CN206327413U - A kind of water conservancy construction haulage equipment - Google Patents
A kind of water conservancy construction haulage equipment Download PDFInfo
- Publication number
- CN206327413U CN206327413U CN201621476192.4U CN201621476192U CN206327413U CN 206327413 U CN206327413 U CN 206327413U CN 201621476192 U CN201621476192 U CN 201621476192U CN 206327413 U CN206327413 U CN 206327413U
- Authority
- CN
- China
- Prior art keywords
- base
- holding frame
- carriage body
- take
- motor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
A kind of water conservancy construction haulage equipment, clamping device is arranged on the left and right sides of carriage body, the holding frame that clamping device is hinged including bottom, jointed shaft is fixedly connected with base, holding frame after being hinged is U-shaped, and the two bottom sides of holding frame are provided with limiting plate, and limiting plate is in pot cover type.Spring is arranged on the lower section of holding frame, and the lower end of base is further fixed on being provided with threading hole on take-up motor, the output shaft of take-up motor.One end of rope on the left of holding frame upper end with being fixedly connected, rope sequentially passes through the guide wheel of in the middle of base front side wall upper end and middle guide wheel, the threading hole on take-up motor output shaft and base rear wall and upper end, and the other end of rope on the right side of holding frame upper end with being fixedly connected.Alarm device includes the warning light for being arranged on the pressure sensor in the middle of carriage body bottom surface and being arranged in the middle of base front and back sides, and the both sides of base upper end are respectively arranged with symmetrical hook.The utility model can conveniently, safely carry pile foundation and pipeline.
Description
Technical field
The utility model is related to a kind of haulage equipment, more specifically to a kind of water conservancy construction haulage equipment.
Background technology
, it is necessary to be carried to a large amount of pipelines and cement pile foundation during water conservancy construction.Due to pipeline and cement pile foundation
Volume and weight is larger, and existing method for carrying is carried generally by crane, but crane is in handling process, typically
It is that pipeline and cement pile foundation are fixed by steel wire, is easily slipped in handling process, there is very big potential safety hazard.
Utility model content
The purpose of this utility model is to provide one kind and overcomes the deficiencies in the prior art, simple in construction, reasonable in design, can be with
Conveniently, safely carry the haulage equipment of pile foundation and pipeline.
To achieve these goals, the technological means that the utility model is taken is:
A kind of water conservancy construction haulage equipment, including carriage body and base, carriage body are arranged on the top of base, and carriage body and base
It is fixedly connected, wheel is provided with below base, also including clamping device and alarm device, clamping device is arranged on a left side for carriage body
Right both sides, the holding frame that clamping device is hinged including bottom, jointed shaft is fixedly connected with base, and the holding frame after being hinged is U-shaped,
Cushion pad is provided with the inside of holding frame, the two bottom sides of holding frame are provided with limiting plate, and limiting plate is in pot cover type.Base lower end is also
Spring is fixed with, spring, which is located in the lower section of holding frame, spring, is provided with arc frame, the lower end of base is further fixed on take-up electricity
Machine, take-up motor is located at the lower section of spring, and is provided with threading hole on the output shaft of take-up motor.The inner side of base left and right ends
Guide wheel is respectively and fixedly provided with, guide wheel is located at the upper end and centre of base respectively, and one end of rope is fixed with the left side of holding frame upper end to be connected
Connect, rope is sequentially passed through after base front side wall upper end and middle guide wheel, the threading hole on take-up motor output shaft and base
The guide wheel of in the middle of the wall of side and upper end, the other end of rope on the right side of holding frame upper end with being fixedly connected.Alarm device includes setting
Pressure sensor in the middle of carriage body bottom surface and the warning light being arranged in the middle of base front and back sides, the both sides point of base upper end
Symmetrical hook is not provided with.
The carriage body is the penetrating U-shape structure in left and right ends with base.
The pressure sensor is strip sensor, and pressure sensor extends to right-hand member from the left end of carriage body.
The cushion pad is elastic caoutchouc cushion pad.
The natural length of the spring is more than the arc length between limiting plate.
The beneficial effects of the utility model are:Pipeline in carriage body and cement pile foundation can be fixed, make handling process
It is safer, alarm can be also sent in pipeline and overweight pile foundation, prevents security incident because overweight.
Brief description of the drawings
The utility model is described in further detail with specific implementation method below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is Fig. 1 right view.
In figure:Carriage body 10;Pressure sensor 11;Holding frame 20;Cushion pad 21;Guide wheel 22;Limiting plate 23;Spring 24;Bottom
Seat 30;Hook 31;Take-up motor 40;Warning light 50.
Embodiment
The utility model is described in further detail with specific implementation method below in conjunction with the accompanying drawings.
Specific embodiment, as shown in Figure 1, 2, a kind of water conservancy construction haulage equipment, including carriage body 10 and base 30, carriage body 10
The top of base 30 is arranged on, and carriage body 10 is fixedly connected with base 30, the lower section of base 30 is provided with wheel, can promote base
30 with adjustment position, and carriage body 10 is the penetrating U-shape structure in left and right ends with base 30, is easy to taking for pipeline and cement pile foundation
Put.Also include clamping device and alarm device, clamping device is arranged on the left and right sides of carriage body 10, to pipeline and cement pile foundation
Two ends are simultaneously fixed, and safe, the holding frame 20 that clamping device is hinged including bottom, jointed shaft is fixedly connected with base 30,
Holding frame 20 after being hinged is U-shaped, and the inner side of holding frame 20 is provided with cushion pad 21, and cushion pad 21 is elastic caoutchouc cushion pad, energy
The pipeline carried and pile foundation, and increasing friction force are protected, the two bottom sides of holding frame 20 are provided with limiting plate 23, and limiting plate 23 is in
The two ends of spring 24 can be positioned by pot cover type.The lower end of base 30 is further fixed on spring 24, and spring 24 is located at holding frame 20
Arc frame is provided with lower section, spring 24, path when arc frame energy limited spring 24 is stretched, the natural length of spring 24 is more than
Arc length between limiting plate 23, can make holding frame 20 keep clamped condition.The lower end of base 30 is further fixed on take-up motor
40, take-up motor 40 is located at the lower section of spring 24, and is provided with threading hole on the output shaft of take-up motor 40.Base 30 or so two
Guide wheel 22 is respectively and fixedly provided with the inside of end, guide wheel 22 is located at the upper end and centre of base 30, one end and the holding frame 20 of rope respectively
It is fixedly connected on the left of upper end, rope sequentially passes through the front side wall upper end of base 30 and middle guide wheel 22, take-up motor 40 are exported
The guide wheel 22 of in the middle of threading hole and the rear wall of base 30 on axle and upper end, the other end of rope and the right side of the upper end of holding frame 20
Side is fixedly connected.Alarm device includes being arranged on the pressure sensor 11 in the middle of the bottom surface of carriage body 10 and being arranged on before and after base 30
Warning light 50 in the middle of side, pressure sensor 11 is strip sensor, and the left end of pressure sensor 11 from carriage body 10 prolongs
Right-hand member is extended, either pipeline and cement pile foundation occur to break away and overweight, or overload, pressure sensor 11 can sense
To and send alarm.The both sides of the upper end of base 30 are respectively arranged with symmetrical hook 31, and hook 31 is used to pass through steel wire with crane
Connection.
When in use, pipeline and cement pile foundation are placed in carriage body 10 the utility model, the clamping of the left and right sides of carriage body 10
Frame 20 is clamped condition under the effect of spring 24, pipeline and cement pile foundation is fixed in carriage body 10, and pressure inductor 11 is in sense
When should arrive carried pipeline and overweight cement pile foundation, warning light 50 flicker can carry out alarm and reminding repeatedly;When needing to remove railway carriage or compartment
When pipeline in body 10 and cement pile foundation, start take-up motor 40, take-up motor 40 is rotated forward, and holding frame 20 is in rope and guide wheel 22
It is opened under effect, releases the fixation to pipeline and cement pile foundation;Remove after pipeline and cement pile foundation, if need to continue to carry,
It is reentered into after pipeline and cement pile foundation, restarts after reversal connection take-up motor 40, take-up motor 40 is inverted, then is restricted in carriage body 10
Suo Songkai, holding frame 20 recovers clamped condition under the effect of spring 24, pipeline and cement pile foundation is fixed in carriage body 10.
Certain described above is not limitation of the utility model, and the utility model is also not limited to the example above, this skill
Change, remodeling, addition or replacement that the those of ordinary skill in art field is made in essential scope of the present utility model, also belong to
In protection domain of the present utility model.
Claims (5)
1. a kind of water conservancy construction haulage equipment, including carriage body (10) and base (30), carriage body (10) are arranged on the upper of base (30)
Side, and carriage body (10) is fixedly connected with base (30), base is provided with wheel below (30), it is characterised in that:Also include folder
Device and alarm device are held, clamping device is arranged on the left and right sides of carriage body (10), the clamping that clamping device is hinged including bottom
Frame (20), jointed shaft is fixedly connected with base (30), and the holding frame (20) after being hinged is U-shaped, is provided with the inside of holding frame (20)
Cushion pad (21), the two bottom sides of holding frame (20) are provided with limiting plate (23), and limiting plate (23) is in pot cover type;Under base (30)
End is further fixed on spring (24), and spring (24), which is located in the lower section of holding frame (20), spring (24), is provided with arc frame, base
(30) lower end is further fixed on take-up motor (40), and take-up motor (40) is located at the lower section of spring (24), and take-up motor (40)
Output shaft on be provided with threading hole;Guide wheel (22), guide wheel (22) difference position are respectively and fixedly provided with the inside of base (30) left and right ends
In the upper end and centre of base (30), one end of rope on the left of holding frame (20) upper end with being fixedly connected, and rope is sequentially passed through
Behind base (30) front side wall upper end and middle guide wheel (22), the threading hole on take-up motor (40) output shaft and base (30)
The guide wheel (22) of in the middle of the wall of side and upper end, the other end of rope on the right side of holding frame (20) upper end with being fixedly connected;Alarm device
Including the pressure sensor (11) being arranged in the middle of carriage body (10) bottom surface and the police being arranged in the middle of base (30) front and back sides
Lamp (50) is reported, the both sides of base (30) upper end are respectively arranged with symmetrical hook (31).
2. a kind of water conservancy construction haulage equipment according to claim 1, it is characterised in that:The carriage body (10) and base
(30) it is the penetrating U-shape structure in left and right ends.
3. a kind of water conservancy construction haulage equipment according to claim 1, it is characterised in that:The pressure sensor (11) is
Strip sensor, and the left end of pressure sensor (11) from carriage body (10) extends to right-hand member.
4. a kind of water conservancy construction haulage equipment according to claim 1, it is characterised in that:The cushion pad (21) is elasticity
Rubber buffer.
5. a kind of water conservancy construction haulage equipment according to claim 1, it is characterised in that:The natural length of the spring (24)
Degree is more than the arc length between limiting plate (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621476192.4U CN206327413U (en) | 2016-12-30 | 2016-12-30 | A kind of water conservancy construction haulage equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621476192.4U CN206327413U (en) | 2016-12-30 | 2016-12-30 | A kind of water conservancy construction haulage equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206327413U true CN206327413U (en) | 2017-07-14 |
Family
ID=59294652
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621476192.4U Expired - Fee Related CN206327413U (en) | 2016-12-30 | 2016-12-30 | A kind of water conservancy construction haulage equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206327413U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108152141A (en) * | 2017-12-15 | 2018-06-12 | 浙江大学自贡创新中心 | A kind of rock mechanics true triaxial experimental provision |
CN110937311A (en) * | 2019-12-17 | 2020-03-31 | 张菊平 | Plank pusher |
CN114714284A (en) * | 2022-05-10 | 2022-07-08 | 广东省源天工程有限公司 | Electromechanical pipeline assembly quality based on BIM |
-
2016
- 2016-12-30 CN CN201621476192.4U patent/CN206327413U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108152141A (en) * | 2017-12-15 | 2018-06-12 | 浙江大学自贡创新中心 | A kind of rock mechanics true triaxial experimental provision |
CN108152141B (en) * | 2017-12-15 | 2024-02-09 | 浙江大学自贡创新中心 | Rock mechanics true triaxial experimental apparatus |
CN110937311A (en) * | 2019-12-17 | 2020-03-31 | 张菊平 | Plank pusher |
CN114714284A (en) * | 2022-05-10 | 2022-07-08 | 广东省源天工程有限公司 | Electromechanical pipeline assembly quality based on BIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206327413U (en) | A kind of water conservancy construction haulage equipment | |
CN105881542B (en) | A kind of deep well rescue machinery hand | |
CN102623928B (en) | Grounding wire hook for overhead transmission line power cut overhaul | |
CN202096624U (en) | Safety belt hanger fixing device | |
CN204428910U (en) | A kind of chain slat type mud scraper tensioning apparatus | |
CN203342241U (en) | Clamping and holding device of deep well rescue device | |
CN205753194U (en) | High-altitude wire bundling device | |
CN202030382U (en) | Communication pipeline cable take-up device | |
CN206549011U (en) | A kind of fast escaping device | |
CN205615914U (en) | Earth connection carries package | |
CN203432847U (en) | Safety protection device for universal tester | |
CN205960523U (en) | Be suitable for distribution lines high altitude operation platform | |
CN206588974U (en) | A kind of high safety vacuum mechanical-arm with Buddha's warrior attendant hook | |
CN203342240U (en) | Deep well rescuing device | |
CN102526908B (en) | A deep well mechanical rescue equipment | |
CN203284100U (en) | Tower crane achieving automatic replacement of steel wire rope | |
CN206827990U (en) | A kind of tower crane variable-amplitude steel wire rope automatic rope tightening device | |
CN203909081U (en) | Auxiliary device used for relay protection testing wire | |
CN103657006B (en) | A kind of exterior wall climbing tool | |
CN206108697U (en) | Forked tail conduit profile vertical hoisting device | |
CN204121625U (en) | A kind of life-saving device for fire | |
CN204196900U (en) | A kind of preventing steel wire rope of overhead passenger safety guard | |
CN204184562U (en) | A kind of Multifunction emergency relief waistband | |
CN217609936U (en) | A wearable underground pipe gallery gas detection alarm | |
CN211602723U (en) | Equipment for testing strength of diamond wire saw |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170714 Termination date: 20181230 |
|
CF01 | Termination of patent right due to non-payment of annual fee |