CN206204972U - A kind of prefabricated tubular pile as well-points dewatering - Google Patents

A kind of prefabricated tubular pile as well-points dewatering Download PDF

Info

Publication number
CN206204972U
CN206204972U CN201621175920.8U CN201621175920U CN206204972U CN 206204972 U CN206204972 U CN 206204972U CN 201621175920 U CN201621175920 U CN 201621175920U CN 206204972 U CN206204972 U CN 206204972U
Authority
CN
China
Prior art keywords
well
pile
prefabricated
concrete pipe
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621175920.8U
Other languages
Chinese (zh)
Inventor
陈明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI OPEN STEEL JOIST CO Ltd
Original Assignee
SHANGHAI OPEN STEEL JOIST CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI OPEN STEEL JOIST CO Ltd filed Critical SHANGHAI OPEN STEEL JOIST CO Ltd
Priority to CN201621175920.8U priority Critical patent/CN206204972U/en
Application granted granted Critical
Publication of CN206204972U publication Critical patent/CN206204972U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model proposes a kind of prefabricated tubular pile as well-points dewatering, including prefabricated concrete pipe pile and drain pipeline structure system;Prefabricated concrete pipe pile is cavity structure, and two ends are respectively openend and sealing end;The side wall of prefabricated concrete pipe pile is provided with several permeable holes, and filtrable water permeable device is provided with permeable hole;Drain pipeline structure system is provided with multiple pumping conduits, and the free end of pumping conduit is inserted from the openend of prefabricated concrete pipe pile.In this application, the plant equipment required for constructing is simple, and can construct part pile foundation in advance, for next step girder system, pier stud construction provide the scope of operation;By the use of adjacent stake holes as well-points dewatering well, prefabricated pile inner chamber forms natural well point, it is able to ensure that the construction quality of well point, and eliminate that original scene was substantial amounts of to punching, the construction operations such as arrangement derrick, wellhole impact shaping, it is substantial amounts of to have saved construction cost and human cost, improve the security and reasonability of Contraction in Site.

Description

A kind of prefabricated tubular pile as well-points dewatering
Technical field
The utility model is related to a kind of industry and residential construction area, more particularly to a kind of prefabricated pipe as well-points dewatering Stake.
Background technology
In the engineering constructions such as basement, deep foundation are carried out, if it is soil that earth's surface is husky or earth's surface upper strata, lower floor is When sand etc., might have substantial amounts of underground water gushes out, and causes landslide, cannot finally construct, and at this moment needs dewatering construction. Traditional Application of light well point precipitation has the following disadvantages:1st, construction manipulation process is complicated, and well-point arrangement will be according to foundation ditch flat shape Arranged with size etc., and the buried depth of foundation ditch is had to enter into water-bearing layer, and scene increases substantial amounts of production work;2nd, it is traditional Well-points dewatering needs to set substantial amounts of well point around foundation ditch, arranges large number of drainage pipeline;3rd, the arrangement of well point is by existing Field construction factor is larger.
Utility model content
The purpose of this utility model be to provide for a kind of economy and constructing operation performance it is all good as well-points dewatering Prefabricated tubular pile.
To achieve these goals, it is the utility model proposes a kind of prefabricated tubular pile as well-points dewatering including prefabricated mixed Solidifying soil pile tube and drain pipeline structure system;The prefabricated concrete pipe pile is cavity structure, and the prefabricated concrete pipe pile Two ends be respectively openend and sealing end;The side wall of the prefabricated concrete pipe pile is provided with several permeable holes, described Filtrable water permeable device is provided with water hole;The drain pipeline structure system is provided with multiple pumping conduits, the pumping conduit Free end inserted from the openend of the prefabricated concrete pipe pile.
Further, in the described prefabricated tubular pile as well-points dewatering, the sealing end of the prefabricated concrete pipe pile It is pyramidal structure.
Further, in the described prefabricated tubular pile as well-points dewatering, the permeable hole is along the precast concrete The horizontal direction of pile tube side wall is uniformly distributed, and vertical direction along side wall is evenly arranged at a certain distance.
Compared with prior art, the beneficial effects of the utility model are mainly reflected in:
1. convenience:Plant equipment required for construction is simple, and can construct part pile foundation in advance, be next step girder system, Pier stud construction provides the scope of operation;
2nd, implementation:By the use of adjacent stake holes as well-points dewatering well, prefabricated pile inner chamber forms natural well point, it can be ensured that well The construction quality of point;
3. economy:By the use of adjacent stake holes as well-points dewatering well, eliminate that original scene was substantial amounts of to punching, arrange derrick It is substantial amounts of to have saved construction cost and human cost Deng work;
4. security:By the use of adjacent stake holes as natural well-points dewatering well, it is to avoid it is live it is substantial amounts of punching, wellhole punching The dangerous construction operation such as shaping is hit, the security and reasonability of Contraction in Site is substantially increased.
Brief description of the drawings
Fig. 1 is the structural representation of the prefabricated tubular pile as well-points dewatering of the present utility model.
Specific embodiment
As shown in figure 1, the utility model proposes a kind of prefabricated tubular pile as well-points dewatering, including precast concrete pipe Stake 1 and drain pipeline structure system 2;The prefabricated concrete pipe pile 1 is cavity structure, and the prefabricated concrete pipe pile 1 Two ends are respectively openend 11 and sealing end 12;The side wall of the prefabricated concrete pipe pile 1 is provided with several permeable holes 3, institute State in permeable hole 3 and be provided with filtrable water permeable device, can effectively prevent other impurity such as silt into prefabricated concrete pipe pile 1 Inner chamber;The drain pipeline structure system 2 is provided with multiple pumping conduits 21, and the free end of the pumping conduit 21 is from described prefabricated The openend 11 of concrete tubular pile 1 is inserted, and the pumping conduit 21 can freely stretch into precast concrete pipe according to actual requirement 1 inner chamber of stake.
In the utility model, its preferred scheme is:The sealing end 12 of the prefabricated concrete pipe pile 1 is pyramidal structure, Enter underground beneficial to prefabricated concrete pipe pile 1.The permeable hole 3 is equal along the horizontal direction of the side wall of the prefabricated concrete pipe pile 1 Even distribution, and vertical direction along side wall is evenly arranged at a certain distance, rationally can effectively carry out high-efficient filter water conservancy project work.
Prefabricated concrete pipe pile 1 is pressed into design and specifies soil layer by pile driving equipment, and underground water is by prefabricated in each soil layer The permeable hole 3 with pervious function of the side wall of concrete tubular pile 1 is penetrated into pile tube, drawing water on the inside of prefabricated concrete pipe pile 1 Pipeline 21 will pour in the water to pile tube and discharges by pumping equipment, and drain pipeline structure system 2 can be easy to multiple pumping conduits 21 carry out drainage works simultaneously, so that this region part level of ground water reduction.
To sum up, in the present embodiment, a kind of prefabricated tubular pile as well-points dewatering of proposition, it has advantages below:
1. convenience:Plant equipment required for construction is simple, and can construct part pile foundation in advance, be next step girder system, Pier stud construction provides the scope of operation;
2nd, implementation:By the use of adjacent stake holes as well-points dewatering well, prefabricated pile inner chamber forms natural well point, it can be ensured that well The construction quality of point;
3. economy:By the use of adjacent stake holes as well-points dewatering well, eliminate that original scene was substantial amounts of to punching, arrange derrick It is substantial amounts of to have saved construction cost and human cost Deng work;
4. security:By the use of adjacent stake holes as natural well-points dewatering well, it is to avoid it is live it is substantial amounts of punching, wellhole punching The dangerous construction operation such as shaping is hit, the security and reasonability of Contraction in Site is substantially increased.

Claims (3)

1. a kind of prefabricated tubular pile as well-points dewatering, it is characterised in that including prefabricated concrete pipe pile and drain pipeline structure System;The prefabricated concrete pipe pile is cavity structure, and the two ends of the prefabricated concrete pipe pile are respectively openend and envelope Mouth end;The side wall of the prefabricated concrete pipe pile is provided with several permeable holes, is provided with filtrable permeable in the permeable hole Device;The drain pipeline structure system is provided with multiple pumping conduits, and the free end of the pumping conduit is from the concrete The openend insertion of native pile tube.
2. the prefabricated tubular pile as well-points dewatering according to claim 1, it is characterised in that the prefabricated concrete pipe pile Sealing end be pyramidal structure.
3. the prefabricated tubular pile as well-points dewatering according to claim 1, it is characterised in that the permeable hole is along described pre- The horizontal direction of concrete tubular pile side processed wall is uniformly distributed, and vertical direction along side wall is evenly arranged at a certain distance.
CN201621175920.8U 2016-10-27 2016-10-27 A kind of prefabricated tubular pile as well-points dewatering Expired - Fee Related CN206204972U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621175920.8U CN206204972U (en) 2016-10-27 2016-10-27 A kind of prefabricated tubular pile as well-points dewatering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621175920.8U CN206204972U (en) 2016-10-27 2016-10-27 A kind of prefabricated tubular pile as well-points dewatering

Publications (1)

Publication Number Publication Date
CN206204972U true CN206204972U (en) 2017-05-31

Family

ID=58758146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621175920.8U Expired - Fee Related CN206204972U (en) 2016-10-27 2016-10-27 A kind of prefabricated tubular pile as well-points dewatering

Country Status (1)

Country Link
CN (1) CN206204972U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894240A (en) * 2018-06-26 2018-11-27 兰州理工大学 Recyclable drainage of foundation pit system and recovery method
CN110080216A (en) * 2019-04-09 2019-08-02 中铁时代建筑设计院有限公司 A kind of water storage system and its construction method using supporting tubular pole
CN113123320A (en) * 2021-04-12 2021-07-16 宁波大学 Method for manufacturing multifunctional prefabricated pile body integrating water permeability or water impermeability, electric conduction or electric conduction
CN114382099A (en) * 2022-01-20 2022-04-22 济南轨道交通集团有限公司 Prefabricated hollow pile also serving as foundation pit dewatering well and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894240A (en) * 2018-06-26 2018-11-27 兰州理工大学 Recyclable drainage of foundation pit system and recovery method
CN110080216A (en) * 2019-04-09 2019-08-02 中铁时代建筑设计院有限公司 A kind of water storage system and its construction method using supporting tubular pole
CN110080216B (en) * 2019-04-09 2021-02-09 中铁时代建筑设计院有限公司 Water storage system utilizing supporting tubular piles and construction method thereof
CN113123320A (en) * 2021-04-12 2021-07-16 宁波大学 Method for manufacturing multifunctional prefabricated pile body integrating water permeability or water impermeability, electric conduction or electric conduction
CN114382099A (en) * 2022-01-20 2022-04-22 济南轨道交通集团有限公司 Prefabricated hollow pile also serving as foundation pit dewatering well and construction method thereof

Similar Documents

Publication Publication Date Title
CN101250868B (en) Precipitation prepressing association motive power induration deep densification method
CN103924602B (en) Deep Thick Soft Ground foundation ditch construction method
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN103758123A (en) Method for constructing protecting wall lining of cast-in-place manual hole digging pile
US11566390B2 (en) Construction method of reclaiming land from the sea based on basement utilization
CN103290848B (en) Large diameter arc-shaped steel sheet pile combined foundation pit retaining structure and construction method thereof
CN106759241A (en) A kind of vacuum method basement process discharge structure
CN102767174A (en) Dynamic and static water-discharging vibration method
CN102296617A (en) Post-grouting reinforcement construction method of flexible joints of diaphragm walls
CN103215945A (en) Stereo combined power drainage solidifying system and method for soft soil foundation of heterogeneous field
CN106120822B (en) A kind of method for protecting support and device that prevent mud stone from coming down
CN110117959B (en) Construction method for foundation pit support near river
CN105421498B (en) A kind of foundation ditch water-impervious and subsidence control method based on three-dimensional curtain gang of wells system
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN108277794B (en) Vacuum power consolidation composite drainage system for hydraulic filling soft soil foundation
CN102995647A (en) Underground water control method used for grouting and seepage insulation of pile hole
CN207003459U (en) Soft foundation cluster type layering precipitation no-arbitrary pricing pipe rams system
CN204386602U (en) Pressure regulating well pit shaft cavity collapse backfill auxiliary structure
CN208293556U (en) A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
CN108625402A (en) Foundation pit fertilizer slot ponding processing method
CN206143783U (en) Supporting device for preventing mud rock landslide
CN101967834A (en) Pulp concentration pool underground base structure with anti-floating function
CN202247924U (en) Assembled steel structure open caisson in pipe jacking construction
CN105970909B (en) Well point plastic strip vacuum preloading seepage consolidation joint precipitating, pre-pressing dynamic consolidation method
CN104895008B (en) The construction method of environmentally friendly ecology wallboard type with ribbing barricade shore protection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170531

CF01 Termination of patent right due to non-payment of annual fee