CN206512704U CN201621438476.4U CN201621438476U CN206512704U CN 206512704 U CN206512704 U CN 206512704U CN 201621438476 U CN201621438476 U CN 201621438476U CN 206512704 U CN206512704 U CN 206512704U
Authority
CN
China
Prior art keywords
outer tube
repeatable
construction equipment
pile construction
filling pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621438476.4U
Other languages
Chinese (zh)
Inventor
廖梓婷
江帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621438476.4U priority Critical patent/CN206512704U/en
Application granted granted Critical
Publication of CN206512704U publication Critical patent/CN206512704U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

It is repeatable with new screw filling pile construction equipment the utility model proposes one kind, including outer tube body (6) and inner prop cylinder (2), outer tube body (6) upper end is provided with outer tube neck ring (5) and enters concrete mouthful (3), and lower end is provided with helical blade (8);Inner prop cylinder (2) upper end is provided with suspension hook (1), and lower end is provided with drill bit (9).The outer tube body upper end, which is provided with outer tube connecting hole (4), the inner prop cylinder, is provided with inner prop connecting hole (10), and two ends insertion.The outer tube body (6), helical blade (8) and drill bit (9) are made using high-carbon steel;Helical blade (8) pitch is smaller, and screw thread is closeer.Advantage is, solve the collapse holes of the pile foundations such as rotary digging stake, sediment thickness, broken pile, level of ground water height can not pore-forming and concrete excess problem.

Description

One kind is repeatable to use new screw filling pile construction equipment
Technical field
The utility model is related to technical field of civil engineering, and in particular to one kind is repeatable to use new screw filling pile construction Equipment.
Background technology
At present, make pile foundation and mainly use country-level engineering method -- half screw bored concrete pile technology, but in actual use During, find this is difficult the complicated geological structure of adaptation southwest, this area mountains and rivers, tributary many ground qualitative change into spiral shell section Change big, formation strength is changed greatly, stratum is widely different because of frequently flood alluviation, and unlike North Plain, that is machine-made Argillic horizon and without obvious supporting course, is very easy to, it is impossible to meet screw rod pile simultaneous techniques into spiral shell.But can not synchronously Complete screw rod pile can not be made.
The soil structure in southwest major part river is back fill course, backfill rock ballast layer, argillic horizon, silty soil layer, powder Layer of sand, middle layer of sand, slightly close boulder bed, in close sandy gravel, Compact sandy-pebble, severely-weathered shale, middle weathered shale, possess geology answer The characteristics of miscellaneous and level of ground water is higher.In the prior art, screw rod pile technique possess have be not afraid of underground water, mud, drift sand, without heavy Slag, without broken pile, noiseless, environmentally friendly advantage, but the complicated geological of southwest is difficult into spiral shell.
Utility model content
The purpose of this utility model is:For above-mentioned southwest complicated geology and level of ground water is higher so that half screw Pile work method is irrigated into the problem of spiral shell is difficult, screw rod pile is unstable, the utility model provides a kind of repeat and irrigated with new screw Pile driving construction equipment.
The technical solution adopted in the utility model is as follows:
One kind is repeatable to use new screw filling pile construction equipment, including outer tube body and inner prop cylinder, the outer tube pipe Body upper end is provided with outer tube neck ring and enters concrete mouthful, and lower end is provided with helical blade;The inner prop cylinder upper end is provided with suspension hook, under End is provided with drill bit.
Further, the outer tube body, helical blade and drill bit are made using high-carbon steel.
Further, the outer tube body upper end, which is provided with outer tube connecting hole, the inner prop cylinder, is provided with inner tube company Connect hole, and two ends insertion.
Further, outer tube connecting hole and inner tube the connecting hole orifice position, size are consistent, and are placed with connection Post.
Further, the connection column length is much larger than outer tube outer tube diameter.
Further, the outer tube body is tubular structure, and the outer tube outer tube diameter is between 400mm-850mm.
Further, the inner prop cylinder is cylinder, and the drill bit is set to taper.
Further, the inner prop cylinder external diameter is consistent with outer tube internal diameter of tube body.
In summary, by adopting the above-described technical solution, the beneficial effects of the utility model are:
Solve the collapse holes of pile foundation such as rotary digging stake, sediment thickness, broken pile, level of ground water height can not pore-forming and concrete excess difficulty Topic.
Brief description of the drawings
Fig. 1 is the utility model stereogram;
Fig. 2 is the utility model profile;
Marked in figure:1- suspension hooks, 2- inner props, 3- enters concrete mouthful, 4- outer tube connecting holes, 5- outer tube neck rings, 6- straightways, 7- Screw section, 8- screw blades, 9- drill bits, 10- inner tube connecting holes, 11- connecting poles.
Embodiment
All features disclosed in this specification, can be with any in addition to mutually exclusive feature and/or step Mode is combined.
The utility model is elaborated with reference to Fig. 1, Fig. 2.
As shown in Figure 1 and Figure 2, it is stereogram of the present utility model and profile.This construction equipment, which mainly includes one kind, to be weighed New screw filling pile construction equipment, including outer tube body 6 and inner prop cylinder 2 are multiplexed, the upper end of outer tube body 6 is provided with outer Neck circle 5 and enter concrete mouthfuls 3, lower end is provided with helical blade 8;The upper end of inner prop cylinder 2 is provided with suspension hook 1, and lower end is provided with Drill bit 9.The outer tube body 6, helical blade 8 and drill bit 9 are made using high-carbon steel.
The upper end of outer tube body 6 is provided with outer tube connecting hole 4, the inner prop cylinder 2 and is provided with inner tube connecting hole 10, And two ends insertion, the pitch of helical blade 8 is smaller, and screw thread is closeer.
Actual use flow is as follows:
(1) inner prop 2 is arranged in outer tube 6, outer tube connecting hole 4 and inner tube connecting hole 10 is alignd, and by connecting pole 11 It is placed into outer tube connecting hole 4 and inner tube connecting hole 10;
(2) filling pile construction equipment is placed into specified location;
(3) power set are fixed on connecting pole 11, start power set, make to be rotated under construction equipment clockwise direction Hole is shaped to designated depth;
(4) connecting pole 11 is extracted, inner prop 2 is extracted by suspension hook 1 using crane;
(5) connecting pole 11 is inserted to outer tube connecting hole 4, and power set is fixed on connecting pole 11;
(6) concrete is extruded from the bottom of outer tube 6 using the extruding of concrete machine, and rotate counterclockwise carries outer tube 6, keeps outer tube 6 and the soil body Pressure differential, it is impossible to interrupt the output of concrete, persistently export concrete to form the stake of lower end screw-type;
(7) outer tube rises close to after the absolute altitude of weak soil bottom, is changed to not rotate from rotation and directly carries, until upper end stake pressure injection completion, Form linear pattern stake and extract outer tube 6.
Wherein, the effect of outer tube neck ring 5 is main in limitation construction equipment submergence depth, it is to avoid it is excessively loose soil layer occur, causes Construction equipment infinitely sagging situation.
This construction equipment strengthens power section, strengthens screw rod rigidity and strength of joint, improvement pile top, can be by the supporting course of stake Close boulder bed, closely knit boulder bed or middle weathering rammell in being directly placed into.
In summary, screw rod soil compaction, squeeze gravel and piles set into rock engineering method and solve during former screw rod pile driving construction hardly enters Close boulder bed, closely knit boulder bed, the problem of middle weathering lithosphere are cannot be introduced into, and solve close cobble during pile tube can not enter Layer, closely knit boulder bed, severely-weathered rammell and the defect of middle weathering rammell.Due to screw rod soil compaction, squeeze gravel engineering method bored concrete pile Cast-in-place concrete, and pile concrete and soil layer effective connection make frictional force increase and stake collateral resistance calculating sectional area Increase, its collateral resistance, end resistance are better than pile tube with aobvious.Solve the collapse hole of pile foundation, sediment thickness, broken pile, the underground water such as rotary digging stake Position it is high can not pore-forming and concrete excess problem.

