CN205742299U - A kind of an ultra shallow buries the float Structure of shield tunnel - Google Patents

A kind of an ultra shallow buries the float Structure of shield tunnel Download PDF

Info

Publication number
CN205742299U
CN205742299U CN201620580858.4U CN201620580858U CN205742299U CN 205742299 U CN205742299 U CN 205742299U CN 201620580858 U CN201620580858 U CN 201620580858U CN 205742299 U CN205742299 U CN 205742299U
Authority
CN
China
Prior art keywords
pressing plate
shield tunnel
pile foundation
ultra shallow
floating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620580858.4U
Other languages
Chinese (zh)
Inventor
索晓华
房师涛
夏正茂
郭强
莫新华
颜其才
李元坤
陈欣
李爱家
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
PowerChina Railway Construction Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
PowerChina Railway Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd, PowerChina Railway Construction Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201620580858.4U priority Critical patent/CN205742299U/en
Application granted granted Critical
Publication of CN205742299U publication Critical patent/CN205742299U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of an ultra shallow buries the float Structure of shield tunnel, the technical problem of shield tunnel anti-floating is buried, it is to avoid structure damages during runing, and effectively reduces construction investment with effectively solution an ultra shallow, reduce both sides, shield interval Safety Construction of Deep Foundation Pit risk, it is ensured that engineering is implemented smoothly.It is embedded in the underground shield tunnel construction being assembled by concrete pipe sheet and being formed including an ultra shallow.Respectively left side pile foundation, right side pile foundation are set along circuit bearing of trend interval outside the both sides of described shield tunnel construction, the top of each left side pile foundation arranges and consolidates the left side pressing plate beam being integrated with it, the top of each right side pile foundation arranges and consolidates the right side pressing plate beam being integrated with it, arranges and consolidate the anti-floating pressing plate being integrated therewith between left side pressing plate beam, right side pressing plate beam.

Description

A kind of an ultra shallow buries the float Structure of shield tunnel
Technical field
This utility model relates to Tunnel Engineering, buries the float Structure of shield tunnel particularly to a kind of an ultra shallow.
Background technology
In shield method tunnel construction, often affected by geological conditions, ground environment, ground environment, shield tunnel Buried depth is inadequate, can not meet the requirement of anti-floating;Additionally an ultra shallow buries shield tunnel top heavy-duty vehicle longtime running, to molding shield Structure method tunnel structure impacts, and affects the service life of structure.
Inadequate to shield tunnel buried depth, the requirement that can not meet anti-floating processes, and conventional processing method is to strengthen shield Interval buried depth, adjusts station buried depth and increasing shield interval longitudinal gradient is jointly processed by.This processing mode increases construction investment, and And add interval Safety Construction of Deep Foundation Pit risk.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of an ultra shallow and buries the float Structure of shield tunnel, to have Effect solves an ultra shallow and buries the technical problem of shield tunnel anti-floating, it is to avoid during runing, structure damages, and effectively reduces work Journey is invested, and reduces both sides, shield interval Safety Construction of Deep Foundation Pit risk, it is ensured that engineering is implemented smoothly.
The technical scheme that the above-mentioned technical problem of this utility model solution is taked is as follows:
A kind of an ultra shallow of the present utility model buries the float Structure of shield tunnel, is embedded in underground by coagulation including an ultra shallow Soil section of jurisdiction assembles the shield tunnel construction formed, and it is characterized in that: extend along circuit respectively outside the both sides of described shield tunnel construction Interval, direction arranges left side pile foundation, right side pile foundation, and the top of each left side pile foundation arranges and consolidates the left side pressing plate beam being integrated with it, The top of each right side pile foundation arranges and consolidates the right side pressing plate beam being integrated with it, arranges between left side pressing plate beam, right side pressing plate beam Consolidate the anti-floating pressing plate being integrated therewith.
Advanced note is formed by grouting and reinforcing in the soil body of shield tunnel lining structure outside below described anti-floating pressing plate Slurry reinforcing body.
The beneficial effects of the utility model are, arrange by left side pile foundation, right side pile foundation, left side pressure outside shield tunnel construction The pile slab structure that plate-girder, right side pressing plate beam and anti-floating pressing plate are formed, effectively solution an ultra shallow bury the technology of shield tunnel anti-floating and ask Topic, does not affect launching shaft, shield interval construction speed, reduces both sides, shield interval Safety Construction of Deep Foundation Pit risk, it is ensured that Engineering is implemented smoothly, advantageously reduces construction investment;Can be prevented effectively from and during runing, tunnel structure structure be damaged, make Space more than shield tunnel construction ground can be made full use of.
Accompanying drawing explanation
This specification includes such as next width accompanying drawing:
Fig. 1 is the cross-sectional view that a kind of an ultra shallow of this utility model buries the float Structure of shield tunnel.
Component shown in figure, position and corresponding labelling: ground 1, back fill course 2, anti-floating pressing plate 3, concrete cushion 4, left side pressing plate beam 5a, right side pressing plate beam 5b, left side pile foundation 6a, right side pile foundation 6b, concrete pipe sheet 7, pre-grouting reinforcing body 8。
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is further illustrated.
With reference to Fig. 1, the float Structure that a kind of an ultra shallow of the present utility model buries shield tunnel includes that an ultra shallow is embedded in ground 1 time Assembled, by concrete pipe sheet 7, the shield tunnel construction formed.Extend along circuit respectively outside the both sides of described shield tunnel construction Interval, direction arranges left side pile foundation 6a, right side pile foundation 6b, and the top of each left side pile foundation 6a arranges and consolidates the left side being integrated with it Pressing plate beam 5a, the top of each right side pile foundation 6b arranges and consolidates the right side pressing plate beam 5b being integrated, left side pressing plate beam 5a, right side with it Arrange between pressing plate beam 5b and consolidate the anti-floating pressing plate 3 being integrated therewith.I.e. arrange outside shield tunnel construction by left side pressing plate beam The pile slab structure that 5a, right side pressing plate beam 5b, left side pile foundation 6a, right side pile foundation 6b and anti-floating pressing plate 3 are formed, effectively solves an ultra shallow and buries The technical problem of shield tunnel anti-floating, does not affect launching shaft, shield interval construction speed, reduces both sides, shield interval deep Security of foundation ditch construction risk, it is ensured that engineering is implemented smoothly, advantageously reduces construction investment.And can be prevented effectively from during runing Tunnel structure structure is damaged, makes the space on more than shield tunnel construction ground to be made full use of.
With reference to Fig. 1, formed by grouting and reinforcing in the soil body of shield tunnel construction outside below described anti-floating pressing plate 3 Pre-grouting reinforcing body 8.I.e. in shield tunneling process, 3 times soil bodys of anti-floating pressing plate are had around shield tunnel construction Advanced Stabilizing Grout targetedly, makes soft stratum form consolidated earth mass, thus avoid excavated section occur " upper soft under Firmly " or stratum discontinuity phenomenon, driving difficulty is caused.Under described anti-floating pressing plate 3 bottom surface, certain thickness concrete is set Bed course 4, anti-floating pressing plate 3 end face is back fill course 2 to ground 1.
With reference to Fig. 1, a kind of an ultra shallow of this utility model buries work progress and the technology requirement of the float Structure of shield tunnel As follows:
(1) construction on the left of pile foundation 6a, right side pile foundation 6b, dig out pile foundation end face and two campshed bases adjacent between the earthwork to coagulation Bottom soil padding 4, and cut pile crown, straightening pile crown reinforcing bar;
(2) construction concrete cushion 4;
(3) construction anti-floating pressing plate 3 and left side pressing plate beam 5a, right side pressing plate beam 5b reinforcing bar, anti-floating pressing plate 3 and left side pile foundation 6a, right side pile foundation 6b Bar Anchorage are in left side pressing plate beam 5a, right side pressing plate beam 5b reinforcing bar, and its anchorage length meets related specifications Requirement.Then carrying out anti-floating pressing plate 3 and left side pressing plate beam 5a, right side pressing plate beam 5b concreting, concrete reaches certain strong After degree, at left side pressing plate beam 5a, right side pressing plate beam 5b and anti-floating pressing plate 3 earth fill last time to original ground.
(4) shield driving is to before anti-floating pressing plate 3, carries out every preparation, and in advance shield body peripheral extent is carried out pin Grouting and reinforcing to property.
(5) carry out shield driving, assembled shield duct piece along designed lines, and carry out secondary grouting.
The above this utility model an ultra shallow that simply explains through diagrams bury shield tunnel some principles of float Structure and Function, be not intended to be confined to this utility model shown in and described concrete structure and the scope of application in, therefore every all can The corresponding amendment that can be utilized and equivalent, belong to the apllied the scope of the claims of this utility model.

Claims (3)

1. an ultra shallow buries a float Structure for shield tunnel, including an ultra shallow be embedded under ground (1) by concrete pipe sheet (7) group The shield tunnel construction that dress is formed, is characterized in that: be spaced along circuit bearing of trend respectively outside the both sides of described shield tunnel construction Arranging left side pile foundation (6a), right side pile foundation (6b), the top of each left side pile foundation (6a) arranges and consolidates the left side pressure being integrated with it Plate-girder (5a), the top of each right side pile foundation (6b) arranges and consolidates right side pressing plate beam (5b) being integrated, left side pressing plate beam with it (5a), arrange between right side pressing plate beam (5b) and consolidate the anti-floating pressing plate (3) being integrated therewith.
A kind of an ultra shallow the most as claimed in claim 1 buries the float Structure of shield tunnel, it is characterized in that: described anti-floating pressing plate (3) lower section forms pre-grouting reinforcing body (8) by grouting and reinforcing in the soil body of shield tunnel construction outside.
A kind of an ultra shallow the most as claimed in claim 1 or 2 buries the float Structure of shield tunnel, it is characterized in that: described anti-floating pressure Arranging certain thickness concrete cushion (4) under plate (3) bottom surface, anti-floating pressing plate (3) end face to ground (1) is back fill course (2).
CN201620580858.4U 2016-06-15 2016-06-15 A kind of an ultra shallow buries the float Structure of shield tunnel Expired - Fee Related CN205742299U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620580858.4U CN205742299U (en) 2016-06-15 2016-06-15 A kind of an ultra shallow buries the float Structure of shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620580858.4U CN205742299U (en) 2016-06-15 2016-06-15 A kind of an ultra shallow buries the float Structure of shield tunnel

Publications (1)

Publication Number Publication Date
CN205742299U true CN205742299U (en) 2016-11-30

Family

ID=57386062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620580858.4U Expired - Fee Related CN205742299U (en) 2016-06-15 2016-06-15 A kind of an ultra shallow buries the float Structure of shield tunnel

Country Status (1)

Country Link
CN (1) CN205742299U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080237A (en) * 2019-05-16 2019-08-02 深圳市工勘岩土集团有限公司 It cheats the shallow earthing subway tunnel pit earthwork in bottom and excavates anti-floating construction method and structure
CN110093822A (en) * 2019-06-05 2019-08-06 中国能源建设集团安徽省电力设计院有限公司 A kind of traction engine for the defeated coal shallow embedding gallery in thermal power plant underground is current to cross over plate and its design method
CN111287171A (en) * 2020-03-16 2020-06-16 中铁二院贵阳勘察设计研究院有限责任公司 Tunnel is with super shallow no beam slab bridge structure of burying down-through highway
CN112682045A (en) * 2020-12-29 2021-04-20 中铁二院工程集团有限责任公司 Bearing structure of underground tunnel ultra-shallow buried underpass highway and construction method
CN113685190A (en) * 2021-08-28 2021-11-23 华东交通大学 Reinforcing system for shield to penetrate through shallow soft clay and construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080237A (en) * 2019-05-16 2019-08-02 深圳市工勘岩土集团有限公司 It cheats the shallow earthing subway tunnel pit earthwork in bottom and excavates anti-floating construction method and structure
CN110093822A (en) * 2019-06-05 2019-08-06 中国能源建设集团安徽省电力设计院有限公司 A kind of traction engine for the defeated coal shallow embedding gallery in thermal power plant underground is current to cross over plate and its design method
CN110093822B (en) * 2019-06-05 2024-01-23 中国能源建设集团安徽省电力设计院有限公司 Heavy-load vehicle passing crossing plate for underground coal conveying shallow-buried corridor of thermal power plant and design method thereof
CN111287171A (en) * 2020-03-16 2020-06-16 中铁二院贵阳勘察设计研究院有限责任公司 Tunnel is with super shallow no beam slab bridge structure of burying down-through highway
CN112682045A (en) * 2020-12-29 2021-04-20 中铁二院工程集团有限责任公司 Bearing structure of underground tunnel ultra-shallow buried underpass highway and construction method
CN112682045B (en) * 2020-12-29 2023-01-20 中铁二院工程集团有限责任公司 Bearing structure of underground tunnel ultra-shallow buried underpass highway and construction method
CN113685190A (en) * 2021-08-28 2021-11-23 华东交通大学 Reinforcing system for shield to penetrate through shallow soft clay and construction method
CN113685190B (en) * 2021-08-28 2024-02-09 华东交通大学 Reinforcing system for shield to penetrate shallow soft clay and construction method

Similar Documents

Publication Publication Date Title
CN205742299U (en) A kind of an ultra shallow buries the float Structure of shield tunnel
CN104500082B (en) In Tunneling by mining method, shield receives construction method
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN104847362B (en) Ground consisting of hard rock construction method across underground digging in subway station greatly
CN208220817U (en) Large section Shallow-Buried Soft Rock tunnel groined type double side wall support system
CN103306713A (en) Networked reinforcement method for cross-layer drilling of outburst coal seam
CN109056746A (en) The design and construction method of rectangle active well supporting construction can be recycled in a kind of flexible compound assembled
CN206308569U (en) It is a kind of to reinforce the road structure for punishing the solution cavity that underlies
CN103122636A (en) Superficial layer groove wall reinforcing method of feeble stratum underground continuous wall
CN104806247A (en) Transport method of building longitudinal composite bridge in middle of strip mine stope
CN104947650B (en) Grouting behind shaft or drift lining closed reinforcing method after sand drain piling prepressing
CN104912561A (en) Construction method for continuously passing through vertical shaft by shield under high confined water complex stratum condition
CN107503754A (en) A kind of construction method of VI grade of country rock rich water Shallow tunnel with large cross-section
CN107130611A (en) A kind of design and construction method of the recyclable circular section Row Piles Supporting Structure of flexible compound antiseepage assembled
CN104532714A (en) Roadbed structure for treating deep soft soil karst foundation
CN102071675A (en) Soft soil foundation consolidation method combining drainage pile loading prepressing and deep mixing piles
CN104895121B (en) Transverse partition method for reducing ground surface settlement and building structure deformation of underground structure construction
CN104929142A (en) Combined cofferdam structure and building construction method thereof
CN107023021B (en) A kind of design and construction method of flexible compound Diaphragm Wall Support Structure
CN205677640U (en) Seasonal tunnel, river valley gate-type enclosed construction is worn under shallow embedding
CN205776276U (en) A kind of large-scale buried friction pile of side slope two-part props up mark structure
CN204627621U (en) A kind of grouting with small pipe support system
CN103966981B (en) Force transferring structure and the construction method thereof of arch dam is built on weathering rock mass
CN104763437A (en) Strong permeable stratum tunnel excavation method
CN101761098B (en) Embedding method of surveying slant and settling tube

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

CF01 Termination of patent right due to non-payment of annual fee