CN205954874U - Lattice column runs through major structure position waterproof construction - Google Patents

Lattice column runs through major structure position waterproof construction Download PDF

Info

Publication number
CN205954874U
CN205954874U CN201620676062.9U CN201620676062U CN205954874U CN 205954874 U CN205954874 U CN 205954874U CN 201620676062 U CN201620676062 U CN 201620676062U CN 205954874 U CN205954874 U CN 205954874U
Authority
CN
China
Prior art keywords
lattice column
water
steel plate
waterproof
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620676062.9U
Other languages
Chinese (zh)
Inventor
郭小龙
李志军
董小龙
彭再勇
何毅
褚凯
柯友华
邹谱华
曾柯
胡斌
孔祥远
姚远
胡朝贵
罗苍宁
李贤龙
董军
高昆
徐雪莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201620676062.9U priority Critical patent/CN205954874U/en
Application granted granted Critical
Publication of CN205954874U publication Critical patent/CN205954874U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model belongs to the technical field of the steel construction, a lattice column runs through major structure position waterproof construction is related to, the major structure includes roof and bottom plate, the waterproof construction includes stagnant water steel sheet, separation steel sheet, chance water inflation sealing rod, cement base infiltration crystallization waterproof coating layer, when the lattice column ran through bottom plate or roof, the waterproofing membrane of bottom plate or roof closed up on the lattice column, applied paint cement base infiltration crystallization water proof coating in the lattice column with a brush, and annular chance water inflation sealing rod is placed in the lattice column outside, lattice column welding stagnant water steel sheet in bottom plate or roof thickness scope, the hole that supplies vibrating rod to pass is seted up to lattice column inner weld separation steel sheet, separation steel sheet. The utility model discloses a separation steel sheet has improved water -proof effects, and the inside cement base infiltration crystallization water proof coating that applies paint with a brush of lattice column has improved waterproof impervious effect.

Description

Lattice column runs through agent structure position waterproof construction
Technical field
This utility model is related to a kind of lattice column and runs through agent structure position waterproof construction, belongs to long strands field.
Background technology
Lattice column in recent years as the part in Large Foundation Pit support system, more and more occur in tunnel, In subway, the construction at station, the form of appearance is also more rich and varied, becomes twin shaft pair from the shaped steel of early stage or steel plate design Claim or mono-symmetry design, variable cross-section lattice column finally, lattice column is so frequently used by designers, and also side is anti- Lattice column convenience, economy and usability are reflected.But lattice column wears the way of agent structure waterproof, for many years but one Directly there is not larger change.
The way that common lattice column wears agent structure waterproof is generally pacified in the lattice column exterior bottom wearing agent structure Fill a ring water-swelling rubber water bar, then one of surrounding weldering or twice steel plate for sealing water outside lattice column.Water-swellable Sealing rod and steel plate for sealing water are all to have carried out the protection of waterproof outside lattice column, and lattice column interior waterproof is processed always Ignored by everybody.In the relatively low environment of level of ground water, common waterproofing process can't make lattice column wear to go out at agent structure Now serious percolating water.Accelerate subway or the submerged tunnel construction of propulsion along with China, agent structure position worn by steel construction The waterproofing process of waterproof weak spot becomes particularly important, because these buildings are all to adjoin rivers,lakes and seas mostly, deeply covers water-bound More and more.
Nanchang Hong Gu tunnel east bank evacuate the length in hall under water and span be domestic, in the protection of riverside cofferdam Lower employing cut and cover tunneling, evacuates hall unit width 38~85m, foundation depth about 12m, and foundation pit enclosure structure is that 1000mm is thick Ground-connecting-wall, foundation ditch top sets Guan Liang and netted reinforced concrete support, supports cross point position to set steel lattice column, agent structure After construction completes, can in dismounting structure and structural top lattice column, and structure roof covers water about 20m, therefore lattice column The waterproof construction wearing agent structure becomes particularly important.
Using common water-proof construction method when early stage constructs, in structure in the completed, stagnant water effect is unsatisfactory, exists Localized seepage's water.Through repeated discussions and the multiple field test of field technician, we determine to take a kind of new construction Method, not only focuses on merely wearing the waterproofing protection of agent structure outside lattice column, strengthens waterproof measure more inside lattice column.
Utility model content
The purpose of this utility model is to provide a kind of lattice column to run through agent structure position waterproof waterproof construction, can be effective The steel lattice column that solves wear the position waterproof construction quality problems of agent structure, and ensure that lattice column inner concrete vibrates Quality, for being used lattice column to provide more efficiently construction method as the engineering construction of main support system in a large number, reduces lattice The impact to structure durability for the percolating water at agent structure worn by structure post.
This utility model is realized by following technical proposals.A kind of lattice column runs through agent structure position waterproof construction, Agent structure includes top board and base plate, waterproof construction include steel plate for sealing water, intercept steel plate, water expandable waterstop, cement based are oozed Crystalline waterproof coating material layer thoroughly;
Waterproof slab coiled material closes up on the lattice column of base plate thickness scope, applies swabbing in the lattice column of base plate thickness scope Mud based penetrant crystalline waterproof coating layer, runs through the water expandable waterstop placing ring-type at bottom cushion position outside lattice column; Steel plate for sealing water is welded, welding below the batten plate nearest away from base plate intercepts steel plate, intercepts steel on the lattice column of base plate thickness scope Plate opens up the hole passing through for vibrating spear;
Waterproof roofing coiled material closes up on the lattice column of top plate thickness scope, applies swabbing in the lattice column of top plate thickness scope Mud based penetrant crystalline waterproof coating layer, the chance water running through placement ring-type at top board cement mortar screed-coat position outside lattice column is swollen Swollen sealing rod;Steel plate for sealing water is welded, welding above the batten plate nearest away from top board intercepts steel on the lattice column of top plate thickness scope Plate, intercepts steel plate and opens up the hole passing through for vibrating spear.
Further preferably, described lattice column is welded by several batten plates of 4 angle steel and each angle steel of connection.
Further preferably, when base plate thickness is less than 1000mm, the lattice column of base plate thickness scope welds one water-stopping steel Plate.
Further preferably, when base plate thickness is more than 1000mm, the lattice column of base plate thickness scope welds twice water-stopping steel Plate.
Further preferably, steel plate for sealing water is welded on the batten plate of lattice column.
Further preferably, intercept the hole that diameter 25cm is opened on steel plate.
Its construction procedure is as follows:
1st, when lattice column runs through base plate or top board, the waterproof roll of base plate or top board closes up, in lattice column on lattice column Brushing cement-based capillary crystalline waterproof coating, wears outside lattice column and places at bottom cushion or top board cement mortar screed-coat position The water expandable waterstop of ring-type;
2nd, the lattice column of polishing base plate or top plate thickness scope, removes debris on lattice column, mud scum and rust it is ensured that lattice Structure post and the seam quality of base plate or top board;
3rd, the lattice column in base plate or top plate thickness scope welds steel plate for sealing water;
4th, lattice column interior welds intercept steel plate, intercept steel plate and are welded on below the nearest batten plate of base plate, or intercept Steel plate is welded on above the nearest batten plate of top board;Intercept steel plate and open up the hole passing through for vibrating spear.
Technique effect of the present utility model:Weld sealing by running through agent structure (base plate or top board) part in lattice column Steel plate and internal obstruct steel plate improve waterproof effect, and the waterproof roll in base plate or top board closes up on lattice column, The internal brushing cement-based capillary crystalline waterproof coating of lattice column, prevents water penetration from entering in lattice column, improves water proof anti-seepage effect Really.
Brief description
Fig. 1 is the schematic diagram that lattice column runs through agent structure.
Fig. 2 is uplift pile and lattice column and chassis connection sections position waterproof construction schematic diagram.
Fig. 3 is the A-A sectional view of Fig. 1.
Fig. 4 is the B-B sectional view of Fig. 1.
Icon explanation:1. first reinforced concrete support;2. lattice column;21. angle steel;22. batten plates;3. top board;4. bottom Plate;41. self waterproofing reinforced concrete structure base plates;42. polymer waterproof cement mortars;43. waterproof slab coiled materials;44. bottom cushions; 51st, 52. steel plate for sealing water;53. obstruct steel plates;6. water expandable waterstop;7. cement-based capillary crystalline waterproof coating;8. resistance to plucking Stake;81. uplift pile lacing wires.
Specific embodiment
Further illustrate this utility model with reference to the accompanying drawings and examples.
As shown in figure 1, in foundation ditch support system, lattice column 2 runs through base plate 4 and the top board 3 of agent structure, reconnects the One reinforced concrete support 1, common waterproof method is to install a ring hydro-expansive rubber sealing in lattice column 2 exterior bottom Bar, then one of surrounding weldering or twice steel plate for sealing water outside lattice column, this method waterproof effect is undesirable.In order to improve Waterproof effect, it is as follows that lattice column runs through agent structure position waterproof construction step:
1 as shown in Fig. 2 base plate 4 include bottom cushion 44, polymer waterproof cement mortar 42, waterproof slab coiled material 43, Self waterproofing reinforced concrete structure base plate 41, polymer waterproof cement mortar 42 is arranged on bottom cushion 44, waterproof slab coiled material 43 It is arranged in polymer waterproof cement mortar 42, self waterproofing reinforced concrete structure base plate 41 is cast in polymer waterproof cement mortar 42 Top, the uplift pile lacing wire 81 of uplift pile 8 extends in self waterproofing reinforced concrete structure base plate 41.
When lattice column 2 runs through base plate 4, waterproof slab coiled material 43 closes up on lattice column 2, the internal brushing cement of lattice column 2 Based penetrant crystalline water-repellent paint 7 (brush along lattice column 2 cross section, cement-base infiltration crystallization by cement-based capillary crystalline waterproof coating 7 Water-repellent paint 7 extends in the polymer waterproof cement mortar 42 in lattice column 2 outside, and tight with polymer waterproof cement mortar 42 Close combination), wear the water expandable waterstop 6 placing ring-type at bottom cushion 44 position outside lattice column 2.
2nd, the lattice column 2 of polishing base plate 4 thickness range, removes debris on lattice column 2, mud scum and rust it is ensured that steel knot Structure and the seam quality of concrete, that is, ensure the seam quality of lattice column 2 and base plate 4.
3rd, as shown in figs. 1 and 4, lattice column 2 by 4 angle steel 21 and connect each angle steel 21 several batten plates 22 weld and Become.Determine the road number of steel plate for sealing water in the range of base plate 4 according to base plate 4 thickness, when base plate 4 thickness is less than 1000mm, welding is together Steel plate for sealing water 52, when thickness is more than 1000mm, lattice column 2 welds twice steel plate for sealing water 52, steel plate for sealing water 52 need to be welded on lattice On the batten plate 22 of structure post 2, reach outside closing subsoil water, as shown in figures 1 and 3.
4 as shown in figure 3, need welding to intercept steel plate 53, obstruct steel plate 53 is welded on nearest away from base plate 4 inside lattice column 2 Being combined closely it is ensured that intercepting steel plate 53 with batten plate 22 in batten plate 22 lower section, and opens the hole of diameter 25cm, hole on intercepting steel plate 53 When hole is used for concreting, insert vibrating spear.All weld seams all need to detect it is ensured that weld seam is full close through welding seam detector Real.
5th, lattice column 2 construction method in the range of top board 3 ibid, but the waterproof of top board 3 top surface need remove exceed portion Point lattice column 2, realize top outer prevent water totally enclosed.
(1) cut off the lattice column 2 beyond top board 3, understand the debris on lattice column 2 in top board 3 thickness range, and use high pressure Water is rinsed well;
(2) the lattice column 2 external welding steel plate for sealing water in top board 3 thickness range, intercepts steel plate in lattice column 2;Intercept steel plate It is welded on and combines closely with batten plate 22 it is ensured that intercepting steel plate away from the nearest batten plate of top board 3 22 top, and open straight on intercepting steel plate The hole of footpath 25cm;
(3) the lattice column 2 end brushing cement-based capillary crystalline waterproof coating at top board 3;
(4) joints cement mortar levelling layer, the then polymer waterproof cement mortar of brushing top board, polymer waterproof cement Waterproof roofing coiled material is set, waterproof roofing coiled material closes up on lattice column 2 in mortar.
By adopting said method, obtain a kind of lattice column and run through agent structure position waterproof construction, agent structure bag Include top board 3 and base plate 4, waterproof construction includes steel plate for sealing water (52,51), intercepts steel plate 53, water expandable waterstop 6, cement based Capillary crystalline waterproof coating material layer;
Waterproof slab coiled material 43 closes up on the lattice column 2 of base plate thickness scope, applies in the lattice column 2 of base plate thickness scope Brush cement-base infiltration crystallization waterproof coating layer, the water-swellable running through placement ring-type at bottom cushion 44 position outside lattice column stops Water bar 6;Steel plate for sealing water 52 is welded, welding below the batten plate 22 nearest away from base plate 2 intercepts on the lattice column 2 of base plate thickness scope Steel plate 53, intercepts steel plate 53 and opens up the hole passing through for vibrating spear;
Waterproof roofing coiled material closes up on the lattice column of top plate thickness scope, applies swabbing in the lattice column of top plate thickness scope Mud based penetrant crystalline waterproof coating layer, the chance water running through placement ring-type at top board cement mortar screed-coat position outside lattice column is swollen Swollen sealing rod;Steel plate for sealing water is welded, welding above the batten plate nearest away from top board intercepts steel on the lattice column of top plate thickness scope Plate, intercepts steel plate and opens up the hole passing through for vibrating spear.

Claims (6)

1. a kind of lattice column run through agent structure position waterproof construction it is characterised in that:Agent structure includes top board and base plate, prevents Water-bound includes steel plate for sealing water, intercepts steel plate, water expandable waterstop, cement-based capillary crystalline waterproof coating layer;
Waterproof slab coiled material closes up on the lattice column of base plate thickness scope, brushing cement based in the lattice column of base plate thickness scope Capillary crystalline waterproof coating material layer, runs through the water expandable waterstop placing ring-type at bottom cushion position outside lattice column;Base plate Weld steel plate for sealing water on the lattice column of thickness range, welding below the batten plate nearest away from base plate intercepts steel plate, intercept steel plate and open If the hole passing through for vibrating spear;
Waterproof roofing coiled material closes up on the lattice column of top plate thickness scope, brushing cement based in the lattice column of top plate thickness scope Capillary crystalline waterproof coating material layer, the water-swellable running through placement ring-type at top board cement mortar screed-coat position outside lattice column stops Water bar;Steel plate for sealing water is welded, welding above the batten plate nearest away from top board intercepts steel plate, resistance on the lattice column of top plate thickness scope Open up the hole passing through for vibrating spear every steel plate.
2. lattice column according to claim 1 run through agent structure position waterproof construction it is characterised in that:Described lattice column It is welded by several batten plates of 4 angle steel and each angle steel of connection.
3. lattice column according to claim 1 run through agent structure position waterproof construction it is characterised in that:Base plate thickness is little When 1000mm, the lattice column of base plate thickness scope welds one steel plate for sealing water.
4. lattice column according to claim 1 run through agent structure position waterproof construction it is characterised in that:Base plate thickness is big When 1000mm, the lattice column of base plate thickness scope welds twice steel plate for sealing water.
5. lattice column according to claim 1 run through agent structure position waterproof construction it is characterised in that:Steel plate for sealing water welds It is connected on the batten plate of lattice column.
6. lattice column according to claim 1 run through agent structure position waterproof construction it is characterised in that:Intercept on steel plate Open the hole of diameter 25cm.
CN201620676062.9U 2016-06-30 2016-06-30 Lattice column runs through major structure position waterproof construction Expired - Fee Related CN205954874U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620676062.9U CN205954874U (en) 2016-06-30 2016-06-30 Lattice column runs through major structure position waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620676062.9U CN205954874U (en) 2016-06-30 2016-06-30 Lattice column runs through major structure position waterproof construction

Publications (1)

Publication Number Publication Date
CN205954874U true CN205954874U (en) 2017-02-15

Family

ID=57969892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620676062.9U Expired - Fee Related CN205954874U (en) 2016-06-30 2016-06-30 Lattice column runs through major structure position waterproof construction

Country Status (1)

Country Link
CN (1) CN205954874U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013472A (en) * 2016-06-30 2016-10-12 中铁隧道集团二处有限公司 Waterproof structure with latticed column penetrating through body structure part and construction method of structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013472A (en) * 2016-06-30 2016-10-12 中铁隧道集团二处有限公司 Waterproof structure with latticed column penetrating through body structure part and construction method of structure

Similar Documents

Publication Publication Date Title
CN106013472A (en) Waterproof structure with latticed column penetrating through body structure part and construction method of structure
CN107190844B (en) A waterproof and drainage system and construction method for basement floor and outer wall
CN110094213B (en) Space combined supporting structure and supporting method for water-rich broken stratum tunnel
AU706164B2 (en) Underwater construction of impermeable protective sheathings for hydraulic structures.
CN104806272B (en) Tunnel diversion compound waterproof and drainage comprehensive system and its construction method and application method
CN204572015U (en) A kind of tunnel shunting combined type waterproof and water drainage system
CN206916753U (en) A kind of water sealing structure of diaphram wall and its seam crossing
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN109667606A (en) A kind of tunnel multiple waterproof construction method
CN109371918A (en) With the dam structure and its construction method faced forever in conjunction with multi-functional drainage box culvert
CN109356162A (en) A kind of OPT interlocking pile slip casting around pile water-stopping method and slip casting pipe device
CN109236367A (en) A tunnel structure with anti-seepage and drainage function and its freezing construction method
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN107012893A (en) A kind of basement bottom wall board post poured band waterproof construction and its construction method
CN206768819U (en) A kind of steel plate combination prestressed anchor water-stopping system
CN113565087A (en) Underground continuous wall reinforcement cage structure with formwork and construction method thereof
CN205954874U (en) Lattice column runs through major structure position waterproof construction
CN209482261U (en) With the dam structure faced forever in conjunction with multi-functional drainage box culvert
KR20130013287A (en) Wet-type constructing method of pier foundation
CN110295630A (en) The late poured band structure of multilayer constraint antiseep
CN111636483A (en) Waterproof device for reverse construction concrete structure gap and construction method
CN109736355A (en) A kind of contrary sequence method basement construction method in old factory rehabilitation
CN208619166U (en) Waterproof drainage structure of tunnel roof
CN105970882A (en) Structure solving reverse osmosis water problem of dam body in construction process of concrete-faced rockfill dam and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant