[go: up one dir, main page]

CN206233896U - For the anti-pumping blocking of gas pumping and the outer plugging device of drainage holes - Google Patents

For the anti-pumping blocking of gas pumping and the outer plugging device of drainage holes Download PDF

Info

Publication number
CN206233896U
CN206233896U CN201621237003.8U CN201621237003U CN206233896U CN 206233896 U CN206233896 U CN 206233896U CN 201621237003 U CN201621237003 U CN 201621237003U CN 206233896 U CN206233896 U CN 206233896U
Authority
CN
China
Prior art keywords
pipe
extraction
drainage
sleeve
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621237003.8U
Other languages
Chinese (zh)
Inventor
李博
张明杰
贾文超
裴景垚
张冠军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201621237003.8U priority Critical patent/CN206233896U/en
Application granted granted Critical
Publication of CN206233896U publication Critical patent/CN206233896U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

For the anti-pumping blocking of gas pumping and the outer plugging device of drainage holes, including drainage tube, drainage tube is provided with drainage holes, web plate is provided with drainage holes, the extraction end of drainage tube is provided with closure plate, and coaxial in drainage tube to be provided with a dredging pipe, dredging tube side part is provided with the air nozzle for being corresponded with web plate and being set, the other end of dredging pipe is connected with an ajutage by an elbow, and ajutage is provided with check valve;A position-arresting disk on the cylindrical upper sleeve through of drainage tube, position-arresting disk is provided with pack hole, and a sleeve is fixedly installed on the outward flange of position-arresting disk, and the circumferential edges of sleeve one end are provided with a circle pointed structures, the spacing ring contacted with position-arresting disk is fixed with drainage tube.The utility model can in time dredge drainage holes and be blocked, so that it is guaranteed that the constant of gas pumping operation is carried out, can thoroughly block gas crack passage, prevent tunnel air from entering drilling and extraction pipeline, the tightness of abundant lift-off seal from cracks in coal seam.

Description

用于瓦斯抽采的防抽气堵塞及抽采孔外封堵装置Anti-gas extraction clogging and drainage hole external plugging device for gas drainage

技术领域technical field

本实用新型属于煤矿瓦斯抽采技术领域,尤其涉及一种用于瓦斯抽采的防抽气堵塞及抽采孔外封堵装置。The utility model belongs to the technical field of gas extraction in coal mines, in particular to a gas extraction blockage prevention and extraction hole external sealing device for gas extraction.

背景技术Background technique

目前,煤矿井下钻孔预抽煤层瓦斯是区域瓦斯治理主要技术,但是存在钻孔抽采瓦斯浓度偏低,严重影响煤层瓦斯抽采效果。在抽采瓦斯过程中,随着大量瓦斯气体从煤体抽出,煤层瓦斯压力和瓦斯含量下降,煤体中的瓦斯弹性潜能得以释放,并由此引发煤层产生变形、位移、卸压(地应力减小)、煤层透气性增大等现象,在钻孔有效作用半径区域内的煤层形成大量微观裂隙及孔隙通道。因此预抽煤层瓦斯后,裂隙发育程度更高。当这些因应力扰动产生的裂隙与外界大气沟通时,如果封孔不严或者封孔段短,未超过裂隙显著发育范围时,在抽采负压作用下空气就由煤帮和抽采钻孔周边进入钻孔及抽放管路,使抽采系统瓦斯浓度下降。另外,在瓦斯抽采过程中,由于煤体内含有较多的水,瓦斯抽采管上的抽采孔容易被煤浆堵塞,导致抽采效率大大降低。At present, the pre-extraction of coal seam gas by underground drilling in coal mines is the main technology for regional gas control, but the concentration of gas extracted by drilling holes is low, which seriously affects the effect of coal seam gas drainage. In the process of gas extraction, as a large amount of gas is extracted from the coal body, the gas pressure and gas content of the coal seam decrease, and the elastic potential of the gas in the coal body is released, which leads to deformation, displacement, and pressure relief of the coal seam (ground stress decrease), the air permeability of coal seam increases, and a large number of microscopic cracks and pore channels are formed in the coal seam within the effective radius of drilling. Therefore, after the pre-pumping of coal seam gas, the degree of fracture development is higher. When these cracks generated by stress disturbance communicate with the outside atmosphere, if the sealing is not strict or the sealing section is short and does not exceed the significant development range of cracks, the air will flow from the coal side and the drainage borehole under the negative pressure of the extraction. The surrounding area enters the borehole and the drainage pipeline to reduce the gas concentration of the drainage system. In addition, during the gas extraction process, due to the large amount of water in the coal body, the extraction holes on the gas extraction pipes are easily blocked by coal slurry, resulting in a greatly reduced extraction efficiency.

实用新型内容Utility model content

本实用新型为了解决现有技术中的不足之处,提供一种结构简单、便于操作、避免空气进入由煤帮和抽采钻孔周边进入钻孔内、安全可靠、能提高瓦斯抽采效率的用于瓦斯抽采的防抽气堵塞及抽采孔外封堵装置。In order to solve the deficiencies in the prior art, the utility model provides a simple structure, easy to operate, avoid air entering into the borehole from the coal side and the periphery of the extraction borehole, safe and reliable, and can improve the efficiency of gas extraction. It is used for gas extraction anti-clogging and drainage hole plugging device.

为解决上述技术问题,本实用新型采用如下技术方案:用于瓦斯抽采的防抽气堵塞及抽采孔外封堵装置,包括抽采管,抽采管上在邻近抽采端均匀设有若干个抽采孔,每个抽采孔内均设置一块网板,抽采管的抽采端设有堵板,抽采管内同轴向设置有一根疏通管,疏通管的一端与堵板内壁固定连接,疏通管外侧与抽采管内壁之间设有连接支撑杆,疏通管侧部设有与每块网板一一对应设置的喷气嘴,疏通管的另一端通过一个弯头连接有一根送风管,送风管垂直穿过抽采管伸入到巷道内,送风管上设有单向阀;抽采管的外圆上穿套上一个限位盘,限位盘上设有充填孔,限位盘的外边缘上固定设置一个与限位盘同中心线的套筒,套筒朝向堵板的一端的圆周边缘设有一圈尖锐结构,抽采管上固定设有与限位盘接触的限位环,限位环和套筒分别位于限位盘的两侧。In order to solve the above-mentioned technical problems, the utility model adopts the following technical scheme: the anti-gas extraction blockage and the plugging device outside the extraction hole for gas extraction, including the extraction pipe, and the extraction pipe is evenly arranged on the adjacent extraction end. There are several extraction holes, each of which is provided with a mesh plate, the extraction end of the extraction pipe is provided with a blocking plate, and a dredging pipe is arranged coaxially in the extraction pipe, and one end of the dredging pipe is connected to the inner wall of the blocking plate. Fixed connection, there is a connecting support rod between the outside of the dredging pipe and the inner wall of the extraction pipe, the side of the dredging pipe is equipped with an air nozzle corresponding to each mesh plate, and the other end of the dredging pipe is connected with a Air supply pipe, the air supply pipe extends vertically through the extraction pipe into the roadway, and a check valve is provided on the air supply pipe; a limit plate is put on the outer circle of the extraction pipe, and a limit plate is set on the limit plate. For the filling hole, a sleeve with the center line of the limit plate is fixed on the outer edge of the limit plate, and a sharp structure is set on the peripheral edge of the end of the sleeve facing the blocking plate. The limit ring that the disc contacts, the limit ring and the sleeve are respectively located on both sides of the limit disc.

送风管与抽采管外壁连接处设有密封圈,送风管上套设有压紧套,送风管上螺纹连接有将压紧套紧压密封圈外圆周的锁紧螺母。A sealing ring is provided at the connection between the air supply pipe and the outer wall of the extraction pipe, a compression sleeve is set on the air supply pipe, and a locking nut is threaded on the air supply pipe to press the compression sleeve tightly against the outer circumference of the sealing ring.

采用上述技术方案,本实用新型在实际应用当中的具体原理及过程为:将抽采管沿抽采孔伸入到煤层内,使用流动性好、致密性好、强度高、高粘结性、强渗透性、有自我膨胀性的封孔材料封堵抽采管外部与钻孔之间的环形腔,送风管位于巷道内并连接井下的高压送风机。待钻孔内的封孔材料固化完毕,在抽采管的外圆上穿套上一个限位盘,限位盘上设有充填孔,限位盘的外边缘上固定设置一个套筒,套筒的一端圆周边缘设有一圈尖锐结构,采用人力或巷道内压缩空气推动限位盘沿抽采管向巷道壁移动,套筒端部的一圈尖锐结构扎入到巷道壁内,然后在抽采管上设有与限位盘顶压接触的限位环,接着通过充填孔向套筒、抽采管外壁、限位盘和巷道壁之间形成的空间内充填封孔材料;待套筒内的封孔材料固化完毕后,将抽采管与瓦斯抽采支管连接,进行正常瓦斯抽采。当煤层内的水与煤形成煤浆将网板堵塞时,设置在抽采管道上的流量计或压力表监测到瓦斯流量变小,启动高压送风机,高压风由送风管进入到疏通管,最后由喷气嘴喷向网板,网板外的煤浆被吹散,网板疏通,从而使瓦斯抽采作业正常进行。By adopting the above-mentioned technical scheme, the specific principle and process of the utility model in practical application are as follows: the extraction pipe is inserted into the coal seam along the extraction hole, and the utility model is used with good fluidity, good compactness, high strength, high cohesiveness, The sealing material with strong permeability and self-expansion seals the annular cavity between the outside of the extraction pipe and the borehole, and the air supply pipe is located in the roadway and connected to the high-pressure blower in the well. After the sealing material in the borehole is solidified, a limit plate is put on the outer circle of the extraction pipe. There is a filling hole on the limit plate, and a sleeve is fixed on the outer edge of the limit plate. There is a circle of sharp structures on the peripheral edge of one end of the sleeve. Manpower or compressed air in the roadway is used to push the limit plate to move along the extraction pipe to the roadway wall. The production pipe is provided with a limit ring that is in pressure contact with the limit plate, and then through the filling hole, fill the hole sealing material into the space formed between the sleeve, the outer wall of the extraction pipe, the limit plate and the roadway wall; After the sealing material inside is solidified, connect the drainage pipe with the gas drainage branch pipe for normal gas drainage. When the water and coal in the coal seam form a coal slurry to block the screen, the flowmeter or pressure gauge installed on the extraction pipeline monitors that the gas flow rate becomes smaller, and the high-pressure blower is started, and the high-pressure air enters the dredging pipe from the air supply pipe. Finally, the air nozzle is sprayed to the screen, the coal slurry outside the screen is blown away, and the screen is dredged, so that the gas drainage operation can be carried out normally.

本实用新型在巷道内壁外设置了一道封孔结构,即在钻孔周围的套筒、抽采管外壁、限位盘和巷道壁之间形成的空间封孔材料进行密封,这样充分提高了密封效果,进一步避免空气由煤帮和抽采钻孔周边进入钻孔及抽放管路。The utility model is provided with a sealing structure outside the inner wall of the roadway, that is, the space sealing material formed between the sleeve around the borehole, the outer wall of the extraction pipe, the limit plate and the roadway wall is sealed, which fully improves the sealing effect. The effect is to further prevent air from entering the drilling and drainage pipeline from the coal side and the periphery of the drainage drilling.

本实用新型还在抽采管内设置了疏通管。在抽采管上的抽采孔被煤浆堵塞时,及时将抽采孔处设置的网板吹开,充分提高瓦斯抽采效率。由于送风管上设有单向阀,这样就避免在抽采瓦斯过程中出现漏气情况(即由送风管进入空气)。密封圈、压紧套和锁紧螺母的设置,确保密封的可靠性。连接支撑杆与堵板起到固定疏通管的作用。The utility model is also provided with a dredging pipe in the extraction pipe. When the drainage holes on the drainage pipes are blocked by coal slurry, blow off the mesh plates set at the drainage holes in time to fully improve the gas drainage efficiency. Since there is a one-way valve on the air supply pipe, it is possible to avoid air leakage during gas extraction (that is, air enters from the air supply pipe). The setting of sealing ring, compression sleeve and lock nut ensures the reliability of sealing. Connecting the support rod and the blocking plate plays the role of fixing the dredging pipe.

本实用新型设计合理,结构简单,安全可靠,在现有抽采管的基础上可进行改造,可及时疏通抽采孔被堵塞,从而确保瓦斯抽采作业的持续不断进行,可彻底封堵瓦斯裂隙通道,防止巷道空气从煤层裂隙进入钻孔及抽放管路,充分提升密封的严密性。The utility model is reasonable in design, simple in structure, safe and reliable, and can be modified on the basis of the existing drainage pipe, and can timely clear the drainage holes from being blocked, thereby ensuring the continuous operation of gas drainage, and can completely block the gas The crack channel prevents roadway air from entering the drilling and drainage pipeline from the coal seam cracks, and fully improves the tightness of the seal.

附图说明Description of drawings

图1是本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

具体实施方式detailed description

如图1所示,本实用新型的用于瓦斯抽采的防抽气堵塞及抽采孔外封堵装置,包括抽采管1,抽采管1上在邻近抽采端均匀设有若干个抽采孔,每个抽采孔内均设置一块网板5,抽采管1的抽采端设有堵板2,抽采管1内同轴向设置有一根疏通管3,疏通管3的一端与堵板2内壁固定连接,疏通管3外侧与抽采管1内壁之间设有连接支撑杆4,疏通管3侧部设有与每块网板5一一对应设置的喷气嘴17,疏通管3的另一端通过一个弯头6连接有一根送风管7,送风管7垂直穿过抽采管1伸入到巷道内,送风管7上设有单向阀8;抽采管1的外圆上穿套上一个限位盘9,限位盘9上设有充填孔10,限位盘9的外边缘上固定设置一个与限位盘9同中心线的套筒11,套筒11朝向堵板2的一端的圆周边缘设有一圈尖锐结构12,抽采管1上固定设有与限位盘9接触的限位环13,限位环13和套筒11分别位于限位盘9的两侧。As shown in Figure 1, the anti-gas extraction blockage and drainage hole plugging device of the present utility model includes a drainage pipe 1, and several gas extraction pipes are evenly arranged near the drainage end Drainage holes, a mesh plate 5 is arranged in each drainage hole, a blocking plate 2 is provided at the extraction end of the extraction pipe 1, and a dredging pipe 3 is arranged coaxially in the extraction pipe 1, and the opening of the dredging pipe 3 One end is fixedly connected to the inner wall of the blocking plate 2, a connecting support rod 4 is provided between the outer side of the dredging pipe 3 and the inner wall of the extraction pipe 1, and the side of the dredging pipe 3 is provided with an air nozzle 17 corresponding to each mesh plate 5, The other end of the dredging pipe 3 is connected with an air supply pipe 7 through an elbow 6, and the air supply pipe 7 vertically passes through the extraction pipe 1 and extends into the roadway, and the air supply pipe 7 is provided with a check valve 8; A limit disc 9 is put on the outer circle of the tube 1, and a filling hole 10 is arranged on the limit disc 9, and a sleeve 11 concentric with the limit disc 9 is fixedly arranged on the outer edge of the limit disc 9, A ring of sharp structures 12 is provided on the peripheral edge of the end of the sleeve 11 facing the blocking plate 2, and a limit ring 13 that is in contact with the limit disc 9 is fixed on the extraction pipe 1, and the limit ring 13 and the sleeve 11 are respectively located at the limit Both sides of the bit disk 9.

送风管7与抽采管1外壁连接处设有密封圈14,送风管7上套设有压紧套15,送风管7上螺纹连接有将压紧套15紧压密封圈14外圆周的锁紧螺母16。A sealing ring 14 is provided at the connection between the air supply pipe 7 and the outer wall of the extraction pipe 1, and a compression sleeve 15 is set on the air supply pipe 7, and the upper air supply pipe 7 is threaded to press the compression sleeve 15 to the outside of the sealing ring 14. Circumferential lock nut 16.

本实用新型在实际应用当中的具体原理及过程为:将抽采管1沿抽采孔伸入到煤层内,使用流动性好、致密性好、强度高、高粘结性、强渗透性、有自我膨胀性的封孔材料封堵抽采管1外部与钻孔之间的环形腔,送风管7位于巷道内并连接井下的高压送风机。待钻孔内的封孔材料固化完毕,在抽采管1的外圆上穿套上一个限位盘9,限位盘9上设有充填孔10,限位盘9的外边缘上固定设置一个套筒11,套筒11的一端圆周边缘设有一圈尖锐结构12,采用人力或巷道内压缩空气推动限位盘9沿抽采管1向巷道壁移动,套筒11端部的一圈尖锐结构12扎入到巷道壁内,然后在抽采管1上设有与限位盘9顶压接触的限位环13,接着通过充填孔10向套筒11、抽采管1外壁、限位盘9和巷道壁之间形成的空间内充填封孔材料;待套筒11内的封孔材料固化完毕后,将抽采管1与瓦斯抽采支管连接,进行正常瓦斯抽采。当煤层内的水与煤形成煤浆将网板5堵塞时,设置在抽采管1道上的流量计或压力表监测到瓦斯流量变小,启动高压送风机,高压风由送风管7进入到疏通管3,最后由喷气嘴17喷向网板5,网板5外的煤浆被吹散,网板5疏通,从而使瓦斯抽采作业正常进行。The specific principle and process of the utility model in practical application are as follows: extend the extraction pipe 1 into the coal seam along the extraction hole, use it with good fluidity, good compactness, high strength, high cohesiveness, strong permeability, The self-expandable sealing material seals the annular cavity between the outside of the extraction pipe 1 and the borehole, and the air supply pipe 7 is located in the roadway and connected to the high-pressure blower in the well. After the sealing material in the borehole is solidified, a limit disc 9 is put on the outer circle of the extraction pipe 1. The limit disc 9 is provided with a filling hole 10, and the outer edge of the limit disc 9 is fixed. A sleeve 11, one end of the sleeve 11 is provided with a circle of sharp structures 12 on the peripheral edge, using manpower or compressed air in the roadway to push the limit plate 9 to move along the extraction pipe 1 to the roadway wall, and a circle of sharp edges at the end of the sleeve 11 The structure 12 is pierced into the roadway wall, and then a limit ring 13 that is in pressure contact with the limit plate 9 is provided on the extraction pipe 1, and then through the filling hole 10, the sleeve 11, the outer wall of the extraction pipe 1, and the limit ring 13 are provided. The space formed between the disk 9 and the roadway wall is filled with sealing material; after the sealing material in the sleeve 11 is solidified, the drainage pipe 1 is connected with the gas drainage branch pipe for normal gas drainage. When the water and coal in the coal seam form a coal slurry to block the screen plate 5, the flow meter or pressure gauge installed on the first extraction pipe monitors that the gas flow rate becomes smaller, and the high-pressure blower is started, and the high-pressure air enters from the air supply pipe 7 The pipe 3 is dredged, and finally the air nozzle 17 is sprayed to the net plate 5, the coal slurry outside the net plate 5 is blown away, and the net plate 5 is dredged, so that the gas drainage operation can be carried out normally.

本实施例并非对本实用新型的形状、材料、结构等作任何形式上的限制,凡是依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均属于本实用新型技术方案的保护范围。This embodiment does not impose any formal restrictions on the shape, material, structure, etc. of the utility model. Any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the utility model belong to the technology of the utility model. protection scope of the program.

Claims (2)

1.用于瓦斯抽采的防抽气堵塞及抽采孔外封堵装置,其特征在于:包括抽采管,抽采管上在邻近抽采端均匀设有若干个抽采孔,每个抽采孔内均设置一块网板,抽采管的抽采端设有堵板,抽采管内同轴向设置有一根疏通管,疏通管的一端与堵板内壁固定连接,疏通管外侧与抽采管内壁之间设有连接支撑杆,疏通管侧部设有与每块网板一一对应设置的喷气嘴,疏通管的另一端通过一个弯头连接有一根送风管,送风管垂直穿过抽采管伸入到巷道内,送风管上设有单向阀;抽采管的外圆上穿套上一个限位盘,限位盘上设有充填孔,限位盘的外边缘上固定设置一个与限位盘同中心线的套筒,套筒朝向堵板的一端的圆周边缘设有一圈尖锐结构,抽采管上固定设有与限位盘接触的限位环,限位环和套筒分别位于限位盘的两侧。1. The anti-gas extraction blockage and drainage hole plugging device for gas drainage is characterized in that: it includes a drainage pipe, and several drainage holes are evenly arranged on the drainage pipe adjacent to the drainage end, each A stencil is arranged in each extraction hole, a blocking plate is provided at the extraction end of the extraction pipe, and a dredging pipe is arranged coaxially in the extraction pipe, one end of the dredging pipe is fixedly connected with the inner wall of the blocking plate, and the outside of the dredging pipe is connected with the extraction pipe. There are connecting support rods between the inner walls of the mining pipes, and the side of the dredging pipe is provided with air nozzles corresponding to each screen plate one by one. The other end of the dredging pipe is connected to an air supply pipe through an elbow, and the air supply pipe is vertical. It passes through the extraction pipe and extends into the roadway, and the air supply pipe is provided with a one-way valve; the outer circle of the extraction pipe is covered with a limit plate, and the limit plate is provided with a filling hole. A sleeve with the same center line as the limit plate is fixed on the edge, and a circle of sharp structures is provided on the peripheral edge of the end of the sleeve facing the blocking plate. The position ring and the sleeve are respectively located on both sides of the limit disc. 2.根据权利要求1所述的用于瓦斯抽采的防抽气堵塞及抽采孔外封堵装置,其特征在于:送风管与抽采管外壁连接处设有密封圈,送风管上套设有压紧套,送风管上螺纹连接有将压紧套紧压密封圈外圆周的锁紧螺母。2. The anti-gas extraction blockage and drainage hole plugging device for gas extraction according to claim 1, characterized in that: a sealing ring is provided at the connection between the air supply pipe and the outer wall of the extraction pipe, and the air supply pipe The upper sleeve is provided with a compression sleeve, and the upper thread of the air supply pipe is connected with a lock nut for pressing the compression sleeve tightly against the outer circumference of the sealing ring.
CN201621237003.8U 2016-11-18 2016-11-18 For the anti-pumping blocking of gas pumping and the outer plugging device of drainage holes Expired - Fee Related CN206233896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621237003.8U CN206233896U (en) 2016-11-18 2016-11-18 For the anti-pumping blocking of gas pumping and the outer plugging device of drainage holes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621237003.8U CN206233896U (en) 2016-11-18 2016-11-18 For the anti-pumping blocking of gas pumping and the outer plugging device of drainage holes

Publications (1)

Publication Number Publication Date
CN206233896U true CN206233896U (en) 2017-06-09

Family

ID=58990323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621237003.8U Expired - Fee Related CN206233896U (en) 2016-11-18 2016-11-18 For the anti-pumping blocking of gas pumping and the outer plugging device of drainage holes

Country Status (1)

Country Link
CN (1) CN206233896U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351606A (en) * 2016-11-18 2017-01-25 河南理工大学 Method for improving hole sealing effect based on drilled surrounding rock fracture structure
CN111608723A (en) * 2020-06-09 2020-09-01 四川川煤华荣能源股份有限公司 Drainage method for gas extraction hole
CN114183187A (en) * 2021-12-06 2022-03-15 中铁十七局集团第三工程有限公司 Gas treatment equipment for gas tunnel construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351606A (en) * 2016-11-18 2017-01-25 河南理工大学 Method for improving hole sealing effect based on drilled surrounding rock fracture structure
CN111608723A (en) * 2020-06-09 2020-09-01 四川川煤华荣能源股份有限公司 Drainage method for gas extraction hole
CN111608723B (en) * 2020-06-09 2021-08-24 四川川煤华荣能源股份有限公司 Drainage method for gas extraction hole
CN114183187A (en) * 2021-12-06 2022-03-15 中铁十七局集团第三工程有限公司 Gas treatment equipment for gas tunnel construction

Similar Documents

Publication Publication Date Title
CN206722798U (en) A kind of combined type coal-bed flooding pressure break and gas pumping one hole sealing device
CN104563958B (en) A sealing device
CN109488250A (en) Hole sealing device and method can be recycled in a kind of coal bed gas extraction drilling mucus dynamic
CN103557012B (en) A kind of roadway with large deformation wall rock grouting fastening carrying structure and construction method
CN206233896U (en) For the anti-pumping blocking of gas pumping and the outer plugging device of drainage holes
CN106351606B (en) The method for improving sealing of hole effect based on wall-rock crack holing structure
CN104405358A (en) Method for fracturing coal seam by employing high-pressure gas
CN209261534U (en) A combined coal seam water injection and gas drainage sealing device
CN203626720U (en) Anti-spray orifice multi-section bag hole packer
CN101457654A (en) Telescopic type pumping hole packer
CN204781016U (en) Gasbag formula open trench tunnel movement joint seal structure
CN107842350B (en) A kind of method that extraction rate is improved in the high gas remainder quantity coal seam of underground coal mine
CN207073674U (en) A kind of crude oil pipeline perforation plugging device
CN210370586U (en) Water outlet elevation drilling and grouting water stopping device
CN204402406U (en) A kind of down-hole coal bed mash gas pumping drilling prosthetic device
CN204646172U (en) Pressure sealing casing head can be repaired
CN203476278U (en) Grouting type hole sealing and automatic water discharging device for underground drilling gas extraction
CN204476353U (en) A kind of mash gas pumping drilling plugging device
CN207315381U (en) A kind of shield launching sealing device
CN103541679B (en) Combined hole sealing method for hydraulic fracturing drilling in coal mine
CN203101382U (en) Injecting paste material filter-pressing effect simulating device
CN204532411U (en) A kind of extension type flushing type gas drainage hole-sealing device
CN203430466U (en) Drill hole sealing device for gas extraction of coal mine
CN205349408U (en) Equipment of putting is taken out to high -pressure coal mine gas of many units
CN205558865U (en) Gas drainage hole sealing slip casting device for coal mine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609

Termination date: 20171118