[go: up one dir, main page]

CN205942290U - A platform system for mechanical and electrical installation - Google Patents

A platform system for mechanical and electrical installation Download PDF

Info

Publication number
CN205942290U
CN205942290U CN201620523889.6U CN201620523889U CN205942290U CN 205942290 U CN205942290 U CN 205942290U CN 201620523889 U CN201620523889 U CN 201620523889U CN 205942290 U CN205942290 U CN 205942290U
Authority
CN
China
Prior art keywords
control equipment
dynamo
quick response
equipment
electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620523889.6U
Other languages
Chinese (zh)
Inventor
朱正
王炤文
唐秀芳
陈永宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Original Assignee
WUXI INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd filed Critical WUXI INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority to CN201620523889.6U priority Critical patent/CN205942290U/en
Application granted granted Critical
Publication of CN205942290U publication Critical patent/CN205942290U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control By Computers (AREA)

Abstract

The utility model discloses a platform system for mechanical and electrical installation, including PC, industry control equipment, production facility, two -dimensional code printer, qr droid private, monitoring device, the PC is connected with industry control equipment, two -dimensional code printer, qr droid private, monitoring device, industry control equipment is connected with the production facility, utilize PC and industry control equipment to realize the automated control to the production facility, carry out the batch prefabrication with the spare part in the PC, and utilize the two -dimensional code printer to print with the two -dimensional code that spare part corresponds, utilize mechanized erection equipment to install spare part, and utilize qr droid private with the on -the -spot installation information of spare part position relation for example, send for the PC through the wireless data transmission module, at later stage fortune dimension in -process, utilize monitoring device to monitor, and rapid certain specific spare part of looking for of the on -the -spot installation information of the spare part through PC storage, be convenient for maintain or the queueing problem, the efficiency of the fortune dimension is improved.

Description

A kind of plateform system for dynamo-electric installation
Technical field
This utility model is related to mechanical and electric equipment installation management domain, especially, is related to a kind of platform for dynamo-electric installation System.
Background technology
Current enterprise's great majority all have automatic machines and equipment, and dynamo-electric industry of installing therefore is born, general industry With the equipment of public, civilian construction project, circuit, pipeline installation, 35 kilovolts and following transformer and distribution power station engineering, non-standard steel structure The making of part, installation, dynamo-electric install be a project scale than larger work, some large enterprises migrate, and an engineering just needs Spend and closely implement over the past half year, and, project content includes boiler, air conditioner, refrigeration, electric, instrument, motor, compressor machine The equipment such as group and broadcast film, tv telecasting control, this is also at a relatively high for the technical requirements installed.
Utility model content
This utility model purpose is to provide a kind of plateform system for dynamo-electric installation, and this system realizes the life of parts Produce and install, and facilitate implementation the monitoring of the O&M of some parts after installation using Quick Response Code and supervising device, for reality Existing above-mentioned purpose, this utility model employs the following technical solutions, this utility model include PC, industrial control equipment, production equipment, two Dimension code printer, two-dimensional code scanning instrument, supervising device, described PC and industrial control equipment, quick response code printer, two-dimensional code scanning Instrument, supervising device connect, and described industrial control equipment is connected with production equipment.
Preferably, described industrial control equipment is industrial PLC, and described industrial control equipment passes through the dynamic of auxiliary reclay and production equipment Power drive connects.
Preferably, described PC internal memory contains the model of parts, is also stored with corresponding with parts in described PC 2 D code information.
Preferably, described production equipment is used for being produced in batches the parts of PC memory storage.
Preferably, the Quick Response Code that PC stores is printed by described quick response code printer, described Quick Response Code and parts Corresponding.
Preferably, described supervising device is placed on equipment and installs and run scene, and described supervising device passes through wireless data Transport module is connected with PC.
Preferably, described two-dimensional code scanning instrument is connected with PC by wireless transmitter module, for Quick Response Code is corresponding Components information is transferred to PC.
This utility model beneficial effect:
In this utility model, realize the Automated condtrol to production equipment using PC and industrial control equipment, by PC It is prefabricated that parts carry out batch, and is printed Quick Response Code corresponding with parts using quick response code printer, using machinery Change installation equipment parts are installed, and using two-dimensional code scanning instrument by the in-site installation information such as position relationship of parts, PC is sent to by wireless data transfer module, during later stage O&M, is monitored using supervising device, and pass through PC The in-site installation information of the parts of machine storage rapidly looks for certain specific parts, is easy to maintenance or queueing problem, Improve O&M efficiency.
Brief description
Below with reference to figure, this utility model is described in further detail.Constitute the accompanying drawing of the part of the application It is used for providing further understanding to of the present utility model, schematic description and description of the present utility model is used for explaining this reality With new, do not constitute to improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is in this utility model case study on implementation, hydromechanical installer industry plateform system schematic diagram;
Fig. 2 is to carry out, using this utility model, the flow chart that produces, be installed to O&M.
Specific embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is described in detail.
Shown in Fig. 1, Fig. 2, including PC, industrial control equipment, production equipment, quick response code printer, two-dimensional code scanning Equipment is installed in instrument, supervising device, mechanization,
Described PC is connected with industrial control equipment, quick response code printer, two-dimensional code scanning instrument, supervising device, and described industry control sets Standby be connected with production equipment,
Carry out parts and Quick Response Code design using BIM modeling in described PC, and using data base by zero The 2 D code information that the model of part is corresponding with parts is stored, and can carry out the modification of BIM model, institute by high in the clouds Stating PC, to control production equipment that parts are carried out batch using industrial control equipment prefabricated, and will be corresponded to by quick response code printer The Quick Response Code of parts prints, by the Quick Response Code with parts material, the default information such as installation site, quantity, batch It is attached on corresponding parts.
Parts with Quick Response Code are installed equipment using mechanization and carries out mechanization installation, and utilize two-dimensional code scanning 2 D code information on parts is transferred to PC by instrument, and PC can intuitively reflect whether parts are installed, and The components information of particular location is directly invoked, using supervising device by erecting bed, Yi Jiyun during the O&M in later stage The reality at row scene is sent to PC, is easy to during later stage O&M this parts of fast searching and remotely surveys this The operation conditions of parts, the problem finding to exist, it is easy to accurately arrange to keep in repair, improve the O&M efficiency of equipment.
Preferably, described industrial control equipment is industrial PLC, and described industrial control equipment passes through the dynamic of auxiliary reclay and production equipment Power drive is connected and is connected with production equipment.
Preferably, described supervising device is connected with PC by wireless data transfer module.
Preferably, described two-dimensional code scanning instrument is connected with PC by wireless transmitter module.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model;For this For the technical staff in field, this utility model can have various modifications and variations.All of the present utility model spirit and principle Within, any modification, equivalent substitution and improvement made etc., should be included within protection domain of the present utility model.

Claims (7)

1. a kind of plateform system for dynamo-electric installation, including PC, industrial control equipment, production equipment, quick response code printer, two dimension Code scanner, supervising device it is characterised in that:Described PC and industrial control equipment, quick response code printer, two-dimensional code scanning instrument, prison Control device connects, and described industrial control equipment is connected with production equipment.
2. according to claim 1 a kind of for the dynamo-electric plateform system installed it is characterised in that:Described industrial control equipment is Industrial PLC, described industrial control equipment is connected with the power drill/driver of production equipment by auxiliary reclay.
3. according to claim 2 a kind of for the dynamo-electric plateform system installed it is characterised in that:Described PC memory storage There is the model of parts, be also stored with described PC the 2 D code information corresponding with parts.
4. according to claim 3 a kind of for the dynamo-electric plateform system installed it is characterised in that:Described production equipment is used In the parts of PC memory storage are produced in batches.
5. according to claim 4 a kind of for the dynamo-electric plateform system installed it is characterised in that:Described Quick Response Code prints The Quick Response Code that PC stores is printed by machine, and described Quick Response Code is corresponding with parts.
6. according to claim 1 a kind of for the dynamo-electric plateform system installed it is characterised in that:Described supervising device is put Put and install in equipment and run scene, described supervising device is connected with PC by wireless data transfer module.
7. according to claim 5 a kind of for the dynamo-electric plateform system installed it is characterised in that:Described two-dimensional code scanning Instrument is connected with PC by wireless transmitter module, for corresponding for Quick Response Code components information is transferred to PC.
CN201620523889.6U 2016-06-02 2016-06-02 A platform system for mechanical and electrical installation Active CN205942290U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620523889.6U CN205942290U (en) 2016-06-02 2016-06-02 A platform system for mechanical and electrical installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620523889.6U CN205942290U (en) 2016-06-02 2016-06-02 A platform system for mechanical and electrical installation

Publications (1)

Publication Number Publication Date
CN205942290U true CN205942290U (en) 2017-02-08

Family

ID=57931667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620523889.6U Active CN205942290U (en) 2016-06-02 2016-06-02 A platform system for mechanical and electrical installation

Country Status (1)

Country Link
CN (1) CN205942290U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108229619A (en) * 2018-01-25 2018-06-29 深圳大学 The indoor storage positioning device and method of a kind of assembled architecture prefabricated components
CN109034291A (en) * 2018-06-11 2018-12-18 顺丰航空有限公司 A kind of information query method and system
CN115018476A (en) * 2022-08-08 2022-09-06 四川新迎顺信息技术股份有限公司 Electromechanical equipment installation intelligent early warning method and device based on big data scene

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108229619A (en) * 2018-01-25 2018-06-29 深圳大学 The indoor storage positioning device and method of a kind of assembled architecture prefabricated components
CN109034291A (en) * 2018-06-11 2018-12-18 顺丰航空有限公司 A kind of information query method and system
CN115018476A (en) * 2022-08-08 2022-09-06 四川新迎顺信息技术股份有限公司 Electromechanical equipment installation intelligent early warning method and device based on big data scene

Similar Documents

Publication Publication Date Title
CN205942290U (en) A platform system for mechanical and electrical installation
CN102518553B (en) Remote real-time monitoring system used for wind power station group
CN102968748A (en) Field comprehensive maintenance system for power distribution network electrical equipment
CN104204514B (en) Method for configuring a wind energy installation, and wind energy installation
CN203217621U (en) On-site comprehensive maintenance system of electrical equipment for distribution network
CN111222226A (en) EMS (energy management system) to GIS (geographic information System) model conversion and access system and method based on scheduling application visual angle
CN106775884A (en) Method and equipment for upgrading control program of wind generating set
KR101568667B1 (en) Automatic recovery system of the photovoltaic power generation-failure based on the Internet of Things
CN112770285A (en) Digital twin factory modeling method and device based on 5G network
CN105634406A (en) Wireless monitoring system of intelligent photovoltaic array
CN104635640A (en) Informatization production management system of equipment for machining before bearing grinding
CN106022621A (en) Power distribution device asset identification management system based on label identification
CN110191162B (en) Power distribution communication equipment field operation and maintenance method, server and system
US20230393013A1 (en) Methods and apparatus for measuring methane emissions within a mesh sensor network
CN106339814A (en) Business expanding service system and business expanding method
CN109685682A (en) The method of regulator control system inspection operation ticket is intelligently generated based on relational database
CN110032552B (en) Standardized system and method for online update based on equipment change information and scheduling
CN103197618A (en) Method and system of monitoring wind-driven generator
CN104778541A (en) Management control system for underground electric power pipe network
CN108195077B (en) Waste heat recovery monitoring system
KR20180000182A (en) Mobile Terminal for Maintaining Wind Power Generator and Maintaining Method
CN107451706A (en) A kind of industrialization mounting means for being used for electromechanical installation
Kawalkar Geo-Intelligent Architecture for Smart Grid Evolution: Addressing Contemporary Challenges through Spatial AI and Knowledge Integration
CN103729481A (en) Geographic information system of power network
CN206696719U (en) A kind of plant equipment remote detection service device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant