[go: up one dir, main page]

CN206389115U - A kind of centralized two-node cluster hot backup for bank electricity system switches high-voltage variable frequency power source - Google Patents

A kind of centralized two-node cluster hot backup for bank electricity system switches high-voltage variable frequency power source Download PDF

Info

Publication number
CN206389115U
CN206389115U CN201720015109.1U CN201720015109U CN206389115U CN 206389115 U CN206389115 U CN 206389115U CN 201720015109 U CN201720015109 U CN 201720015109U CN 206389115 U CN206389115 U CN 206389115U
Authority
CN
China
Prior art keywords
frequency converters
frequency
node cluster
hot backup
cluster hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720015109.1U
Other languages
Chinese (zh)
Inventor
赵毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING SOLARWE CLEANING ENERGY TECHNOLOGY CO LTD
Dalian Port Machinery Co Ltd
Original Assignee
BEIJING SOLARWE CLEANING ENERGY TECHNOLOGY CO LTD
Dalian Port Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING SOLARWE CLEANING ENERGY TECHNOLOGY CO LTD, Dalian Port Machinery Co Ltd filed Critical BEIJING SOLARWE CLEANING ENERGY TECHNOLOGY CO LTD
Priority to CN201720015109.1U priority Critical patent/CN206389115U/en
Application granted granted Critical
Publication of CN206389115U publication Critical patent/CN206389115U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Stand-By Power Supply Arrangements (AREA)

Abstract

A kind of centralized two-node cluster hot backup for bank electricity system switches high-voltage variable frequency power source, each berth high pressrue connection box connects electric substation's power network by double-machine equipment system, double-machine equipment system is made up of the 1# frequency converters, 2# frequency converters and a two-node cluster hot backup switching device of two same parameters, two-node cluster hot backup switching device includes control system and by-pass switching system, 1# frequency converters and 2# frequency converters connect control system, by-pass switching system connection 1# frequency converters, 2# frequency converters, switch cubicle and load motor by work and hot standby signal wire.The utility model is using centralized high pressure variable voltage variable frequency device, and Large Copacity variable voltage variable frequency device is strong to the load variations Ability of Resisting Disturbance of load-side;Power supplying efficiency is higher;Using concentration supply power, flexible is configured to the electricity capacity of dock vessels, the fixed capacity limitation in some berth is no longer limited;Equipment is concentrated and is easily managed and maintains easily;High voltage power supply uses the high-voltage variable frequency power source of two-node cluster hot backup switching device, greatly improves the reliability of load running.

Description

A kind of centralized two-node cluster hot backup for bank electricity system switches high-voltage variable frequency power source
Technical field
The utility model is related to the variable-frequency power sources field in ship power supply technical field, more particularly to bank electricity system.
Background technology
Ship does not use the generator on ship during reaching port, but the skill of the energy is provided using harbour bank electricity system Art is bank electricity technology.Because load peculiar to vessel includes two kinds of different frequency 50HZ and 60HZ, and domestic mains frequency is 50HZ, because This 60HZ bank electricity system needs to be provided with variable-frequency power sources.The scheme that current bank electricity variable-frequency power sources electric power system is mainly used due into This problem, generally the capacity of high frequency electric source multiply simultaneity factor according to ship capacity and get, cause the overload of variable-frequency power sources Ability, and variable-frequency power sources power electronic devices due to being made up of, due to 60HZ operations cannot with power frequency as stand-by power supply, Once failure can cause the power failure of ship.
Utility model content
In order to which in order to solve the above mentioned problem that existing bank electricity system carrys out energy presence, the utility model is used for there is provided one kind The centralized two-node cluster hot backup switching high-voltage variable frequency power source of bank electricity system.
The technical scheme that the utility model is used to achieve the above object is:A kind of centralization for bank electricity system is double Machine hot standby switch high-voltage variable frequency power source, each berth high pressrue connection box connects electric substation's power network commonly through double-machine equipment system, double Machine equipment system is made up of the 1# frequency converters, 2# frequency converters and a two-node cluster hot backup switching device of two same parameters, 1# frequency conversions Device and 2# inverter inputs connection power network, two-node cluster hot backup switching device include control system and by-pass switching system, 1# frequency conversions Device and 2# frequency converters connect control system by work and hot standby signal wire, and control system connection by-pass switching system, bypass is cut Change system connection 1# frequency converters, the input/output terminal of 2# frequency converters, switch cubicle and load motor.
The 1# frequency converters and 2# frequency converters are provided with 485 communication modules, 1# frequency converters and 2# frequency converters and control system it Between using 485 communication connection.
Centralized two-node cluster hot backup of the present utility model for bank electricity system switches high-voltage variable frequency power source, and bank electricity system is used Centralized high pressure variable voltage variable frequency device, Large Copacity variable voltage variable frequency device is strong to the load variations Ability of Resisting Disturbance of load-side;Power supply Efficiency is higher;Using concentration supply power, flexible is configured to the electricity capacity of dock vessels, the fixed appearance in some berth is no longer limited Amount limitation;Equipment is concentrated and is easily managed and maintains easily;High voltage power supply uses the high-voltage variable frequency power source of two-node cluster hot backup switching device, Greatly improve the reliability of load running.
Brief description of the drawings
Fig. 1 is the schematic diagram for the centralized two-node cluster hot backup switching high-voltage variable frequency power source that the utility model is used for bank electricity system.
Fig. 2 is the utility model two-node cluster hot backup switching device schematic diagram.
Embodiment
Centralized two-node cluster hot backup of the present utility model for bank electricity system switches high-voltage variable frequency power source, principle such as Fig. 1 with Shown in Fig. 2, each berth high pressrue connection box connects electric substation's power network commonly through double-machine equipment system, and double-machine equipment system is by Liang Tai 1# frequency converters, 2# frequency converters and a two-node cluster hot backup switching device for same parameter is constituted, 1# frequency converters and the input of 2# frequency converters End connection power network, whole high-voltage variable frequency power source two-node cluster hot backup switching device is made up of control system, by-pass switching system two parts. Disconnecting switch, breaker are included in by-pass switching system, 1# frequency converters, the input and output of 2# frequency converters, switch cubicle are connected respectively And load motor.
Control signal between control system and 1# frequency converters, 2# frequency converters is transmitted by hardwire, working state signal: Variable-frequency power sources is in running order;Hot standby status signal:Variable-frequency power sources has been provided with the condition of putting into operation, and can put into operation at any time.Control System control sytsem is connected by 485 communications with 1# frequency converters, 2# frequency converters, passes through electric hardwire transmission work, hot standby letter Number;Parameter between two variable-frequency power sources carries out real-time synchronization by the communication module of frequency converter, and control system is in two changes It is shared parameter region that certain area is opened up inside the PLC of frequency device, and the shared parameter region data of two frequency converters can be with real-time synchronization. Parameter current is updated to shared parameter under working condition;Parameter is shared under hot standby state and is updated to parameter current.
Two-node cluster hot backup switching device controls a frequency converter to enter the operation such as line precharge, normally starts after ready(Below Be exemplified as first starting for 1# frequency converters), then control another frequency converter(2# frequency converters)Into the operation such as precharge, treat ready Enter hot standby state afterwards.When 1# frequency converters break down, the control system of two-node cluster hot backup switching device obtains failure letter After number, 1# variable-frequency power sources working conditions are switched to malfunction, major loop wiring is switched to by 2# by bypass changeover device Variable-frequency power sources, then starts 2# variable-frequency power sources, and 2# variable-frequency power sources is according to the original operational factor startup optimization of 1# variable-frequency power sources, so The hot standby state of 2# variable-frequency power sources is switched into working condition afterwards.
In the case of 1# variable-frequency power sources failures, by bypass changeover device by 1# variable-frequency power sources and high_voltage isolation, wait to become After frequency power is repaired, 1# variable-frequency power sources is connected with high pressure by bypass changeover device after precharge, after ready, control system The state of 1# variable-frequency power sources is changed to hot standby state.
The utility model sets up the frequency conversion shore electric power of centralization in the higher level of multiple berth bank electricity systems, and its capacity is many The capacity summation of individual bank electricity system variable-frequency power sources, the capacity very little of the impact relative to total variable-frequency power sources in single berth, does not allow Easily cause power failure;The high-voltage variable frequency power source of two same parameters of use and a two-node cluster hot backup switching device constitute double simultaneously Machine hot-backup system, it is ensured that in the case of wherein one high-voltage variable frequency power source failure, can be with switching undisturbed to another high voltage variable Frequency power is run, and substantially increases the reliability of bank electricity system.

