CN206052682U - A kind of gantry type board-plugging device for treatment of soft foundation - Google Patents
A kind of gantry type board-plugging device for treatment of soft foundation Download PDFInfo
- Publication number
- CN206052682U CN206052682U CN201620761450.7U CN201620761450U CN206052682U CN 206052682 U CN206052682 U CN 206052682U CN 201620761450 U CN201620761450 U CN 201620761450U CN 206052682 U CN206052682 U CN 206052682U
- Authority
- CN
- China
- Prior art keywords
- treatment
- gantry type
- plate
- soft foundation
- plugging device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
A kind of gantry type board-plugging device for treatment of soft foundation, which includes hoist engine, the actuating device for being arranged at saddle, the vibration hammer for being connected to actuating device and the sleeve pipe for being connected to vibration hammer, hoist engine driving transmission device;The front end of sleeve pipe is provided with plug, and plug includes plate-shaped member and is connected to the connection member of plate-shaped member, and the area of plate-shaped member is more than the area of the front end of sleeve pipe.Plastic draining board is connected to into plug, sleeve pipe has exclusion to act in its vicinity mud in down process, extends tube drawing certain hour and be then conducive to extruding force of the mud recovery around to sleeve pipe, so as to increase the pressure of steel plate, to ensure that plastic draining board is not rewinded.
Description
Technical field
This utility model is related to the realm of building construction, in particular to a kind of gantry type plate for treatment of soft foundation
Machine.
Background technology
Coastal, rivers, lakeland mud depth are deeper, typically at 5~30 meters, even up to 40 meters.For this silt
The deeper soft base of mud typically adopts pile foundation method, draining concretion method.Pile foundation method is mainly comprising cement mixing method, concrete prefabricated
Stake, bored concrete pile, draining concretion method are mainly plastic draining board draining.Compared with pile foundation method, plastic draining board treatment of soft foundation tool
Have the advantages that speed of application is fast, low cost.One board-plugging device daily can be with 10000~15000 meters of plate, the soft base in identical location
Using plastic draining board process, its cost is only the 1/10~1/5 of pile foundation method treatment of soft foundation, and economic advantages are fairly obvious.
Sand bedding course (generally 0.8~1 meter) is generally laid in existing plastic draining board treatment of soft foundation design in soft basic unit,
Plate construction is carried out on sand bedding course, wrench, back-up sand, precompressed of banketing then is buried.Have a disadvantage in that:First, soft base bearing capacity
Poor, construction machinery, personnel cannot be constructed thereon;Second, sand bedding course is laid immediately on soft base, is conducted oneself with dignity and is applied at which
Under work load action, 0.8~1 meter of sand bedding course will sink rapidly quickly, along with banket and precompressed after settle, sand bedding course will be deep
Deep to fall into below ground, as the purposes of transverse drainage passage, which will be unable to realize that drainage effect is greatly reduced.Plastic draining
In plate construction, modal problem is to rewind, and general conventional processing method increases chain method, overstriking Implant Method, sleeve to lengthen
Top water-filling method etc..Have a disadvantage in that, prevent the success rate for rewinding relatively low.
Utility model content
The purpose of this utility model is to provide a kind of gantry type board-plugging device for treatment of soft foundation, its prevent from rewinding into
Power is higher.
What embodiment of the present utility model was realized in:
A kind of gantry type board-plugging device for treatment of soft foundation, which includes hoist engine, the actuating device for being arranged at saddle, connection
To actuating device vibration hammer and be connected to the sleeve pipe of vibration hammer, hoist engine driving transmission device;The front end of sleeve pipe is provided with
Plug, plug include plate-shaped member and are connected to the connection member of plate-shaped member, and the area of plate-shaped member is more than before sleeve pipe
The area at end.
In this utility model preferred embodiment, the plate-shaped member of the above-mentioned gantry type board-plugging device for treatment of soft foundation
Shape is rectangle.
In this utility model preferred embodiment, the plate-shaped member of the above-mentioned gantry type board-plugging device for treatment of soft foundation is opened
It is provided with the installing hole of mounting and connection parts.
In this utility model preferred embodiment, the saddle of the above-mentioned gantry type board-plugging device for treatment of soft foundation is gate-type
Saddle.
In this utility model preferred embodiment, the actuating device bag of the above-mentioned gantry type board-plugging device for treatment of soft foundation
Include installing rack, be arranged at installing rack one end first pulley and be arranged at the second pulley of installing rack.
