CN205654137U - Integrated base station - Google Patents
Integrated base station Download PDFInfo
- Publication number
- CN205654137U CN205654137U CN201620328695.0U CN201620328695U CN205654137U CN 205654137 U CN205654137 U CN 205654137U CN 201620328695 U CN201620328695 U CN 201620328695U CN 205654137 U CN205654137 U CN 205654137U
- Authority
- CN
- China
- Prior art keywords
- cabinet
- integrated
- air
- base station
- channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Air Conditioning Control Device (AREA)
Abstract
本实用新型公开了一种一体化基站,用以提高基站空间的利用率,降低能耗,提高基站内各设备之间安装连接的方便性和连接线缆布线的整洁清晰性。一体化基站包括空调综合柜,空调综合柜内包括:空调、通信主设备的第一容纳空间、为第一容纳空间内的通信主设备供电的第一直流配电单元,且空调综合柜上设有走线槽;电源综合柜,电源综合柜内包括:交流配电单元、电源插框、通信主设备的第二容纳空间、以及与电源插框电连接、为第二容纳空间内的通信主设备供电的第二直流配电单元,电源综合柜上设有走线槽,第一直流配电单元通过连接导线与电源综合柜内的电源插框电连接,且连接导线位于空调综合柜上设有的走线槽和电源综合柜上设有的走线槽内。
The utility model discloses an integrated base station, which is used for improving the space utilization rate of the base station, reducing energy consumption, improving the convenience of installation and connection among various devices in the base station and the neatness and clarity of connecting cables. The integrated base station includes an air-conditioning integrated cabinet. The air-conditioning integrated cabinet includes: the air conditioner, the first storage space for the communication main equipment, and the first DC power distribution unit for supplying power to the communication main equipment in the first storage space. The air-conditioning integrated cabinet is equipped with There is a wiring trough; the integrated power supply cabinet, which includes: AC power distribution unit, power subrack, and the second storage space for the main communication equipment; For the second DC power distribution unit powered by the equipment, there is a wiring trough on the integrated power cabinet, and the first DC power distribution unit is electrically connected to the power socket in the integrated power cabinet through connecting wires, and the connecting wires are located on the integrated air-conditioning cabinet. The wiring trough and the wiring trough provided on the integrated power supply cabinet.
Description
技术领域technical field
本实用新型涉及电力通信网络设备技术领域,特别是涉及一种一体化基站。The utility model relates to the technical field of power communication network equipment, in particular to an integrated base station.
背景技术Background technique
传统基站建设中,电源系统、蓄电池组、通讯主设备、空调、动环境监控等各功能设备都是分散独立安装,在安装时,将各个设备安装在合适的位置后,再进行走线将各个设备进行电连接,但各个设备可能由不同设备厂商提供,设备大小、形态和外观等可能存在较大差异,因此可能造成整体外观一致性差,能耗高,维护界面差等问题,走线时由于各个设备分布不均匀,容易造成走线较乱。In the construction of traditional base stations, various functional equipment such as power supply systems, battery packs, communication main equipment, air conditioners, and dynamic environment monitoring are installed independently. The equipment is electrically connected, but each equipment may be provided by different equipment manufacturers, and the size, shape, and appearance of the equipment may be quite different, which may cause problems such as poor overall appearance consistency, high energy consumption, and poor maintenance interface. The distribution of each device is uneven, which is likely to cause messy wiring.
实用新型内容Utility model content
本实用新型提供了一种一体化基站,用以提高基站空间的利用率,降低能耗,提高基站内各设备之间安装连接的方便性和连接线缆布线的整洁清晰性。The utility model provides an integrated base station, which is used to improve the utilization rate of the space of the base station, reduce energy consumption, improve the convenience of installation and connection between various devices in the base station and the neatness and clarity of the wiring of connecting cables.
为达到上述目的,本实用新型提供以下技术方案:In order to achieve the above object, the utility model provides the following technical solutions:
本实用新型提供了一种一体化基站,包括:The utility model provides an integrated base station, comprising:
空调综合柜,所述空调综合柜内包括:空调、通信主设备的第一容纳空间、为所述第一容纳空间内的通信主设备供电的第一直流配电单元,且所述空调综合柜上设有走线槽;An air-conditioning integrated cabinet, the air-conditioning integrated cabinet includes: an air conditioner, a first accommodation space for the main communication equipment, and a first DC power distribution unit for supplying power to the communication main equipment in the first accommodation space, and the air-conditioning integrated There is a wire slot on the cabinet;
与所述空调综合柜并排设置的电源综合柜,所述电源综合柜内包括:交流配电单元、用于将所述交流配电单元输出的交流电转化为直流电的电源插框、通信主设备的第二容纳空间、以及与所述电源插框电连接、为所述第二容纳空间内的通信主设备供电的第二直流配电单元,所述电源综合柜上设有走线槽,所述第一直流配电单元通过连接导线与所述电源综合柜内的电源插框电连接,且所述连接导线位于所述空调综合柜上设有的所述走线槽和所述电源综合柜上设有的所述走线槽内。An integrated power supply cabinet arranged side by side with the integrated air-conditioning cabinet. The integrated power supply cabinet includes: an AC power distribution unit, a power subrack for converting the AC power output by the AC power distribution unit into DC power, and the communication main equipment The second storage space, and the second DC power distribution unit electrically connected to the power supply subrack and supplying power to the communication master equipment in the second storage space, the integrated power supply cabinet is provided with a wiring trough, the first A DC power distribution unit is electrically connected to the power socket frame in the integrated power supply cabinet through connecting wires, and the connecting wires are located in the wiring trough provided on the integrated air-conditioning cabinet and on the integrated power supply cabinet. in the wire duct.
本实用新型提供的一体化基站,通过设置空调综合柜和电源综合柜,可以将原有的多个独立的设备,进行模块化设计,形成在不同柜体内,减小多个设备大小、形状和外观等存在的差异,在安装时,可以先在空调综合柜和电源综合柜内将相应的需要连接部件连接,后期只需要将柜体之间进行安装布线连接即可,且在空调综合柜和电源综合柜上均设有走线槽,使得连接走线可以隐藏在走线槽内,减少布线较乱的现象的发生,另外本实用新型提供的一体化基站将传统基站整合在一个小空间内后,通过合理的热量管理,可以有效降低能耗与运营成本。The integrated base station provided by the utility model can modularize the original multiple independent equipment by setting the integrated air-conditioning cabinet and the integrated power supply cabinet, and form them in different cabinets, reducing the size, shape and size of multiple equipment. Due to differences in appearance, etc., during installation, you can first connect the corresponding components that need to be connected in the air-conditioning integrated cabinet and power supply integrated cabinet. Later, you only need to install wiring connections between the cabinets. The integrated power supply cabinets are equipped with wiring troughs, so that the connecting wiring can be hidden in the wiring troughs, reducing the occurrence of messy wiring. In addition, the integrated base station provided by the utility model integrates traditional base stations in a small space. , Through reasonable heat management, energy consumption and operating costs can be effectively reduced.
故,本实用新型提供的一体化基站,可以提高基站空间的利用率,降低能耗,提高基站内各设备之间安装连接的方便性和连接线缆布线的整洁清晰性。Therefore, the integrated base station provided by the utility model can improve the utilization rate of the space of the base station, reduce energy consumption, improve the convenience of installation and connection between various devices in the base station and the cleanliness and clarity of the connection cable wiring.
在一些可选的实施方式中,上述一体化基站,还包括:为所述电源插框提供备用电的蓄电池柜,所述蓄电池柜内沿其高度方向设有多个电池容纳空间,每个电池容纳空间用于容纳至少一节电池,且所述蓄电池柜上设有走线槽,所述蓄电池柜通过所述走线槽与所述电源综合柜进行布线连接。上述蓄电池柜的设置,可以使得蓄电池组的容纳空间被单独管理,保证蓄电池组在适合的温度和环境下工作。In some optional implementation manners, the above-mentioned integrated base station further includes: a battery cabinet that provides backup power for the power supply frame, and a plurality of battery accommodation spaces are arranged in the battery cabinet along its height direction, each The battery accommodating space is used to accommodate at least one battery, and the battery cabinet is provided with a wiring trough, and the battery cabinet is connected to the integrated power supply cabinet through the wiring trough. The arrangement of the above-mentioned storage battery cabinet can make the storage space of the storage battery pack be managed separately, so as to ensure that the storage battery pack works under a suitable temperature and environment.
