CN205893838U - Bridge is punching frame for guardrail - Google Patents

Bridge is punching frame for guardrail Download PDF

Info

Publication number
CN205893838U
CN205893838U CN201620523739.5U CN201620523739U CN205893838U CN 205893838 U CN205893838 U CN 205893838U CN 201620523739 U CN201620523739 U CN 201620523739U CN 205893838 U CN205893838 U CN 205893838U
Authority
CN
China
Prior art keywords
bridge
guard rail
drilling frame
tie
frame according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620523739.5U
Other languages
Chinese (zh)
Inventor
马骞
王志军
王敬
夏绍明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Shuohuang Railway Development Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Shuohuang Railway Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, Shuohuang Railway Development Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201620523739.5U priority Critical patent/CN205893838U/en
Application granted granted Critical
Publication of CN205893838U publication Critical patent/CN205893838U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a bridge field discloses a bridge is punching frame for guardrail, this bridge is punching frame for guardrail including be provided with base plate (10) of a plurality of locating holes and be used for with base plate (10) keep (20) on the bridge tie of bridge. During the use, through above -mentioned punching frame keep stable the keeping on the bridge tie of bridge of this punching frame of inferior officer, can be through aiming at the drill bit locating hole on the base plate during drilling to can creep into line location to water through this locating hole, in order to avoid running the emergence of boring the phenomenon, simultaneously, because the interval of a plurality of locating holes on the base plate certain, consequently adopt this punching frame to punch on the bridge tie and not only guaranteed the interval between the kong yukong, saved artifical step of drawing hole and measuring aperture interval on every bridge tie in addition, when saving the labour, improved the operating efficiency. In addition, can also avoid owing to draw the artificial distruction that hole etc. Is former therefore lead to the fact the bridge tie on the bridge tie.

Description

Guard rail of bridge drilling frame
Technical field
This utility model is related to bridge field, in particular it relates to a kind of guard rail of bridge drilling frame.
Background technology
Guard rail of bridge (hereinafter referred guard rail) refers to be arranged on two parallel rail inside the stock rail of bridge, its work With being to when rolling stock is when occurring derailing on bridge, the vehicle of derailing be limited between stock rail and guard rail In flangeway, go out along rolling bridge, to prevent rolling stock outwardly away from clashing into bridge or fall under bridge.At present, in order to big for cooperation Type road maintainance machinery operation (for example, tamping operation) requires, need by " bridge gauge " regulation change shifting guard rail (that is, change guard rail with substantially The distance between rail).
Traditional, change when moving guard rail using by the way of be: on every bridge tie, measurement needs the position (position of punching of punching Put corresponding with the width of guard rail) and draw hole by artificial, then by the eyelet of drill bit (generally water drilling) be aligned picture, thus Realize punching on bridge tie.
However, generally water drilling is not allowed to be fixed easily on concrete bridge tie, easily run and bore, thus being easily caused punching Spacing is inaccurate.And, workload of being punched by way of artificial picture hole is too big, less efficient, bows for a long time simultaneously and bends over Operation is healthy also very unfavorable to staff.
Utility model content
The purpose of this utility model is to provide a kind of guard rail of bridge drilling frame, to overcome punching present in prior art Spacing is inaccurate, perforating efficiency is low and the too big problem of workload.
To achieve these goals, this utility model provides a kind of guard rail of bridge drilling frame, and this guard rail of bridge punches Frame includes substrate and the maintaining part for being maintained at described substrate on the bridge tie of bridge being provided with multiple location holes.
Preferably, described maintaining part is configured to be fastened on described bridge tie.
Preferably, described maintaining part includes at least one pair of buckling plate, and buckling plate described in each pair is arranged on the width of described substrate The both sides in degree direction simultaneously extend perpendicular to the plate face of described substrate from described substrate.
Preferably, the relative both sides of the length direction of described substrate are provided with the groove for avoiding obstacles.
Preferably, it has been bent to form butting section in one end of the length direction of described substrate.
Preferably, described guard rail of bridge drilling frame includes the positioning hole collumn extending vertically upwards around described location hole.
Preferably, described substrate is steel plate, and described positioning hole collumn is steel cylindrical tube, and described steel cylindrical tube is welded and fixed On described steel plate.
Preferably, the height of described positioning hole collumn is 5-8cm.
Preferably, multiple described location holes are along the length direction linear arrangement of described substrate.
Preferably, described location hole is two right, the pitch of holes of two location holes in location hole described in each pair and described bridge The width of beam guard rail is corresponding.
During use, by the maintaining part of above-mentioned drilling frame by the bridge tie being maintained at bridge stable for this drilling frame, hole When can by by drill bit (for example, water drilling) be aligned substrate on location hole such that it is able to be carried out to water drilling by this location hole Positioning, to avoid running the generation boring phenomenon;Simultaneously as the spacing of the multiple location holes on substrate is certain, therefore adopt This drilling frame punches the spacing that not only ensure that between Kong Yukong on bridge tie, and eliminates and artificial on every bridge tie draw hole And the step measuring pitch of holes, while saving labour force, improve working performance.In addition it is possible to avoid due in bridge tie The reasons such as upper picture hole and artificial destruction that bridge tie is caused.
Other features and advantages of the utility model will be described in detail in subsequent specific embodiment part.
Brief description
Accompanying drawing is used to provide and further understands to of the present utility model, and constitutes a part for description, and following Specific embodiment be used for together explaining this utility model, but do not constitute to restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the structural representation of the guard rail of bridge drilling frame that specific embodiment of the present utility model provides.
Fig. 2 is the structural representation of the other direction of guard rail of bridge drilling frame shown in Fig. 1.
Description of reference numerals
10: substrate;20: maintaining part;
30: groove;40: butting section;
50: positioning hole collumn.
Specific embodiment
Below in conjunction with accompanying drawing, specific embodiment of the present utility model is described in detail.It should be appreciated that herein Described specific embodiment is merely to illustrate and explains this utility model, is not limited to this utility model.
In this utility model, in the case of illustrating on the contrary, the noun of locality such as " upper and lower, left and right " of use is generally Refer to the upper and lower, left and right shown in refer to the attached drawing;" inside and outside " refers to inside and outside with respect to each part profile of itself.
Based on the problem that present in prior art, punching spacing is inaccurate, perforating efficiency is low and workload is too big, this reality With a kind of guard rail of bridge drilling frame that can overcome above-mentioned technical problem of new offer, hereinafter with reference to accompanying drawing, this bridge is protected Rail drilling frame is described in detail.
Suitably with reference to Fig. 1, guard rail of bridge drilling frame that embodiment of the present utility model provides includes being provided with many The substrate 10 of individual location hole and the maintaining part 20 for being maintained at substrate 10 on the bridge tie of bridge.
During use, by above-mentioned maintaining part 20, drilling frame is maintained on the bridge tie of bridge, can be by boring during boring Head (for example, water drilling) be aligned substrate 10 on location hole such that it is able to position to water drilling by this location hole, with avoid race Bore the generation of phenomenon;Simultaneously as the spacing of the multiple location holes on substrate 10 is certain, therefore adopt this drilling frame in bridge Punch on pillow the spacing that not only ensure that between Kong Yukong, and eliminate and artificial on every bridge tie draw hole and measure pitch of holes Step, save labour force while, improve working performance.In addition it is possible to avoid due to reasons such as race brills to bridge tie The artificial destruction that structure causes.
Wherein, described maintaining part 20 can make substrate 10 (namely drilling frame) be maintained at the bridge of bridge in several ways That is to say, that it is holding in this utility model that any structure that drilling frame can be maintained on bridge tie can be assumed that on pillow Portion 20, for example, described maintaining part 20 is configured to be fastened on bridge tie.
Specifically, in conjunction with Fig. 2, described maintaining part 20 includes at least one pair of buckling plate, and each pair buckling plate is arranged on substrate 10 The both sides of width and from described substrate 10 perpendicular to this substrate 10 plate face extend.It is understood that working as described guarantor When to hold portion 20 be a pair of buckling plate, the length of this buckling plate need to meet can by stable for drilling frame be maintained on bridge tie (because If for the length of buckling plate less it may be impossible to stable for drilling frame is maintained on bridge tie), meanwhile, when described holding When portion 20 is the situation more than a pair of buckling plate, the distance between each pair buckling plate also should be according to can be stable by drilling frame It is maintained at and be determined on bridge tie.
Due to generally, when changing shifting guard rail, after punching is typically completed on bridge tie, just former guard rail being torn open Unload, and guard rail is installed to by specified location by the hole beaten, so in punching, drilling frame may be former with for installing The bolt of guard rail interferes, and make drilling frame substrate 10 can not be stable be maintained on bridge tie, for this reason, described substrate 10 The relative both sides of length direction are both needed to be provided for the groove 30 of avoiding obstacles (for example, fastening bolt), such that it is able to make Substrate 10 can smoothly be positioned on bridge tie, to improve the precision of punching.
Further, in order to be further ensured that drilling precision, it is bent to form in one end of the length direction of described substrate 10 There is butting section 40, can be by butting section 40 be resisted against on the part of a certain fixation (generally former guard rail rail when so punching Bottom, because now former guard rail is not also dismantled) such that it is able to make drilling frame more stable in punching.Preferred reality in diagram Apply in mode, butting section 40 can be arranged in pairs in the both sides of one end of substrate 10, provided with one side and equalize in the width direction Against on the other hand groove 30 being arranged between paired butting section 40.
In addition, if only avoid running by location hole boring phenomenon, may not be particularly reliable (for example, if substrate 10 Than relatively thin when, that is, the depth of location hole is inadequate), so boring phenomenon to avoid further running, described guard rail of bridge is with beating Aperture frame also includes the positioning hole collumn 50 extending vertically upwards around location hole, so drill bit can be stretched to positioning in punching In hole post 50, thus avoiding well running the generation boring phenomenon.Meanwhile, according to practical situation, the height of positioning hole collumn 50 also needs It is maintained in certain numerical range, for example, for 5-8cm wherein, multiple location holes are permissible for the height of described positioning hole collumn 50 Length direction linear arrangement along substrate 10.
Specifically, described substrate 10 can be steel plate, and described positioning hole collumn 50 is steel cylindrical tube, described steel cylindrical tube It is weldingly fixed on described steel plate.Certainly, described substrate 10 can also adopt other materials or its other party with positioning hole collumn 50 Formula is fixed.
Wherein, according to practical situation, described location hole can be right, between the hole of two location holes in each pair location hole for two Away from corresponding with the width of guard rail of bridge such that it is able to be fixed on each guard rail between each pair location hole.
Therefore, the drilling frame that this utility model provides can not only ensure punching accurately, perforating efficiency, simultaneously it can be avoided that Artificial destruction bridge tie being caused due to drawing the reasons such as hole on bridge tie is it is achieved that people's safety operation is punched.
Describe preferred implementation of the present utility model above in association with accompanying drawing in detail, but, this utility model does not limit Detail in above-mentioned embodiment, in range of the technology design of the present utility model, can be to skill of the present utility model Art scheme carries out multiple simple variant, and these simple variant belong to protection domain of the present utility model.
It is further to note that each particular technique feature described in above-mentioned specific embodiment, in not lance In the case of shield, can be combined by any suitable means.In order to avoid unnecessary repetition, this utility model is to each Plant possible compound mode no longer separately to illustrate.
Additionally, combination in any can also be carried out, as long as it is not disobeyed between various different embodiment of the present utility model Carry on the back thought of the present utility model, it equally should be considered as content disclosed in the utility model.

Claims (10)

1. a kind of guard rail of bridge drilling frame is it is characterised in that this guard rail of bridge drilling frame includes being provided with multiple location holes Substrate (10) and the maintaining part (20) for being maintained at described substrate (10) on the bridge tie of bridge.
2. guard rail of bridge drilling frame according to claim 1 is it is characterised in that described maintaining part (20) is configured to It is fastened on described bridge tie.
3. guard rail of bridge drilling frame according to claim 2 is it is characterised in that described maintaining part (20) includes at least one To buckling plate, buckling plate described in each pair is arranged on both sides of width of described substrate (10) vertical from described substrate (10) Plate face in described substrate (10) extends.
4. guard rail of bridge drilling frame according to claim 1 is it is characterised in that the length direction of described substrate (10) Relative both sides are provided with the groove (30) for avoiding obstacles.
5. guard rail of bridge drilling frame according to claim 1 is it is characterised in that length direction in described substrate (10) One end be bent to form butting section (40).
6. guard rail of bridge drilling frame according to claim 1 is it is characterised in that described guard rail of bridge drilling frame includes The positioning hole collumn (50) extending vertically upwards around described location hole.
7. guard rail of bridge drilling frame according to claim 6 is it is characterised in that described substrate (10) is steel plate, described Positioning hole collumn (50) is steel cylindrical tube, and described steel cylindrical tube is weldingly fixed on described steel plate.
8. guard rail of bridge drilling frame according to claim 6 is it is characterised in that the height of described positioning hole collumn (50) is 5-8cm.
9. guard rail of bridge drilling frame according to claim 1 is it is characterised in that multiple described location hole is along described substrate (10) length direction linear arrangement.
10. the guard rail of bridge drilling frame according to any one in claim 1-9 is it is characterised in that described location hole Right for two, the pitch of holes of two location holes in location hole described in each pair is corresponding with the width of described guard rail of bridge.
CN201620523739.5U 2016-06-01 2016-06-01 Bridge is punching frame for guardrail Active CN205893838U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620523739.5U CN205893838U (en) 2016-06-01 2016-06-01 Bridge is punching frame for guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620523739.5U CN205893838U (en) 2016-06-01 2016-06-01 Bridge is punching frame for guardrail

Publications (1)

Publication Number Publication Date
CN205893838U true CN205893838U (en) 2017-01-18

Family

ID=57767190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620523739.5U Active CN205893838U (en) 2016-06-01 2016-06-01 Bridge is punching frame for guardrail

Country Status (1)

Country Link
CN (1) CN205893838U (en)

Similar Documents

Publication Publication Date Title
CN204530494U (en) High pier binder template is set up and is used support
KR101359488B1 (en) Micropile including radially extendable head unit for maximization of supporting force and constructing method of micropile using the same
CN205893838U (en) Bridge is punching frame for guardrail
CN204457821U (en) A kind of for construction of tunnel preliminary bracing anchor pole position scriber
CN204590640U (en) A kind of prefabricated concrete structure longitudinal reinforcement location adjustment jig
CN204139643U (en) Punch after a kind of shear wall ruggedized construction
CN215290196U (en) Foundation pit slope protection device
CN204879292U (en) A ten thousand logical grooves for subway equipment fixing
CN204940303U (en) A kind of large rigidity foundation pit supporting pile
US10557243B2 (en) Arrangement for supporting a steel pile in an impact pile driving device, an impact pile driving device, an impact pile driving machine, and a method for arranging the support of a steel pile in an impact pile driving device
CN209129557U (en) A kind of engineering driller positioning guiding structure
CN205856936U (en) Bridge guard rail changes the special anchor frame of shifting
CN202833492U (en) U-shaped fixing clip for open lightning grounding flat steel
CN205134963U (en) Roof beam rebar installation instrument
CN202356926U (en) Drilling tool for cylindrical laterally-pushed guide rod
CN207390758U (en) Elevator toe guard structure and its elevator toe guard
CN106089267A (en) Excavator auxiliary steel arch-shelf mounting process
CN105370046B (en) A kind of application method of beam steel installation tool
CN216412532U (en) Punching-free embedded CP III embedded part mark
CN214997481U (en) Bridge bored concrete pile drilling accuracy control device
CN104930307A (en) Universal groove suitable for subway equipment installation
CN205805417U (en) Shallow layer ground-temperature energy develops engineering land used source well construction deviation controlling device
CN213317893U (en) Auxiliary device for drilling inclined hole
CN116427680B (en) A cantilever frame structure for scaffolding support