In this utility model preferred embodiment, the hoist engine of the above-mentioned gantry type board-plugging device for treatment of soft foundation includes
Motor and pass through motor-driven reel.
In this utility model preferred embodiment, the actuating device of the above-mentioned gantry type board-plugging device for treatment of soft foundation is also
Including rope, one end of rope is connected to the other end connection of the reel of hoist engine, rope through first pulley and second pulley and rope
To vibration hammer.
In this utility model preferred embodiment, the above-mentioned gantry type board-plugging device for treatment of soft foundation also includes control electricity
The control station of machine.
In this utility model preferred embodiment, the gantry type plate of the above-mentioned gantry type board-plugging device for treatment of soft foundation
Machine also includes that one end of base station is connected to saddle for installing the base station of hoist engine and control station.
In this utility model preferred embodiment, the base station of the above-mentioned gantry type board-plugging device for treatment of soft foundation is provided with
Roller.
The beneficial effect of this utility model embodiment is:Gantry type board-plugging device for treatment of soft foundation includes hoist engine, sets
The actuating device for being placed in saddle, the vibration hammer for being connected to actuating device and the sleeve pipe for being connected to vibration hammer, hoist engine drive and pass
Dynamic device;The front end of sleeve pipe is provided with plug, and plug includes plate-shaped member and is connected to the connection member of plate-shaped member, tabular
Plastic draining board is connected to plug more than the area of the front end of sleeve pipe by the area of part, and sleeve pipe is in down process to sleeve pipe
Surrounding mud has exclusion to act on, and extends tube drawing certain hour and is then conducive to extruding force of the mud recovery around to sleeve pipe, so as to increase
Plus the pressure of steel plate, to ensure that plastic draining board is not rewinded.
Description of the drawings
In order to be illustrated more clearly that the technical scheme of this utility model embodiment, below will be to using needed for embodiment
Accompanying drawing be briefly described, it will be appreciated that the following drawings illustrate only some embodiments of the present utility model, therefore should not be by
Regard the restriction to scope as, for those of ordinary skill in the art, on the premise of not paying creative work, may be used also
To obtain other related accompanying drawings according to these accompanying drawings.
Fig. 1 is the side schematic view of the gantry type board-plugging device for treatment of soft foundation of the present utility model;
Fig. 2 is the schematic perspective view of the plug of the gantry type board-plugging device for treatment of soft foundation of the present utility model;
Fig. 3 is the side schematic view of the plug of the gantry type board-plugging device for treatment of soft foundation of the present utility model.
In figure:
For the gantry type board-plugging device 100 for the treatment of of soft foundation, hoist engine 110, motor 111, reel 112, actuating device 120,
First pulley 121, second pulley 122, rope 123, installing rack 124, saddle 130, vibration hammer 140, sleeve pipe 150, body 151 are front
End 152, plug 160, plate-shaped member 161, connection member 162, control station 170, base station 180, plastic draining board 210.
Specific embodiment
It is to make purpose, technical scheme and the advantage of this utility model embodiment clearer, new below in conjunction with this practicality
Accompanying drawing in type embodiment, is clearly and completely described to the technical scheme in this utility model embodiment, it is clear that retouched
The embodiment stated is a part of embodiment of this utility model, rather than the embodiment of whole.Generally described in accompanying drawing herein and
The component of this utility model embodiment for illustrating can be arranged and be designed with a variety of configurations.
Therefore, the detailed description of embodiment of the present utility model below to providing in the accompanying drawings is not intended to limit requirement
The scope of the present utility model of protection, but it is merely representative of selected embodiment of the present utility model.Based in this utility model
Embodiment, the every other embodiment obtained under the premise of creative work is not made by those of ordinary skill in the art, all
Belong to the scope of this utility model protection.
It should be noted that:Similar label and letter represent similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined in individual accompanying drawing, then in subsequent accompanying drawing which further need not be defined and is explained.
In description of the present utility model, it should be noted that term " " center ", " on ", D score, "left", "right", " perpendicular
Directly ", the orientation or position relationship of the instruction such as " level ", " interior ", " outward " be based on orientation shown in the drawings or position relationship, or
Person be the utility model product using when the orientation usually put or position relationship, be for only for ease of description this utility model and
Simplify description, rather than indicate or imply that the device or element of indication must be with specific orientation, with specific azimuth configuration
And operation, therefore it is not intended that to restriction of the present utility model.Additionally, term " first ", " second ", " the 3rd " etc. are only used for
Description is distinguished, and it is not intended that indicating or implying relative importance.
In description of the present utility model, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " sets
Put ", " installation ", should be interpreted broadly " being connected ", " connection ", for example, it may be fixedly connected, or be detachably connected,
Or be integrally connected;Can be mechanically connected, or electrically connect;Can be joined directly together, it is also possible to by intermediary
It is indirectly connected to, can is the connection of two element internals.For the ordinary skill in the art, can be managed with concrete condition
Solve concrete meaning of the above-mentioned term in this utility model.
First embodiment
Fig. 1 is refer to, the present embodiment provides a kind of gantry type board-plugging device 100 for treatment of soft foundation, and which includes hoist engine
110th, actuating device 120, vibration hammer 140, sleeve pipe 150 and plug 160,110 driving transmission device 120 of hoist engine, transmission dress
120 driving vibration hammers 140 are put, sleeve pipe 150 is connected to vibration hammer 140, and plug 160 is arranged at the front end 152 of sleeve pipe 150.
The reel 112 that hoist engine 110 is included motor 111 and driven by motor 111, when motor 111 is with first direction
It is (such as clockwise) that motor 111 is rotated with first direction with movable reel 112 when rotating, when motor 111 with second direction (for example
When rotating counterclockwise), motor 111 is rotated with second direction with movable reel 112.
Actuating device 120 includes first pulley 121, second pulley 122 and rope 123, and actuating device 120 is installed on installation
On frame 124, installing rack 124 be arranged on saddle 130 on, restrict 123 one end be connected to reel 112 and restrict 123 the other end connect
Vibration hammer 140 is connected to, the mid portion of rope 123 is coordinated with first pulley 121 and second pulley 122 respectively.Motor 111 drives volume
Cylinder 112 is rotated, and reel 112 drives vibration hammer 140 to move up and down by rope 123.The work of first pulley 121 and second pulley 122
With being, first effect is the direction of motion for changing rope 123 so that vibration hammer 140 can be moved up and down, and second effect is
It is laborsaving, for reducing the driving force for pulling rope 123, to reduce the energy consumption of motor 111.In the present embodiment, saddle 130 adopts door
Posture saddle 130.It should be understood that in other embodiments, a pulley or plural pulley can be adopted as needed.
Sleeve pipe 150 is connected to vibration hammer 140, and sleeve pipe 150 includes body 151 and is connected to the front end 152 of body 151,
One end of body 151 is connected to vibration hammer 140, and the other end of body 151 is connected to front end 152.For the door frame for the treatment of of soft foundation
Formula board-plugging device 100 also includes control station 170 and installs the base station 180 of control station 170, and control station 170 and hoist engine 110 are installed
Above base station 180, one end of base station 180 is connected to door frame.It should be understood that base station 180 can be positioned below roller so that
Base station 180 can be promoted to move.
Fig. 2 and Fig. 3 is refer to, plug 160 includes plate-shaped member 161 and connection member 162, the area of plate-shaped member 161
More than the area of the front end 152 of sleeve pipe 150.In the present embodiment, the shape of plate-shaped member 161 is rectangle, it should be appreciated that at other
In embodiment, the shape of plate-shaped member 161 can be other shapes.Plate-shaped member 161 offers the hole of mounting and connection parts 162,
In the present embodiment, connection member 162 is steel wire, it should be appreciated that in other embodiments, can adopt other connection members
162.A piece steel wire is each passed through two installing holes, and two free ends of a steel wire are linked together, for example can be with
By being threaded together or welding together by hand.
In the present embodiment, the construction technology of back-up sand after first banketing before being constructed using plastic draining board 210, additionally, for
Process is rewinded using steel plate time expander method, its specific procedure is as follows:
First, a temporary drain is dug in both sides of the road, depth of drainage ditch, width are more than 1 meter, while the draining
Ditch try one's best from treatment of soft foundation scope away from some, in case during treatment of soft foundation to both sides squeeze become silted up, gutter deform.The gutter
Primarily serve the purpose of the existing pumping equipment draining of holding unobstructed, precipitation is carried out to aqueous in need soft base mud to be processed.In construction
During to check gutter at any time, remove mud, debris, particularly soft base sinking lateral displacement causes gutter deformation to cause
Draining congestion, is keeped in repair at any time, it is ensured that draining is unobstructed.
Second, according to soft base depth, 0.8~1.5 meter thick is first banketed after clear table, the earthwork must be the preferable sand of water penetration
Property soil, it is impossible to containing compared with ratchel, with 150 plate of blockage resisting sleeve pipe.Back-up sand again after leveling, then carries out plastic draining thereon
Plate 210 is constructed.Sand material requires middle sand or the coarse sand for being not more than 5% for clay content, and its infiltration coefficient is not less than 5 × 10-3cm/s.
The adjacent treatment region of sand bedding course in principle should be basically identical, and keeps smooth, is beneficial to draining.
3rd, after back-up sand again of first banketing, soft base moment sedimentation has been basically completed, and has had enough strength support machines
Tool is constructed thereon.But this has a certain impact to plate construction, i.e.,:After first banketing, soil layer has under Gravitative Loads necessarily
Intensity, causes plate machinery to carry out plate construction it is difficult to be directed through the fill stratum.Therefore, hole must be drawn before plate construction,
Drawing hole construction is carried out using quartering hammer, while being lengthened to big gun bar according to soil thickness or overstriking transformation.
4th, the selection of plate machinery:Soft base depth is general using crawler type board-plugging device within 30 meters, and which is main excellent
Point is that speed of application is fast, movement is flexible, low cost;Employing gantry type board-plugging device of the soft base depth more than 30 meters, which is main excellent
Point is safety, the relatively deep soft base effect of process is good.In the present embodiment, using gantry type board-plugging device.
5th, plastic draining board 210 is general to be laid using equilateral triangle, and the position of every plate is accurately made on sand bedding course
Put, and have significantly mark, setting the bright drilling depth mark of equipment subscript, with elevation control.
6th, plate construction sequence of construction:A, positioning:Board-plugging device is in place, adjusts 130 perpendicularity of saddle, in hollow set
Plastic draining board 210, align piles position are penetrated in pipe 150.B, wear boots:210 end of plastic draining board is fixed through prefabricated boots head
Frame, doubling belt are about 10cm, and fixed connection prevents silt sleeve pipe 150.C, sink to:Hoist engine 110 is by 150 He of sleeve pipe
Draining board exciting shuts down down to after projected depth with entering.D, sleeve pipe 150 are pulled up:Start hoist engine 110, extract sleeve pipe 150, instantly
Mouth bassets, you can displacement.Plastic draining board 210 requires to be downwardly into hard stratum 1.0m, and wrench protruded length is many upwards
In 20cm and sand bedding course is inserted, to ensure construction quality.
In the present embodiment, steel plate time expander method uses above-mentioned plug 160, cancels 150 lower chain of sleeve pipe and latch, uses tabular
Part 161 replaces, it should be appreciated that the length of plate-shaped member 161, width and height can be selected as needed, in this enforcement
In example, plate-shaped member 161 is using steel plate and connection member 162 is steel wire or iron wire, it should be appreciated that tabular in other embodiments
Part 161 and connection member 162 can be made using other materials.The perforating on steel plate is put on iron bar, plastic draining board 210
Then boots are worn again through iron bar, and wrench is worn boots part using the long steel staple connections of 2cm, makes 210 one-tenth of steel plate and plastic draining board
For entirety.Steel plate is close to sleeve pipe 150, and after squeezing into sleeve pipe 150, sleeve pipe 150 is stopped in mud 15~25 seconds, then transfers to set again
Pipe 150.
The principle that its prevention is rewinded is to replace latch that 150 bottom of sleeve pipe can be made more to close with plate-shaped member 161, most
The reduction mud sleeve pipe 150 of limits, meanwhile, the area of plate-shaped member 161 is larger, and in tube drawing, resistance is larger, sleeve pipe
150 have exclusion to act in mud around sleeve pipe 150 in down process, extend tube drawing and are then conducive within 15~25 seconds mud around extensive
The multiple extruding force to sleeve pipe 150, so as to increase the pressure of steel plate, it is ensured that plastic draining board 210 is not rewinded.It should be understood that extend pulling out
The time of pipe can be adjusted according to practical situation.
In the present embodiment, the quality for the treatment of of soft foundation is guaranteed using following measures.
First, Plastic Drain Slab Construction strictly presses design requirement arrangement pitch, draws drawing, and scene is released in road
Heart pile No., releases the point position of draining board by drawing.Interval error should be less than 15cm.
Second, board-plugging device inspection in place:Plastic draining board inserting piling machinery, after the completion of Assembling, close inspection plate
The safe handling of machine, plate quarry bar are higher, and in work progress, vibration force is larger, and drilling cramp will have enough stability, it is ensured that apply
The safety of work.Steel wire rope of windlass, circuit connection and circuit protection device will be checked comprehensively.Job site is in sidewalk and machine
Warning line is set in the range of the 50m of tool construction, it is ensured that construction safety.Mechanically actuated code, safety warning-panel are hung up properly on board-plugging device
With construction billboard.
3rd, plate should be advanced from both sides ramp to center, and every plastic draining board length is made up of four parts:Bury depth
Degree, fill platform thickness, 100cm Base with Sand Gravel Cushion, expose 20cm and bend.Deviation during construction:Plastic draining board is taken during tube drawing
Perpendicularity deviation should control within 1.5%.Before construction, run of steel is accurately measured, inserting piling depth mark is set on drilling cramp
Chi, is easy to the control of depth.During setting when plastic draining board drilling depth length is inadequate, do not allow to continue plastics using overlap joint
Draining board, to ensure the performance of plastic draining board.
4th, plastic plate should ensure that plate is non-warping during insertion ground, and water permeable membrane is not broken and is not contaminated, plate
Reliable anchor measure should be arranged at bottom, in order to avoid going out plastic strip strip when protecting pipe is extracted out, should will be exposed at bed course in time after being plugged
Outer redundance cut-out, and being protected, in case piling machine movement, the turnover of vehicle or it is rainy when be subject to damage ring and reduce
Drainage effect.
5th, when lifting sleeve pipe 150 in Plastic Drain Slab Construction, plastic plate is brought out, or rewinds seriously, not up to sets
During meter depth, then should be against complement in situ.
6th, it is the water penetration of the drainage performance and plastic draining board filter membrane for keeping natural sand bedding course good, will must not inserts
The mud taken out of during beating, is poured in hole with water, is polluted plastic draining board filter membrane, or closure at sand bedding course position, is affected sand
Bedding course drainage.Soil is thoroughly removed, is excluded beyond roadbed.
In sum, the gantry type board-plugging device 100 for treatment of soft foundation of the present utility model includes hoist engine 110, arranges
Actuating device 120 in saddle 130, it is connected to the vibration hammer 140 of actuating device 120 and is connected to the sleeve pipe of vibration hammer 140
150,110 driving transmission device 120 of hoist engine;The front end 152 of sleeve pipe 150 is provided with plug 160, and plug 160 includes plate-like portion
Part 161 and the connection member 162 of plate-shaped member 161 is connected to, the front end 152 of the area of plate-shaped member 161 more than sleeve pipe 150
Area, plastic draining board 210 is connected to into plug 160, sleeve pipe 150 has row to mud around sleeve pipe 150 in down process
Effect is squeezed, is extended tube drawing certain hour and is then conducive to extruding force of the mud recovery around to sleeve pipe 150, so as to increase the pressure of steel plate
Power, to ensure that plastic draining board 210 is not rewinded.
Preferred embodiment of the present utility model is the foregoing is only, this utility model is not limited to, for this
For the technical staff in field, this utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle
Within, any modification, equivalent substitution and improvements made etc. are should be included within protection domain of the present utility model.
Claims (10)
1. a kind of gantry type board-plugging device for treatment of soft foundation, it is characterised in which includes hoist engine, is arranged at the transmission of saddle
Device, the vibration hammer for being connected to the actuating device and the sleeve pipe of the vibration hammer is connected to, the hoist engine drives described
Actuating device;The front end of described sleeve pipe is provided with plug, and the plug includes plate-shaped member and is connected to the plate-shaped member
Connection member, the area of the area of the plate-shaped member more than the front end of described sleeve pipe.
2. the gantry type board-plugging device for treatment of soft foundation according to claim 1, it is characterised in that the plate-shaped member
Shape is rectangle.
3. the gantry type board-plugging device for treatment of soft foundation according to claim 1, it is characterised in that the plate-shaped member is opened
It is provided with the installing hole for installing the connection member.
4. the gantry type board-plugging device for treatment of soft foundation according to claim 1, it is characterised in that the saddle is gate-type
Saddle.
5. the gantry type board-plugging device for treatment of soft foundation according to claim 1, it is characterised in that the actuating device bag
Include installing rack, be arranged at the installing rack one end first pulley and be arranged at the second pulley of the installing rack.
6. the gantry type board-plugging device for treatment of soft foundation according to claim 5, it is characterised in that the hoist engine includes
Motor and pass through the motor-driven reel.
7. the gantry type board-plugging device for treatment of soft foundation according to claim 6, it is characterised in that the actuating device is also
Including rope, one end of the rope is connected to the reel of the hoist engine, the rope through the first pulley and described
The other end of two pulleys and the rope is connected to the vibration hammer.
8. the gantry type board-plugging device for treatment of soft foundation according to claim 6, it is characterised in that the gantry type plate
Machine also includes the control station of the control motor.
9. the gantry type board-plugging device for treatment of soft foundation according to claim 8, it is characterised in that the gantry type plate
Machine also includes that one end of the base station is connected to the saddle for installing the base station of the hoist engine and the control station.
10. the gantry type board-plugging device for treatment of soft foundation according to claim 9, it is characterised in that the base station is arranged
There is roller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620761450.7U CN206052682U (en) | 2016-07-18 | 2016-07-18 | A kind of gantry type board-plugging device for treatment of soft foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620761450.7U CN206052682U (en) | 2016-07-18 | 2016-07-18 | A kind of gantry type board-plugging device for treatment of soft foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206052682U true CN206052682U (en) | 2017-03-29 |
Family
ID=58376224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620761450.7U Active CN206052682U (en) | 2016-07-18 | 2016-07-18 | A kind of gantry type board-plugging device for treatment of soft foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206052682U (en) |
-
2016
- 2016-07-18 CN CN201620761450.7U patent/CN206052682U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69736200T2 (en) | LOCAL CONSTRUCTION OF A PROTECTION TANK UNDER A RADIOACTIVE OR HAZARDOUS STORAGE | |
CN111851484B (en) | Method for cutting off semi-invasive prestressed anchor cable in supporting pile by rotary drilling rig | |
CN218880917U (en) | Dewatering well structure for foundation pit drainage | |
CN216788447U (en) | A Construction Device for Rectangular Anchor Pile Based on Leroy's Triangle | |
CN113235601A (en) | Deep foundation pit construction risk control structure and method for collapsible loess adjacent building | |
CN110735432A (en) | Method for clearing pile foundation and controlling parameters in shield tunneling machine over-invasion limit tunnel range | |
CN107190776B (en) | Water discharge tunnel standpipe plants pipe construction device and method | |
CN107653889A (en) | A kind of shaped steel pressure is poured water the construction method of soil curtain support pile | |
CN108625362A (en) | A kind of bayonet type cast-in-situ bored pile building enclosure and construction method | |
CN206052682U (en) | A kind of gantry type board-plugging device for treatment of soft foundation | |
CN206143760U (en) | Ally oneself with formula of arranging bored concrete pile device on water | |
CN110258600B (en) | Vertical cofferdam construction method suitable for deepwater area | |
CN209260739U (en) | A kind of foundation pit water-stopping system close to river permeable stratum | |
CN103669333B (en) | It is easy to the friction pile of vacuum-dewatering | |
CN111764380A (en) | Cast-in-situ bored pile construction method | |
CN114961336B (en) | Protective demolition construction method for foundation pile of basement close to existing subway line | |
CN206570811U (en) | Existing bridge pile pulling device is passed through in weak soil shield driving area | |
CN206887939U (en) | It is applied to the flexible shroud of steel reinforcement cage under coral reef geology | |
CN117627531A (en) | Ultra-long spiral drilling machine for cast-in-place pile in beach area and construction method | |
JPH0369717A (en) | Construction method and equipment for steel pipe piles for constructing offshore structures | |
WO2011107818A1 (en) | Method of cutting foundation elements in the ground | |
JP3663541B2 (en) | Impermeable mountain retaining wall with groundwater flow conservation function and its groundwater flow conservation method | |
CN112482363A (en) | Method for processing underground pipeline in urban pile foundation construction | |
CN113605378A (en) | Construction method of non-pull-out type half-sleeve retaining wall cast-in-situ bored pile | |
JP2009155807A (en) | Erection method for reinforcement cage for cast-in-place pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 210017 4, building 223, Shui Simen street, Jianye District, Nanjing, Jiangsu. Patentee after: Jiangsu Yan Ning Engineering Science and Technology Group Co., Ltd. Address before: 210019 room 1501, building B, 88 Yunlong Shan Road, Nanjing, Jiangsu. Patentee before: Jiangsu Yearning Construction Co., Ltd. |