[go: up one dir, main page]

CN206408659U - Earth excavation slope control chi - Google Patents

Earth excavation slope control chi Download PDF

Info

Publication number
CN206408659U
CN206408659U CN201720027754.5U CN201720027754U CN206408659U CN 206408659 U CN206408659 U CN 206408659U CN 201720027754 U CN201720027754 U CN 201720027754U CN 206408659 U CN206408659 U CN 206408659U
Authority
CN
China
Prior art keywords
bar
horizon
gradient
vertical
earth excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720027754.5U
Other languages
Chinese (zh)
Inventor
田连江
王雪明
王雪彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Senyuan Construction Co Ltd
Original Assignee
Tianjin Senyuan Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Senyuan Construction Co Ltd filed Critical Tianjin Senyuan Construction Co Ltd
Priority to CN201720027754.5U priority Critical patent/CN206408659U/en
Application granted granted Critical
Publication of CN206408659U publication Critical patent/CN206408659U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a kind of earth excavation slope control chi, its drip irrigation device is to include horizon bar, vertical bar and gradient bar, it is connected with horizon bar for making the horizon rule of horizon bar holding level, horizon bar and vertical bar are affixed and are arranged in a mutually vertical manner, horizon bar is with having the chute for the sliding of gradient bar two ends on the inside of vertical bar, horizon bar and vertical bar slide the rotating shaft for being connected with and being fixed with gradient bar, shaft thread is connected with the nut for abutting horizon bar or vertical bar increase pretightning force, has reached the effect of the adjustable detection gradient.

Description

Earth excavation slope control chi
Technical field
The utility model is related to construction aid field, more particularly to a kind of earth excavation slope control chi.
Background technology
Earth excavation is engineering initial stage so that critical process in work progress.Soil and rock are loosened, crushed, dug The engineering dug and transported.By rock and soil properties, earthwork evacuation point earth excavation and rock excavation.In order to prevent Tu Bi from caving in, really Construction safety is protected, when excavation exceedes certain depth or embankment exceedes certain altitude, enough side slopes that its edge should be released, this It is exactly slope.The gradient of slope has industry regulation, during some channel excavations, and survey crew utilizes spirit level, ruler Calculated etc. apparatus measures to control the gradient, it is cumbersome, waste a large amount of manpowers.
The existing Chinese patent for referring to Application No. 201320265380.2, it discloses a kind of pit earthwork side slope The control cage of the gradient, including foundation ditch and side slope, are mainly made up of hypotenuse bar, horizon bar, vertical bar and horizon rule I, horizon rule II, To be put on this horizon bar, the vertical bar right side put and a hypotenuse bar left side put group be welded into right angled triangle, and make the epimere of hypotenuse bar upward Horizon bar is tiltedly stretched out, meanwhile, the acute angle between this hypotenuse bar and horizon bar is side slope face and the base that within angle is equal to foundation ditch Acute angle between the ground level in hole is the gradient of side slope, in addition, horizon rule I is fixedly mounted on the bottom surface of horizon bar, and Horizon rule II is fixedly mounted on vertical bar left surface.
During using above-mentioned control cage, as long as hypotenuse bar is resisted against on side slope face, in observation horizon rule I, horizon rule II Bubble whether centering, so that it may detect and control the gradient of excavation slope.But it is due to that horizon bar, vertical bar and hypotenuse bar are to pass through Group weldering is relatively-stationary, is only used for detecting a kind of gradient of fixation.In work progress, a variety of gradients may be used, then Need to prepare multiple different control cage for fixing the gradients, be not easy to very much actual use.
Utility model content
The purpose of this utility model is to provide a kind of earth excavation slope control chi of the adjustable detection gradient.
Above-mentioned technical purpose of the present utility model technical scheme is that:
It is connected with a kind of earth excavation slope control chi, including horizon bar, vertical bar and gradient bar, horizon bar for making Horizon bar keeps the horizon rule of level, and horizon bar and vertical bar are affixed and are arranged in a mutually vertical manner, and horizon bar on the inside of vertical bar with dividing The chute for the sliding of gradient bar two ends is not provided with, and horizon bar and vertical bar slide the rotating shaft for being connected with and being fixed with gradient bar, turn Axle thread is connected with the nut for abutting horizon bar or vertical bar increase pretightning force.
By using such scheme, gradient bar two ends is slid along chute, so as to be adjusted to required gradient numerical value, then revolve Tight nut, so that this gradient numerical value be fixed;The laminating of gradient bar is resisted against on domatic when using, the shape of horizon rule is observed State, it can be seen from prior art, if the bubble of horizon rule is centrally located, then it represents that horizon bar is in horizontality, so that The gradient of side slope reaches preferable numerical value, conversely, then the gradient of side slope is unqualified.So replace multiple with a slope control chi Grade rod, is easy to use.
Preferably, horizon bar is connected with the chute of both vertical bars in both fixing positions.
By using such scheme, interconnected chute is easy to open up, and prevents chute not connectivity part and gradient bar Interference, the upset for hindering gradient bar.
Preferably, horizon bar and vertical bar have the word hole slid for rotating shaft, two word holes are respectively along level Bar and the extension of vertical bar length direction.
By using such scheme, a word hole limits the glide direction of rotating shaft, rotating shaft is together slided with gradient bar in chute Move so that gradient bar can be adjusted to behind optional position fixed.
Preferably, being connected in the middle part of two word holes with chute, and extend through horizon bar and vertical bar;Rotating shaft runs through one Word hole, and both sides are ridden on the side wall in a word hole.
By using such scheme, word hole two parts positioned at chute both sides limit the glide direction of rotating shaft jointly, protect Demonstrate,prove the stabilization of gradient bar sliding.
Preferably, gradient bar two ends are provided with the through hole run through for rotating shaft.
By using such scheme, rotating shaft is inserted directly into through hole, so that rotating shaft is radially fixed along itself with gradient bar, So that rotating shaft can slide with gradient boom end, while the glide direction of the further ruling grade bar of rotating shaft, so as to utilize slope Spend the movement and upset of bar.
Preferably, rotating shaft is bolt, bolt-through one is connected behind word hole with nut thread.
By using such scheme, bolt is easily installed and bought, and is easy to the installation of nut.
Preferably, horizon bar and vertical bar are carved with unit length identical scale, scale is from both fixing positions along a word hole Bearing of trend stretches out.
By using such scheme, the position of the gradient bar adjusted according to scale is easy to needed for gradient bar is adjusted to The gradient, makes adjustment process more efficient and convenient.
Preferably, gradient bar includes being used for sliding the connecting rod being connected with horizon bar and vertical bar respectively, is used for and side The measurement bar of slope abutting and the side lever being fixed on measurement bar two ends in connecting rod, measurement bar are parallel to each other with connecting rod.
By using such scheme, the gradient is measured using measurement bar, because measurement bar is parallel to each other with connecting rod, therefore is surveyed Gauge rod is identical with the gradient of connecting rod, consequently facilitating regulation;The setting of gradient bar, the shadow of elimination of level bar and vertical boom end Ring, be easy to directly withstand on gradient bar on slight slope.
In summary, the utility model has the advantages that:Gradient bar is set to be slid along chute, and bolt was both used as and turned Axle, also serves as a part for fixture so that gradient bar overturns the gradient bar while being slid along chute, by axle of bolt and changed The gradient of gradient bar, then be that two pairs of bolts and nut clamp vertical bar and horizon bar respectively by tightening nut, so that fixed slope Spend bar;So change the gradient of gradient bar to detect whether slight slope is up to standard;And the setting of measurement bar eliminates horizon bar and vertical The interference of boom end, allows gradient bar directly to be fitted with slight slope.
Brief description of the drawings
Fig. 1 is earth excavation slope control chi structural representation;
Fig. 2 is earth excavation slope control chi sectional view.
In figure, 1, horizon bar;11st, caulking groove;2nd, vertical bar;3rd, gradient bar;31st, connecting rod;311st, fillet;312nd, through hole; 32nd, measurement bar;33rd, side lever;4th, chute;5th, a word hole;6th, bolt;7th, nut;8th, scale;9th, horizon rule.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical accompanying drawing Mark is represented.It should be noted that the word "front", "rear", "left", "right", the "up" and "down" that are used below in description refer to It is the direction in accompanying drawing, word " bottom surface " and " top surface ", " interior " and " outer " are referred respectively to towards or away from particular elements geometry The direction at center.
A kind of earth excavation slope control chi, as depicted in figs. 1 and 2, including horizon bar 1, vertical bar 2 and gradient bar 3.
Horizon bar 1, vertical bar 2 are into rectangular-shape.Horizon bar 1 is one piece L-shaped by pane cutting with vertical bar 2 Prism so that horizon bar 1 is arranged in a mutually vertical manner with vertical bar 2.
Horizon bar 1 is respectively provided with rectangular chute 4 with the inner side of vertical bar 2, and two chutes 4 are connected in both junctions.And And horizon bar 1 and vertical bar 2 are provided with a word hole 5 in the both sides of chute 4, so that two word holes 5 middle part is connected with chute 4, And the side wall of chute 4 is run through at two ends.Two word holes 5 extend along horizon bar 1, the length direction of vertical bar 2 respectively, and in vertical bar 2 connect with the junction of horizon bar 1.
Gradient bar 3 includes the connecting rod 31, measurement bar 32 and side lever 33 into rectangular strip.Two isometric side levers 33 Two ends with one end respectively with connecting rod 31 are welded, and side lever 33 is vertically arranged with measurement bar 32;And two side levers 33 is another End is directly welded in connecting rod 31, so that measurement bar 32 is fixed in connecting rod 31, and measurement bar 32 is protected with connecting rod 31 Maintain an equal level row.
The two ends of connecting rod 31 are rounded down 311, and are provided with the through hole 312 run through for rotating shaft.Bolt 6 runs through as rotating shaft Behind one word hole 5 and through hole 312, it is threadedly coupled with nut 7.
Horizon bar 1 is carved with unit length identical scale 8 with vertical bar 2, and scale 8 prolongs from both fixing positions along a word hole 5 Direction is stretched to stretch out.Caulking groove 11 is provided with close to the one end of vertical bar 2 on horizon bar 1, caulking groove 11 is embedded with for protecting horizon bar 1 The flat horizon rule 9 of water holding, horizon rule 9 uses prior art, and this is repeated no more using new.
Using needing to be adjusted before earth excavation slope control chi.Nut 7 is unclamped, the two ends of gradient bar 3 is slided along chute 4 Move, the gradient of gradient bar 3 adjusted according to scale 8, measurement bar 32 is so adjusted to required gradient numerical value, then tightening nut 7, So as to which this gradient numerical value be fixed;The laminating of measurement bar 32 is resisted against on domatic when using, the state of horizon rule 9, root is observed Understood according to prior art, if the bubble of horizon rule 9 is centrally located, then it represents that horizon bar 1 is in horizontality, so that side slope The gradient reach preferable numerical value, conversely, then the gradient of side slope is unqualified.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected in right of the present utility model by Patent Law.

Claims (8)

1. it is solid on a kind of earth excavation slope control chi, including horizon bar (1), vertical bar (2) and gradient bar (3), horizon bar (1) It is connected to the horizon rule (9) for making horizon bar (1) keep level, it is characterised in that:Horizon bar (1) and vertical bar (2) it is affixed and It is arranged in a mutually vertical manner, horizon bar (1) is with having the chute (4) slid for gradient bar (3) two ends, water on the inside of vertical bar (2) Flat bar (1) and vertical bar (2), which slide, is connected with the rotating shaft fixed with gradient bar (3), and shaft thread is connected with abutting horizon bar (1) or vertical bar (2) increase pretightning force nut (7).
2. earth excavation slope control chi according to claim 1, it is characterised in that:Horizon bar (1) and vertical bar (2) two The chute (4) of person is connected in both fixing positions.
3. earth excavation slope control chi according to claim 1, it is characterised in that:Horizon bar (1) and vertical bar (2) point The word hole (5) slid for rotating shaft is not provided with, and two word holes (5) are respectively along horizon bar (1) and vertical bar (2) length direction Extension.
4. earth excavation slope control chi according to claim 3, it is characterised in that:In the middle part of two word holes (5) with Chute (4) is connected, and extends through horizon bar (1) and vertical bar (2);Rotating shaft runs through a word hole (5), and both sides ride over a word hole (5) on side wall.
5. earth excavation slope control chi according to claim 4, it is characterised in that:Gradient bar (3) two ends are provided with for turning The through hole (312) that axle runs through.
6. earth excavation slope control chi according to claim 5, it is characterised in that:Rotating shaft is bolt (6), bolt (6) It is threadedly coupled afterwards with nut (7) through a word hole (5).
7. earth excavation slope control chi according to claim 1, it is characterised in that:Horizon bar (1) is carved with vertical bar (2) There is unit length identical scale (8), scale (8) stretches out from both fixing positions along word hole (5) bearing of trend.
8. earth excavation slope control chi according to claim 1, it is characterised in that:Gradient bar (3) includes being used to distinguish The connecting rod (31) being connected is slid with horizon bar (1) and vertical bar (2), for the measurement bar (32) abutted with side slope and general Measurement bar (32) two ends are fixed on the side lever (33) in connecting rod (31), and measurement bar (32) is parallel to each other with connecting rod (31).
CN201720027754.5U 2017-01-10 2017-01-10 Earth excavation slope control chi Expired - Fee Related CN206408659U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720027754.5U CN206408659U (en) 2017-01-10 2017-01-10 Earth excavation slope control chi

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720027754.5U CN206408659U (en) 2017-01-10 2017-01-10 Earth excavation slope control chi

Publications (1)

Publication Number Publication Date
CN206408659U true CN206408659U (en) 2017-08-15

Family

ID=59555031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720027754.5U Expired - Fee Related CN206408659U (en) 2017-01-10 2017-01-10 Earth excavation slope control chi

Country Status (1)

Country Link
CN (1) CN206408659U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552382A (en) * 2019-09-20 2019-12-10 北京燕化天钲建筑工程有限责任公司 Slope measurement and control tool for inverted cone concrete foundation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552382A (en) * 2019-09-20 2019-12-10 北京燕化天钲建筑工程有限责任公司 Slope measurement and control tool for inverted cone concrete foundation
CN110552382B (en) * 2019-09-20 2024-02-20 北京燕化天钲建筑工程有限责任公司 Measuring and controlling tool for slope of inverted cone concrete foundation

Similar Documents

Publication Publication Date Title
WO2019233105A1 (en) Device and method for measuring flow rate, flow direction, and geological parameter of deep-well cross-hole groundwater
CN103487373B (en) slope crack monitoring device and measuring method thereof
CN103485320B (en) U-shaped inclinometer and mounting and embedding method thereof
CN105973141B (en) A kind of duct pieces of shield tunnel faulting of slab ends measuring device
CN104236489B (en) Prismatical joint basalt surrounding rock of chamber anisotropy relative relaxation degree evaluation method
CN108195687B (en) Three-dimensional pressure-bearing overwater coal mining pressure relief simulation test bed
CN110207657B (en) Thick unconsolidated formation mining rock stratum movement and surface subsidence detection device
CN107102378B (en) Utilize the method for hole pressure touching methods measurement artesian aquifer water level and head height
CN106013049A (en) Construction method for foundation pile engineering in karst area
CN206408659U (en) Earth excavation slope control chi
CN111075460A (en) Shield construction and monitoring method for urban dense building
CN104389613B (en) Slurry balance shield passes through the construction method of jeopardously underground pipelines
CN207633314U (en) A kind of soil pressure cell inbuilt device
CN108918823B (en) Prediction method for the length of mud inrush and sedimentation in tunnel water inrush and mud inrush
CN206862446U (en) A kind of inclinometer pipe available for Water Level in Foundation Pit monitoring
CN206891428U (en) Base pit engineering slope control measurement control chi
CN209589038U (en) A kind of height-adjustable ground settlement measuring point
CN103486977B (en) Large-section underground country rock convergence method for fast measuring
CN205049135U (en) Solve inclinometer card gauge head unit
CN103376094B (en) Husky survey meter and detection method are adopted in lake, river
CN206467646U (en) A kind of foundation pit slope protection horizontal displacement monitoring device
CN117309224A (en) External water pressure reduction coefficient testing device and testing method
CN216787088U (en) Horizontal drainage system for strip mine slope
CN206724870U (en) A kind of blast hole determines device
CN206438493U (en) A kind of geotechnical engineering measuring pipe chute

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170815

Termination date: 20190110

CF01 Termination of patent right due to non-payment of annual fee