CN206457929U - 一种耗能型震后自复位的梁柱节点 - Google Patents
一种耗能型震后自复位的梁柱节点 Download PDFInfo
- Publication number
- CN206457929U CN206457929U CN201621304682.6U CN201621304682U CN206457929U CN 206457929 U CN206457929 U CN 206457929U CN 201621304682 U CN201621304682 U CN 201621304682U CN 206457929 U CN206457929 U CN 206457929U
- Authority
- CN
- China
- Prior art keywords
- steel
- column
- plate
- pipe column
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
本实用新型属于建筑结构领域,涉及一种耗能型震后自复位的梁柱节点,包括钢梁(1)和方钢管柱(2),所述的钢梁(1)与方钢管柱(2)通过预应力钢绞线(3)和角钢(9)连接,所述的钢梁(1)端部上下两侧分别设有加强板(10),所述的方钢管柱(2)靠近梁侧设有填板(7),背对梁侧设有钢板(5),所述的预应力钢绞线(3)穿过方钢管柱(2)和柱侧的钢板(5),用锚固件(4)锚固在柱侧的钢板(5)外侧。所述的角钢(9)通过螺杆(11)和螺母(12)分别与钢梁(1)和方钢管柱(2)连接。所述的角钢(9)与填板(7)、加强板(10)之间设有橡胶垫(8)。所述方钢管柱(2)内部与加强板(10)等高处设有加劲肋(6)。本实用新型改善了节点的抗震性能,在地震作用下,利用橡胶垫、角钢提高耗能能力,利用预应力钢绞线实现震后自复位的功能。
Description
技术领域
本实用新型涉及一种耗能型震后自复位的梁柱节点,属于建筑结构工程领域,涉及自复位结构的消能减震技术。
背景技术
建筑结构一旦地震后存在较明显的残余变形或主要受力构件遭受严重损伤,则预示其修复难度的加大和相应成本的增加,甚至部分建筑物难以满足其使用功能要求而丧失了修复继续使用的价值。这种情况促使了自复位结构的诞生,这种结构具有在震后恢复到原位或基本恢复的能力,不需要或稍微修复即可使用,自复位结构主要是通过自复位节点来实现自动复位。
发明内容
本实用新型的目的在于解决现有梁柱节点的缺陷,提供一种耗能型且震后具有自动复位能力的梁柱节点,该节点既能保证小震下结构稳定,又能提供较大的耗能能力,震后结构自复位的理想效果。
为了实现上述目的,本实用新型采用的技术方案是:
一种耗能型震后自动复位的梁柱节点,包括钢梁和方钢管柱,所述的钢梁与方钢管柱通过预应力钢绞线和角钢连接,所述的钢梁端部上下两侧分别设有加强板,所述的方钢管柱靠近梁侧设有填板,背对梁侧设有钢板,所述的预应力钢绞线穿过方钢管柱和柱侧的钢板,用锚固件锚固在柱侧的钢板外侧。所述的角钢通过螺杆和螺母分别与钢梁和方钢管柱连接。所述的角钢与填板、加强板之间设有橡胶垫。所述方钢管柱内部与加强板等高处设有加劲肋。
所述的方钢管柱和柱侧的钢板上设有钢绞线孔,引导钢绞线穿过。
所述的方钢管柱和方钢管柱靠近梁侧所设填板上设有螺杆孔,引导螺杆穿过。
所述的钢梁以及梁侧的加强板和角钢上设有螺杆孔,引导螺杆穿过。
所述的角钢上设置有孔洞供螺杆穿过。
所述的加强板、方钢管柱靠近梁侧所设填板与角钢之间设有L型橡胶垫。
所述的钢梁和方钢管柱为预制,预留孔道引导钢绞线穿过。
所述的钢绞线位于钢梁的上下两侧,用量和预应力均匀配置。
对于钢梁,所述的螺杆通过螺母固定在角钢外侧;对于方钢管柱,所述的螺杆通过螺母固定在角钢外侧。
所述的锚固件为夹片式锚具、支承式锚具或锥塞式锚具。
由于采用了上述方案,本实用新型的有益效果是:采用本实用新型提供的耗能型震后自动复位的梁柱节点,方案简单,施工方便,可以很好的实现小震下结构稳定、大震下结构出现大变形但不破坏、震后结构自复位的效果。
本实用新型可广泛应用于消能减震结构体系中,在地震作用下既可提供良好的耗能能力,又能实现理想的消能减震效果,实现减小结构地震损害的目的。
附图说明
图1是本实用新型的结构示意图。
图中:1.钢梁、2.方钢管柱、3.预应力钢绞线、4.锚固件、5.钢板、6.加劲肋、7.填板、8.橡胶垫、9.角钢、10.加强板、11.螺杆、12.螺母。
具体实施方式
下面结合附图所示实施例对本实用新型做进一步说明。
该耗能型震后自动复位的梁柱节点,包括钢梁1和方钢管柱2,钢梁1和方钢管柱2通过预应力钢绞线3和角钢9连接,钢梁1端部上下两侧分别设有加强板10,方钢管柱2靠近梁侧设有填板7,背对梁侧设有钢板5,预应力钢绞线3穿过方钢管柱2和柱侧的钢板5,用锚固件4锚固在柱侧的钢板5外侧,角钢9通过螺杆11和螺母12分别与钢梁1和方钢管柱2连接,角钢9与填板7、加强板10之间设有橡胶垫8,方钢管柱2内部与加强板10等高处设有加劲肋6。
方钢管柱2和柱侧的钢板5上设有钢绞线孔,引导钢绞线穿过。
方钢管柱2和方钢管柱靠近梁侧所设填板7上设有螺杆孔,引导螺杆11穿过。
钢梁1以及梁侧的加强板10和角钢9上设有螺杆孔,引导螺杆11穿过。
角钢9上设置有孔洞供螺杆11穿过。
加强板10、方钢管柱2靠近梁侧所设填板7与角钢9之间设有L型橡胶垫8。
钢梁1和方钢管柱2为预制,预留孔道引导钢绞线3穿过。
钢绞线3位于钢梁1的上下两侧,用量和预应力均匀配置。
对于钢梁1,所述的螺杆11通过螺母12固定在角钢9外侧;对于方钢管柱2,所述的螺杆11通过螺母12固定在角钢9外侧。
锚固件4为夹片式锚具、支承式锚具或锥塞式锚具。
Claims (10)
1.一种耗能型震后自复位的梁柱节点,其特征在于:包括钢梁(1)和方钢管柱(2),所述的钢梁(1)与方钢管柱(2)通过预应力钢绞线(3)和角钢(9)连接,所述的钢梁(1)端部上下两侧分别设有加强板(10),所述的方钢管柱(2)靠近梁侧设有填板(7),背对梁侧设有钢板(5),所述的预应力钢绞线(3)穿过方钢管柱(2)和柱侧的钢板(5),用锚固件(4)锚固在柱侧的钢板(5)外侧,所述的角钢(9)通过螺杆(11)和螺母(12)分别与钢梁(1)和方钢管柱(2)连接,所述的角钢(9)与填板(7)、加强板(10)之间设有橡胶垫(8),所述方钢管柱(2)内部与加强板(10)等高处设有加劲肋(6)。
2.根据权利要求1所述的耗能型震后自复位的梁柱节点,其特征在于:所述的方钢管柱(2)和柱侧的钢板(5)上设有钢绞线孔,引导钢绞线(3)穿过。
3.根据权利要求1所述的耗能型震后自复位的梁柱节点,其特征在于:所述的方钢管柱(2)和方钢管柱(2)靠近梁侧所设填板(7)上设有螺杆孔,引导螺杆(11)穿过。
4.根据权利要求1所述的耗能型震后自复位的梁柱节点,其特征在于:所述的钢梁(1)以及梁侧的加强板(10)和角钢(9)上设有螺杆孔,引导螺杆(11)穿过。
5.根据权利要求1所述的耗能型震后自复位的梁柱节点,其特征在于:所述的角钢(9)上设置有孔洞供螺杆(11)穿过。
6.根据权利要求1所述的耗能型震后自复位的梁柱节点,其特征在于:所述的加强板(10)、方钢管柱(2)靠近梁侧所设填板(7)与角钢(9)之间设有L型橡胶垫(8)。
7.根据权利要求1所述的耗能型震后自复位的梁柱节点,其特征在于:所述的钢梁(1)和方钢管柱(2)为预制,预留孔道引导钢绞线(3)穿过。
8.根据权利要求1所述的耗能型震后自复位的梁柱节点,其特征在于:所述的钢绞线(3)位于钢梁(1)的上下两侧,用量和预应力均匀配置。
9.根据权利要求1所述的耗能型震后自复位的梁柱节点,其特征在于:对于钢梁(1),所述的螺杆(11)通过螺母(12)固定在角钢(9)外侧;对于方钢管柱(2),所述的螺杆(11)通过螺母(12)固定在角钢(9)外侧。
10.根据权利要求1所述的耗能型震后自复位的梁柱节点,其特征在于:所述的锚固件(4)为夹片式锚具、支承式锚具或锥塞式锚具。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621304682.6U CN206457929U (zh) | 2016-12-01 | 2016-12-01 | 一种耗能型震后自复位的梁柱节点 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621304682.6U CN206457929U (zh) | 2016-12-01 | 2016-12-01 | 一种耗能型震后自复位的梁柱节点 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206457929U true CN206457929U (zh) | 2017-09-01 |
Family
ID=59693199
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621304682.6U Expired - Fee Related CN206457929U (zh) | 2016-12-01 | 2016-12-01 | 一种耗能型震后自复位的梁柱节点 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206457929U (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107905369A (zh) * | 2017-12-25 | 2018-04-13 | 合肥工业大学 | 装配式框架梁柱连接节点 |
CN108035440A (zh) * | 2017-10-27 | 2018-05-15 | 西安建筑科技大学 | 一种带楔形装置的装配式自复位钢框架节点 |
CN108867851A (zh) * | 2018-06-15 | 2018-11-23 | 西安建筑科技大学 | 具有自复位功能的角钢耗能式圆钢管混凝土柱-钢梁连接节点 |
CN109868898A (zh) * | 2019-03-12 | 2019-06-11 | 青岛理工大学 | 一种装配式自复位节点 |
WO2020019166A1 (zh) * | 2018-07-24 | 2020-01-30 | 陈敬全 | 一种动静钢结构连接器及拼装建筑结构 |
CN112376738A (zh) * | 2020-11-18 | 2021-02-19 | 石河子大学 | 一种钢丝网煤矸石混凝土装配式剪力墙及其施工方法 |
CN114482272A (zh) * | 2021-12-20 | 2022-05-13 | 青岛腾远设计事务所有限公司 | 一种耗能减震型装配式梁柱节点 |
-
2016
- 2016-12-01 CN CN201621304682.6U patent/CN206457929U/zh not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035440A (zh) * | 2017-10-27 | 2018-05-15 | 西安建筑科技大学 | 一种带楔形装置的装配式自复位钢框架节点 |
CN107905369A (zh) * | 2017-12-25 | 2018-04-13 | 合肥工业大学 | 装配式框架梁柱连接节点 |
CN107905369B (zh) * | 2017-12-25 | 2024-02-23 | 合肥工业大学 | 装配式框架梁柱连接节点 |
CN108867851A (zh) * | 2018-06-15 | 2018-11-23 | 西安建筑科技大学 | 具有自复位功能的角钢耗能式圆钢管混凝土柱-钢梁连接节点 |
WO2020019166A1 (zh) * | 2018-07-24 | 2020-01-30 | 陈敬全 | 一种动静钢结构连接器及拼装建筑结构 |
CN109868898A (zh) * | 2019-03-12 | 2019-06-11 | 青岛理工大学 | 一种装配式自复位节点 |
WO2020181794A1 (zh) * | 2019-03-12 | 2020-09-17 | 青岛理工大学 | 一种装配式自复位节点 |
CN112376738A (zh) * | 2020-11-18 | 2021-02-19 | 石河子大学 | 一种钢丝网煤矸石混凝土装配式剪力墙及其施工方法 |
CN114482272A (zh) * | 2021-12-20 | 2022-05-13 | 青岛腾远设计事务所有限公司 | 一种耗能减震型装配式梁柱节点 |
CN114482272B (zh) * | 2021-12-20 | 2024-04-30 | 青岛腾远设计事务所有限公司 | 一种耗能减震型装配式梁柱节点 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206457929U (zh) | 一种耗能型震后自复位的梁柱节点 | |
CN106522382B (zh) | 一种装配式钢管混凝土柱-h型钢梁自复位耗能连接节点 | |
CN105525679B (zh) | 一种局部预应力装配式耗能梁柱节点 | |
CN103132602A (zh) | 一种自复位框架梁柱节点 | |
WO2019149270A1 (zh) | 一种普通钢筋与精轧螺纹钢筋混合配筋的拼装墩 | |
CN203096950U (zh) | 一种自复位框架梁柱节点 | |
CN103628587B (zh) | 自复位梁-格栅式摩擦墙结构体系 | |
CN103711330B (zh) | 一种预应力装配预制钢筋混凝土框架加固已有结构的方法 | |
CN103147458B (zh) | 一种自复位框架柱脚节点 | |
CN108756005A (zh) | 震后可快速修复的高耗能外露式钢柱脚及施工、维护方法 | |
CN107152097B (zh) | 带悬挑板框架外附预应力装配式耗能框架加固的结构 | |
CN203769122U (zh) | 一种外置摩擦阻尼器的自复位约束砌体墙 | |
CN103290993B (zh) | 跨中自复位软钢耗能混凝土梁 | |
CN203669112U (zh) | 一种多层混凝土框架结构顶部的加层钢框架柱脚节点 | |
CN108193792A (zh) | 一种新型可更换式摇摆耗能柱脚 | |
CN103866687A (zh) | 一种耗能自复位桥梁墩柱结构 | |
CN108755951A (zh) | 预制预应力混凝土框架消能减震梁柱节点 | |
CN107060360A (zh) | 一种砌体结构减震加固方法 | |
CN203583708U (zh) | 自复位梁-格栅式摩擦墙结构体系 | |
CN209082693U (zh) | 带耗能装置的无粘结预应力装配式节点 | |
CN207228402U (zh) | 内置预应力钢斜撑的钢筋混凝土剪力墙 | |
CN105421583A (zh) | 一种三向可恢复功能的框架结构 | |
CN204491831U (zh) | 新型可恢复功能框架-支撑结构体系 | |
CN204570719U (zh) | 一种提离式桩基础的限位装置 | |
CN206143933U (zh) | 一种装配式钢管混凝土柱‑h型钢梁自复位耗能连接节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170901 Termination date: 20181201 |
|
CF01 | Termination of patent right due to non-payment of annual fee |