[go: up one dir, main page]

CN205825948U - Marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness - Google Patents

Marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness Download PDF

Info

Publication number
CN205825948U
CN205825948U CN201620496842.5U CN201620496842U CN205825948U CN 205825948 U CN205825948 U CN 205825948U CN 201620496842 U CN201620496842 U CN 201620496842U CN 205825948 U CN205825948 U CN 205825948U
Authority
CN
China
Prior art keywords
jackstone
thickness
plastic tube
dike
sedimentation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620496842.5U
Other languages
Chinese (zh)
Inventor
陈富
张健
喻志发
侯晋芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd
Tianjin Harbor Engineering Quality Inspection Center Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd
Tianjin Harbor Engineering Quality Inspection Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd, Tianjin Harbor Engineering Quality Inspection Center Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201620496842.5U priority Critical patent/CN205825948U/en
Application granted granted Critical
Publication of CN205825948U publication Critical patent/CN205825948U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a kind of marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness, including the plastic tube being embedded in ground, plastic tube bottom reaches below the compression soil depth that affected by jackstone dike additional load;Plastic tube bottom is arranged with the first magnet ring, is arranged with the second magnet ring at plastic tube ground basal plane;A protection board it is arranged with on plastic tube above second magnet ring;Being arranged with protection pipe on plastic tube more than protection board, protection length of tube is more than jackstone dike thickness.First magnet ring is used for verifying that plastic tube bottom is elevation fixed point, and the difference of the degree of depth of each measurement of the second magnet ring at ground basal plane is i.e. the settling amount of jackstone dike.The second magnet ring at ground basal plane is exactly jackstone thickness with the difference of jackstone levee crown face to plastic tube mouth of pipe distance.This utility model both can guarantee that the sedimentation of jackstone dike and the certainty of measurement requirement of thickness, again can be cost-effective, buries underground conveniently.

