- Publication number
- CN205864047U CN205864047U CN201620723650.3U CN201620723650U CN205864047U CN 205864047 U CN205864047 U CN 205864047U CN 201620723650 U CN201620723650 U CN 201620723650U CN 205864047 U CN205864047 U CN 205864047U
- Authority
- CN
- China
- Prior art keywords
- circuit breaker
- outgoing line
- cabinet
- outlets
- normally opened
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005611 electricity Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000011017 operating method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本实用新型属于供电系统的技术领域,具体涉及一种室外10kV开闭站四供二备供电系统;解决的技术问题为:提供一种能够实现城网网格化、多电源、多分段高且供电可靠性高的问题;采用的技术方案为:一种室外10kV开闭站四供二备供电系统,包括10kV开闭站、110kV甲变电站、110 kV乙变电站和10kV开闭所,还包括第一环网柜、第二环网柜和第三环网柜,所述10kV开闭站内设有第一进出线柜和第二进出线柜;适用于配电网。
The utility model belongs to the technical field of power supply systems, and specifically relates to a four-supply and two-standby power supply system for an outdoor 10kV switching station; And the problem of high power supply reliability; the technical solution adopted is: an outdoor 10kV switch station four-supply and two-standby power supply system, including 10kV switch station, 110kV A substation, 110 kV B substation and 10kV switch station, also includes The first ring network cabinet, the second ring network cabinet and the third ring network cabinet, the 10kV switching station is equipped with a first incoming and outgoing line cabinet and a second incoming and outgoing line cabinet; it is suitable for distribution networks.
Description
技术领域technical field
本实用新型属于供电系统的技术领域,具体涉及一种室外10kV开闭站四供二备供电系统。The utility model belongs to the technical field of power supply systems, in particular to a four-supply and two-standby power supply system for an outdoor 10kV switching station.
背景技术Background technique
目前,县级城网大多是由若干条10千伏线路单电源辐射状供电,不能满足当电力系统中任一元件,如线路、变压器、或某一系统无故障或因故障断开,电力系统仍应能保持稳定运行和正常供电的要求,对供电要求高可靠性的用户,即使实现了双电源环网互供,但仍不能满足其高可靠性的供电需求。At present, most of the county-level urban networks are powered radially by several 10kV lines with a single power source, which cannot meet the requirements of any component in the power system, such as lines, transformers, or a system that is fault-free or disconnected due to a fault. It should still be able to maintain stable operation and normal power supply requirements. For users who require high reliability of power supply, even if the mutual supply of dual power supply ring networks is realized, it still cannot meet their high reliability power supply needs.
实用新型内容Utility model content
本实用新型克服现有技术存在的不足,所要解决的技术问题为:提供一种能够实现城网网格化、多电源、多分段高且供电可靠性高的问题。The utility model overcomes the deficiencies in the prior art, and the technical problem to be solved is: to provide a problem that can realize urban grid grid, multi-power supply, high multi-section and high power supply reliability.
为了解决上述技术问题,本实用新型采用的技术方案为:一种室外10kV开闭站四供二备供电系统,包括10kV开闭站、110kV甲变电站、110 kV乙变电站和10kV开闭所,还包括第一环网柜、第二环网柜和第三环网柜,所述10kV开闭站内设有第一进出线柜和第二进出线柜;In order to solve the above technical problems, the technical solution adopted by the utility model is: an outdoor 10kV switching station with four supplies and two backup power supply systems, including a 10kV switching station, a 110kV substation A, a 110kV substation B and a 10kV switching station, and Including the first ring network cabinet, the second ring network cabinet and the third ring network cabinet, the 10kV switching station is equipped with a first incoming and outgoing line cabinet and a second incoming and outgoing line cabinet;
所述第一进出线柜断路器Q1的常开触点Q1.1与第二进出线柜断路器Q2的常开触点Q2.1相连,110kV甲变电站断路器Q3的常开触点Q3.1与1号出线的一端相连,1号出线的另一端与第二进出线柜断路器Q2的常开触点Q2.2相连,110kV甲变电站断路器Q3的常开触点Q3.2与2号出线的一端相连,2号出线的另一端与第一环网柜断路器Q5的常开触点Q5.1相连,断路器Q5的常开触点Q5.2与5号出线的一端相连,5号出线的另一端与第二环网柜断路器Q6的常开触点Q6.1相连,断路器Q5的常开触点Q5.3与6号出线的一端相连;The normally open contact Q1.1 of the first incoming and outgoing line cabinet circuit breaker Q1 is connected to the normally open contact Q2.1 of the second incoming and outgoing line cabinet circuit breaker Q2, and the normally open contact Q3 of the 110kV A substation circuit breaker Q3. 1 is connected to one end of No. 1 outgoing line, the other end of No. 1 outgoing line is connected to the normally open contact Q2.2 of the circuit breaker Q2 of the second incoming and outgoing cabinet, and the normally open contact Q3.2 of the circuit breaker Q3 of 110kV Substation A One end of the No. 2 outlet is connected, the other end of the No. 2 outlet is connected with the normally open contact Q5.1 of the circuit breaker Q5 of the first ring network cabinet, and the normally open contact Q5.2 of the circuit breaker Q5 is connected with one end of the No. 5 outlet. The other end of the No. 5 outgoing line is connected to the normally open contact Q6.1 of the circuit breaker Q6 of the second ring network cabinet, and the normally open contact Q5.3 of the circuit breaker Q5 is connected to one end of the No. 6 outgoing line;
6号出线的另一端与第一进出线柜断路器Q1的常开触点Q1.2相连,断路器Q1的常开触点Q1.3与3号出线的一端相连,3号出线的另一端与110 kV乙变电站断路器Q4的常开触点Q4.1相连,断路器Q4的常开触点Q4.2与4号出线的一端相连,4号出线的另一端与10kV开闭所断路器Q8的常开触点Q8.1相连,断路器Q8的常开触点Q8.2与7号出线的一端相连,7号出线的另一端与断路器Q6的常开触点Q6.2相连,断路器Q8的常开触点Q8.3与8号出线的一端相连,8号出线的另一端与第三环网柜断路器Q7的常开触点Q7.1相连,断路器Q7的常开触点Q7.2与9号出线的一端相连,9号出线的另一端与断路器Q2的常开触点Q2.3相连。The other end of the outgoing line No. 6 is connected to the normally open contact Q1.2 of the circuit breaker Q1 of the first incoming and outgoing line cabinet, the normally open contact Q1.3 of the circuit breaker Q1 is connected to one end of the outgoing line No. 3, and the other end of the outgoing line No. 3 Connect with normally open contact Q4.1 of circuit breaker Q4 of 110 kV substation B, connect normally open contact Q4.2 of circuit breaker Q4 with one end of No. The normally open contact Q8.1 of Q8 is connected, the normally open contact Q8.2 of the circuit breaker Q8 is connected with one end of the No. 7 outgoing line, and the other end of the No. 7 outgoing line is connected with the normally open contact Q6.2 of the circuit breaker Q6. The normally open contact Q8.3 of the circuit breaker Q8 is connected to one end of the No. 8 outgoing line, and the other end of the No. The contact Q7.2 is connected with one end of the No. 9 outgoing line, and the other end of the No. 9 outgoing line is connected with the normally open contact Q2.3 of the circuit breaker Q2.
所述第一进出线柜断路器Q1的常开触点Q1.1通过电缆与第二进出线柜断路器Q2的常开触点Q2.1相连。The normally open contact Q1.1 of the first incoming and outgoing line cabinet circuit breaker Q1 is connected to the normally open contact Q2.1 of the second incoming and outgoing line cabinet circuit breaker Q2 through a cable.
所述1号出线、2号出线、3号出线、4号出线、5号出线、6号出线、7号出线、8号出线和9号出线均为10kV连接线。The No. 1 outgoing line, No. 2 outgoing line, No. 3 outgoing line, No. 4 outgoing line, No. 5 outgoing line, No. 6 outgoing line, No. 7 outgoing line, No. 8 outgoing line and No. 9 outgoing line are all 10kV connecting lines.
所述第一环网柜、第二环网柜和第三环网柜均为10kV 环网柜。The first ring network cabinet, the second ring network cabinet and the third ring network cabinet are all 10kV ring network cabinets.
本实用新型与现有技术相比具有以下有益效果:Compared with the prior art, the utility model has the following beneficial effects:
本实用新型构建了以110kV甲变电站和110 kV乙变电站为主供电源,构建以电缆或10kV连接线连接起来的室外10kV开闭站、10kV室内开闭所、第一环网柜、第二环网柜和第三环网柜供电网络,使变电站起到分流负荷、环网柜互供、开闭所互供、运行方式灵活的网格化供电结构,提高了供电可靠率,充分满足了客户的用电需求,形成了坚强的县城配电网。The utility model constructs the 110kV A substation and the 110kV B substation as the main power supply, constructs the outdoor 10kV switching station, the 10kV indoor switching station, the first ring network cabinet, and the second ring network cabinet connected by cables or 10kV connecting wires. The power supply network of the network cabinet and the third ring network cabinet enables the substation to divert load, mutual supply of ring network cabinets, mutual supply of switching stations, and flexible operation mode grid power supply structure, which improves the reliability of power supply and fully satisfies customers electricity demand, forming a strong county distribution network.
附图说明Description of drawings
下面结合附图对本实用新型做进一步详细的说明;Below in conjunction with accompanying drawing, the utility model is described in further detail;
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图中:1为10kV开闭站,2为110kV甲变电站,3为110 kV乙变电站,4为10kV开闭所,5为第一环网柜,6为第二环网柜,7为第三环网柜,8为第一进出线柜,9为第二进出线柜,10为电缆,11为1号出线,12为3号出线,13为2号出线,14为6号出线,15为5号出线,16为7号出线,17为4号出线,18为8号出线,19为9号出线。In the figure: 1 is the 10kV switching station, 2 is the 110kV substation A, 3 is the 110kV substation B, 4 is the 10kV switching station, 5 is the first ring main unit, 6 is the second ring main unit, and 7 is the third Ring network cabinet, 8 is the first incoming and outgoing line cabinet, 9 is the second incoming and outgoing line cabinet, 10 is the cable, 11 is the No. 1 outgoing line, 12 is the No. 3 outgoing line, 13 is the No. 2 outgoing line, 14 is the No. 6 outgoing line, and 15 is 5th, 16th for 7th, 17th for 4th, 18th for 8th, and 19th for 9th.
具体实施方式detailed description
为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型的一部分实施例,而不是全部的实施例;基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present invention , not all embodiments; based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without creative work all belong to the protection scope of the present utility model.
如图1所示,一种室外10kV开闭站四供二备供电系统,包括10kV开闭站1、110kV甲变电站2、110 kV乙变电站3和10kV开闭所4,还包括第一环网柜5、第二环网柜6和第三环网柜7,所述10kV开闭站1内设有第一进出线柜8和第二进出线柜9,第一进出线柜8相当于Ⅰ段母线,第二进出线柜9相当于Ⅱ段母线;As shown in Figure 1, an outdoor 10kV switching station four-supply and two-backup power supply system includes 10kV switching station 1, 110kV A substation 2, 110kV B substation 3 and 10kV switching station 4, and the first ring network Cabinet 5, the second ring network cabinet 6 and the third ring network cabinet 7, the 10kV switching station 1 is provided with a first incoming and outgoing line cabinet 8 and a second incoming and outgoing line cabinet 9, the first incoming and outgoing line cabinet 8 is equivalent to I section busbar, the second incoming and outgoing line cabinet 9 is equivalent to section II busbar;