Claims (8)

1. one kind is repeatable to use new screw filling pile construction equipment, including outer tube body (6) and inner prop cylinder (2), its feature It is, outer tube body (6) upper end is provided with outer tube neck ring (5) and enters concrete mouthful (3), and lower end is provided with helical blade (8);Institute State inner prop cylinder (2) upper end and be provided with suspension hook (1), lower end is provided with drill bit (9).
2. it is according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described outer Pipe body (6), helical blade (8) and drill bit (9) are made using high-carbon steel;Helical blade (8) pitch is smaller, and screw thread is more It is close.
3. it is according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described outer Pipe body upper end, which is provided with outer tube connecting hole (4), the inner prop cylinder, is provided with inner tube connecting hole (10), and two ends insertion.
4. it is according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described outer Pipe connecting hole (4) and inner tube connecting hole (10) position, size are consistent, and are placed with connecting pole (11).
5. one kind according to claim 1 or claim 4 is repeatable with new screw filling pile construction equipment, its feature It is, connecting pole (11) length is much larger than outer tube body (6) external diameter.
6. it is according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that described outer Pipe body (6) is tubular structure, and the outer tube body (6) external diameter is between 400mm-850mm.
7. it is according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that in described Post cylinder (2) is cylinder, and the drill bit (9) is set to taper.
8. it is according to claim 1 a kind of repeatable with new screw filling pile construction equipment, it is characterised in that in described Post cylinder (2) external diameter is consistent with outer tube body (6) internal diameter.
CN201621438476.4U 2016-12-26 2016-12-26 One kind is repeatable to use new screw filling pile construction equipment Expired - Fee Related CN206512704U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621438476.4U CN206512704U (en) 2016-12-26 2016-12-26 One kind is repeatable to use new screw filling pile construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621438476.4U CN206512704U (en) 2016-12-26 2016-12-26 One kind is repeatable to use new screw filling pile construction equipment

Publications (1)

Publication Number Publication Date
CN206512704U true CN206512704U (en) 2017-09-22

Family

ID=59863660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621438476.4U Expired - Fee Related CN206512704U (en) 2016-12-26 2016-12-26 One kind is repeatable to use new screw filling pile construction equipment

Country Status (1)

Country Link
CN (1) CN206512704U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498937A (en) * 2016-12-26 2017-03-15 廖梓婷 A kind of repeatable with new screw filling pile construction equipment
CN113089659A (en) * 2021-04-15 2021-07-09 兰州交通大学 Rotary excavating hole-forming cast-in-place screw pile construction method for permafrost region

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498937A (en) * 2016-12-26 2017-03-15 廖梓婷 A kind of repeatable with new screw filling pile construction equipment
CN113089659A (en) * 2021-04-15 2021-07-09 兰州交通大学 Rotary excavating hole-forming cast-in-place screw pile construction method for permafrost region

Similar Documents

Publication Publication Date Title
CN103835284B (en) A kind of Pile In Drill In Karst Terrain structure and construction method
CN101812976B (en) Adjustable multiple coil extruding and expanding drilling tool
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
CN104988907A (en) Construction method of concrete pile
CN102691296A (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN109537583A (en) A kind of slip casting plant pile construction method of PHC tubular pole
CN103669365A (en) External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof
CN111851479B (en) Method for constructing immersed tube rammed cast-in-place pile in sand layer or gravel layer
CN103806840A (en) One-way spiral half soil compaction drill bit and one-way spiral half soil compaction pile construction technology
CN203741820U (en) Cast-in-situ bored pile structure for karst area
CN103556551B (en) Reinforce the construction method of the dumb-bell shape drilled pile composite foundation structure of embankment widening
CN105220714B (en) Built-in anchor cable fills core compound prestress pile tube float Structure construction method
CN103953030B (en) The compacted castinplace pile of screw thread supination joint bar
CN108756809B (en) A kind of sealing method for shield tunnel geological exploration borehole
CN206512704U (en) One kind is repeatable to use new screw filling pile construction equipment
CN107268608A (en) Building waste earth-boring stake forming hole method
CN104404956A (en) Construction method for pedestal piles
CN201183950Y (en) Self-propelling type anchor rod of seamless steel pipe
CN205576957U (en) Stake end pilework
CN206721875U (en) A kind of pressure-bearing type boulder and cobble soil layer enlarging anchor rod
CN1995689B (en) Pile forming method of pile forming mechanism with gyro bit
CN102979087B (en) Construction method for rotary excavation pile
CN205934916U (en) Steel casing pipe pore -forming anti -floating anchor rod
CN108842761A (en) Drilling guiding prefabricated pile post-grouting technology
CN201406687Y (en) Deep foundation pit supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170922

Termination date: 20191226

CF01 Termination of patent right due to non-payment of annual fee