206512704U (en) | 2016-12-26 | 2016-12-26 | One kind is repeatable to use new screw filling pile construction equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206512704U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106498937A (en) * | 2016-12-26 | 2017-03-15 | 廖梓婷 | A kind of repeatable with new screw filling pile construction equipment |
CN113089659A (en) * | 2021-04-15 | 2021-07-09 | 兰州交通大学 | Rotary excavating hole-forming cast-in-place screw pile construction method for permafrost region |
-
2016
- 2016-12-26 CN CN201621438476.4U patent/CN206512704U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106498937A (en) * | 2016-12-26 | 2017-03-15 | 廖梓婷 | A kind of repeatable with new screw filling pile construction equipment |
CN113089659A (en) * | 2021-04-15 | 2021-07-09 | 兰州交通大学 | Rotary excavating hole-forming cast-in-place screw pile construction method for permafrost region |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103835284B (en) | A kind of Pile In Drill In Karst Terrain structure and construction method | |
CN101812976B (en) | Adjustable multiple coil extruding and expanding drilling tool | |
WO2018210019A1 (en) | Pile formation method for down-the-hole impact rotary jet composite piles | |
CN104988907A (en) | Construction method of concrete pile | |
CN102691296A (en) | Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof | |
CN109537583A (en) | A kind of slip casting plant pile construction method of PHC tubular pole | |
CN103669365A (en) | External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof | |
CN111851479B (en) | Method for constructing immersed tube rammed cast-in-place pile in sand layer or gravel layer | |
CN103806840A (en) | One-way spiral half soil compaction drill bit and one-way spiral half soil compaction pile construction technology | |
CN203741820U (en) | Cast-in-situ bored pile structure for karst area | |
CN103556551B (en) | Reinforce the construction method of the dumb-bell shape drilled pile composite foundation structure of embankment widening | |
CN105220714B (en) | Built-in anchor cable fills core compound prestress pile tube float Structure construction method | |
CN103953030B (en) | The compacted castinplace pile of screw thread supination joint bar | |
CN108756809B (en) | A kind of sealing method for shield tunnel geological exploration borehole | |
CN206512704U (en) | One kind is repeatable to use new screw filling pile construction equipment | |
CN107268608A (en) | Building waste earth-boring stake forming hole method | |
CN104404956A (en) | Construction method for pedestal piles | |
CN201183950Y (en) | Self-propelling type anchor rod of seamless steel pipe | |
CN205576957U (en) | Stake end pilework | |
CN206721875U (en) | A kind of pressure-bearing type boulder and cobble soil layer enlarging anchor rod | |
CN1995689B (en) | Pile forming method of pile forming mechanism with gyro bit | |
CN102979087B (en) | Construction method for rotary excavation pile | |
CN205934916U (en) | Steel casing pipe pore -forming anti -floating anchor rod | |
CN108842761A (en) | Drilling guiding prefabricated pile post-grouting technology | |
CN201406687Y (en) | Deep foundation pit supporting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170922 Termination date: 20191226 |
|