Utility model content
The purpose of this utility model is the defect for prior art and deficiency, it is provided that a kind of metallurgical red slag Exposure degree utilizes system
System.
In order to solve the problem existing for background technology, the metallurgical red slag Exposure degree of one of the present utility model utilizes system, its bag
Containing fluidization hood, air compartment, water pump, waste residue car, ash-removing valve, dedusting ash silo, air-introduced machine, cleaner unit, chimney, a slagging
Device, cyclone separator, power station bypass flue, burner hearth, boiler, electric traction fixed mount, tractizer, traction steel rope of cable,
Red slag entrance, primary fragmentation agent, red slag railcar, vibrosieve, recursher, red slag warehouse, air and powder mixer, air-supply
Machine, red slag warehouse negative pressure regulation door;The internally installed of air compartment has fluidization hood, and the bottom of an air compartment is mixed with wind powder respectively
Clutch, pressure fan connect, and air and powder mixer is arranged on the bottom of red slag warehouse, and red slag warehouse is arranged on the side of body of wall, body of wall
Upper end be provided with red slag railcar, red slag railcar is connected with tractizer by traction steel rope of cable, and tractizer is arranged on
On electric traction fixed mount, red slag warehouse being provided with red slag entrance, primary fragmentation agent, vibrosieve, recursher are pacified successively
Being contained in the inside of red slag warehouse, the middle part of red slag warehouse is connected by the middle part of red slag warehouse negative pressure regulation door and an air compartment, and one
Secondary air compartment be internally provided with burner hearth, the upper end of burner hearth is connected with boiler, and the lower end of burner hearth is connected with water pump, an air compartment
Right side is connected with cyclone separator, and the upper end of cyclone separator is connected with cleaner unit by power station bypass flue, cyclone separator
Bottom is provided with slagging device, and the downside of slagging device is provided with waste residue car, and the downside of cleaner unit is provided with dedusting ash silo, dedusting ash silo
Bottom ash-removing valve is installed, the side of cleaner unit is connected with chimney by air-introduced machine.
This utility model has the beneficial effect that and facilitates implementation the transport of red slag, storage, Exposure degree and vent gas treatment, and speed is fast,
And can work continuously, time-consuming.
Detailed description of the invention
Below in conjunction with the accompanying drawings, this utility model is further described.
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing and specific embodiment party
Formula, is further elaborated to this utility model.Should be appreciated that detailed description of the invention described herein is only in order to explain
This utility model, is not used to limit this utility model.
As it is shown in figure 1, this detailed description of the invention adopts the following technical scheme that it comprises fluidization hood 1, air compartment 2, a water pump
3, waste residue car 4, ash-removing valve 5, dedusting ash silo 6, air-introduced machine 7, cleaner unit 8, chimney 9, slagging device 10, cyclone separator
11, power station bypass flue 12, burner hearth 13, boiler 15, electric traction fixed mount 16, tractizer 17, traction steel rope of cable
18, red slag entrance 19, primary fragmentation agent 20, red slag railcar 21, vibrosieve 22, recursher 23, red slag warehouse 25,
Air and powder mixer 26, pressure fan 27, red slag warehouse negative pressure regulation door 28;The internally installed of air compartment 2 has fluidization hood 1,
The bottom of air compartment 2 is connected with air and powder mixer 26, pressure fan 27 respectively, and air and powder mixer 26 is arranged on red slag warehouse 25
Bottom, red slag warehouse 25 is arranged on the side of body of wall 24, and the upper end of body of wall 24 is provided with red slag railcar 21, red slag rail
Road car 21 is connected with tractizer 17 by traction steel rope of cable 18, and tractizer 17 is arranged on electric traction fixed mount 16,
Being provided with red slag entrance 19 on red slag warehouse 25, primary fragmentation agent 20, vibrosieve 22, recursher 23 are sequentially arranged at
The inside of red slag warehouse 25, the middle part of red slag warehouse 25 is connected by the middle part of red slag warehouse negative pressure regulation door 28 with an air compartment 2
Connect, an air compartment 2 be internally provided with burner hearth 13, the upper end of burner hearth 13 is connected with boiler 15, the lower end of burner hearth 13 with
Water pump 3 connects, and the right side of an air compartment 2 is connected with cyclone separator 11, and the upper end of cyclone separator 11 is bypassed by power station
Flue 12 is connected with cleaner unit 8, and the bottom of cyclone separator 11 is provided with slagging device 10, and the downside of slagging device 10 is provided with
Waste residue car 4, the downside of cleaner unit 8 is provided with dedusting ash silo 6, and the bottom of dedusting ash silo 6 is provided with ash-removing valve 5, cleaner unit 8
Side be connected with chimney 9 by air-introduced machine 7.
The operation principle of this detailed description of the invention is: after high temperature red slag material goes out the metallurgical furnace of magnesium metal, falls directly into and designs
Red slag railcar, railcar design, in the groove of guide rail is laid in stokehold, is positioned electronic the leading of red slag warehouse unit through a distant place
Drawing, the guide rail travelled to red slag warehouse unit along guide rail is spacing, and after electric traction railcar slag, railcar returns magnesium metal
Charging discharging flow process next time is waited before metallurgical furnace.
Red slag delivery unit is by red slag transport extremely red slag warehouse entrance, by electronic slag;Red slag enters red slag warehouse unit, warp
Crossing primary fragmentation crusher machine, the design of red slag warehouse is sieved by the vibration-type double-edged fine-toothed comb of cam driven, and fine slag is directly entered warehouse bottom;
Through the red slag bulky grain of primary fragmentation along double-edged fine-toothed comb landing to recursher, carry out second-time breakage;Red through primary fragmentation
Slag bulky grain, along double-edged fine-toothed comb landing to recursher, carries out second-time breakage;Disintegrating machine cam is provided power by frequency modulation motor, turns
Speed is adjustable, controls red slag warehouse red slag particle degree;Because red slag temperature is high, adopt carry in other ways equipment and materials requirement the highest,
Equipment failure rate can be caused high and cost is the highest, so the red solid impurity particle of high temperature in red slag warehouse uses wind model, red slag is through wind
Powder mixer is delivered to red slag Exposure degree unit;In red slag warehouse unit, owing to devising a pulverizer and separating twice
Machine, so a large amount of airborne dust can be produced, in order to avoid high temperature airborne dust is elegant from cinder notch, returns with red slag sensible heat at red slag warehouse unit
Receive and between Duan Yuan, connecting pipe is set, utilize red slag Exposure degree unit negative pressure to reconcile negative pressure through negative pressure regulation door.
Crusher design is water-cooling shaft, it is ensured that run under worst hot case;Disintegrating machine ring hammer uses casting heat resistant steel, it is ensured that at height
Safe and reliable operation under temperature operating mode;In red slag warehouse unit, owing to devising a pulverizer and secondary pulverizer, so meeting
Produce a large amount of airborne dust, in order to avoid high temperature airborne dust is elegant from cinder notch, between red slag warehouse unit and red slag Exposure degree Duan Yuan
Connecting pipe is set, utilizes red slag Exposure degree unit negative pressure to reconcile negative pressure through negative pressure regulation door.
The above, only in order to the technical solution of the utility model to be described and unrestricted, those of ordinary skill in the art are to this practicality
Other amendment or equivalent that novel technical scheme is made, without departing from spirit and the model of technical solutions of the utility model
Enclose, all should contain in the middle of right of the present utility model.