[go: up one dir, main page]

CN205577589U - Coffin chamber structure that contains built -in tombstone - Google Patents

Coffin chamber structure that contains built -in tombstone Download PDF

Info

Publication number
CN205577589U
CN205577589U CN201620346996.6U CN201620346996U CN205577589U CN 205577589 U CN205577589 U CN 205577589U CN 201620346996 U CN201620346996 U CN 201620346996U CN 205577589 U CN205577589 U CN 205577589U
Authority
CN
China
Prior art keywords
gravestone
coffin chamber
chamber cavity
tomb
draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620346996.6U
Other languages
Chinese (zh)
Inventor
黄畅辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huang Changhui
Qingmeng Cultural Science And Technology Chengdu Co ltd
Original Assignee
Sichuan Qingmeng Life Cutural Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Qingmeng Life Cutural Development Co Ltd filed Critical Sichuan Qingmeng Life Cutural Development Co Ltd
Priority to CN201620346996.6U priority Critical patent/CN205577589U/en
Application granted granted Critical
Publication of CN205577589U publication Critical patent/CN205577589U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model relates to a coffin chamber structural design field discloses a coffin chamber structure that contains built -in tombstone. This coffin chamber structure includes tombstone, coffin chamber cavity and tomb hat, the tomb hat is located coffin chamber cavity top, the tombstone lay on coffin chamber cavity lateral wall or the coffin chamber cavity in. This coffin chamber structure lay the tombstone on coffin chamber cavity lateral wall or the coffin chamber cavity in, saved out a large amount of spaces for ceremony park ground installation installs with the developing of moving about of be correlated with to the comprehensive utilization in ceremony park soil has been improved.

Description

Tomb cell structure containing built-in gravestone
Technical field
This utility model relates to coffin chamber field of structural design, a kind of tomb cell structure containing built-in gravestone.
Background technology
A few days ago, 9 departments such as Ministry of Civil Affairs print and distribute " about the instruction of ecological burial of carrying out saving land ", wherein propose to encourage family to become Member uses the mode of burying in the same grave to improve single tomb position utilization rate, and bone ash is buried, and gravestone in kind is not stayed on ground.For saving grave land used, carry The utilization rate of high single tomb position, it is achieved the way of the ecological burial that saves land, the structure of grave facility is then reach this purpose important Link.
In traditional grave facility, gravestone is generally installed on ground, and this kind of gravestone is stone structure, is arranged at ground Face also affects environment, is unfavorable for Economization on land and requirement of beautifying the environment, reduces the sustainable utilization rate of soil space.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of tomb cell structure containing built-in gravestone, to improve soil, ceremony park Comprehensive utilization ratio and beautifying the environment.
The disclosed tomb cell structure containing built-in gravestone of this utility model, is preced with including gravestone, coffin chamber cavity and tomb, described tomb hat position Above coffin chamber cavity, described gravestone is placed on coffin chamber cavity wall or in coffin chamber cavity.
Preferably, the gravestone that in described gravestone is placed in coffin chamber cavity, upper end is arranged is laid in draw-in groove.
Preferably, described coffin chamber cavity inner wall top is provided with gravestone and lays draw-in groove, and the gravestone of described coffin chamber cavity inner wall lays card Groove upper end is provided with opening, and described gravestone is placed in the gravestone of coffin chamber inside cavities and lays in draw-in groove.
Preferably, it is Open architecture that the gravestone of described coffin chamber inside cavities lays draw-in groove towards the middle side part in coffin chamber cavity, The both sides of described Open architecture are provided with the card trough rim for stable gravestone, and described card trough rim is integrated into coffin chamber cavity wall Type structure.
Preferably, described coffin chamber chamber outer wall top is provided with gravestone and lays draw-in groove, outside the gravestone outside described coffin chamber cavity is laid Draw-in groove upper end, chamber is provided with opening, and described gravestone is placed in gravestone and lays in exocoel draw-in groove.
Preferably, both sides, described gravestone top are provided with stretching structure.
Preferably, in described coffin chamber cavity, arranged superposed has at least two-layer cinerary casket floor dividing plate, described cinerary casket floor dividing plate bag Including base plate and at least two riser, described each riser is arranged in parallel on base plate and is mutually perpendicular to base plate.
Preferably, described tomb is preced with 3 outer surface four limits and is provided with Sign Board 7, and described Sign Board 7 is provided with coding.
The beneficial effects of the utility model are: gravestone is placed on coffin chamber cavity wall or in coffin chamber cavity by this tomb cell structure, Thoroughly solve ground not set up a tombstone the difficult problem being difficult to carry out, thus for protection environment, save the area, soil space sustainable development Exhibition and raising market operation create condition.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the embodiment in gravestone is placed in coffin chamber cavity in this utility model;
Fig. 2 is the schematic diagram of the embodiment that gravestone is placed in coffin chamber cavity inner wall in this utility model;
Fig. 3 is the schematic diagram of the embodiment that gravestone is placed in coffin chamber chamber outer wall in this utility model;
Fig. 4 is the top view of cinerary casket floor dividing plate in this utility model;
Fig. 5 is the schematic diagram of gravestone in this utility model;
Fig. 6 is to be positioned at the gravestone of coffin chamber cavity inner wall in this utility model to lay the schematic cross-section of draw-in groove.
Reference: gravestone 1, stretching structure 11, coffin chamber cavity 2, Open architecture 21, card trough rim 22, tomb hat 3, bone Ash box floor dividing plate 5, base plate 51, side plate 52, cinerary casket 6, Sign Board 7.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is further illustrated.
Tomb cell structure containing built-in gravestone of the present utility model, is preced with 3 including gravestone 1, coffin chamber cavity 2 and tomb, described tomb hat 3 Being positioned at above coffin chamber cavity 2, described gravestone 1 is placed on coffin chamber cavity 2 sidewall or in coffin chamber cavity 2.
For formula graveyard is buried in the same grave by family, enter tomb with each kinsfolk and bury in the same grave to be required to gravestone 1 is carried out increase and carve, because of The mode of laying of this gravestone 1 need to ensure what it can be retrieved, and the convenience considering to retrieve and again placing.Make For one of which optimal way, as it is shown in figure 1, described gravestone 1 is placed in the gravestone that upper end in coffin chamber cavity 2 arranges lays card In groove.The advantage of this kind of mode is, picking and placeing of gravestone 1 is convenient, after opening coffin chamber cavity 2, can see tomb intuitively Upright stone tablet 1, shortcoming is then generally to be only applicable to the coffin chamber that area is less.
For the coffin chamber that area is bigger, this utility model also provides for following two gravestone and lays mode, one way in which such as Fig. 2 Shown in, described coffin chamber cavity 2 upper inside wall is provided with gravestone and lays draw-in groove, and the gravestone of described coffin chamber cavity 2 inwall lays draw-in groove Upper end is provided with opening, and the gravestone that described gravestone 1 is placed in inside coffin chamber cavity 2 is laid in draw-in groove.
Another way lays draw-in groove, described coffin chamber cavity as it is shown on figure 3, described coffin chamber cavity 2 outer wall top is provided with gravestone Gravestone outside 2 is laid draw-in groove upper end and is provided with opening, and the gravestone that described gravestone 1 is placed in outside coffin chamber cavity 2 lays draw-in groove In.For ease of picking and placeing of gravestone 1, the gravestone of inside and outside wall is laid draw-in groove and be may be contained within the top of coffin chamber cavity 2 sidewall, and Top of chamber opening.For build mode, the gravestone of outer wall lays draw-in groove can be extra after coffin chamber cavity 2 sidewall has been built Set up.It is the most different that the gravestone of inwall lays draw-in groove, it is preferred that, the gravestone inside described coffin chamber cavity 2 lays draw-in groove court A middle side part in coffin chamber cavity 2 is Open architecture 21, and the both sides of described Open architecture 21 are provided with for stable tomb The card trough rim 22 of upright stone tablet 1, described card trough rim 22 and coffin chamber cavity 2 sidewall are formed in one structure.The setting of Open architecture 21 Making to open the content that coffin chamber can be immediately seen on gravestone 1, the setting of card trough rim 22 then can stablize gravestone 1 well, Card trough rim 22 is conducive to the prefabricated of coffin chamber with coffin chamber cavity 2 sidewall integrated formed structure, can reduce it and build quantities.And be just In picking and placeing of gravestone 1, it is preferred that, as it is shown in figure 5, both sides, described gravestone top are provided with stretching structure 11.Lifting Structure 11 can use the ear structure of protrusion, it is possible to uses groove-like structure.
In formula coffin chamber cavity is buried in the same grave by family, same coffin chamber cavity certainly will need dispose multiple cinerary casket 6, for Appropriate application tomb Solid space in chamber body, it is preferred that, as shown in Figure 4, in described coffin chamber cavity 2, arranged superposed has at least two-layer Cinerary casket floor dividing plate 5, described cinerary casket floor dividing plate 5 includes base plate 51 and at least two riser 52, described each riser 52 It is arranged in parallel on base plate 51 and is mutually perpendicular to base plate 51.
After one layer of cinerary casket floor dividing plate 5 is piled, then one layer of cinerary casket floor dividing plate 5 of overlapping placement above it Position laid by extension cinerary casket 6, can more make full use of space in coffin chamber cavity 1, reduces graveyard floor space, improves graveyard and utilizes Rate.
Because gravestone 1 is in underground, when offering a sacrifice to gods or ancestors, accurately distinguish tomb owner for ease of descendant, it is preferred that, described tomb It is preced with 3 outer surface four limits and is provided with Sign Board 7, described Sign Board 7 is provided with coding.Quick Response Code also can be set up at Sign Board 7, Descendant scans Quick Response Code can understand the relevant information of this tomb more by network.

Claims (8)

1. the tomb cell structure containing built-in gravestone, is preced with (3) including gravestone (1), coffin chamber cavity (2) and tomb, described tomb hat (3) It is positioned at coffin chamber cavity (2) top, it is characterised in that: described gravestone (1) is placed on coffin chamber cavity (2) sidewall or coffin chamber In cavity (2).
2. the tomb cell structure containing built-in gravestone as claimed in claim 1, it is characterised in that: described gravestone (1) is placed in The gravestone that coffin chamber cavity (2) interior upper end is arranged is laid in draw-in groove.
3. the tomb cell structure containing built-in gravestone as claimed in claim 1, it is characterised in that: in described coffin chamber cavity (2) Wall top is provided with gravestone and lays draw-in groove, and the gravestone of described coffin chamber cavity (2) inwall is laid draw-in groove upper end and is provided with opening, described Gravestone (1) is placed in the gravestone of coffin chamber cavity (2) inner side and lays in draw-in groove.
4. the tomb cell structure containing built-in gravestone as claimed in claim 3, it is characterised in that: in described coffin chamber cavity (2) It is Open architecture (21) that the gravestone of side lays draw-in groove towards the middle side part in coffin chamber cavity (2), described Open architecture (21) Both sides be provided with the card trough rim (22) for stable gravestone (1), described card trough rim (22) with coffin chamber cavity (2) sidewall is Integrated formed structure.
5. the tomb cell structure containing built-in gravestone as claimed in claim 1, it is characterised in that: described coffin chamber cavity (2) is outward Wall top is provided with gravestone and lays draw-in groove, and the gravestone in described coffin chamber cavity (2) outside is laid draw-in groove upper end and is provided with opening, described Gravestone (1) is placed in the gravestone in coffin chamber cavity (2) outside and lays in draw-in groove.
6. the tomb cell structure containing built-in gravestone as described in claim 3,4 or 5, it is characterised in that: described gravestone (1) Both sides, top are provided with stretching structure (11).
7. the tomb cell structure containing built-in gravestone as described in claim 1,2,3,4 or 5, it is characterised in that: described tomb Chamber body (2) interior arranged superposed has at least two-layer cinerary casket floor dividing plate (5), described cinerary casket floor dividing plate (5) to include the end Plate (51) and at least two riser (52), described each riser (52) be arranged in parallel upper in base plate (51) and with base plate (51) It is mutually perpendicular to.
8. the tomb cell structure containing built-in gravestone as described in claim 1,2,3,4 or 5, it is characterised in that: described tomb Hat (3) outer surface four limit is provided with Sign Board (7), and described Sign Board is provided with coding on (7).
CN201620346996.6U 2016-04-22 2016-04-22 Coffin chamber structure that contains built -in tombstone Expired - Fee Related CN205577589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620346996.6U CN205577589U (en) 2016-04-22 2016-04-22 Coffin chamber structure that contains built -in tombstone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620346996.6U CN205577589U (en) 2016-04-22 2016-04-22 Coffin chamber structure that contains built -in tombstone

Publications (1)

Publication Number Publication Date
CN205577589U true CN205577589U (en) 2016-09-14

Family

ID=56860661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620346996.6U Expired - Fee Related CN205577589U (en) 2016-04-22 2016-04-22 Coffin chamber structure that contains built -in tombstone

Country Status (1)

Country Link
CN (1) CN205577589U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107401317A (en) * 2017-07-28 2017-11-28 上海技匠电子科技有限公司 Lift family grave system and its application method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107401317A (en) * 2017-07-28 2017-11-28 上海技匠电子科技有限公司 Lift family grave system and its application method
CN107401317B (en) * 2017-07-28 2023-08-04 上海技匠电子科技有限公司 Lifting type family tomb system and using method thereof

Similar Documents

Publication Publication Date Title
CN205577589U (en) Coffin chamber structure that contains built -in tombstone
CN205476802U (en) From generation to generation with family's coffin chamber
JP2009235697A (en) Joint grave
CN210768084U (en) Tripod-shaped tomb crown and tomb structure
CN201106306Y (en) Solid coffin chamber
CN205422129U (en) View flower bed formula wo beimu
CN202299587U (en) Wall burying device with folding supplying tables
CN107327205A (en) A kind of novel solid is buried
CN102619379A (en) Method for constructing ecology landscape type cemetery
CN204418786U (en) A kind of many people bury in the same grave tomb body structure and cemetery
CN202520049U (en) Land-saving burial chamber
CN203066589U (en) Cavity burying cemetery
KR101431341B1 (en) Lime vessel for a grave, block for assembling the vessel and method for making the vessel and the block
CN205531618U (en) Coffin chamber and tomb hat with function of beautifying environment
CN201158959Y (en) Grave
CN205370082U (en) Non - font bone ash memorial park of nature massif tunnel type
CN207144616U (en) A kind of concave is more for family coffin pit
CN201665807U (en) Cement earth surface capable of planting grass and model block thereof
CN214576160U (en) Grid type household burial grave system
Morris A lead-lined coffin burial from Winchester
CN205382752U (en) Environmental protection reduces funeral and interment building of land used
CN204920427U (en) Multi -functional imitative masonry dam
CN222263830U (en) A hidden support device for transplanting large trees in urban parks
CN202031374U (en) Intensive cemetery placing room
JP7397515B2 (en) Urn burial type cemetery structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 610020 Yuefu Street, Jinjiang District, Chengdu City, Sichuan Province, No. 38, Building 1, Unit 16, Floor 1608

Co-patentee after: Huang Changhui

Patentee after: Qingmeng Cultural Science and Technology (Chengdu) Co.,Ltd.

Address before: 610020 Yuefu Street, Jinjiang District, Chengdu City, Sichuan Province, No. 38, Building 1, Unit 16, Floor 1608

Co-patentee before: Huang Changhui

Patentee before: SICHUAN QINGMENG LIFE CULTURE DEVELOPMENT Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160914