所述第一进出线柜8断路器Q1的常开触点Q1.1与第二进出线柜9断路器Q2的常开触点Q2.1相连,110kV甲变电站2断路器Q3的常开触点Q3.1与1号出线11的一端相连,1号出线11的另一端与第二进出线柜9断路器Q2的常开触点Q2.2相连,110kV甲变电站2断路器Q3的常开触点Q3.2与2号出线13的一端相连,2号出线13的另一端与第一环网柜5断路器Q5的常开触点Q5.1相连,断路器Q5的常开触点Q5.2与5号出线15的一端相连,5号出线15的另一端与第二环网柜6断路器Q6的常开触点Q6.1相连,断路器Q5的常开触点Q5.3与6号出线14的一端相连;The normally open contact Q1.1 of the first incoming and outgoing line cabinet 8 circuit breaker Q1 is connected to the normally open contact Q2.1 of the second incoming and outgoing line cabinet 9 circuit breaker Q2, and the normally open contact of the 110kV A substation 2 circuit breaker Q3 Point Q3.1 is connected to one end of No. 1 outgoing line 11, the other end of No. 1 outgoing line 11 is connected to the normally open contact Q2.2 of the second incoming and outgoing line cabinet 9 circuit breaker Q2, and the normally open contact of 110kV A substation 2 circuit breaker Q3 Contact Q3.2 is connected to one end of No. 2 outlet 13, and the other end of No. 2 outlet 13 is connected to the normally open contact Q5.1 of the circuit breaker Q5 of the first ring main unit 5, and the normally open contact Q5 of the circuit breaker Q5 .2 Connect with one end of No. 5 outgoing line 15, the other end of No. 5 outgoing line 15 is connected with the normally open contact Q6.1 of the circuit breaker Q6 of the second ring network cabinet 6, and the normally open contact Q5.3 of the circuit breaker Q5 is connected with One end of No. 6 outgoing line 14 is connected;
6号出线14的另一端与第一进出线柜8断路器Q1的常开触点Q1.2相连,断路器Q1的常开触点Q1.3与3号出线12的一端相连,3号出线12的另一端与110 kV乙变电站3断路器Q4的常开触点Q4.1相连,断路器Q4的常开触点Q4.2与4号出线17的一端相连,4号出线17的另一端与10kV开闭所4断路器Q8的常开触点Q8.1相连,断路器Q8的常开触点Q8.2与7号出线16的一端相连,7号出线16的另一端与断路器Q6的常开触点Q6.2相连,断路器Q8的常开触点Q8.3与8号出线18的一端相连,8号出线18的另一端与第三环网柜7断路器Q7的常开触点Q7.1相连,断路器Q7的常开触点Q7.2与9号出线19的一端相连,9号出线19的另一端与断路器Q2的常开触点Q2.3相连。The other end of No. 6 outgoing line 14 is connected to the normally open contact Q1.2 of the circuit breaker Q1 of the first incoming and outgoing line cabinet 8, and the normally open contact Q1.3 of the circuit breaker Q1 is connected to one end of No. 3 outgoing line 12. No. 3 outgoing line The other end of 12 is connected to the normally open contact Q4.1 of circuit breaker Q4 of 110 kV B substation 3, the normally open contact Q4.2 of circuit breaker Q4 is connected to one end of No. 4 outgoing line 17, and the other end of No. 4 outgoing line 17 It is connected to the normally open contact Q8.1 of the circuit breaker Q8 of the 10kV switching station 4, the normally open contact Q8.2 of the circuit breaker Q8 is connected to one end of the No. 7 outgoing line 16, and the other end of the No. 7 outgoing line 16 is connected to the circuit breaker Q6 The normally open contact Q6.2 of the circuit breaker Q8 is connected with one end of the No. The contact Q7.1 is connected, the normally open contact Q7.2 of the circuit breaker Q7 is connected with one end of the No. 9 outgoing line 19, and the other end of the No. 9 outgoing line 19 is connected with the normally open contact Q2.3 of the circuit breaker Q2.
所述第一进出线柜8断路器Q1的常开触点Q1.1通过电缆10与第二进出线柜9断路器Q2的常开触点Q2.1相连。The normally open contact Q1.1 of the circuit breaker Q1 of the first incoming and outgoing line cabinet 8 is connected to the normally open contact Q2.1 of the second incoming and outgoing line cabinet 9 circuit breaker Q2 through a cable 10 .
所述1号出线11、2号出线13、3号出线12、4号出线17、5号出线15、6号出线14、7号出线16、8号出线18和9号出线19均为10kV连接线。The 1st outgoing line 11, the 2nd outgoing line 13, the 3rd outgoing line 12, the 4th outgoing line 17, the 5th outgoing line 15, the 6th outgoing line 14, the 7th outgoing line 16, the 8th outgoing line 18 and the 9th outgoing line 19 are all 10kV connections Wire.
所述第一环网柜5、第二环网柜6和第三环网柜7均为10kV 环网柜。The first ring network cabinet 5, the second ring network cabinet 6 and the third ring network cabinet 7 are all 10kV ring network cabinets.
根据配网运行方式,确定一种供电正常运行模式110 kV乙变电站3通过3号出线12进入10kV开闭站1内第一进出线柜8,第一进出线柜8和第二进出线柜9通过电缆10并列运行,1号出线11进入第二进出线柜9,第二进出线柜9断路器Q2常开触点Q2.2处于断开位置,同时6号出线14进入第一进出线柜8,第一进出线柜8断路器Q1常开触点Q1.2处于断开位置,即10kV开闭站1由110 kV乙变电站3主供电源;According to the distribution network operation mode, determine a power supply normal operation mode 110 kV B substation 3 enters the first incoming and outgoing line cabinet 8, the first incoming and outgoing line cabinet 8 and the second incoming and outgoing line cabinet 9 in the 10kV switching station 1 through the No. 3 outgoing line 12 Parallel running through cables 10, No. 1 outgoing line 11 enters the second incoming and outgoing line cabinet 9, the second incoming and outgoing line cabinet 9 circuit breaker Q2 normally open contact Q2.2 is in the disconnected position, and No. 6 outgoing line 14 enters the first incoming and outgoing line cabinet 8. The circuit breaker Q1 normally open contact Q1.2 of the first incoming and outgoing line cabinet 8 is in the disconnected position, that is, the 10kV switching station 1 is powered by the 110kV B substation 3 main power supply;
第一环网柜5由110kV甲变电站2通过2号出线13连接作为主供电源,第一环网柜5通过5号出线15向第二环网柜6供电,10kV开闭所4通过7号出线16与第二环网柜6连接,第二环网柜6断路器Q6的常开触点Q6.1处于断开位置;The first ring network cabinet 5 is connected as the main power supply by the 110kV A substation 2 through the No. 2 outlet 13, the first ring main unit 5 supplies power to the second ring main unit 6 through the No. 5 outlet 15, and the 10kV switching station 4 passes through No. 7 The outgoing line 16 is connected to the second ring network cabinet 6, and the normally open contact Q6.1 of the circuit breaker Q6 of the second ring network cabinet 6 is in the disconnected position;
第三环网柜7由10kV开闭站1通过9号出线19连接作为主供电源,10kV开闭所4通过8号出线18与第三环网柜7连接,第三环网柜7断路器Q7的常开触点Q7.1处于断开位置;The third ring network cabinet 7 is connected to the 10kV switching station 1 through No. 9 outlet 19 as the main power supply, and the 10kV switching station 4 is connected to the third ring network cabinet 7 through No. 8 outlet 18. The circuit breaker of the third ring network cabinet 7 The normally open contact Q7.1 of Q7 is in the disconnected position;
10kV开闭所4由110 kV乙变电站3通过4号出线17连接作为主供电源。The 10kV switching station 4 is connected to the 110kV B substation 3 through the No. 4 outgoing line 17 as the main power supply.
当10kV开闭站1供电能力不足以满足客户负荷需求时,10kV开闭站1内第一进出线柜8和第二进出线柜9分别代表的Ⅰ段母线和Ⅱ段母线开始分段运行,第一进出线柜8断路器Q1的常开触点Q1.1和第二进出线柜9断路器Q2的常开触点Q2.1处于断开位置,即第一进出线柜8由110 kV乙变电站3所连接的3号出线12供电,第二进出线柜9由110kV甲变电站2所连接的1号出线11供电;When the power supply capacity of 10kV switching station 1 is not enough to meet the load demand of customers, the busbars of section I and section II respectively represented by the first incoming and outgoing line cabinet 8 and the second incoming and outgoing line cabinet 9 in the 10kV switching station 1 start to operate in sections. The normally open contact Q1.1 of the first incoming and outgoing line cabinet 8 circuit breaker Q1 and the normally open contact Q2.1 of the second incoming and outgoing line cabinet 9 circuit breaker Q2 are in the disconnected position, that is, the first incoming and outgoing line cabinet 8 is powered by 110 kV The No. 3 outgoing line 12 connected to the B substation 3 supplies power, and the second incoming and outgoing line cabinet 9 is powered by the No. 1 outgoing line 11 connected to the 110kV A substation 2;
当1号出线11(或3号出线12)线路因检修或故障停电时,能够用3号出线12(或1号出线12)正常线路对10kV开闭站1供电,第一进出线柜8和第二进出线柜9通过电缆10并列运行;When the line 11 of No. 1 outgoing line (or 12 of No. 3 outgoing line) loses power due to maintenance or failure, the normal line of No. 3 outgoing line 12 (or No. 1 outgoing line 12) can be used to supply power to the 10kV switching station 1. The first incoming and outgoing line cabinet 8 and The second incoming and outgoing line cabinet 9 runs in parallel through the cables 10;
当1号出线11和3号出线12线路因检修或故障停电时,第一环网柜5通过6号出线14对10kV开闭站1供电,或第三环网柜7通过9号出线19对10kV开闭站1供电,第一进出线柜8和第二进出线柜9通过电缆10并列运行;When line 11 of line 1 and line 12 of line 3 lose power due to maintenance or failure, the first ring network cabinet 5 supplies power to 10kV switching station 1 through line 14 of line 6, or the third ring network cabinet 7 passes line 19 of line 9 The 10kV switching station 1 supplies power, and the first incoming and outgoing line cabinet 8 and the second incoming and outgoing line cabinet 9 run in parallel through cables 10;
当2号出线13检修或故障停电时,第一环网柜5通过6号出线14对10kV开闭站1供电,但5号出线15进入第一环网柜5断路器Q5的常开触点Q5.2处于断开位置;When the No. 2 outgoing line 13 is overhauled or power failure occurs, the first ring main unit 5 supplies power to the 10kV switching station 1 through the No. 6 outgoing line 14, but the No. 5 outgoing line 15 enters the normally open contact of the first ring main unit 5 circuit breaker Q5 Q5.2 is in the off position;
第一环网柜5与第二环网柜6能够通过5号出线15互供。The first ring network cabinet 5 and the second ring network cabinet 6 can supply each other through the No. 5 outgoing line 15 .
本供电系统由110kV甲变电站2和110 kV乙变电站3通过1号出线11、2号出线13、3号出线12和4号出线17向10kV开闭站1、10kV开闭所4、第一环网柜5、第二环网柜6和第三环网柜7供电,配网运行方式得到了进一步的优化,运行方式灵活、供电可靠性高、负荷分配合理、接线简单清晰,初步形成了配网拉手互供的四供二备供电模式。本供电系统极大的提高了供电可靠性,但要注意供电线路的安全载流量、开闭站或环网柜的出线断路器开断容量不得超过额定负荷容量,并做好现场运行规程的修订,确保严格按照运行规程操作、执行,以确保该供电系统的安全、可靠。The power supply system consists of 110kV A substation 2 and 110kV B substation 3 to 10kV switching station 1, 10kV switching station 4, the first ring through No. Network cabinet 5, the second ring network cabinet 6 and the third ring network cabinet 7 supply power, and the operation mode of the distribution network has been further optimized. The operation mode is flexible, the power supply reliability is high, the load distribution is reasonable, and the wiring is simple and clear. The four-supply and two-standby power supply mode with mutual supply of network and hands. This power supply system greatly improves the reliability of power supply, but attention should be paid to the safe current carrying capacity of the power supply line, the breaking capacity of the outlet circuit breaker of the switching station or the ring network cabinet must not exceed the rated load capacity, and the revision of the on-site operating procedures should be done. , to ensure the operation and execution in strict accordance with the operating procedures, so as to ensure the safety and reliability of the power supply system.
本实用新型构建了以110kV甲变电站和110 kV乙变电站为主供电源,构建以电缆或10kV连接线连接起来的室外10kV开闭站、10kV室内开闭所、第一环网柜、第二环网柜和第三环网柜供电网络,使变电站起到分流负荷、环网柜互供、开闭所互供、运行方式灵活的网格化供电结构,提高了供电可靠率,充分满足了客户的用电需求,形成了坚强的县城配电网。The utility model constructs the 110kV A substation and the 110kV B substation as the main power supply, constructs the outdoor 10kV switching station, the 10kV indoor switching station, the first ring network cabinet, and the second ring network cabinet connected by cables or 10kV connecting wires. The power supply network of the network cabinet and the third ring network cabinet enables the substation to divert load, mutual supply of ring network cabinets, mutual supply of switching stations, and flexible operation mode grid power supply structure, which improves the reliability of power supply and fully satisfies customers electricity demand, forming a strong county distribution network.
最后应说明的是:以上各实施例仅用以说明本实用新型的技术方案,而非对其限制;尽管参照前述各实施例对本实用新型进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本实用新型各实施例技术方案的范围。Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present utility model, and are not intended to limit it; although the present utility model has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand : It can still modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements to some or all of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions depart from the embodiments of the present utility model Scope of technical solutions.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620723650.3U CN205864047U (en) | 2016-07-11 | 2016-07-11 | A kind of outdoor 10kV Switching Station four supplies two for electric power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620723650.3U CN205864047U (en) | 2016-07-11 | 2016-07-11 | A kind of outdoor 10kV Switching Station four supplies two for electric power system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205864047U true CN205864047U (en) | 2017-01-04 |
Family
ID=57646398
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620723650.3U Expired - Fee Related CN205864047U (en) | 2016-07-11 | 2016-07-11 | A kind of outdoor 10kV Switching Station four supplies two for electric power system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205864047U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106059050A (en) * | 2016-07-11 | 2016-10-26 | 国家电网公司 | Outdoor 10kV on-off station four-supply two-backup power supply system |
-
2016
- 2016-07-11 CN CN201620723650.3U patent/CN205864047U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106059050A (en) * | 2016-07-11 | 2016-10-26 | 国家电网公司 | Outdoor 10kV on-off station four-supply two-backup power supply system |
CN106059050B (en) * | 2016-07-11 | 2018-05-01 | 国家电网公司 | Outdoor 10kV Switching Stations four supply two available electric systems |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101537802B (en) | Traction power supply system of electrified railway novel AT power supply mode | |
CN102368612B (en) | Triple-double wiring way of medium-voltage electric distribution network | |
CN203367955U (en) | Low voltage power cable isolation device | |
CN204928156U (en) | A distribution network frame wiring structure | |
CN102931587B (en) | Protect supplying electricity and power distribution car | |
CN204835226U (en) | Line arrangement structure of two complete clusters is joined in marriage into in wiring of one and half circuit breakers | |
CN205178525U (en) | Asynchronous conversion device of high-voltage direct-current two-end power grid | |
CN203813223U (en) | A comprehensive automatic substation | |
CN112510706B (en) | Same-mother loop closing circuit for 10kV power distribution network | |
CN205864047U (en) | A kind of outdoor 10kV Switching Station four supplies two for electric power system | |
CN204230846U (en) | A kind of low-voltage cable junction box wiring system | |
CN106059050B (en) | Outdoor 10kV Switching Stations four supply two available electric systems | |
CN202405780U (en) | medium voltage distribution network | |
CN107240884B (en) | Distribution device HGIS equipment's arrangement structure | |
CN209948370U (en) | Bypass node type PT cabinet | |
CN211089136U (en) | 6kV house service power interconnection device | |
CN205985758U (en) | Novel electric main wiring of 220kV transformer substation | |
CN107482523A (en) | Double bus scheme GIS device and its repair method, pressure test method | |
CN202918045U (en) | 10KV three-supply-one-backup ring network power supply system | |
CN208257496U (en) | Dual-power automatic switching formula heating tape current supply circuit | |
CN208571602U (en) | A kind of power switching apparatus and power supply and distribution of electric power system | |
CN100401611C (en) | A Substation Wiring Method for Balanced Switching of Four-way Power Supply | |
CN208158122U (en) | A kind of power switching apparatus and power supply and distribution of electric power system | |
CN208045949U (en) | A main wiring system of a high-voltage power distribution device | |
CN110086091A (en) | Shunt nodes type PT cabinet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170104 Termination date: 20180711 |