在一些可选的实施方式中,所述蓄电池柜、所述空调综合柜以及所述电源综合柜上均设有门禁报警器,每个所述门禁报警器用于监控对应的柜的柜门是否关闭。确保每个柜体内的设备在柜门关闭状态下进行工作,防止外界环境中的杂质和灰尘对柜体内的设备造成污染。In some optional implementations, the battery cabinet, the integrated air-conditioning cabinet and the integrated power supply cabinet are all provided with an access alarm, and each of the access alarms is used to monitor whether the door of the corresponding cabinet is closed. Ensure that the equipment in each cabinet works with the cabinet door closed to prevent impurities and dust in the external environment from polluting the equipment in the cabinet.
在一些可选的实施方式中,所述蓄电池柜内还包括:与所述空调综合柜内的空调的进风口连通的第一通道、与所述空调综合柜内的空调的出风口连通的第二通道,且所述第一通道内设有吹风机,所述第二通道内设有抽风机。可以通过第一通道和第二通道以及空调、抽风机、吹风机对蓄电池柜内的温度进行管理和控制。In some optional implementations, the battery cabinet further includes: a first passage communicated with the air inlet of the air conditioner in the air conditioner integrated cabinet, a first passage communicated with the air outlet of the air conditioner in the air conditioner integrated cabinet There are two channels, and the first channel is provided with a blower, and the second channel is provided with an exhaust fan. The temperature in the battery cabinet can be managed and controlled through the first channel and the second channel, as well as air conditioners, exhaust fans, and hair dryers.
在一些可选的实施方式中,所述空调综合柜还包括:In some optional embodiments, the integrated air-conditioning cabinet also includes:
一端与所述第一通道连通、另一端与所述空调的进风口连通的第三通道;一端与所述第二通道连通、另一端与所述空调的出风口连通的第四通道,第三通道和第四通道的设置便于对空调综合柜内的温度进行控制和管理。A third channel whose one end communicates with the first channel and whose other end communicates with the air inlet of the air conditioner; a fourth channel whose one end communicates with the second channel and whose other end communicates with the air outlet of the air conditioner; The setting of the channel and the fourth channel facilitates the control and management of the temperature in the air-conditioning integrated cabinet.
在一些可选的实施方式中,所述电源综合柜还包括:与所述第三通道连通的第五通道、以及与所述第四通道连通的第六通道。第五通道和第六通道的设置便于对电源综合柜内的温度进行控制和管理。In some optional implementation manners, the integrated power cabinet further includes: a fifth channel communicated with the third channel, and a sixth channel communicated with the fourth channel. The setting of the fifth channel and the sixth channel is convenient for controlling and managing the temperature in the integrated power supply cabinet.
在一些可选的实施方式中,所述蓄电池柜内还包括:温度传感器,用于检测所述蓄电池柜内的温度;In some optional implementation manners, the battery cabinet further includes: a temperature sensor, configured to detect the temperature in the battery cabinet;
所述电源综合柜内还包括:The integrated power supply cabinet also includes:
与所述温度传感器、所述空调、所述抽风机、所述吹风机信号连接的控制模块,所述控制模块用于当所述温度传感器检测到的所述蓄电池柜内的温度高于设定温度时,控制所述空调制冷、所述抽风机和所述吹风机工作;用于当所述温度传感器检测到的所述蓄电池柜内的温度低于所述设定温度时,控制所述空调、所述抽风机和所述吹风机停止工作。保证用户设备和电池工作在适当的工作环境,降低系统的能耗。A control module signal-connected to the temperature sensor, the air conditioner, the exhaust fan, and the blower, the control module is used for when the temperature in the battery cabinet detected by the temperature sensor is higher than the set temperature When the temperature in the battery cabinet detected by the temperature sensor is lower than the set temperature, it is used to control the air conditioner, the exhaust fan and the blower to work; The exhaust fan and the blower stop working. Ensure that user equipment and batteries work in an appropriate working environment and reduce system energy consumption.
在一些可选的实施方式中,所述电源综合柜内还包括:与所述控制模块信号连接的水浸传感器和/或与所述控制模块信号连接的烟感传感器。水浸传感器用于检测是否有水进入基站内部,若检测到有水浸入系统底部,就会上报水浸告警信号给控制模块,烟感传感器用于检测一体化基站内是否有短路燃烧的现象的发生,当烟感传感器检测到烟雾时,可以及时通知给基站的控制系统,使得控制系统及时作出相应对策,减少一体化基站内的设备的损失。In some optional implementation manners, the integrated power cabinet further includes: a water immersion sensor signally connected to the control module and/or a smoke sensor signally connected to the control module. The water immersion sensor is used to detect whether there is water entering the base station. If water immersion is detected at the bottom of the system, a water immersion alarm signal will be reported to the control module. The smoke sensor is used to detect whether there is a short-circuit burning phenomenon in the integrated base station. When the smoke sensor detects smoke, it can be notified to the control system of the base station in time, so that the control system can take corresponding countermeasures in time to reduce the loss of equipment in the integrated base station.