Description

Marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness
Technical field
This utility model belongs to Geotechnical Engineering monitoring field, relates particularly to a kind of marine jackstone dike sedimentation and jackstone is thick The measurement apparatus of degree.
Background technology
Need to build breakwater in order to wave resistance subtracts silt during port construction, or sea reclamation needs to build cofferdam then Carry out hydraulic reclamation.Breakwater and cofferdam use jackstone embankment structure mostly, and Specific construction technique is for first setting plastic draining in the soil body Plate is as vertical drainage passage, and then laying medium coarse sand bed course is as horizontal drainage bed course, finally carries out jackstone waterborne and forms dike Body.In order to ensure stablizing of ground during jackstone and structure, need the sedimentation to ground and horizontal displacement to be observed, close Reason adjusts construction jackstone speed, it is ensured that construction safety.
Can use for settlement monitoring and bury the instrument such as fluid pressure differential sedimentometer or steel chord type pantograph underground, but bury underground Process is complicated, and instrument cost is higher.In order to cost-effective, some engineerings use and first places large-scale sedimentation plate then in former mud face By measuring the method that in sedimentation plate, bar cope level carrys out predicting sett ment.But owing to sea cannot be carried out the measurement of the level, can only GPS technology is used to measure sedimentation plate elevation.This measuring method two problems of existence: on the one hand GPS-RTK commercial measurement elevation Middle error is relatively big, and is affected bigger by factors such as weather conditions, base station distance, around construction machinery boats and ships;On the other hand, heavy In fall dish, bar may be pounded disconnected by block stone or squeeze curved during jackstone, and is difficult under water find, causes settlement measurement to tie Bigger than normal.
Developing a kind of marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness, solve two problems, one is that protection is surveyed Amount device is not smashed by block stone, and is modified contingent inclination, and two are intended to cost-effective, bury underground conveniently, it is simple to push away Wide application.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, it is provided that a kind of marine jackstone dike sedimentation and jackstone are thick The measurement apparatus of degree, can improve the sedimentation of jackstone dike and the precision of thickness measurement, again can be cost-effective, buries underground conveniently.
This utility model is achieved through the following technical solutions:
A kind of marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness, including the plastic tube (1) being embedded in ground, mould Material pipe (1) bottom reaches below the compression soil depth that affected by jackstone dike (2) additional load (the most uncompressed soil layer);Plastic tube (1) bottom is arranged with the first magnet ring (3), and plastic tube (1) Ni Mianchu is arranged with the second magnet ring (4);At the mud face of plastic tube (1) also It is arranged with protection board (5), the plastic tube (1) more than protection board (5) is arranged with upper protection pipe (6), the bottom of upper protection pipe Fix with protection board (5) and be connected, and upper protection pipe (6) length is more than jackstone dike thickness.
In technique scheme, plastic tube (1) uses hard PVC inclinometer pipe, interior fluted, inclinometer pipe external diameter 80mm.
In technique scheme, protection board (5) is square, and the length of side is 3m, and thickness is 30~50mm.
In technique scheme, protection board (5) is circular, and a diameter of 3m, thickness is 30~50mm.
In technique scheme, protection board (5) center offer a diameter of 90mm for penetrating the logical of plastic tube (1) Hole.
In technique scheme, upper protection pipe (6) uses steel pipe, internal diameter 90mm, wall thickness 5~10mm.
In technique scheme, on protection board (5) plastic tube below, set is additionally provided with lower protection pipe (7), upper protection The bottom of (6) and the top of lower protection pipe (7) form with ring flange of managing is fixed with protection board (5) and is connected, described second magnet ring (4) it is set on lower protection pipe (7).
In technique scheme, lower protection pipe 7 uses austenitic stainless steel, internal diameter 90mm, wall thickness 5~10mm, length 500~1000mm.
In technique scheme, described compression soil depth desirable jackstone dike additional stress should equal to soil layer effective weight The degree of depth of the 10% of power.
The using method of the measurement apparatus of described marine jackstone dike sedimentation and jackstone thickness: with laminated settlement meter (7) respectively Measuring the first magnet ring (3), the second magnet ring (4) degree of depth away from plastic tube (1) mouth of pipe, the first magnet ring (3) is used for verifying plastic tube (1) Bottom is elevation fixed point, and the difference of the degree of depth of each measurement of the second magnet ring (4) at ground basal plane is i.e. the sedimentation of jackstone dike (2) Amount, the second magnet ring (4) at ground basal plane is exactly jackstone thickness with the difference of jackstone dike (2) end face to plastic tube (1) mouth of pipe distance.
Advantage of the present utility model and having the beneficial effect that
This utility model increases the depth of burying of plastic tube further, utilizes the uncompressed soil layer conduct of plastic tube bottom Elevation fixed point, overcoat magnet ring at the mud face of plastic tube reliably, and protection board and protection pipe are set, it is ensured that magnetic at ground basal plane Ring synchronizes sedimentation with jackstone dike, determines jackstone dike settling amount and jackstone thickness by measuring the change in depth of magnet ring at ground basal plane, And the inclination of plastic tube can be modified.It both can guarantee that the sedimentation of jackstone dike and the certainty of measurement requirement of thickness, can save again About cost, buries underground conveniently.
Accompanying drawing explanation
Fig. 1 is the structural representation of the measurement apparatus of a kind of marine jackstone dike sedimentation of this utility model and jackstone thickness.
Fig. 2 is inclinometer pipe cross-sectional view.
Fig. 3 is protection board and upper protection pipe, lower protection pipe connection diagram
In figure: 1 be plastic tube, 2 be jackstone dike, 3 be the first magnet ring, 4 be the second magnet ring, 5 be protection board, 6 for upper protection Pipe, 7 be lower protection manage.
Detailed description of the invention
The technical solution of the utility model is further illustrated below in conjunction with specific embodiment.
See accompanying drawing 1, a kind of marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness, ground is embedded with plastic tube 1 (needing the perpendicularity ensureing plastic tube 1 during burying underground less than 1%), plastic tube 1 uses hard PVC inclinometer pipe, interior fluted (seeing accompanying drawing 2), inclinometer pipe external diameter 80mm, plastic tube 1 bottom reaches the compression soil depth affected by jackstone dike 2 additional load Below (described compression soil depth desirable jackstone dike additional stress equal to soil layer effective weight stress 10% the degree of depth), as Elevation fixed point;More than plastic tube 1 bottom 1 meter of distance is arranged with the first magnet ring 3, and the first magnet ring 3 internal diameter is 90mm;Plastic tube Being arranged with the second magnet ring 4 at the ground basal plane of 1, the second magnet ring 4 internal diameter is 90mm;It is arranged with one on plastic tube 1 above second magnet ring 4 Protection board 5, protection board 5 is square or circular, the length of side or a diameter of 3m, and thickness is 30mm, and protection board 5 can use plank system Making, and colligation block stone or sand pocket auxiliary protection plate 5 sink on plank, protection board 5 center offers the use of a diameter of 90mm In the through hole penetrating plastic tube 1;Being arranged with protection pipe 6 on the plastic tube 1 of protection board more than 5, upper protection pipe 6 uses steel Pipe, internal diameter 90mm, wall thickness 5~10mm, protection pipe 6 length, can spreading as required more than jackstone dike thickness;See accompanying drawing 3, On the plastic tube 1 of protection board less than 5, set is additionally provided with lower protection pipe 7, the bottom of upper protection pipe 6 and the top of lower protection pipe 7 with The form of ring flange and protection board 5 is fixing to be connected, and lower protection pipe 7 uses austenitic stainless steel, internal diameter 90mm, wall thickness 5~10mm, Length 500~1000mm, described second magnet ring 4 is set on lower protection pipe 7.
In jackstone dike work progress, measure first magnet ring the 3, second magnet ring 4 respectively away from plastic tube 1 with laminated settlement meter 7 The degree of depth of the mouth of pipe, the first magnet ring 3 is used for verifying that plastic tube 1 bottom is elevation fixed point, each time of the second magnet ring 4 at ground basal plane The difference of the degree of depth measured is exactly the settling amount of jackstone dike 2.At ground basal plane, the second magnet ring 4 and jackstone dike 2 end face are to plastic tube 1 mouth of pipe The difference of distance is exactly jackstone thickness.
When finding that plastic tube 1 tilts, can measure at its deeply mixing cement-soil pile correction ground basal plane with sliding inclinometer Second magnet ring 4 settling amount.
Above this utility model is done exemplary description, it should explanation, without departing from core of the present utility model In the case of the heart, any simple deformation, amendment or other those skilled in the art can not spend creative work etc. Protection domain of the present utility model is each fallen within replacing.

Claims (9)

1. a marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness, it is characterised in that: include that be embedded in ground moulds Material pipe (1), plastic tube (1) bottom reaches below the compression soil depth that affected by jackstone dike (2) additional load;Plastic tube (1) Bottom is arranged with the first magnet ring (3), and plastic tube (1) Ni Mianchu is arranged with the second magnet ring (4);Also overlap at the mud face of plastic tube (1) Be provided with protection board (5), the plastic tube (1) more than protection board (5) is arranged with upper protection pipe (6), the bottom of upper protection pipe with Protection board (5) is fixing to be connected, and upper protection pipe (6) length is more than jackstone dike thickness.
Marine jackstone dike sedimentation the most according to claim 1 and the measurement apparatus of jackstone thickness, it is characterised in that: plastic tube (1) hard PVC inclinometer pipe is used, interior fluted, inclinometer pipe external diameter 80mm.
Marine jackstone dike sedimentation the most according to claim 1 and the measurement apparatus of jackstone thickness, it is characterised in that: protection board (5) being square, the length of side is 3m, and thickness is 30~50mm.
Marine jackstone dike sedimentation the most according to claim 1 and the measurement apparatus of jackstone thickness, it is characterised in that: protection board (5) being circular, a diameter of 3m, thickness is 30~50mm.
Marine jackstone dike sedimentation the most according to claim 1 and the measurement apparatus of jackstone thickness, it is characterised in that: protection board (5) center offers the through hole for penetrating plastic tube (1) of a diameter of 90mm.
Marine jackstone dike sedimentation the most according to claim 1 and the measurement apparatus of jackstone thickness, it is characterised in that: upper protection Pipe (6) uses steel pipe, internal diameter 90mm, wall thickness 5~10mm.
Marine jackstone dike sedimentation the most according to claim 1 and the measurement apparatus of jackstone thickness, it is characterised in that: in protection Also be arranged with lower protection pipe (7) on plate (5) plastic tube below, the top of the upper protection pipe bottom of (6) and lower protection pipe (7) with The form of ring flange is fixing with protection board (5) to be connected, and described second magnet ring (4) is set on lower protection pipe (7).
Marine jackstone dike sedimentation the most according to claim 7 and the measurement apparatus of jackstone thickness, it is characterised in that: lower protection Pipe uses austenitic stainless steel, internal diameter 90mm, wall thickness 5~10mm, length 500~1000mm.
Marine jackstone dike sedimentation the most according to claim 1 and the measurement apparatus of jackstone thickness, it is characterised in that: described pressure The contracting soil depth desirable jackstone dike additional stress degree of depth equal to the 10% of soil layer effective weight stress.
CN201620496842.5U 2016-05-26 2016-05-26 Marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness Active CN205825948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620496842.5U CN205825948U (en) 2016-05-26 2016-05-26 Marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620496842.5U CN205825948U (en) 2016-05-26 2016-05-26 Marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness

Publications (1)

Publication Number Publication Date
CN205825948U true CN205825948U (en) 2016-12-21

Family

ID=57558826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620496842.5U Active CN205825948U (en) 2016-05-26 2016-05-26 Marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness

Country Status (1)

Country Link
CN (1) CN205825948U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107436139A (en) * 2016-05-26 2017-12-05 中交第航务工程局有限公司 Marine jackstone dike sedimentation and the measurement apparatus and its measuring method of jackstone thickness
WO2020082475A1 (en) * 2018-10-23 2020-04-30 西北农林科技大学 Measurement method for measuring thickness of soil layer based on magnetic susceptibility

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107436139A (en) * 2016-05-26 2017-12-05 中交第航务工程局有限公司 Marine jackstone dike sedimentation and the measurement apparatus and its measuring method of jackstone thickness
WO2020082475A1 (en) * 2018-10-23 2020-04-30 西北农林科技大学 Measurement method for measuring thickness of soil layer based on magnetic susceptibility
GB2583409A (en) * 2018-10-23 2020-10-28 Univ Northwest A&F Measurement method for measuring thickness of soil layer based on magnetic susceptibility
GB2583409B (en) * 2018-10-23 2023-02-08 Univ Nanjing Forestry Measuring soil erosion or deposition using magnetic susceptibility

Similar Documents

Publication Publication Date Title
CN104196034B (en) A kind of utilize steel sheet pile as the foundation ditch construction method in supporting cofferdam
CN103061329B (en) Underwater grouting grout based on soft-base large immersed tunnel foundation and grouting process thereof
CN104805854B (en) A kind of Deep Water Ultra-long steel sheet pile cofferdam construction method under tide environment
CN106381866A (en) Construction method of ultra-deep underground diaphragm wall in water-rich soft-soil area
CN107436139A (en) Marine jackstone dike sedimentation and the measurement apparatus and its measuring method of jackstone thickness
CN101215834A (en) Construction Method of Outrigger Type Diaphragm Wall
CN102635124A (en) Construction method aiming to large open caisson in weak soil area
CN102296572B (en) Earth and rockfill dam body seepage monitoring structure provided with abandoned dreg site behind dam and construction method thereof
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN107763307A (en) A kind of water filling nature immersed tube crosses the installation method of river pipeline
CN103266591A (en) Foundation treatment method of seabed oil and gas pipeline paving sand milling area
CN112281810A (en) Construction method of underground diaphragm wall with water-rich fine sand layer
CN205825948U (en) Marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness
CN105839619A (en) Construction method for drilling pile under bad geological conditions
CN205748469U (en) Many Information Field monitoring systems of a kind of reservoir landslide
CN104264653A (en) Superhigh energy level dynamic compaction and replacement compatible construction process
CN208934002U (en) a retaining wall structure
CN104153383A (en) Marine facies soft soil foundation structure and processing method thereof
CN107587497B (en) A method of improving hydraulic reclamation flatness
CN107975376B (en) Connecting structure of tunnel shield jacking pipe and vertical pipeline and construction method
CN108547308A (en) A kind of mud sleeve auxiliary Double-Wall Steel Boxed Cofferdam sinking construction method
CN104195980B (en) A kind of outfitting quay structure
CN204530815U (en) Rubble bedding desilting equipment
CN203869691U (en) Highway subgrade settlement determination device
CN207741750U (en) Survey river bank slope bed mud thickness and jackstone sideline device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant