CN205873594U - Special construction elevator of cooling tower section of thick bamboo wall - Google Patents
Special construction elevator of cooling tower section of thick bamboo wall Download PDFInfo
- Publication number
- CN205873594U CN205873594U CN201620646157.6U CN201620646157U CN205873594U CN 205873594 U CN205873594 U CN 205873594U CN 201620646157 U CN201620646157 U CN 201620646157U CN 205873594 U CN205873594 U CN 205873594U
- Authority
- CN
- China
- Prior art keywords
- bearing frame
- cage
- cooling tower
- link
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a special construction elevator of cooling tower section of thick bamboo wall, including the bearing frame, one side even interval ground in the vertical direction of bearing frame sets firmly the support that adheres to that is used for with cooling tower wall connection, lie in keep away from adhere to support one side the bearing frame upward swing joint have the cage, the cage passes through the levelling device and is connected with the bearing frame, the levelling device include with the same link of bearing frame inclination, the bottom and the cage fixed connection of link, the top and the centre of link are connected with the link through the towline respectively, the individual direction rack that is equipped with of lateral wall of bearing frame, the link pass through the gear with the direction rack is connected to remove along the direction rack. Make the outer wall of bearing frame laminating cooling tower in vertical orientation, the cage is connected to the rethread levelling device, and messenger's cage under the horizontality, operates steadily all the time, and stable in structure.
Description
Technical field
This utility model relates to building hoist field, particularly relates to a kind of special building hoist of Cooling Tower Wall.
Background technology
Building hoist is manned, loading construction machinery commonly used in building, is mainly used in the inside and outside of skyscraper
The construction of the building such as finishing, bridge, owing to the body structure of its uniqueness allows workmen take the most comfortable but also safety, makes to execute
The application in engineering construction of the work elevator is more and more extensive.But the operation principle of current existing building hoist is linear type
Ascending, descending, it is applicable in the structure that outer wall is vertical-horizontal use, and the outer wall of cooling tower is usually up-small and down-big shaped form
, cause existing building hoist can not be suitable for the operating mode of this curve construction, so it is the safest but also steady that one is presently required
The special building hoist of fixed cooling tower.
Utility model content
The purpose of this utility model is to provide a kind of special building hoist of Cooling Tower Wall, solves present stage shortage cooling
The problem of the special building hoist of this curve of tower wall construction operating mode.
For solving above-mentioned technical problem, this utility model adopts the following technical scheme that
A kind of special building hoist of Cooling Tower Wall, including bearing frame, the side of described bearing frame is in vertical direction
It is evenly spaced apart to be installed with the steel framework for being connected with cooling tower outer wall, is located remotely from the bearing frame of steel framework side
It is connected with cage;Described cage is connected with bearing frame by levelling device, and described levelling device includes and described bearing frame
The link that angle of inclination is identical, the bottom of described link is fixing with cage to be connected, and top and the centre of link lead to respectively
Cross hoist ropes to be connected with link;The sidewall of described bearing frame is provided with guiding tooth bar, and described link passes through gear with described
Guiding tooth bar connects, and moves along guiding tooth bar.
Scheme, described link is installed with driving machine and traction sheave further, and described hoist ropes end is wrapped in traction
It is connected with link again on wheel;The output shaft of described driving machine is connected with described traction sheave, drives cage to hang down along bearing frame
Nogata moving up and down upwards.
Scheme further, the bottom of described bearing frame is detachable with the ground of concreting to be connected;The end of bearing frame
End outside is provided with end guardrail, and the top of bearing frame is provided with pillory cage.
Scheme further, the distance between adjacent two steel frameworks is 6 meters.
Scheme further, described cage is provided with boom hoisting.
Scheme further, described bearing frame is to be connected in sequence by multiple standard knots head and the tail, and described guiding tooth bar is arranged
On the intermediate standard joint in addition to each joint standard knot in two ends.
Scheme further, is additionally provided with the cable drum putting the cable connecting driving machine for volume, and described bearing frame is spaced
Being disposed with cable saddle, described cable is connected to driving machine by cable saddle after cable drum is released.
Compared with prior art, Advantageous Effects of the present utility model is as follows:
Adpting flange is built on ground by concrete, then by bolt by bearing frame bottom be connected acting flange
Connect fixing, bearing frame is played fixing effect and is then connected on the outer wall of cooling tower by steel framework, make bearing frame
The outer wall of in the vertical direction laminating cooling tower is obliquely installed, then connects cage by levelling device, makes cage all the time in level
Under state, operate steadily, and Stability Analysis of Structures.
Accompanying drawing explanation
The utility model is described in further detail in explanation below in conjunction with the accompanying drawings.
Fig. 1 is axonometric chart of the present utility model;
Fig. 2 is partial side view of the present utility model;
In figure: 1, bearing frame, 101, standard knot;2, steel framework;3, cage;4, levelling device, 401, hoist ropes, 402,
Traction sheave, 403, link;5, machine is driven;6, tooth bar is guided;7, end guardrail;8, pillory cage;9, boom hoisting, 10, cable drum;
11, cable saddle;12, gear.
Detailed description of the invention
As shown in Figure 1, 2, a kind of special building hoist of Cooling Tower Wall, including bearing frame 1, the one of described bearing frame 1
Side is evenly spaced apart to be installed with the steel framework 2 for being connected with cooling tower outer wall in vertical direction, is located remotely from attachment
It is connected with cage 3 on the bearing frame 1 of frame 2 side;Described cage 3 is connected with bearing frame 1 by levelling device 4, described tune
Leveling device 4 includes the link 403 identical with described bearing frame 1 angle of inclination, and the bottom of described link 403 is solid with cage 3
Fixed connection, the top of link 403 and centre are connected with link 403 by hoist ropes 401 respectively;The side of described bearing frame 1
Wall is provided with guiding tooth bar 6, and described link 403 is connected with described guiding tooth bar 6 by gear 12, and along guiding tooth bar 6
Mobile.
Scheme, described link 403 is installed with driving machine 5 and traction sheave 402, the end of described hoist ropes 401 further
Portion is wrapped on traction sheave 402 and is connected with link 403;The output shaft of described driving machine 5 is connected with described traction sheave 402,
Cage 3 is driven to carry out moving up and down in vertical direction along bearing frame 1.
Scheme further, the bottom of described bearing frame 1 is detachable with the ground of concreting to be connected;Bearing frame 1
Bottom periphery encloses and is provided with end guardrail 7, prevents layman from arbitrarily entering this region, causes personal injury;The top of bearing frame 1
It is provided with pillory cage 8, is convenient for people to requirements of one's work on bearing frame 1 top.
Scheme further, the distance between adjacent two steel frameworks 2 is 6 meters.
Scheme further, described cage 3 is provided with boom hoisting 9, facilitates the lifting of cage internal objects.
Scheme further, described bearing frame 1 is to be connected in sequence by multiple standard knots 101 head and the tail, described guiding tooth bar 6
It is arranged on the intermediate standard joint in addition to each joint standard knot in two ends.
Scheme further, is additionally provided with the cable drum 10 putting the cable connecting driving machine 5 for volume, on described bearing frame 1
Interval is disposed with cable saddle 11, and described cable is connected to driving machine 5 by cable saddle 11 after cable drum 10 is released,
Make cable smooth and easy, will not tie a knot.
In this device, the bottom of bearing frame 1 removably connects with the ground of concreting, as mixed in passed through by adpting flange
Solidifying soil is built on ground, is then bolt-connected to bearing frame bottom, and bearing frame plays fixing effect;Described load-bearing
Frame 1 is connected on the outer wall of cooling tower by steel framework 2, in order to strengthen the steadiness of connection, is evenly spaced apart to arrange several more
Individual steel framework 2, specifically the distance with two adjacent steel frameworks 2 is 6 meters, makes bearing frame 1 cooling tower outer wall of fitting exist
Shape on vertical direction, its outline is curved;Described bearing frame 1 is connected with cage 3 by levelling device 4, described
Cage 3 is located remotely from described steel framework 2 side;Make no matter cage can keep level on the bearing frame that slope is how many;
Being driven traction sheave 402 to rotate by driving machine 5, the friction produced between traction sheave 402 and hoist ropes 401 produces leading cage 3
Gravitation, cage 3 is moved along the guiding tooth bar 6 on bearing frame 1 by the gear 12 on link 403, it is achieved cage 3 exists
Moving up and down on bearing frame 1, gear ratio is more stable, makes cage run more steady.
Described bearing frame 1 is connected in sequence by multiple standard knots 101 head and the tail, both convenient dismounting, again convenient laminating cooling
The curvilinear structures of tower wall.Topmost it is not provided with guiding on a described standard knot of joint 101 and a bottom described standard knot 101 of joint
Tooth bar 6, remaining described standard knot 101 is respectively provided with tooth bar 6, saves, due to the space of cage based on a bottom joint standard knot
Relation, drives machine 5 will not contact with this joint standard knot, so not setting tooth bar;Topmost arrange spacing below a joint standard knot
Device, prevents cage from deviating from track.
Embodiment described above is only to be described optimal way of the present utility model, not to of the present utility model
Scope is defined, and on the premise of without departing from this utility model design spirit, those of ordinary skill in the art are new to this practicality
Various deformation that the technical scheme of type is made and improvement, all should fall into the protection domain that this utility model claims determine
In.
Claims (7)
1. the special building hoist of Cooling Tower Wall, including bearing frame (1), it is characterised in that: the one of described bearing frame (1)
Side is evenly spaced apart the steel framework (2) being installed with for being connected with cooling tower outer wall in vertical direction, is located remotely from attachment
It is connected with cage (3) on the bearing frame (1) of support (2) side;Described cage (3) passes through levelling device (4) and bearing frame
(1) connecting, described levelling device (4) includes the link (403) identical with described bearing frame (1) angle of inclination, described connection
The bottom of frame (403) is fixing with cage (3) to be connected, and the top of link (403) and centre are passed through hoist ropes (401) respectively and connected
Connect frame (403) to connect;The sidewall of described bearing frame (1) is provided with guiding tooth bar (6), and described link (403) passes through gear
(12) it is connected with described guiding tooth bar (6), and mobile along guiding tooth bar (6).
The special building hoist of Cooling Tower Wall the most according to claim 1, it is characterised in that: described link (403)
On be installed with driving machine (5) and traction sheave (402), described hoist ropes (401) end be wrapped on traction sheave (402) again be connected
Frame (403) connects;The output shaft of described driving machine (5) is connected with described traction sheave (402), drives cage (3) along bearing frame (1)
Carry out moving up and down in vertical direction.
The special building hoist of Cooling Tower Wall the most according to claim 1, it is characterised in that: described bearing frame (1)
Bottom is detachable with the ground of concreting to be connected;The bottom periphery of bearing frame (1) encloses and is provided with end guardrail (7), bearing frame
(1) top is provided with pillory cage (8).
The special building hoist of Cooling Tower Wall the most according to claim 1, it is characterised in that: adjacent two steel frameworks
(2) distance between is 6 meters.
The special building hoist of Cooling Tower Wall the most according to claim 1, it is characterised in that: described cage sets on (3)
There is boom hoisting (9).
The special building hoist of Cooling Tower Wall the most according to claim 1, it is characterised in that: described bearing frame (1) is
Being connected in sequence by multiple standard knots (101) head and the tail, described guiding tooth bar (6) is arranged in addition to each joint standard knot in two ends
On intermediate standard joint.
The special building hoist of Cooling Tower Wall the most according to claim 1, it is characterised in that: it is additionally provided with for the volume company of putting
Connecing the cable drum (10) of the cable of driving machine (5), the upper interval of described bearing frame (1) is disposed with cable saddle (11), described electricity
Cable is connected to driving machine (5) by cable saddle (11) after cable drum (10) is released.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620646157.6U CN205873594U (en) | 2016-06-27 | 2016-06-27 | Special construction elevator of cooling tower section of thick bamboo wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620646157.6U CN205873594U (en) | 2016-06-27 | 2016-06-27 | Special construction elevator of cooling tower section of thick bamboo wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205873594U true CN205873594U (en) | 2017-01-11 |
Family
ID=57692636
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620646157.6U Expired - Fee Related CN205873594U (en) | 2016-06-27 | 2016-06-27 | Special construction elevator of cooling tower section of thick bamboo wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205873594U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110422722A (en) * | 2019-08-12 | 2019-11-08 | 廊坊凯博建设机械科技有限公司 | A kind of mechanical self-level(l)ing device and method |
CN114368664A (en) * | 2021-12-30 | 2022-04-19 | 江苏省送变电有限公司 | Inclined construction elevator cage |
CN114394499A (en) * | 2021-12-30 | 2022-04-26 | 国网江苏省电力有限公司建设分公司 | Safety monitoring system and monitoring method for angle-adjustable suspension cage |
-
2016
- 2016-06-27 CN CN201620646157.6U patent/CN205873594U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110422722A (en) * | 2019-08-12 | 2019-11-08 | 廊坊凯博建设机械科技有限公司 | A kind of mechanical self-level(l)ing device and method |
CN114368664A (en) * | 2021-12-30 | 2022-04-19 | 江苏省送变电有限公司 | Inclined construction elevator cage |
CN114394499A (en) * | 2021-12-30 | 2022-04-26 | 国网江苏省电力有限公司建设分公司 | Safety monitoring system and monitoring method for angle-adjustable suspension cage |
CN114368664B (en) * | 2021-12-30 | 2024-04-26 | 江苏省送变电有限公司 | Inclined construction elevator cage |
CN114394499B (en) * | 2021-12-30 | 2024-05-17 | 国网江苏省电力有限公司建设分公司 | Safety monitoring system and monitoring method for angle-adjustable suspension cage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101514586B (en) | Hanger rail type electric hanging boat and construction method thereof | |
CN205387439U (en) | Mast hoisting accessory | |
CN101537976B (en) | Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof | |
CN201376848Y (en) | Large-scale double-tower automatic-elevation hoisting equipment | |
CN205873594U (en) | Special construction elevator of cooling tower section of thick bamboo wall | |
CN205294665U (en) | Jack -up tower crane based on engineering mechanics | |
CN103274315B (en) | Installing and hoisting device for side plate and upright of gas chamber | |
CN101863405A (en) | Traction elevator with counterweight of double cars in single hoistway | |
CN210084788U (en) | Tower crane for building | |
CN103306218B (en) | Bottom width overhaul hanging basket of bridge | |
CN107476195A (en) | A kind of suspension bridge transports the fortune beam tackle system of stiff girder | |
CN203794505U (en) | Internal climbing steel beam conveying device of internal climbing movable arm tower crane | |
CN202899720U (en) | Steel pole provided with foot treadles and used for high-tension transmission line iron tower | |
CN201762053U (en) | Simple automatic hoisting rod | |
CN206109992U (en) | Bridge bottom surface construction platform | |
CN213653209U (en) | Integrated construction movable platform for bridge flange plate | |
CN205591115U (en) | Suspension type catwalk veil installing the system | |
CN209567730U (en) | A kind of small-sized lattice dead man steel construction | |
CN204938801U (en) | The tower crane that is connected can be realized with building | |
CN2703832Y (en) | Elevator well creeping formwork hoisting frame | |
CN2256418Y (en) | Creeping formwork lifting frame for lift shaft | |
CN208980118U (en) | A machine room-less elevator rope head fixing device | |
CN205099168U (en) | Elevator without engine room | |
CN209924424U (en) | Creeping formwork device with safety structure | |
CN206667773U (en) | The climbing type concrete spreader being arranged in high-rise building elevator shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170111 Termination date: 20210627 |