在一些可选的实施方式中,所述蓄电池柜的内侧壁上设有保温层;和/或,In some optional embodiments, an insulation layer is provided on the inner wall of the battery cabinet; and/or,
所述空调综合柜的第一容纳空间靠近所述第四通道的一侧设有保温层;和/或,The first accommodation space of the integrated air-conditioning cabinet is provided with an insulation layer on the side close to the fourth channel; and/or,
所述电源综合柜的第二容纳空间靠近所述第六通道的一侧设有保温层。保温层的设置可以进一步保证一体化基站内的设备在适合的环境温度下进行工作。The second accommodation space of the integrated power supply cabinet is provided with an insulation layer on a side close to the sixth channel. The setting of the insulation layer can further ensure that the equipment in the integrated base station works at a suitable ambient temperature.
在一些可选的实施方式中,上述一体化基站还包括:用于支撑、并将所述空调综合柜、所述电源综合柜以及所述蓄电池综合柜相对固定的底座。底座一方面可以避免机房单位面积内负荷较重,另一方面可以进一步提高基站一体化。In some optional implementation manners, the above-mentioned integrated base station further includes: a base for supporting and relatively fixing the integrated air-conditioning cabinet, the integrated power supply cabinet, and the integrated battery cabinet. On the one hand, the base can avoid the heavy load per unit area of the computer room, and on the other hand, it can further improve the integration of the base station.
附图说明Description of drawings
此处所说明的附图用来提供对本实用新型的进一步理解,构成本实用新型的一部分,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。在附图中:The accompanying drawings described here are used to provide a further understanding of the utility model and constitute a part of the utility model. The schematic embodiments of the utility model and their descriptions are used to explain the utility model and do not constitute an improper limitation of the utility model . In the attached picture:
图1为本实用新型实施例提供的一体化基站的结构示意图;FIG. 1 is a schematic structural diagram of an integrated base station provided by an embodiment of the present invention;
图2为图1所示的一体化基站的A向结构示意图;FIG. 2 is a schematic diagram of the A-direction structure of the integrated base station shown in FIG. 1;
图3为本实用新型实施例提供的空调综合柜的结构示意图;Fig. 3 is the schematic structural view of the integrated air-conditioning cabinet provided by the embodiment of the utility model;
图4为本实用新型实施例提供的电源综合柜的结构示意图;Fig. 4 is a schematic structural diagram of a power supply integrated cabinet provided by an embodiment of the present invention;
图5为本实用新型实施例提供的蓄电池柜的内部结构示意图;Fig. 5 is a schematic diagram of the internal structure of the battery cabinet provided by the embodiment of the present invention;
图6为本实用新型实施例提供的一体化基站内的冷热循环示意图。Fig. 6 is a schematic diagram of the cooling and heating cycle in the integrated base station provided by the embodiment of the present invention.
附图标记:Reference signs:
1-空调综合柜 11-空调1-Air conditioner integrated cabinet 11-Air conditioner
2-电源综合柜 21-交流配电单元2-Power integrated cabinet 21-AC power distribution unit
22-电源插框 23-控制模块22-Power subrack 23-Control module
31-第一直流配电单元 32-第二直流配电单元31-First DC power distribution unit 32-Second DC power distribution unit
4-走线槽 51-第一容纳空间4-Wiring trough 51-The first storage space
52-第二容纳空间52-Second storage space
6-蓄电池柜 61-电池容纳空间6-battery cabinet 61-battery storage space
7-门禁报警器 81-第一通道7-Access control alarm 81-The first channel
82-第二通道 83-第三通道82-Second channel 83-Third channel
84-第四通道 85-第五通道84-the fourth channel 85-the fifth channel
86-第六通道 9-底座86-sixth channel 9-base
具体实施方式detailed description
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example.
如图1、图2、图3和图4所示,其中:图1为本实用新型实施例提供的一体化基站的结构示意图;图2为图1所示的一体化基站的A向结构示意图;图3为本实用新型实施例提供的空调综合柜的结构示意图;图4为本实用新型实施例提供的电源综合柜的结构示意图;本实用新型提供了一种一体化基站,包括:As shown in Figure 1, Figure 2, Figure 3 and Figure 4, wherein: Figure 1 is a schematic structural view of the integrated base station provided by the embodiment of the present invention; Figure 2 is a schematic structural view of the A-direction of the integrated base station shown in Figure 1 ; Figure 3 is a schematic structural view of the integrated air-conditioning cabinet provided by the embodiment of the present invention; Figure 4 is a schematic structural view of the integrated power supply cabinet provided by the embodiment of the present utility model; the utility model provides a kind of integrated base station, comprising:
空调综合柜1,空调综合柜1内包括:空调11、通信主设备的第一容纳空间51,为第一容纳空间51内的通信主设备供电的第一直流配电单元31,且空调综合柜1上设有走线槽4;The air-conditioning integrated cabinet 1, the air-conditioning integrated cabinet 1 includes: the air conditioner 11, the first accommodation space 51 of the communication main equipment, the first DC power distribution unit 31 for supplying power to the communication main equipment in the first accommodation space 51, and the air-conditioning integrated The cabinet 1 is provided with a wiring trough 4;
与空调综合柜1并排设置的电源综合柜2,电源综合柜2内包括:交流配电单元21、用于将交流配电单元输出的交流电转化为直流电的电源插框22、通信主设备的第一容纳空间51、以及与电源插框22电连接、为第一容纳空间51内的通信主设备供电的第二直流配电单元32,第一直流配电单元31通过连接导线与电源综合柜2内的电源插框22电连接,且连接导线位于空调综合柜1上设有的走线槽4和电源综合柜2上设有的走线槽4内。The integrated power cabinet 2 arranged side by side with the integrated air-conditioning cabinet 1, the integrated power cabinet 2 includes: an AC power distribution unit 21, a power socket 22 for converting the AC power output by the AC power distribution unit into DC power, and the first communication main equipment A storage space 51, and a second DC power distribution unit 32 that is electrically connected to the power socket 22 and supplies power to the communication master equipment in the first storage space 51. The first DC power distribution unit 31 is connected to the integrated power supply cabinet through connecting wires The power supply frame 22 in the 2 is electrically connected, and the connecting wire is located in the wiring trough 4 provided on the air-conditioning integrated cabinet 1 and the wiring trough 4 provided on the power supply integrated cabinet 2.
本实用新型提供的一体化基站,通过设置空调综合柜1和电源综合柜2,可以将原有的多个独立的设备,进行模块化设计,形成在不同柜体内,减小多个设备大小、形状和外观等存在的差异,在安装时,可以先在空调综合柜和电源综合柜内将相应的需要连接部件连接,后期只需要将柜体之间进行安装布线连接即可,且在空调综合柜1和电源综合柜2上均设有走线槽4,使得连接走线可以隐藏在走线槽4内,减少布线较乱的现象的发生,另外本实用新型提供的一体化基站将传统基站整合在一个小空间内后,通过合理的热量管理,可以有效降低能耗与运营成本。The integrated base station provided by the utility model, by setting the integrated air-conditioning cabinet 1 and the integrated power supply cabinet 2, can carry out modular design of multiple original independent devices and form them in different cabinets, reducing the size of multiple devices, There are differences in shape and appearance. During installation, you can first connect the corresponding parts that need to be connected in the air-conditioning integrated cabinet and power supply integrated cabinet. Later, you only need to install and connect the cabinets. Both the cabinet 1 and the integrated power supply cabinet 2 are equipped with a wiring trough 4, so that the connecting wiring can be hidden in the wiring trough 4, reducing the occurrence of messy wiring. In addition, the integrated base station provided by the utility model replaces the traditional base station After being integrated in a small space, energy consumption and operating costs can be effectively reduced through reasonable heat management.
故,本实用新型提供的一体化基站,可以提高基站空间的利用率,降低能耗,提高基站内各设备之间安装连接的方便性和连接线缆布线的整洁清晰性。Therefore, the integrated base station provided by the utility model can improve the utilization rate of the space of the base station, reduce energy consumption, improve the convenience of installation and connection between various devices in the base station and the cleanliness and clarity of the connection cable wiring.
基站内的蓄电池组也可以被放置在电源综合柜2内,上述电源综合柜2和空调综合柜1的个数可以根据需要设定,这样可以方便容量扩容。The battery pack in the base station can also be placed in the integrated power supply cabinet 2, and the number of the above-mentioned integrated power supply cabinet 2 and integrated air-conditioning cabinet 1 can be set according to needs, which can facilitate capacity expansion.
基站内的蓄电池组可以安放在电源综合柜2的外面,可选的,如图1和图4所示,图4为本实用新型实施例提供的电源综合柜的结构示意图;上述一体化基站,还包括:为电源插框22提供备用电的蓄电池柜6,蓄电池柜6内沿其高度方向设有多个电池容纳空间61,每个电池容纳空间61用于容纳至少一节电池,且蓄电池柜6上设有走线槽4,蓄电池柜6通过走线槽4与电源综合柜2进行布线连接。上述蓄电池柜6的设置,可以使得蓄电池组的容纳空间可以被单独管理,保证蓄电池组在适合的温度和环境下工作,需要说明的是,上述电源综合柜2、空调综合柜1和蓄电池柜6的排列顺序不限于图中所列举的顺序。The battery pack in the base station can be placed outside the integrated power cabinet 2, optionally, as shown in Figure 1 and Figure 4, Figure 4 is a schematic structural diagram of the integrated power cabinet provided by the embodiment of the present invention; the above-mentioned integrated base station, It also includes: a battery cabinet 6 that provides backup power for the power supply frame 22. A plurality of battery accommodation spaces 61 are arranged in the battery cabinet 6 along its height direction, and each battery accommodation space 61 is used to accommodate at least one battery, and the battery The cabinet 6 is provided with a wiring trough 4 through which the storage battery cabinet 6 is wired and connected to the integrated power supply cabinet 2 . The arrangement of the above-mentioned battery cabinet 6 can enable the storage space of the battery pack to be managed separately to ensure that the battery pack works under a suitable temperature and environment. It should be noted that the above-mentioned integrated power supply cabinet 2, integrated air-conditioning cabinet 1, and The order of arrangement is not limited to the order listed in the figure.
如图3、图4和图5所示,蓄电池柜6、空调综合柜1以及电源综合柜2上均设有门禁报警器7,每个门禁报警器7用于监控对应的柜的柜门是否关闭。确保每个柜体内的设备在柜门关闭状态下进行工作,防止外界环境中的杂质和灰尘对柜体内的设备造成污染。As shown in Fig. 3, Fig. 4 and Fig. 5, the battery cabinet 6, the integrated air-conditioning cabinet 1 and the integrated power supply cabinet 2 are all equipped with an access control alarm 7, and each access control alarm 7 is used to monitor whether the cabinet door of the corresponding cabinet is closure. Ensure that the equipment in each cabinet works with the cabinet door closed to prevent impurities and dust in the external environment from polluting the equipment in the cabinet.
进一步的,如图6所示,图6为本实用新型实施例提供的一体化基站内的冷热循环示意图,蓄电池柜6内还包括:与空调综合柜1内的空调11的进风口连通的第一通道81、与空调综合柜1内的空调11的出风口连通的第二通道82,且第一通道81内设有吹风机,第二通道82内设有抽风机。可以通过第一通道81和第二通道82以及空调11、抽风机、吹风机对蓄电池柜6内的温度进行管理和控制,上述第一通道81和第二通道82在蓄电池柜6内的具体位置不限于图示所示。Further, as shown in FIG. 6, FIG. 6 is a schematic diagram of the cooling and heating cycle in the integrated base station provided by the embodiment of the present invention. The battery cabinet 6 also includes: the air inlet connected to the air conditioner 11 in the integrated air conditioner cabinet 1. The first channel 81 and the second channel 82 communicate with the air outlet of the air conditioner 11 in the air-conditioning integrated cabinet 1, and the first channel 81 is provided with a blower, and the second channel 82 is provided with an exhaust fan. The temperature in the battery cabinet 6 can be managed and controlled through the first channel 81 and the second channel 82 as well as the air conditioner 11, exhaust fan, and blower. The specific positions of the first channel 81 and the second channel 82 in the battery cabinet 6 are not determined limited to those shown in the illustration.
一种可选的实施方式中,蓄电池柜6内还包括:温度传感器,用于检测蓄电池柜6内的温度;In an optional embodiment, the battery cabinet 6 further includes: a temperature sensor for detecting the temperature in the battery cabinet 6;
电源综合柜2内还包括:The integrated power supply cabinet 2 also includes:
与温度传感器、空调11、抽风机、吹风机信号连接的控制模块23,控制模块23用于当温度传感器检测到的蓄电池柜6内的温度高于设定温度时,控制空调11制冷、抽风机和吹风机工作;用于当温度传感器检测到的蓄电池柜6内的温度低于设定温度时,控制空调11、抽风机和吹风机停止工作。保证用户设备和电池工作在适当的工作环境,降低系统的能耗。上述设定温度本领域技术人员可以根据实际需要设定。The control module 23 that is connected with temperature sensor, air conditioner 11, exhaust fan, blower signal, control module 23 is used for when the temperature in the storage battery cabinet 6 that temperature sensor detects is higher than setting temperature, controls air conditioner 11 refrigeration, exhaust fan and The blower works; it is used to control the air conditioner 11, exhaust fan and blower to stop working when the temperature in the battery cabinet 6 detected by the temperature sensor is lower than the set temperature. Ensure that user equipment and batteries work in an appropriate working environment and reduce system energy consumption. The aforementioned set temperature can be set by those skilled in the art according to actual needs.
如图6所示,空调综合柜1还包括:As shown in Figure 6, the integrated air-conditioning cabinet 1 also includes:
一端与第一通道81连通、另一端与空调11的进风口连通的第三通道83;A third channel 83 that communicates with the first channel 81 at one end and communicates with the air inlet of the air conditioner 11 at the other end;
一端与第二通道82连通、另一端与空调11的出风口连通的第四通道84。第三通道83和第四通道84的设置便于对空调综合柜1内的温度进行控制和管理。上述第三通道83和第四通道84在空调综合柜1内的具体位置不限于图示所示。The fourth passage 84 communicates with the second passage 82 at one end and communicates with the air outlet of the air conditioner 11 at the other end. The arrangement of the third channel 83 and the fourth channel 84 facilitates the control and management of the temperature in the integrated air-conditioning cabinet 1 . The specific positions of the above-mentioned third channel 83 and fourth channel 84 in the integrated air-conditioning cabinet 1 are not limited to those shown in the figure.
为了便于各个通道之间的连接,电源综合柜2还包括:与第三通道83连通的第五通道85、以及与第四通道84连通的第六通道86。第五通道85和第六通道86的设置便于对电源综合柜2内的温度进行控制和管理。上述第五通道85和第六通道86在空调综合柜1内的具体位置不限于图示所示。In order to facilitate the connection between various channels, the integrated power cabinet 2 further includes: a fifth channel 85 communicating with the third channel 83 , and a sixth channel 86 communicating with the fourth channel 84 . The arrangement of the fifth channel 85 and the sixth channel 86 is convenient for controlling and managing the temperature in the integrated power supply cabinet 2 . The specific positions of the fifth channel 85 and the sixth channel 86 in the integrated air-conditioning cabinet 1 are not limited to those shown in the figure.
优选的实施方式中,蓄电池柜6内还包括:与控制模块23信号连接的水浸传感器和/或与控制模块23信号连接的烟感传感器。水浸传感器用于检测是否有水进入基站内部,若检测到有水浸入系统底部,就会上报水浸告警信号给控制模块,烟感传感器用于检测一体化基站内是否有短路燃烧的现象的发生,当烟感传感器检测到烟雾时,可以及时通知给基站的控制系统,使得控制系统及时作出相应对策,减少一体化基站内的设备的损失。In a preferred embodiment, the battery cabinet 6 further includes: a water sensor connected with the control module 23 and/or a smoke sensor connected with the control module 23 . The water immersion sensor is used to detect whether there is water entering the base station. If water immersion is detected at the bottom of the system, a water immersion alarm signal will be reported to the control module. The smoke sensor is used to detect whether there is a short-circuit burning phenomenon in the integrated base station. When the smoke sensor detects smoke, it can be notified to the control system of the base station in time, so that the control system can take corresponding countermeasures in time to reduce the loss of equipment in the integrated base station.
优选的,上述蓄电池柜6的内侧壁上设有保温层;和/或,Preferably, an insulation layer is provided on the inner wall of the battery cabinet 6; and/or,
空调综合柜的1第一容纳空间51靠近述第四通道84的一侧设有保温层;和/或,The first storage space 51 of the air-conditioning integrated cabinet is provided with an insulation layer on the side close to the fourth passage 84; and/or,
电源综合柜2的第二容纳空间52靠近第六通道86的一侧设有保温层。保温层的设置可以进一步保证一体化基站内的设备在适合的环境温度下进行工作。The side of the second accommodation space 52 of the integrated power supply cabinet 2 close to the sixth channel 86 is provided with an insulating layer. The setting of the insulation layer can further ensure that the equipment in the integrated base station works at a suitable ambient temperature.
上述一体化基站还包括:用于支撑、并将空调综合柜1、电源综合柜2以及蓄电池柜6相对固定的底座9。底座9一方面可以避免机房单位面积内负荷较重,另一方面可以进一步提高基站一体化。The above-mentioned integrated base station also includes: a base 9 for supporting and relatively fixing the integrated air-conditioning cabinet 1 , the integrated power supply cabinet 2 and the storage battery cabinet 6 . On the one hand, the base 9 can avoid heavy loads per unit area of the computer room, and on the other hand, it can further improve the integration of the base station.
显然,本领域的技术人员可以对本实用新型进行各种改动和变型而不脱离本实用新型的精神和范围。这样,倘若本实用新型的这些修改和变型属于本实用新型权利要求及其等同技术的范围之内,则本实用新型也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the utility model without departing from the spirit and scope of the utility model. In this way, if these modifications and variations of the utility model fall within the scope of the claims of the utility model and equivalent technologies thereof, the utility model is also intended to include these modifications and variations.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620328695.0U CN205654137U (en) | 2016-04-19 | 2016-04-19 | Integrated base station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620328695.0U CN205654137U (en) | 2016-04-19 | 2016-04-19 | Integrated base station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205654137U true CN205654137U (en) | 2016-10-19 |
Family
ID=57391521
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620328695.0U Active CN205654137U (en) | 2016-04-19 | 2016-04-19 | Integrated base station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205654137U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107831806A (en) * | 2017-11-03 | 2018-03-23 | 江苏恒达微波技术开发有限公司 | A kind of new communication base station cabinet |
-
2016
- 2016-04-19 CN CN201620328695.0U patent/CN205654137U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107831806A (en) * | 2017-11-03 | 2018-03-23 | 江苏恒达微波技术开发有限公司 | A kind of new communication base station cabinet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109066889A (en) | A kind of container-type energy-storage system | |
CN103369908B (en) | Container-type data system | |
CN106440071A (en) | Guiding mechanism of cabinet air conditioner | |
CN204651716U (en) | A kind of outdoor power cabinet and outdoor power system system | |
CN103369917A (en) | Container type data system | |
CN220254165U (en) | Energy storage cabinet | |
KR101915876B1 (en) | Eco-friendly Energy Storage System | |
CN115912663A (en) | Distributed energy storage system | |
CN205319561U (en) | Outdoor long -range block terminal of wall formula | |
CN113707988A (en) | Energy storage charging and discharging equipment | |
CN217427395U (en) | Distributed energy storage cabinet | |
CN205654137U (en) | Integrated base station | |
CN111416372A (en) | Outdoor box type energy storage battery power station and method | |
CN206060560U (en) | A kind of domestic photovoltaic inversion case | |
CN211267504U (en) | Air-cooled outdoor communication rack | |
CN211481646U (en) | Cabinet and data center | |
CN102645939A (en) | Temperature control cabinet of electronic equipment | |
CN216351980U (en) | Photovoltaic cooling device for refrigeration of outdoor power distribution room | |
CN214176939U (en) | Container type energy storage device | |
CN114122988B (en) | An outdoor centralized control cabinet for a substation | |
CN104734262B (en) | Charging station | |
CN203550096U (en) | Intelligent energy-saving system of communication base station | |
CN205452812U (en) | Novel UPS power module inserts frame | |
CN206834511U (en) | A kind of centrally stored device of transformer station's power-supply device | |
JP7092126B2 (en) | Power supply device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Nanshan District Xueyuan Road in Shenzhen city of Guangdong province 518055 No. 1001 Nanshan Chi Park building B2 Patentee after: Vitamin Technology Co., Ltd. Address before: Nanshan District Xueyuan Road in Shenzhen city of Guangdong province 518055 No. 1001 Nanshan Chi Park building B2 Patentee before: Aimosheng Network Energy Source Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder |