[go: up one dir, main page]

CN206232144U - An automatic tube feeding mechanism - Google Patents

An automatic tube feeding mechanism Download PDF

Info

Publication number
CN206232144U
CN206232144U CN201621047318.6U CN201621047318U CN206232144U CN 206232144 U CN206232144 U CN 206232144U CN 201621047318 U CN201621047318 U CN 201621047318U CN 206232144 U CN206232144 U CN 206232144U
Authority
CN
China
Prior art keywords
guide rail
feeding mechanism
driver
clip assembly
clamping plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621047318.6U
Other languages
Chinese (zh)
Inventor
胡泳江
曾冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Mimaisi Automation Equipment Co ltd
Original Assignee
Dongguan Mimaisi Automation Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Mimaisi Automation Equipment Co ltd filed Critical Dongguan Mimaisi Automation Equipment Co ltd
Priority to CN201621047318.6U priority Critical patent/CN206232144U/en
Application granted granted Critical
Publication of CN206232144U publication Critical patent/CN206232144U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Intermediate Stations On Conveyors (AREA)

Abstract

The utility model relates to an automatic pipe feeding mechanism, include along the initial first guide rail that carries the direction level formation of pipe position to terminal point feeding position, follow first guide rail synchronous movement's the clamp subassembly that is used for the centre gripping pipe and drives the lift assembly and the drive of clamp subassembly lift movement the clamp subassembly with lift assembly follows first guide rail synchronous movement's first driver, lift assembly with the clamp subassembly is connected, the clamp subassembly with lift assembly installs on the first guide rail. The utility model discloses an automatic pipe feeding mechanism can carry the pipe of putting on the pipe carrier in disorder to conveyer belt or other mechanisms, makes the pipe only one deck and orderly arrange, and rethread conveyer belt transmission reaches at last and can feed the pipe one by one to the equipment of any kind of pipe processing, and whole process can not produce the friction to protect the pipe well and avoid wearing and tearing.

Description

一种自动喂管机构An automatic tube feeding mechanism

技术领域technical field

本实用新型涉及传输设备技术领域,更具体地说,涉及一种自动喂管机构。The utility model relates to the technical field of transmission equipment, in particular to an automatic tube feeding mechanism.

背景技术Background technique

现有技术中的喂管机构在运输管子过程容易产生摩擦,管子表面易受磨损,造成损失。The pipe feeding mechanism in the prior art is prone to friction during the pipe transportation process, and the surface of the pipe is susceptible to abrasion, resulting in losses.

实用新型内容Utility model content

本实用新型的目的在于提供一种自动喂管机构,解决了现有技术中喂管机构在运输管子过程容易产生摩擦导致管子表面受损的问题。The purpose of the utility model is to provide an automatic tube feeding mechanism, which solves the problem in the prior art that the tube feeding mechanism is prone to friction during the transportation of the tubes and causes the surface of the tubes to be damaged.

本实用新型解决技术问题所采用的技术方案是:一种自动喂管机构,包括沿初始载管位置至终点喂管位置的方向水平形成的第一导轨、沿所述第一导轨同步移动的用于夹持管子的夹子组件和带动所述夹子组件升降移动的升降组件、以及带动所述夹子组件和所述升降组件沿所述第一导轨同步移动的第一驱动器,所述升降组件与所述夹子组件相连接,所述夹子组件和所述升降组件安装在所述第一导轨上。The technical solution adopted by the utility model to solve the technical problem is: an automatic tube feeding mechanism, including a first guide rail formed horizontally along the direction from the initial tube loading position to the final tube feeding position, and a device that moves synchronously along the first guide rail. The clip assembly used to clamp the pipe, the lifting assembly that drives the clip assembly to move up and down, and the first driver that drives the clip assembly and the lifting assembly to move synchronously along the first guide rail, the lifting assembly and the The clip assembly is connected, and the clip assembly and the lifting assembly are installed on the first guide rail.

在本实用新型的自动喂管机构中,所述升降组件包括可升降移动的主体,所述主体的一端与所述夹子组件相连接,在所述主体上形成有齿条,所述齿条上啮合有用于带动所述主体升降移动的驱动轮,所述驱动轮连接有第二驱动器且所述第二驱动器为所述驱动轮提供动力。In the automatic tube feeding mechanism of the present utility model, the lifting assembly includes a main body that can be moved up and down, one end of the main body is connected with the clip assembly, a rack is formed on the main body, and a rack is formed on the rack. A drive wheel for driving the main body to move up and down is engaged, the drive wheel is connected with a second driver, and the second driver provides power for the drive wheel.

在本实用新型的自动喂管机构中,所述夹子组件和所述升降组件通过滑动连接板安装在所述第一导轨上,所述滑动连接板上设置有与所述第一导轨相匹配的第一滑块,所述第一滑块与所述第一导轨滑动连接,所述夹子组件安装在所述滑动连接板的下方,所述升降组件安装在所述滑动连接板的上方,所述主体向下穿插至所述滑动连接板的下方并与所述夹子组件相连接,所述第二驱动器和驱动轮安装在所述滑动连接板上。In the automatic tube feeding mechanism of the present utility model, the clip assembly and the lifting assembly are installed on the first guide rail through a sliding connecting plate, and the sliding connecting plate is provided with a a first slider, the first slider is slidably connected to the first guide rail, the clip assembly is installed below the sliding connection plate, the lifting assembly is installed above the sliding connection plate, the The main body penetrates downwards to the bottom of the sliding connection plate and is connected with the clip assembly, and the second driver and the driving wheel are installed on the sliding connection plate.

在本实用新型的自动喂管机构中,所述主体上形成有滑动导向轨,所述滑动连接板上安装有与所述滑动导向轨相匹配的滑槽。In the automatic tube feeding mechanism of the present utility model, a sliding guide rail is formed on the main body, and a chute matching the sliding guide rail is installed on the sliding connecting plate.

在本实用新型的自动喂管机构中,所述夹子组件包括相对设置的第一夹板和第二夹板,所述第一夹板配置有带动所述第一夹板朝向所述第二夹板移动的第三驱动器,所述第二夹板配置有带动所述第二夹板朝向所述第一夹板移动的第四驱动器,所述第三驱动器和第四驱动器分别相对应地带动所述第一夹板和第二夹板同步相对运动实现夹紧动作和同步相背离运动实现松开动作。In the automatic tube feeding mechanism of the present utility model, the clip assembly includes a first clamping plate and a second clamping plate oppositely arranged, and the first clamping plate is equipped with a third clamping plate that drives the first clamping plate to move toward the second clamping plate. A driver, the second splint is equipped with a fourth driver that drives the second splint to move toward the first splint, and the third driver and the fourth driver correspondingly drive the first splint and the second splint respectively The synchronous relative movement realizes the clamping action and the synchronous phase departure movement realizes the loosening action.

在本实用新型的自动喂管机构中,所述夹子组件还包括有相对设置的两个第二导轨,在所述第一夹板和所述第二夹板上分别设置有与每一所述第二导轨相匹配的第二滑块,每一所述第二滑块与相对应的所述第二导轨滑动连接。In the automatic tube feeding mechanism of the present utility model, the clip assembly also includes two second guide rails oppositely arranged, and each second guide rail is respectively provided on the first clamping plate and the second clamping plate. A second sliding block that matches the guide rail, and each second sliding block is slidingly connected to the corresponding second guide rail.

在本实用新型的自动喂管机构中,所述第一夹板与所述第二滑块之间以及所述第二夹板与所述第二滑块之间分别通过连接板相连接,所述第三驱动器的驱动端和所述第四驱动器的驱动端分别与相对应的所述连接板相连接。In the automatic tube feeding mechanism of the present utility model, between the first splint and the second slider and between the second splint and the second slider are respectively connected by connecting plates. The driving ends of the three drivers and the driving end of the fourth driver are respectively connected to the corresponding connecting plates.

在本实用新型的自动喂管机构中,所述第一夹板与所述第二夹板的相对侧壁上分别设置有柔韧体。In the automatic tube feeding mechanism of the present invention, flexible bodies are respectively arranged on opposite side walls of the first splint and the second splint.

在本实用新型的自动喂管机构中,所述夹子组件还包括至少一用于通过红外线感应最高点管子的感应器。In the automatic tube feeding mechanism of the present invention, the clip assembly further includes at least one sensor for sensing the tube at the highest point by infrared rays.

实施本实用新型的自动喂管机构,具有以下有益效果:本实用新型的自动喂管机构可将凌乱地放在载管车上的管子搬运到输送带或其它机构上,使管子只有一层而整齐的排好,再通过输送带传输,最后达到可以将管子一根一根地喂到任何一种管加工的设备上,整个过程不会产生摩擦,从而很好地保护管子免受磨损,该自动喂管机构适合所有管型,尤其是异型管。Implementing the automatic pipe feeding mechanism of the present utility model has the following beneficial effects: the automatic pipe feeding mechanism of the present utility model can transport the pipes placed messily on the pipe loading vehicle to the conveyor belt or other mechanisms, so that the pipes have only one layer and Neatly arranged, and then transported by the conveyor belt, and finally the tubes can be fed one by one to any kind of tube processing equipment. The whole process will not produce friction, so that the tubes are well protected from wear and tear. The automatic tube feeding mechanism is suitable for all tube shapes, especially shaped tubes.

附图说明Description of drawings

图1为本实用新型的自动喂管机构的第一角度的结构示意图;Fig. 1 is the structural representation of the first angle of the automatic pipe feeding mechanism of the present utility model;

图2为本实用新型的自动喂管机构的第二角度的结构示意图;Fig. 2 is the structural representation of the second angle of the automatic pipe feeding mechanism of the present utility model;

图3为本实用新型的自动喂管机构的第三角度的结构示意图;Fig. 3 is the structural representation of the third angle of the automatic pipe feeding mechanism of the present utility model;

图4为本实用新型的自动喂管机构的局部第一角度的放大示意图;Fig. 4 is the enlarged schematic view of the partial first angle of the automatic pipe feeding mechanism of the present invention;

图5为本实用新型的自动喂管机构的局部第二角度的放大示意图。Fig. 5 is an enlarged schematic diagram of a partial second angle of the automatic tube feeding mechanism of the present invention.

具体实施方式detailed description

下面结合附图和实施例,对本实用新型的自动喂管机构的结构及作用原理作进一步说明:Below in conjunction with accompanying drawing and embodiment, the structure and function principle of automatic pipe feeding mechanism of the present utility model are further explained:

在本实用新型的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”、“顺时针”、“逆时针”等指示方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In describing the present utility model, it should be understood that the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", "Vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships are based on the orientations or positions shown in the drawings The relationship is only for the convenience of describing the utility model and simplifying the description, but does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as a limitation of the utility model.

如图1-3所示,一种自动喂管机构,包括安装架1,在安装架1上设置有沿初始载管位置至终点喂管位置的方向水平形成的第一导轨2,也就是第一导轨2从装载待喂管的载管车导向至用于传输管子的输送带等之类的,在第一导轨2上安装有沿第一导轨2同步移动的用于夹持管子的夹子组件3和带动夹子组件3升降移动的升降组件4,升降组件4与夹子组件3相连接,如图4所示,在安装架1上还安装有带动夹子组件3和升降组件4沿第一导轨2同步移动的第一驱动器5。其中第一驱动器5可以为气缸、液压缸或电机等。As shown in Figure 1-3, an automatic tube feeding mechanism includes a mounting frame 1, on which is provided a first guide rail 2 formed horizontally along the direction from the initial tube loading position to the final tube feeding position, that is, the first A guide rail 2 is guided from the pipe carrier truck loaded with pipes to be fed to the conveyor belt for transporting pipes, etc., and the clamp assembly for clamping pipes that moves synchronously along the first guide rail 2 is installed on the first guide rail 2 3 and the lifting assembly 4 that drives the clip assembly 3 to lift and move. Synchronous movement of the first drive 5. Wherein the first driver 5 may be an air cylinder, a hydraulic cylinder, or an electric motor.

如图4所示,夹子组件3和升降组件4通过滑动连接板6安装在第一导轨2上,滑动连接板6上设置有与第一导轨2相匹配的第一滑块7,第一滑块7与第一导轨2滑动连接,夹子组件3安装在滑动连接板6的下方,升降组件4安装在滑动连接板6的上方。As shown in Figure 4, the clip assembly 3 and the lifting assembly 4 are installed on the first guide rail 2 through the sliding connecting plate 6, and the first sliding block 7 matched with the first guiding rail 2 is arranged on the sliding connecting plate 6. The block 7 is slidably connected with the first guide rail 2 , the clip assembly 3 is installed under the sliding connection plate 6 , and the lifting assembly 4 is installed above the sliding connection plate 6 .

在本实施例中,升降组件4包括可升降移动的主体41,主体41的一端向下穿插至滑动连接板6的下方并与夹子组件3相连接,在主体41上形成有齿条411,齿条411上啮合有用于带动主体41升降移动的驱动轮(图中未标示),驱动轮连接有第二驱动器42且第二驱动器42为驱动轮提供动力。第二驱动器42可以为电机或马达等。第二驱动器42和驱动轮安装在滑动连接板6上。由第二驱动器42带动驱动轮转动,主体41上的齿条411与驱动轮啮合进而上下移动,进而夹子组件3随主体41升降移动。In this embodiment, the lifting assembly 4 includes a main body 41 that can be moved up and down. One end of the main body 41 penetrates downwards to the bottom of the sliding connecting plate 6 and is connected with the clip assembly 3. A rack 411 is formed on the main body 41. The teeth A driving wheel (not shown in the figure) is engaged with the bar 411 to drive the main body 41 to move up and down. The driving wheel is connected to a second driver 42 and the second driver 42 provides power for the driving wheel. The second driver 42 can be a motor or a motor, etc. The second driver 42 and the driving wheel are installed on the sliding connecting plate 6 . The driving wheel is driven by the second driver 42 to rotate, the rack 411 on the main body 41 meshes with the driving wheel and then moves up and down, and then the clip assembly 3 moves up and down with the main body 41 .

在主体41上形成有滑动导向轨412,滑动连接板6上安装有与滑动导向轨412相匹配的滑槽43,滑动导向轨412与滑槽43之间滑动连接。在其它实施例中,也可以不设计滑动动导向轨412和滑槽43。A sliding guide rail 412 is formed on the main body 41 , and a sliding groove 43 matching the sliding guiding rail 412 is installed on the sliding connecting plate 6 , and the sliding guiding rail 412 is slidably connected to the sliding groove 43 . In other embodiments, the sliding guide rail 412 and the slide groove 43 may not be designed.

在其它实施例中(未有图标示),升降组件4也可以通过钢丝绳吊住夹子组件3,通过导向轮导向,由驱动器(电机、马达等)带动钢丝绳移动,进而带动夹子组件3升降移动。In other embodiments (not shown), the lifting assembly 4 can also hang the clamp assembly 3 through a wire rope, guide the guide wheel, and drive the wire rope to move by the driver (motor, motor, etc.), and then drive the clip assembly 3 to move up and down.

夹子组件3包括相对设置的两个第一支架31,在两个第一支架31之间相对设置有两个第二导轨32,每一个第二导轨32的两端连接在两个第一支架31上。在两个第一支架31之间并列平行设置有第二支架33,主体41与第二支架33相连接,第二支架33的两端分别与两个第二导轨32相连接。The clip assembly 3 includes two first brackets 31 oppositely arranged, and two second guide rails 32 are arranged oppositely between the two first brackets 31 , and the two ends of each second guide rail 32 are connected to the two first brackets 31 superior. Between the two first brackets 31 , a second bracket 33 is arranged in parallel. The main body 41 is connected to the second bracket 33 , and both ends of the second bracket 33 are respectively connected to the two second guide rails 32 .

如图4-5所示,夹子组件3还包括相对设置的第一夹板34和第二夹板35,第一夹板34配置有带动第一夹板34朝向第二夹板35移动的第三驱动器36,第二夹板35配置有带动第二夹板35朝向第一夹板34移动的第四驱动器37,通过第三驱动器36和第四驱动器37带动第一夹板34和第二夹板35同步相对运动实现夹紧和同步相背离运动实现松开动作。其中,第三驱动器36和第四驱动器37分别各自为气缸、液压缸或电机等等。As shown in FIGS. 4-5 , the clip assembly 3 also includes a first clamping plate 34 and a second clamping plate 35 oppositely arranged. The first clamping plate 34 is configured with a third driver 36 that drives the first clamping plate 34 to move toward the second clamping plate 35 . The second clamping plate 35 is equipped with a fourth driver 37 that drives the second clamping plate 35 to move towards the first clamping plate 34, and the first clamping plate 34 and the second clamping plate 35 are driven by the third driver 36 and the fourth driver 37 to move synchronously relative to each other to realize clamping and synchronization The movement away from each other realizes the release action. Wherein, the third driver 36 and the fourth driver 37 are air cylinders, hydraulic cylinders or motors, etc. respectively.

在第一夹板34和第二夹板35上分别设置有与每一第二导轨32相匹配的第二滑块38,每一第二滑块38与相对应的第二导轨32滑动连接。具体地,第一夹板34与第二滑块38之间以及第二夹板35与第二滑块38之间分别通过连接板39相连接,第三驱动器36的驱动端和第四驱动器37的驱动端分别与相对应的连接板39相连接。A second sliding block 38 matching with each second guide rail 32 is respectively arranged on the first clamping plate 34 and the second clamping plate 35 , and each second sliding block 38 is slidably connected with the corresponding second guide rail 32 . Specifically, between the first clamping plate 34 and the second slider 38 and between the second clamping plate 35 and the second slider 38 are respectively connected through a connecting plate 39, the driving end of the third driver 36 and the driving end of the fourth driver 37 The ends are respectively connected with the corresponding connecting plates 39.

在第一夹板34与第二夹板35的相对侧壁上分别设置有柔韧体40(图中未标示),该柔韧体40可以为橡胶、硅胶或海绵体等,进而方便夹持管子。Flexible bodies 40 (not shown in the figure) are provided on the opposite side walls of the first clamping plate 34 and the second clamping plate 35 respectively, and the flexible bodies 40 can be rubber, silica gel or sponge, so as to facilitate clamping of pipes.

夹子组件3还包括至少一用于通过红外线感应最高点管子的感应器(图中未有标示),在本实施例中,感应器的数量为两个,且分别安装在两个第二导轨32的下方,并比第一夹板34和第二夹板35的底端位置略低。在其它实施例中,感应器的数量也可以为一个或四个。The clip assembly 3 also includes at least one sensor (not shown in the figure) for sensing the highest point pipe by infrared rays. In this embodiment, the number of the sensor is two, and they are installed on two second guide rails 32 respectively. and slightly lower than the bottom positions of the first clamping plate 34 and the second clamping plate 35. In other embodiments, the number of sensors can also be one or four.

工作原理如下:第一驱动器5驱动夹子组件3和升降组件4同步移动至载管车的位置,由升降组件4的主体41带动夹子组件3向下移动,当感应器探测到凌乱管子的最高点时,夹子组件3停止下降,启动第一夹板34和第二夹板35夹持管子,然后再通过升降组件4提升夹子组件3,之后由第一驱动器5驱动夹子组件3和升降组件4同步移动至输送带的位置,第一夹板34和第二夹板35松开,使管子落至输送带上。The working principle is as follows: the first driver 5 drives the clip assembly 3 and the lifting assembly 4 to move synchronously to the position of the pipe loading vehicle, and the main body 41 of the lifting assembly 4 drives the clip assembly 3 to move downward. When the sensor detects the highest point of the messy pipe , the clamp assembly 3 stops descending, starts the first clamping plate 34 and the second clamping plate 35 to clamp the pipe, and then lifts the clamp assembly 3 through the lifting assembly 4, and then the first driver 5 drives the clamping assembly 3 and the lifting assembly 4 to move synchronously to The position of the conveyor belt, the first clamping plate 34 and the second clamping plate 35 are loosened, and the pipe is dropped onto the conveyor belt.

应当理解的是,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,所有改进或变换都应属于本实用新型所附权利要求的保护范围之内。It should be understood that those skilled in the art can make improvements or changes based on the above description, and all improvements or changes should fall within the protection scope of the appended claims of the present utility model.

Claims (9)

1.一种自动喂管机构,其特征在于,包括沿初始载管位置至终点喂管位置的方向水平形成的第一导轨(2)、沿所述第一导轨(2)同步移动的用于夹持管子的夹子组件(3)和带动所述夹子组件(3)升降移动的升降组件(4)、以及带动所述夹子组件(3)和所述升降组件(4)沿所述第一导轨(2)同步移动的第一驱动器(5),所述升降组件(4)与所述夹子组件(3)相连接,所述夹子组件(3)和所述升降组件(4)安装在所述第一导轨(2)上。1. An automatic tube feeding mechanism, characterized in that it comprises a first guide rail (2) formed horizontally along the direction from the initial tube loading position to the terminal tube feeding position, a device for synchronously moving along the first guide rail (2) The clip assembly (3) for clamping the pipe and the lifting assembly (4) that drives the clip assembly (3) to move up and down, and drives the clip assembly (3) and the lifting assembly (4) along the first guide rail (2) The first driver (5) that moves synchronously, the lifting assembly (4) is connected with the clip assembly (3), and the clip assembly (3) and the lifting assembly (4) are installed on the on the first rail (2). 2.根据权利要求1所述的自动喂管机构,其特征在于,所述升降组件(4)包括可升降移动的主体(41),所述主体(41)的一端与所述夹子组件(3)相连接,在所述主体(41)上形成有齿条(411),所述齿条(411)上啮合有用于带动所述主体(41)升降移动的驱动轮,所述驱动轮连接有第二驱动器(42)且所述第二驱动器(42)为所述驱动轮提供动力。2. The automatic tube feeding mechanism according to claim 1, characterized in that, the lifting assembly (4) includes a main body (41) that can be moved up and down, and one end of the main body (41) is connected to the clip assembly (3) ), a rack (411) is formed on the main body (41), and a driving wheel for driving the main body (41) to move up and down is engaged on the rack (411), and the driving wheel is connected with A second drive (42) and the second drive (42) powers the drive wheels. 3.根据权利要求2所述的自动喂管机构,其特征在于,所述夹子组件(3)和所述升降组件(4)通过滑动连接板(6)安装在所述第一导轨(2)上,所述滑动连接板(6)上设置有与所述第一导轨(2)相匹配的第一滑块(7),所述第一滑块(7)与所述第一导轨(2)滑动连接,所述夹子组件(3)安装在所述滑动连接板(6)的下方,所述升降组件(4)安装在所述滑动连接板(6)的上方,所述主体(41)向下穿插至所述滑动连接板(6)的下方并与所述夹子组件(3)相连接,所述第二驱动器(42)和驱动轮安装在所述滑动连接板(6)上。3. The automatic tube feeding mechanism according to claim 2, characterized in that, the clip assembly (3) and the lifting assembly (4) are installed on the first guide rail (2) through a sliding connecting plate (6) On the sliding connection plate (6) is provided with a first slider (7) matching the first guide rail (2), the first slider (7) and the first guide rail (2) ) sliding connection, the clip assembly (3) is installed below the sliding connecting plate (6), the lifting assembly (4) is installed above the sliding connecting plate (6), and the main body (41) The second driver (42) and the driving wheel are installed on the sliding connecting plate (6) and penetrate downward to the bottom of the sliding connecting plate (6) and connected with the clip assembly (3). 4.根据权利要求3所述的自动喂管机构,其特征在于,所述主体(41)上形成有滑动导向轨(412),所述滑动连接板(6)上安装有与所述滑动导向轨(412)相匹配的滑槽(43)。4. The automatic tube feeding mechanism according to claim 3, characterized in that, a sliding guide rail (412) is formed on the main body (41), and a sliding guide rail (412) is installed on the sliding connecting plate (6) to connect with the sliding guide rail. Rail (412) matching chute (43). 5.根据权利要求1所述的自动喂管机构,其特征在于,所述夹子组件(3)包括相对设置的第一夹板(34)和第二夹板(35),所述第一夹板(34)配置有带动所述第一夹板(34)朝向所述第二夹板(35)移动的第三驱动器(36),所述第二夹板(35)配置有带动所述第二夹板(35)朝向所述第一夹板(34)移动的第四驱动器(37),所述第三驱动器(36)和第四驱动器(37)分别相对应地带动所述第一夹板(34)和第二夹板(35)同步相对运动实现夹紧动作和同步相背离运动实现松开动作。5. The automatic tube feeding mechanism according to claim 1, characterized in that, the clip assembly (3) comprises a first clamping plate (34) and a second clamping plate (35) oppositely arranged, and the first clamping plate (34) ) is configured with a third driver (36) that drives the first splint (34) to move toward the second splint (35), and the second splint (35) is configured to drive the second splint (35) toward The fourth driver (37) that the first clamping plate (34) moves, the third driver (36) and the fourth driver (37) correspondingly drive the first clamping plate (34) and the second clamping plate ( 35) The synchronous relative movement realizes the clamping action and the synchronous phase departure movement realizes the loosening action. 6.根据权利要求5所述的自动喂管机构,其特征在于,所述夹子组件(3)还包括有相对设置的两个第二导轨(32),在所述第一夹板(34)和所述第二夹板(35)上分别设置有与每一所述第二导轨(32)相匹配的第二滑块(38),每一所述第二滑块(38)与相对应的所述第二导轨(32)滑动连接。6. The automatic tube feeding mechanism according to claim 5, characterized in that, the clip assembly (3) also includes two second guide rails (32) arranged oppositely, between the first splint (34) and The second clamping plate (35) is respectively provided with a second slider (38) matched with each of the second guide rails (32), and each of the second sliders (38) is matched with the corresponding The second guide rail (32) is slidingly connected. 7.根据权利要求6所述的自动喂管机构,其特征在于,所述第一夹板(34)与所述第二滑块(38)之间以及所述第二夹板(35)与所述第二滑块(38)之间分别通过连接板(39)相连接,所述第三驱动器(36)的驱动端和所述第四驱动器(37)的驱动端分别与相对应的所述连接板(39)相连接。7. The automatic tube feeding mechanism according to claim 6, characterized in that, between the first clamping plate (34) and the second slider (38) and between the second clamping plate (35) and the The second sliders (38) are respectively connected by connecting plates (39), and the driving end of the third driver (36) and the driving end of the fourth driver (37) are respectively connected to the corresponding plate (39) is connected. 8.根据权利要求5所述的自动喂管机构,其特征在于,所述第一夹板(34)与所述第二夹板(35)的相对侧壁上分别设置有柔韧体(40)。8. The automatic tube feeding mechanism according to claim 5, characterized in that, flexible bodies (40) are respectively provided on opposite side walls of the first splint (34) and the second splint (35). 9.根据权利要求1所述的自动喂管机构,其特征在于,所述夹子组件(3)还包括至少一用于通过红外线感应最高点管子的感应器。9. The automatic tube feeding mechanism according to claim 1, characterized in that the clip assembly (3) further comprises at least one sensor for sensing the tube at the highest point by infrared rays.
CN201621047318.6U 2016-09-09 2016-09-09 An automatic tube feeding mechanism Expired - Fee Related CN206232144U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621047318.6U CN206232144U (en) 2016-09-09 2016-09-09 An automatic tube feeding mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621047318.6U CN206232144U (en) 2016-09-09 2016-09-09 An automatic tube feeding mechanism

Publications (1)

Publication Number Publication Date
CN206232144U true CN206232144U (en) 2017-06-09

Family

ID=58981877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621047318.6U Expired - Fee Related CN206232144U (en) 2016-09-09 2016-09-09 An automatic tube feeding mechanism

Country Status (1)

Country Link
CN (1) CN206232144U (en)

Similar Documents

Publication Publication Date Title
CN106167180B (en) Automatic unloading robot system
CN106170594A (en) For laying and regain the accessory of road cone
CN102303658B (en) Automatic tire feeding system
CN111532801B (en) System for recycling on-line and empty boxes of automobile body wire harness and control method
CN107413979A (en) A kind of metal board beader feed mechanism
CN105000206A (en) Battery case film covering method
CN109250516A (en) A kind of cantilever palletizing machine
CN202953505U (en) Material conveyor
CN204038979U (en) Material box hoisters
CN208132520U (en) A kind of workpiece steering feeding mechanism for automotive seat pipe fitting automatic processing system
CN104724503A (en) Clamping and stacking device
CN206232144U (en) An automatic tube feeding mechanism
CN209922141U (en) Integrated laser automatic feeding and discharging mechanism
CN207645375U (en) One kind is novel to tear palletizing apparatus open
CN206654572U (en) Induction system for entrucking
CN219363165U (en) Automatic get goods robot
CN102182507A (en) Telescopic height-regulating transferring device of belt conveyer
CN205589549U (en) Automatic around sticky tape mechanism
CN205574953U (en) Turnaround draw gear
CN108820819A (en) A kind of work transfer device
CN209896587U (en) Cable conveyor for shore power telescopic arm cable reel
ITMI20090035A1 (en) WAREHOUSE OF TRANSPORT UNIT FOR ROPE TRANSPORTATION SYSTEMS AND METHOD OF DRIVING THIS WAREHOUSE
CN206288680U (en) Profile shapes automatic basket loading equipment
CN109484796B (en) Power and free chain with vertical lifting up-down part system
CN219194412U (en) Translation type polar roll conveying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609

Termination date: 20210909