CN206266182U - Stone Vertical transport hanging basket in exterior wall scaffold - Google Patents
Stone Vertical transport hanging basket in exterior wall scaffold Download PDFInfo
- Publication number
- CN206266182U CN206266182U CN201621231701.7U CN201621231701U CN206266182U CN 206266182 U CN206266182 U CN 206266182U CN 201621231701 U CN201621231701 U CN 201621231701U CN 206266182 U CN206266182 U CN 206266182U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- vertical
- square tube
- exterior wall
- hoist engine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004575 stone Substances 0.000 title claims abstract description 81
- 230000032258 transport Effects 0.000 claims abstract description 44
- 230000008878 coupling Effects 0.000 claims abstract description 25
- 238000010168 coupling process Methods 0.000 claims abstract description 25
- 238000005859 coupling reaction Methods 0.000 claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims description 47
- 239000010959 steel Substances 0.000 claims description 47
- 230000001681 protective effect Effects 0.000 claims description 6
- 230000000712 assembly Effects 0.000 claims description 4
- 238000000429 assembly Methods 0.000 claims description 4
- 239000000463 material Substances 0.000 abstract description 53
- 238000010276 construction Methods 0.000 abstract description 18
- 238000010586 diagram Methods 0.000 description 12
- 230000005484 gravity Effects 0.000 description 11
- 238000000034 method Methods 0.000 description 9
- 230000008569 process Effects 0.000 description 8
- 238000009434 installation Methods 0.000 description 7
- 238000003466 welding Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 4
- 229910052782 aluminium Inorganic materials 0.000 description 4
- 239000004411 aluminium Substances 0.000 description 4
- 230000033001 locomotion Effects 0.000 description 4
- 238000012986 modification Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 4
- 239000011248 coating agent Substances 0.000 description 3
- 238000000576 coating method Methods 0.000 description 3
- 238000012937 correction Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 238000012856 packing Methods 0.000 description 3
- 230000000630 rising effect Effects 0.000 description 3
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 239000004677 Nylon Substances 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000009545 invasion Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 230000003442 weekly effect Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides Stone Vertical transport hanging basket in a kind of exterior wall scaffold, the utility model is in solution traditional construction, the stone material shipping yard of external wall of high-rise building stone material construction is narrow and small, vertical transport difficulty is big, safety is difficult to ensure that, the problem of labor intensive material resources, for the vertical transport of outer wall stone, innovated there is provided one kind, efficiently, Stone Vertical transport hanging basket in the exterior wall scaffold of safety, by fast-assembling bolster, hoist engine, hanging basket, the cooperating of the components such as vertical dragline, so that the stone material in scaffold in vertical direction transports the simple of change, safety, it is reliable, and install, dismounting is simple and quick.In addition, vertical dragline one end is directly connected by vertical dragline coupling assembly with the exterior wall scaffold, influence of the ground factor to vertical transport equipment is eliminated.
Description
Technical field
The utility model belongs to building decoration engineering construction field, Stone Vertical fortune in more particularly to a kind of exterior wall scaffold
Defeated hanging basket.
Background technology
Conventional outer wall stone material is constructed, after alien invasion builds scaffold so that the transport of stone material is carried out in small space.Manpower
Carry difficulty big, and security is difficult to ensure that, while easily causing the breakage of stone material.Goods lift is carried away from operation ground, and
Need manpower rehandling, security, integrality, it is difficult to ensure.
Utility model content
The purpose of this utility model is to provide Stone Vertical transport hanging basket in a kind of exterior wall scaffold, can solve the problem that tradition
In construction, the stone material shipping yard of external wall of high-rise building stone material construction is narrow and small, and vertical transport difficulty is big, is difficult to ensure that safely, consumes
Take the problem of manpower and materials.
To solve the above problems, the utility model provides Stone Vertical transport hanging basket in a kind of exterior wall scaffold, including:
Exterior wall scaffold, is separated by predeterminable range, the bottom of the exterior wall scaffold between the exterior wall scaffold and wall
It is provided with two vertical dragline coupling assemblies extended to the wall;
The fast-assembling bolster on the wall is arranged at, the fast-assembling bolster is relative with the top of the exterior wall scaffold;
Two spaced vertical draglines, the top of every vertical dragline is connected with the fast-assembling bolster, and every vertical
The bottom of dragline vertical dragline coupling assembly described with is connected;
The hoist engine on the fast-assembling bolster is arranged at, and the Operation switch being connected with the hoist engine;
Move up and down and surround vertical space in the exterior wall scaffold, wall, hoist engine and vertical dragline coupling assembly
Interior hanging basket, the hanging basket upper end is provided with hanger, and the hanger is connected with the serving on the hoist engine, the hanging basket both sides
Two groups of slide guide wheels are provided with, every group of slide guide wheel is slided on a vertical dragline.
Further, in above-mentioned hanging basket, the fast-assembling bolster by 9 square tubes and 2 blocks of steel plates, wherein the first square tube and wall
Body is be arranged in parallel, and the two ends of first square tube are vertical with one end of the second square tube and third party's pipe respectively to be connected, and described first
The centre of square tube is vertical with one end of the 4th square tube and the 5th square tube respectively to be connected, second square tube, third party's pipe, four directions
Pipe and the 5th square tube and the wall body vertical, the oblique other end with the 4th square tube in one end of the 6th square tube are connected, and the 6th
The other end of square tube is connected with the first steel plate, first steel plate and the wall connecting, and one end of the 7th square tube is oblique and institute
The other end connection of the 5th square tube is stated, the other end of the 7th square tube is connected with first steel plate, one end of eighth pipe and institute
One end connection of the 4th square tube is stated, the other end of eighth pipe is connected with the second steel plate, one end of the 9th square tube and the described 5th
One end connection of square tube, the other end of the 9th square tube is connected with the second steel plate, and second steel plate is connected on the wall, institute
Hoist engine is stated to be fixed in the 4th square tube and the 5th square tube, two vertical draglines respectively with the second square tube and third party's pipe
The other end is connected.
Further, in above-mentioned hanging basket, protective cover is provided with the hoist engine.
Further, in above-mentioned hanging basket, the Operation switch is arranged on the pre- of the exterior wall scaffold by extended line
If on height.
Further, in above-mentioned hanging basket, mouth is additionally provided with stopping means, the spacing dress under the serving of the hoist engine
Put and be connected with the power supply of hoist engine.
Further, in above-mentioned hanging basket, every group of slide guide wheel is made up of two pulleys, and every vertical dragline is from two
Passed through between pulley, described two pulleys are slided on a vertical dragline simultaneously.
Further, in above-mentioned hanging basket, the hanging basket is L-shaped.
Further, in above-mentioned hanging basket, the hanging basket external coating has yellow black alternate striped.
Further, in above-mentioned hanging basket, safety belt is provided with the hanging basket.
Compared with prior art, the utility model for solve traditional construction in, external wall of high-rise building stone material construction stone material
Shipping yard is narrow and small, and vertical transport difficulty is big, is difficult to ensure that safely, the problem of labor intensive material resources, for hanging down for outer wall stone
Straight transport, there is provided Stone Vertical transport hanging basket in a kind of innovation, exterior wall scaffold efficiently, safe, by fast-assembling bolster, volume
Raise the cooperating of the components such as machine, hanging basket, vertical dragline so that in scaffold in vertical direction stone material transport become it is simple,
It is safe and reliable, and install, dismantle it is simple and quick.In addition, vertical dragline one end is by the way that vertical dragline coupling assembly is direct and institute
Exterior wall scaffold connection is stated, influence of the ground factor to vertical transport equipment is eliminated.
Brief description of the drawings
Fig. 1 is the structure chart that Stone Vertical transports hanging basket in the exterior wall scaffold of the embodiment of the utility model one;
Fig. 2 is the Facad structure figure of the fast-assembling bolster of the embodiment of the utility model one;
Fig. 3 is the backside structure figure of the fast-assembling bolster of the embodiment of the utility model one;
Fig. 4 is the scheme of installation of the hoist engine of the embodiment of the utility model one;
Fig. 5 is the structure chart of the Operation switch of the embodiment of the utility model one;
Fig. 6 is the scheme of installation of the stopping means of the embodiment of the utility model one;
Fig. 7 is the connection diagram of the hanging basket of the embodiment of the utility model one;
Fig. 8 is the schematic diagram of the slide guide wheel of the embodiment of the utility model one;
Fig. 9 is the schematic diagram of the hanging basket for being brushed with yellow black alternate striped of the embodiment of the utility model one;
Figure 10 is the structure chart of the hanging basket of the embodiment of the utility model one;
Figure 11 is the profile of the hanging basket of the embodiment of the utility model one;
Figure 12 is the connection diagram of the vertical dragline coupling assembly of the embodiment of the utility model one;
Figure 13 is the structure chart of the scaffold fastenings of the embodiment of the utility model one;
Figure 14 is the structure chart of the vertical dragline connector of the embodiment of the utility model one;
Figure 15 is the connection diagram of the vertical dragline connector of the embodiment of the utility model one;
Figure 16 is the connection diagram of the vertical dragline of the embodiment of the utility model one;
Figure 17 is the connection enlarged drawing of the vertical dragline of the embodiment of the utility model one;
Figure 18 be the embodiment of the utility model one can folding and unfolding load-bearing operating platform structure chart;
Figure 19 be the embodiment of the utility model one can folding and unfolding load-bearing operating platform scheme of installation;
Figure 20 is the connection diagram of the platform coupling assembly of the embodiment of the utility model one;
Figure 21 is the schematic diagram of the platform coupling assembly of the embodiment of the utility model one;
Figure 22 be the embodiment of the utility model one can folding and unfolding hook pack up schematic diagram;
Figure 23 be the embodiment of the utility model one can folding and unfolding hook expanded schematic diagram;
Figure 24 be the embodiment of the utility model one can folding and unfolding load-bearing operating platform put down schematic diagram;
Figure 25 be the embodiment of the utility model one can folding and unfolding hook connection diagram;
Figure 26 be the embodiment of the utility model one can folding and unfolding load-bearing operating platform pack up front elevation;
Figure 27 be the embodiment of the utility model one can folding and unfolding load-bearing operating platform pack up back view.
Specific embodiment
To enable above-mentioned purpose of the present utility model, feature and advantage more obvious understandable, below in conjunction with the accompanying drawings and tool
Body implementation method is described in further detail to the utility model.
As shown in figure 1, the utility model provides Stone Vertical transport hanging basket in a kind of exterior wall scaffold, including:
Exterior wall scaffold 1, is separated by predeterminable range, the bottom of the exterior wall scaffold between the exterior wall scaffold 1 and wall 5
Portion is provided with two vertical dragline coupling assemblies 2 extended to the wall;
It is arranged at the fast-assembling bolster 3 on the wall 5, the top phase of the fast-assembling bolster 3 and the exterior wall scaffold 1
It is right;
Two spaced vertical draglines 4, the top of every vertical dragline 4 is connected with the fast-assembling bolster 3, and every hangs down
The bottom vertical dragline coupling assembly 2 described with of straight dragline 4 is connected;
The hoist engine 6 on the fast-assembling bolster 3 is arranged at, and the Operation switch 7 being connected with the hoist engine 6;Hoist engine
1~100 meter of hoisting depth of design;
Moving up and down, it is vertical to be surrounded in the exterior wall scaffold 1, wall 5, hoist engine 6 and vertical dragline coupling assembly 2
Hanging basket 8 in space, the hanging basket upper end is provided with hanger 9, and the hanger 9 is connected with the serving 10 on the hoist engine 6, institute
State the both sides of hanging basket 8 and be provided with two groups of slide guide wheels 11, every group of slide guide wheel 11 is slided on a vertical dragline 4.Here, this
Utility model is in solution traditional construction, the stone material shipping yard of external wall of high-rise building stone material construction is narrow and small, vertical transport difficulty
Greatly, it is difficult to ensure that safely, labor intensive material resources, for the vertical transport of outer wall stone, there is provided one kind innovation, efficient, safety
Exterior wall scaffold in Stone Vertical transport hanging basket, by the cooperation of the components such as fast-assembling bolster, hoist engine, hanging basket, vertical dragline
Work so that it is simple, safe and reliable that the stone material transport in scaffold in vertical direction becomes, and install, dismantle simply soon
Speed, in addition, vertical dragline one end by vertical dragline coupling assembly directly and exterior wall scaffold connection, eliminate ground because
Influence of the element to vertical transport equipment, and install, dismantle quick and convenient, the other end and fast-assembling bolster are connected.As shown in figure 12, institute
Vertical dragline coupling assembly 2 is stated by the scaffold fastenings 21 including being sequentially connected, extension framework 22, vertical dragline connector
23, the extension framework 22 is connected by scaffold fastenings 21 with exterior wall scaffold 1, and the extension framework 22 is by vertically leading
Rope connector 23 is connected with the vertical dragline 4, and the part of the scaffold fastenings 21 is as shown in figure 13, described vertical
As shown in figure 14, the extension framework 22 is vertical with described by vertical dragline connector 23 for the part of dragline connector 23
The enlarged drawing of the connection of dragline 4 is as shown in figure 15.
In the embodiment of the utility model one, may also include and be movably connected in the preset height of the exterior wall scaffold 1
Can folding and unfolding load-bearing operating platform 12, it is described can folding and unfolding load-bearing operating platform 12 guardrail of the exterior wall scaffold 1 is formed when packing up,
It is described can folding and unfolding load-bearing operating platform 12 exterior wall scaffold 1 is extended to the wall 5 when putting down.
In the embodiment of the utility model one, as shown in Figures 2 and 3, the fast-assembling bolster 3 by 9 square tubes and 2 blocks of steel plates, its
In the first square tube 31 be arranged in parallel with wall 5, the two ends of first square tube 31 respectively with the second square tube 32 and third party's pipe 33
One end vertically connect, the centre of first square tube 31 is vertical with one end of the 4th square tube 34 and the 5th square tube 35 respectively to be connected
Connect, second square tube 32, third party's pipe 33, the 4th square tube 34 and the 5th square tube 35 are vertical with the wall 5, the 6th square tube 36
The oblique other end with the 4th square tube 34 in one end be connected, the other end of the 6th square tube 36 is connected with the first steel plate 38, institute
State the first steel plate 38 to be connected with the wall 5, the oblique other end with the 5th square tube 35 in one end of the 7th square tube 37 is connected,
The other end of the 7th square tube 37 is connected with first steel plate 38, one end of one end of eighth pipe 38 and the 4th square tube 34
Connection, the other end of eighth pipe 39 is connected with the second steel plate 41, one end of the 9th square tube 40 and the one of the 5th square tube 35
End connection, the other end of the 9th square tube 40 is connected with the second steel plate 41, and second steel plate 41 is connected on the wall 5, institute
State hoist engine 6 to be fixed in the 4th square tube 34 and the 5th square tube 35, as shown in FIG. 16 and 17, two vertical draglines 4 are distinguished
The other end with the second square tube 32 and third party's pipe 33 is connected.Here, fast-assembling bolster passes through weldering by 9 square steel and two blocks of steel plates
Connect, bolt connection is constituted, as shown in figure 4, hoist engine 6 is connected by 4 flat head bolts with the 4th square tube 34 and the 5th square tube 35,
By being welded to connect between square steel and steel plate, by welding and bolt connection between square steel and square steel, the first and second steel plates point
Not Tong Guo 3 expansion bolts and wall connecting, install, dismantle it is simple and quick.
In the embodiment of the utility model one, as shown in figure 4, being provided with protective cover 13 on the hoist engine 6, hoist engine passes through
4 flat head bolts and fast-assembling bolster are connected, and protective cover is set on hoist engine, play a part of sun-proof rain-proof.This practicality is new
In the embodiment of type one, hoist engine is maximum to carry 1000KG, and design carries 500KG.
In the embodiment of the utility model one, as shown in figure 5, the Operation switch 7 be arranged on by extended line 14 can folding and unfolding
Near load-bearing operating platform 12, operating personnel are facilitated to operate hoist engine according to field condition, the Operation switch includes up pressing
Button 71 and down button 72.Here, pinning up button, hoist engine is up lifted, and hoist engine stops lifting after the button that comes loose;Together
Reason, pins down button, and hoist engine down declines, and hoist engine stops declining after the button that comes loose, and prevents the generation of maloperation event.
Down button is pinned, hoist engine down declines, hoist engine stops declining after the button that comes loose, simple to operate to understand, prevents maloperation
The generation of event.
In the embodiment of the utility model one, as shown in fig. 6, mouth is additionally provided with stopping means under the serving of the hoist engine 6
15, the stopping means 15 is connected with the power supply of hoist engine 6, here, setting stopping means as Anti-over-hoisting device, hoist engine is carried
During rising, lower mouth stopping means is bumped against when hanger rises, then stopping means is connected with power supply can at once cut off the electricity of hoist engine
Source, it is to avoid hoist engine is rushed to summit damage.
In the embodiment of the utility model one, every group of slide guide wheel is made up of two pulleys, and every vertical dragline is from two
Passed through between pulley, described two pulleys are slided on a vertical dragline simultaneously.Here, hanging basket both sides respectively set double group slide guides
Wheel, vertical dragline is passed through between two pulleys, and cooperating limits the movement locus of hanging basket, it is therefore prevented that hanging basket is in level
Motion on direction and topple.
In the embodiment of the utility model one, as shown in Fig. 7,8,9,10 and 11, the hanging basket 8 is L-shaped, is easy to load stone
Material.Here, L-shaped hanging basket originally belongs to eccentric equipment, eccentric hanger is used as by increasing the upper end hanger 9 of hanging basket 8, and by with volume
Raise under the orientation works status condition that machine 6 is connected and every group of slide guide wheel 11 is made up of two pulleys, eliminate the eccentric shadow of hanging basket
Ring, reach antidumping effect.Hanging basket center of gravity and hanger, vertical dragline are in same vertical plane.Stone material is positioned in hanging basket
When, oblique placement, its center of gravity and hanging basket center of gravity are in same vertical plane.
In the embodiment of the utility model one, as shown in figure 9, the external coating of the hanging basket 8 has yellow black alternate striped 82,
Reach warning function, it is ensured that the safety in operating process.
In the embodiment of the utility model one, as shown in Fig. 7,9,10 and 11, safety belt 81 is provided with the hanging basket 8.This
In the embodiment of utility model one, hanging basket 800-1000mm high, 1800mm long, 300mm wide are made up of steel frame and aluminium sheet, can be same
When load the stone material high of 2-3 blocks 1600 wide 700, two retractable safety bands are set on hanging basket, fixing stone, limitation stone material is in water
Square upward displacement, it is ensured that the security of transport hanging basket.
In the embodiment of the utility model one, as shown in Figure 18~27, it is described can folding and unfolding load-bearing operating platform 12, by steel frame
Constituted with aluminium sheet, it is ensured that while its rigidity, alleviate its weight, it is described can folding and unfolding load-bearing operating platform 12 side by flat
Platform coupling assembly 121 and the exterior wall scaffold 1 are flexibly connected, while can be provided with can the another both sides of folding and unfolding load-bearing operating platform
122 and pulling plug 123 are linked up with folding and unfolding, by can folding and unfolding link up with 122, platform coupling assembly 121 and pulling plug 123 so that can folding and unfolding hold
Weight operating platform 12 and the hanging basket of the exterior wall scaffold 1 are combined as a whole, and during work, putting down can receive load-bearing operating platform, such as scheme
19th, shown in 24 and 25, can folding and unfolding hook 122 and the exterior wall scaffold 1 connect, play transfer stone material, load-bearing, active station people etc. and make
With, now can folding and unfolding hook 122 state it is as shown in figure 23.Can folding and unfolding hook 122 and can folding and unfolding load-bearing operating platform 12 frame
Frame is welded.As shown in figures 26 and 27, when not working, pack up can folding and unfolding hook, packing up can receive load-bearing operating platform, pulling plug and described
Exterior wall scaffold is connected, and load-bearing operating platform can use as scaffold guard rail, now can folding and unfolding hook 122 state such as Figure 22
It is shown.And remove and install simple, quick, the rapid working face installed and need handling.Platform coupling assembly, and load-bearing operation
Platform welding, scaffold is connected by flat head bolt.In addition, safety net can be set in lifting working face both sides, it is ensured that lifted
Personal security in journey.
As shown in figure 1, Stone Vertical transports the installation and application of hanging basket in above-mentioned exterior wall scaffold, including:
Exterior wall scaffold 1 is set, is separated by predeterminable range between the exterior wall scaffold 1 and wall 5, in the outer foundation hand
The bottom of frame 1 sets two vertical dragline coupling assemblies 2 extended to the wall 6;Here, according to construction speed, it is determined that outward
Foundation hand cradle, fast-assembling bolster, can folding and unfolding load-bearing operating platform, vertical hoist cable installation site;In stone wall surface construction, it is desirable under
Supreme construction;
Face is indulged according to stone material construction working, fast-assembling bolster 3 is fixed on the wall, the fast-assembling bolster 3 is outer with described
The top of foundation hand cradle is relative, and hoist engine 6, and the Operation switch being connected with the hoist engine 6 are installed on the fast-assembling bolster 3
7, two vertical draglines 4 are installed, the top of every vertical dragline 4 is connected with the fast-assembling bolster 3, the every bottom of vertical dragline 4
End vertical dragline coupling assembly 2 described with is connected, and the Operation switch 7 is arranged on into the outer foundation hand by extended line
Near stone material construction height on frame;
Hanging basket 8 is installed from the bottom of exterior wall scaffold 1, hanger 9 is set in the upper end of hanging basket 8, by the hanger 9 and the volume
The serving 10 raised on machine 6 is connected, and two groups of slide guide wheels 11 are set in the both sides of the hanging basket 8, and every group of slide guide wheel 11 is described vertical at one
Slided on straight dragline 4, the hanging basket 8 moves up and down in the exterior wall scaffold, wall, hoist engine and vertical dragline coupling assembly
In surrounded vertical space;
Lifting group, every group of 2 people are set, and are equipped with intercom 2, wherein, ground handling operator 1, take charge stone
The loading of material, after loading is finished, intercom notifies that scope of operation operating personnel are responsible for lifting operation, and is responsible for the peace during lifting
Full monitoring, scope of operation operating personnel operate the button of the Operation switch to continue to put down hanging basket to job platform, are responsible for stone material
Unloading, the ground and operation and operating personnel respectively at lifting bottom and the scope of operation can folding and unfolding load-bearing operating platform side be absorbed in it is whole
Individual hoisting process, correction in time of pinpointing the problems, and keep in touch at any time, it is ensured that lifting safety;
The scope of operation operating personnel are down to the bottom of exterior wall scaffold by hanging basket 8, and the hook of hanging basket and hoist engine is all the time
In connection status, toppling for hanging basket is prevented, be positioned over stone material on hanging basket by the ground handling operator, oblique placement, protected
Card stone material center of gravity and hanging basket center of gravity are on a vertical plane;
The ground handling operator notifies the scope of operation operating personnel by the Operation switch, control by intercom
Hoist engine lifts by crane the stone material in the hanging basket, and at the beginning, speed is slow, during lifting, at the uniform velocity carries out for lifting, during lifting,
Lower work personnel forbid to enter lifting working region;
When hanging basket rises to the job platform, the scope of operation operating personnel are stopped by the release Operation switch
The hoist engine drives the hanging basket to continue to lift by crane rising, and the scope of operation standing unloads stone on the job platform
After material, the hoist engine is controlled to drive hanging basket to continue to drop to ground floor by the Operation switch.
In the embodiment of the utility model one, while installing two vertical draglines, always according to stone material construction height described
Being installed on exterior wall scaffold 1 can folding and unfolding load-bearing operating platform 12.
In the embodiment of the utility model one,
Lifting group, every group of 2 people are set, and are equipped with intercom 2, wherein, ground handling operator 1, take charge stone
The loading of material, after loading is finished, intercom notifies that scope of operation operating personnel are responsible for lifting operation, and is responsible for the peace during lifting
Full monitoring, the button of the scope of operation operating personnel operation Operation switch makes hanging basket to job platform, is responsible for the unloading of stone material, institute
State ground and operation and operating personnel respectively at lifting bottom and the scope of operation can folding and unfolding load-bearing operating platform side be absorbed in whole lifting
Process, correction in time of pinpointing the problems, and keep in touch at any time, it is ensured that lifting safety;
The scope of operation operating personnel are down to the bottom of exterior wall scaffold by hanging basket 8, and the hook of hanging basket and hoist engine is all the time
In connection status, toppling for hanging basket is prevented, be positioned over stone material on hanging basket by the ground handling operator, oblique placement, protected
Card stone material center of gravity and hanging basket center of gravity are on a vertical plane;
The ground handling operator notifies the scope of operation operating personnel by the Operation switch, control by intercom
Hoist engine lifts by crane the stone material in the hanging basket, and at the beginning, speed is slow, during lifting, at the uniform velocity carries out for lifting, during lifting,
Lower work personnel forbid to enter lifting working region;
When hanging basket rises to the job platform, the scope of operation operating personnel are stopped by the release Operation switch
The hoist engine drives the hanging basket to continue to lift by crane rising, and the scope of operation standing unloads stone on the job platform
After material, the hoist engine is controlled to drive hanging basket to continue to drop to ground floor by the Operation switch, including:
Lifting group, every group of 2 people are set, and are equipped with intercom 2, wherein, ground handling operator 1, take charge stone
The loading of material, after loading is finished, intercom notifies that scope of operation operating personnel are responsible for lifting operation, and is responsible for the peace during lifting
Full monitoring, after hanging basket is higher than job platform, scope of operation operating personnel unclamp the button of the Operation switch, stop lifting, put
It is lower described can be after folding and unfolding load-bearing operating platform, scope of operation operating personnel operate the button of the Operation switch to continue to put down hanging basket extremely
Can folding and unfolding load-bearing operating platform, be responsible for the unloading of stone material, the ground and operation and operating personnel respectively at lifting bottom and work
Industry face can be absorbed in whole hoisting process by folding and unfolding load-bearing operating platform, correction in time of pinpointing the problems, and keep in touch at any time, it is ensured that
Lifting safety;
The scope of operation operating personnel are down to the bottom of exterior wall scaffold by hanging basket 8, and the hook of hanging basket and hoist engine is all the time
In connection status, toppling for hanging basket is prevented, be positioned over stone material on hanging basket by the ground handling operator, oblique placement, protected
Card stone material center of gravity and hanging basket center of gravity are on a vertical plane;
The scope of operation operating personnel will it is described can folding and unfolding load-bearing operating platform set and be in collapsed state, the ground behaviour
Make personnel notifies the scope of operation operating personnel by the Operation switch by intercom, and control hoist engine lifts by crane the hanging basket
In stone material, at the beginning, speed is slow, during lifting, at the uniform velocity carries out for lifting, during lifting, lower work personnel forbid into
Enter to lift working region;
When hanging basket rise to it is described can 1 meter of folding and unfolding load-bearing operating platform top when, the scope of operation operating personnel are by described
Unclamp Operation switch, stop the hoist engine and drive the hanging basket to continue to lift by crane and rise, put down it is described can folding and unfolding load-bearing operation it is flat
After platform, fall hanging basket extremely can folding and unfolding load-bearing operating platform, the scope of operation standing it is described can folding and unfolding load-bearing operation it is flat
After unloading stone material on platform, by the Operation switch control the hoist engine drive hanging basket rise to it is described can folding and unfolding load-bearing operate it is flat
Platform top 1 meter of height, pack up can folding and unfolding load-bearing operating platform, can folding and unfolding load-bearing operating platform used as scaffold guard rail,
Hanging basket continues to drop to ground floor.
In the embodiment of the utility model one, after hanging basket is installed from the bottom of exterior wall scaffold, also include:
In the range of 1 meter of both sides of the vertical space, longitudinally disposed safety net, with during ensureing vertical transport, under
Side passes through without personnel, it is ensured that construction safety.
In the embodiment of the utility model one, fast-assembling bolster is fixed on the wall, volume is installed on the fast-assembling bolster
Machine is raised, including:
The fast-assembling bolster by 9 square tubes and 2 blocks of steel plates, wherein, the first square tube and wall are be arranged in parallel, by described
The two ends of one square tube are vertical with one end of the second square tube and third party's pipe respectively to be connected, by the centre of first square tube respectively with
One end of 4th square tube and the 5th square tube vertically connects, second square tube, third party's pipe, the 4th square tube and the 5th square tube and institute
Wall body vertical is stated, the oblique other end with the 4th square tube in one end of the 6th square tube is connected, by the other end of the 6th square tube
It is connected with the first steel plate, it is by first steel plate and the wall connecting, one end of the 7th square tube is oblique with the 5th side
The other end connection of pipe, the other end of the 7th square tube is connected with the first steel plate, by one end of eighth pipe and the 4th square tube
One end connection, the other end of eighth pipe is connected with the second steel plate, by one end of the 9th square tube and the 5th square tube
One end is connected, and the other end of the 9th square tube is connected with the second steel plate, and the eighth pipe and the 9th square tube are parallel with wall, will
Second steel plate is connected on the wall, the hoist engine is fixed in the 4th square tube and the 5th square tube, two
The vertical other end of the dragline respectively with the second square tube and third party's pipe is connected.Here, fast-assembling bolster is by 9 square steel and two blocks of steel plates
It is made up of welding, bolt connection, hoist engine is connected by 4 flat head bolts with the 4th square tube and the 5th square tube, square steel and steel
By being welded to connect between plate, by welding and bolt connection between square steel and square steel, the first and second steel plates pass through 3 respectively
Expansion bolt and wall connecting, install, dismantle it is simple and quick.
In the embodiment of the utility model one, after installation hoist engine on the fast-assembling bolster, also include:
Protective cover is set in the hoist engine, hoist engine is connected by 4 flat head bolts and fast-assembling bolster, hoist engine
Upper setting protective cover, plays a part of sun-proof rain-proof.In the embodiment of the utility model one, hoist engine is maximum to carry 1000KG, if
Meter carries 500KG.
In the embodiment of the utility model one, the Operation switch is arranged on the default of the exterior wall scaffold by extended line
On height, operating personnel are facilitated to operate hoist engine according to field condition, the Operation switch includes up button and down button.
Here, pinning up button, hoist engine is up lifted, and hoist engine stops lifting after the button that comes loose;Similarly, down button is pinned,
Hoist engine down declines, and hoist engine stops declining after the button that comes loose, and prevents the generation of maloperation event.Down button is pinned, is rolled up
Raise machine down to decline, hoist engine stops declining after the button that comes loose, simple to operate to understand, prevents the generation of maloperation event.
In the embodiment of the utility model one, after installation hoist engine on the fast-assembling bolster, also include:
Mouth sets stopping means under the serving of the hoist engine, and the stopping means is connected with the power supply of hoist engine,
Here, setting stopping means as Anti-over-hoisting device, in hoist engine lifting process, lower mouth stopping means is bumped against when hanger rises,
Then stopping means is connected with power supply can at once cut off the power supply of hoist engine, it is to avoid hoist engine is rushed to summit damage.
In the embodiment of the utility model one, two groups of slide guide wheels are set in the hanging basket both sides, every group of slide guide wheel is in an institute
State and slided on vertical dragline, including:
Every group of slide guide wheel is set to be made up of two pulleys, the vertical dragline is passed through between two pulleys, institute
Two pulleys are stated to be slided on the vertical dragline simultaneously.Here, hanging basket both sides respectively set double group slide guide wheels, vertical dragline is from two
Passed through between individual pulley, cooperating, limit the movement locus of hanging basket, it is therefore prevented that hanging basket motion in the horizontal direction and inclined
Cover.
In the embodiment of the utility model one, the hanging basket is L-shaped, to facilitate loading stone material.Here, L-shaped hanging basket belongs to originally
Designed in bias, eccentric hanger be used as by increasing hanging basket upper end hanger, and by be connected with hoist engine and every group of slide guide wheel by
Under two orientation works status conditions of pulley composition, the Influence from Eccentric of hanging basket is eliminated, reach antidumping effect.Hanging basket center of gravity
It is in same vertical plane with hanger, vertical dragline.When stone material is positioned in hanging basket, oblique placement, its center of gravity and hanging basket weight
The heart is in same vertical plane.
In the embodiment of the utility model one, before hanging basket is installed from the bottom of exterior wall scaffold, also include:
In the yellow black alternate striped of the hanging basket external coating, warning function has been reached, it is ensured that the safety in operating process.
In the embodiment of the utility model one, after hanging basket is installed from the bottom of exterior wall scaffold, also include:
Safety belt is set on the hanging basket;
After stone material is positioned on hanging basket, also include:
Using safety belt fixing stone position.In the embodiment of the utility model one, hanging basket 800-1000mm high is long
1800mm, 300mm wide, are made up of steel frame and aluminium sheet, can simultaneously load the stone material high of 2-3 blocks 1600 wide 700, are set on hanging basket
Two retractable safety bands, fixing stone, limitation stone material displacement in the horizontal direction, it is ensured that the security of transport hanging basket.
In the embodiment of the utility model one, on the exterior wall scaffold install can folding and unfolding load-bearing operating platform, including:
By it is described can folding and unfolding load-bearing operating platform be set to be made up of steel frame and aluminium sheet, it is ensured that while its rigidity, subtract
Light its weight, by it is described can folding and unfolding load-bearing operating platform side by platform coupling assembly and exterior wall scaffold activity
Connection, at the same can folding and unfolding load-bearing operating platform another both sides set can folding and unfolding hook and pulling plug;
Put down it is described can folding and unfolding load-bearing operating platform, including:
Remove it is described can folding and unfolding load-bearing operating platform and the exterior wall scaffold pulling plug connection, put down can folding and unfolding hook,
Put down it is described can folding and unfolding load-bearing operating platform, here, now hanger and the exterior wall scaffold are connected, play load-bearing effect, subsequently
Hanging basket to load-bearing operating platform can be fallen, stone material is unloaded, home is transported to;
Pack up can folding and unfolding load-bearing operating platform, including:
Pack up it is described can folding and unfolding load-bearing operating platform, pack up it is described can folding and unfolding hook, will it is described can folding and unfolding load-bearing operation it is flat
Platform is connected by pulling plug and the exterior wall scaffold, subsequently falls hanging basket to ground, transport of reloading.Specifically, removing is held
Weight operating platform and the exterior wall scaffold pulling plug connection, put down can folding and unfolding hook, put down can folding and unfolding load-bearing operating platform, this
When can folding and unfolding hook and the exterior wall scaffold connection, rise load-bearing effect.Fall hanging basket extremely can folding and unfolding load-bearing operating platform, it is described
Second standing it is described can unload stone material on folding and unfolding load-bearing operating platform after, the volume is controlled by the Operation switch
Raise machine drive hanging basket rise to it is described can the 1 meter of height in folding and unfolding load-bearing operating platform top, pack up can folding and unfolding load-bearing operating platform, pack up
Can folding and unfolding hook, load-bearing operating platform connected by pulling plug and the exterior wall scaffold, can be used as scaffold guard rail.Fall
Hanging basket to ground, transport of reloading.Here, by can folding and unfolding hook, platform coupling assembly and pulling plug so that load-bearing operation is flat
Platform and the exterior wall scaffold hanging basket are combined as a whole, and during work, putting down can receive load-bearing operating platform, can folding and unfolding hook and it is described
Exterior wall scaffold is connected, and plays transfer stone material, load-bearing, active station people etc..Can folding and unfolding hook and platform framework welding, do not work
When, pack up can folding and unfolding hook, packing up can receive load-bearing operating platform, and pulling plug and the exterior wall scaffold are connected, load-bearing operating platform
Can be used as scaffold guard rail, and remove and install simple, quick, the rapid working face installed and need handling.Platform connects
Connected components, and the welding of load-bearing operating platform, scaffold is connected by flat head bolt.In addition, can be set in lifting working face both sides
Safety net, it is ensured that the personal security in hoisting process.
In addition, in terms of hoist engine maintenance:(1) the braking hanging basket to hoist engine carries out regular adjustment, holds lotus situation
Under, without lower sliding phenomenon after object of slinging shutdown.(2) weld seam between bolster answers the phenomenons such as flawless, displacement.(3) hoist engine with
The connecting bolt of square steel answers non-loosening, by the phenomenon for cutting flexural deformation.(4) the hand-held switch of hoist engine, it is necessary to keep dry
Dry, the rainy day is wrapped using application Nylon Bag, prevents electric leakage of making moist.(5) equipment is periodically checked weekly by full-time staff, adjusted
It is whole.Adjustment braking hanging basket process should be debugged with peak load, have no lower sliding phenomenon.
In sum, the utility model is in solution traditional construction, the stone material of external wall of high-rise building stone material construction transports field
Ground is narrow and small, and vertical transport difficulty is big, is difficult to ensure that safely, the problem of labor intensive material resources, for the vertical transport of outer wall stone,
There is provided Stone Vertical transport hanging basket in a kind of innovation, exterior wall scaffold efficiently, safe, by fast-assembling bolster, hoist engine, hang
The cooperating of the components such as basket, vertical dragline so that in scaffold in vertical direction stone material transport become it is simple, safe, can
Lean on, and install, dismantle it is simple and quick.In addition, vertical dragline one end by vertical dragline coupling assembly directly with the exterior wall
Scaffold is connected, and eliminates influence of the ground factor to vertical transport equipment.
Each embodiment is described by the way of progressive in this specification, and what each embodiment was stressed is and other
The difference of embodiment, between each embodiment identical similar portion mutually referring to.
Obviously, those skilled in the art can carry out various changes to utility model and modification is new without deviating from this practicality
The spirit and scope of type.So, if it is of the present utility model these modification and modification belong to the utility model claim and its
Within the scope of equivalent technologies, then the utility model is also intended to including including these changes and modification.
Claims (9)
1. Stone Vertical transports hanging basket in a kind of exterior wall scaffold, it is characterised in that including:
Exterior wall scaffold, is separated by predeterminable range between the exterior wall scaffold and wall, the bottom of the exterior wall scaffold is set
There are two vertical dragline coupling assemblies extended to the wall;
The fast-assembling bolster on the wall is arranged at, the fast-assembling bolster is relative with the top of the exterior wall scaffold;
Two spaced vertical draglines, the top of every vertical dragline is connected with the fast-assembling bolster, every vertical dragline
Bottom vertical dragline coupling assembly described be connected;
The hoist engine on the fast-assembling bolster is arranged at, and the Operation switch being connected with the hoist engine;
Move up and down and surrounded in vertical space in the exterior wall scaffold, wall, hoist engine and vertical dragline coupling assembly
Hanging basket, the hanging basket upper end is provided with hanger, and the hanger is connected with the serving on the hoist engine, and the hanging basket both sides are set
There are two groups of slide guide wheels, every group of slide guide wheel is slided on a vertical dragline.
2. in exterior wall scaffold as claimed in claim 1 Stone Vertical transport hanging basket, it is characterised in that the fast-assembling bolster by
9 square tubes and 2 blocks of steel plates, wherein the first square tube be arranged in parallel with wall, the two ends of first square tube respectively with the second square tube
One end with third party's pipe vertically connects, and the one end of the centre of first square tube respectively with the 4th square tube and the 5th square tube is vertical
Connection, second square tube, third party's pipe, the 4th square tube and the 5th square tube and the wall body vertical, one end of the 6th square tube is oblique
It is connected to the other end with the 4th square tube, the other end of the 6th square tube is connected with the first steel plate, first steel plate and institute
Wall connecting is stated, the oblique other end with the 5th square tube in one end of the 7th square tube is connected, the other end of the 7th square tube and institute
The connection of the first steel plate is stated, one end of eighth pipe is connected with one end of the 4th square tube, the other end of eighth pipe and second
Steel plate is connected, and one end of the 9th square tube is connected with one end of the 5th square tube, and the other end of the 9th square tube and the second steel plate connect
Connect, second steel plate is connected on the wall, the hoist engine is fixed in the 4th square tube and the 5th square tube, two
The vertical other end of the dragline respectively with the second square tube and third party's pipe is connected.
3. Stone Vertical transports hanging basket in exterior wall scaffold as claimed in claim 1, it is characterised in that set on the hoist engine
It is equipped with protective cover.
4. Stone Vertical transports hanging basket in exterior wall scaffold as claimed in claim 1, it is characterised in that the Operation switch is led to
Extended line is crossed to be arranged in the preset height of the exterior wall scaffold.
5. Stone Vertical transports hanging basket in exterior wall scaffold as claimed in claim 1, it is characterised in that the volume of the hoist engine
The lower mouth of rope is additionally provided with stopping means, and the stopping means is connected with the power supply of hoist engine.
6. Stone Vertical transports hanging basket in exterior wall scaffold as claimed in claim 1, it is characterised in that every group of slide guide wheel
It is made up of two pulleys, every vertical dragline is passed through between two pulleys, described two pulleys are simultaneously in a vertical dragline
Upper slip.
7. Stone Vertical transports hanging basket in exterior wall scaffold as claimed in claim 1, it is characterised in that the hanging basket is L-shaped.
8. Stone Vertical transports hanging basket in exterior wall scaffold as claimed in claim 1, it is characterised in that the hanging basket surface applies
It is brushed with yellow black alternate striped.
9. Stone Vertical transports hanging basket in exterior wall scaffold as claimed in claim 1, it is characterised in that set on the hanging basket
There is safety belt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621231701.7U CN206266182U (en) | 2016-11-16 | 2016-11-16 | Stone Vertical transport hanging basket in exterior wall scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621231701.7U CN206266182U (en) | 2016-11-16 | 2016-11-16 | Stone Vertical transport hanging basket in exterior wall scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206266182U true CN206266182U (en) | 2017-06-20 |
Family
ID=59039475
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621231701.7U Expired - Fee Related CN206266182U (en) | 2016-11-16 | 2016-11-16 | Stone Vertical transport hanging basket in exterior wall scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206266182U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106586908A (en) * | 2016-11-16 | 2017-04-26 | 上海市建筑装饰工程集团有限公司 | Vertical stone conveying lifting basket inside external wall scaffold |
-
2016
- 2016-11-16 CN CN201621231701.7U patent/CN206266182U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106586908A (en) * | 2016-11-16 | 2017-04-26 | 上海市建筑装饰工程集团有限公司 | Vertical stone conveying lifting basket inside external wall scaffold |
CN106586908B (en) * | 2016-11-16 | 2019-07-12 | 上海市建筑装饰工程集团有限公司 | Stone Vertical transports hanging basket in exterior wall scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106639287B (en) | Stone Vertical transportation resources in exterior wall scaffold | |
CN204703746U (en) | A kind of removable level-sensing device repairing platform device | |
CN206266182U (en) | Stone Vertical transport hanging basket in exterior wall scaffold | |
CN204689430U (en) | To Construction of Silo movable hoisting device | |
CN106586907B (en) | The installation and application of Stone Vertical transport hanging basket in exterior wall scaffold | |
CN206309001U (en) | Stone Vertical transportation system in exterior wall scaffold | |
CN103274310B (en) | Self-lifting type cableway transporting device | |
CN111994820A (en) | New energy automobile overhauls platform | |
CN106586908B (en) | Stone Vertical transports hanging basket in exterior wall scaffold | |
CN110029807A (en) | For installing the device of steel construction traverse colored steel | |
CN106639288A (en) | Installing using method of vertical transporting platform of stone in outer wall scaffold | |
CN106592955A (en) | Platform for vertically conveying stone material in exterior wall scaffolding | |
CN106522537B (en) | Stone Vertical transportation system in exterior wall scaffold | |
CN208500144U (en) | Bridge crane | |
CN206267514U (en) | Stone Vertical shipping platform in exterior wall scaffold | |
CN207732338U (en) | A kind of substation's cabinet installation hand push frame | |
CN206722431U (en) | Discharging platform for high-rise building construction | |
CN216196814U (en) | Adjustable horizontal entrance to a cave anti-falling device | |
CN212105183U (en) | A safe unloading platform for high-rise buildings | |
CN210594973U (en) | Multilayer indoor type arranges hoist and mount isolated plant who pulls pavilion dish cabinet of electric substation | |
CN203946779U (en) | Loose steel pipe operation combined sling | |
CN208022620U (en) | A kind of telescopic hoisting platform | |
CN214399682U (en) | Hoisting device for building | |
CN205916997U (en) | Mechanical and electrical installation movable tipping arrangement | |
CN206088904U (en) | Guide tracked lift of guide rail detachable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170620 Termination date: 20191116 |
|
CF01 | Termination of patent right due to non-payment of annual fee |