Claims (2)

1. a kind of centralized two-node cluster hot backup for bank electricity system switches high-voltage variable frequency power source, it is characterised in that:Each berth high pressure Junction box connects electric substation power network commonly through double-machine equipment system, double-machine equipment system by two same parameters 1# frequency conversions Device, 2# frequency converters and a two-node cluster hot backup switching device are constituted, 1# frequency converters and 2# inverter inputs connection power network, dual-locomotive heat Standby switching device includes control system and by-pass switching system, and 1# frequency converters and 2# frequency converters are connected by work and hot standby signal wire Connected control system, control system connection by-pass switching system, by-pass switching system connection 1# frequency converters, 2# frequency converters input it is defeated Go out end, switch cubicle and load motor.
2. a kind of centralized two-node cluster hot backup for bank electricity system according to claim 1 switches high-voltage variable frequency power source, its It is characterised by:The 1# frequency converters and 2# frequency converters are provided with 485 communication modules, 1# frequency converters and 2# frequency converters and control system it Between using 485 communication connection.
CN201720015109.1U 2017-01-06 2017-01-06 A kind of centralized two-node cluster hot backup for bank electricity system switches high-voltage variable frequency power source Expired - Fee Related CN206389115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720015109.1U CN206389115U (en) 2017-01-06 2017-01-06 A kind of centralized two-node cluster hot backup for bank electricity system switches high-voltage variable frequency power source

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720015109.1U CN206389115U (en) 2017-01-06 2017-01-06 A kind of centralized two-node cluster hot backup for bank electricity system switches high-voltage variable frequency power source

Publications (1)

Publication Number Publication Date
CN206389115U true CN206389115U (en) 2017-08-08

Family

ID=59493177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720015109.1U Expired - Fee Related CN206389115U (en) 2017-01-06 2017-01-06 A kind of centralized two-node cluster hot backup for bank electricity system switches high-voltage variable frequency power source

Country Status (1)

Country Link
CN (1) CN206389115U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110190668A (en) * 2019-05-29 2019-08-30 北京动力源科技股份有限公司 A kind of hot standby speed regulation power supply system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110190668A (en) * 2019-05-29 2019-08-30 北京动力源科技股份有限公司 A kind of hot standby speed regulation power supply system

Similar Documents

Publication Publication Date Title
CN203871871U (en) Intelligent power station for ship
CN104578187B (en) Multi-terminal flexible direct-current power transmission system-level coordination control device
CN106471704A (en) Uninterrupted power supply(ups)
CN104113060A (en) Convertible static synchronous series compensator
CN105514957B (en) One kind mixing back-to-back DC power transmission system and trend reversion control method
CN103441677B (en) Intermediate frequency three level full-bridge direct current converter is pressed in modularization megawatt
CN105584614A (en) Ship energy management system based on hot redundancy controllers
CN103715754A (en) UPS and power supply system
CN109687570A (en) One kind zero flashes low-voltage distribution system and operating method
KR20210094630A (en) Flexible connection substation and control method
CN103457259B (en) Middle straightening stream region distribution system
CN104124694A (en) Convertible static compensator applicable to a plurality of lines
CN105610238A (en) Redundant architecture-based power distribution system and power distribution method for intelligent network
CN206389115U (en) A kind of centralized two-node cluster hot backup for bank electricity system switches high-voltage variable frequency power source
CN106494599A (en) A kind of light-seine fishery fishing boat electric propulsion system
CN111244997A (en) Structure and control method for four-port flexible-straight system access loop-closing grid frame
CN102522808A (en) Auxiliary power supply system and auxiliary power supply method of power electronic equipment
CN106451445A (en) A ship shore power system with multiple machines running in parallel
CN108736480A (en) A kind of multichannel AC looped network type energy router
CN105490308A (en) Middle-high-voltage grid-connected system and middle-high-voltage grid-connected power generation system
CN211830340U (en) Circuit for seamless switching between diesel generating set and mains supply
CN101714776A (en) 10KV station electric control system of convertor station adopting selecting 2 from 3 logic
CN206992781U (en) A kind of redundance type variable-frequency power sources control system suitable for bank electricity system
CN205092799U (en) Be suitable for high -voltage inverter's two -node cluster hot backup auto -change over device and two -node cluster hot backup system
CN108270362B (en) Combined intermediate frequency power supply based on DSP and FPGA parallel machine control

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170808

Termination date: 20220106