CN205501991U - Prevent blockking up multi -functional precast tubular pile - Google Patents
Prevent blockking up multi -functional precast tubular pile Download PDFInfo
- Publication number
- CN205501991U CN205501991U CN201620219560.0U CN201620219560U CN205501991U CN 205501991 U CN205501991 U CN 205501991U CN 201620219560 U CN201620219560 U CN 201620219560U CN 205501991 U CN205501991 U CN 205501991U
- Authority
- CN
- China
- Prior art keywords
- foundation
- pile
- construction
- tubular pile
- precipitation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 25
- 239000004575 stone Substances 0.000 claims description 8
- 239000002689 soil Substances 0.000 abstract description 21
- 238000010276 construction Methods 0.000 abstract description 20
- 230000000694 effects Effects 0.000 abstract description 20
- 238000001556 precipitation Methods 0.000 abstract description 14
- 239000012466 permeate Substances 0.000 abstract 3
- 238000000034 method Methods 0.000 description 19
- 230000002093 peripheral effect Effects 0.000 description 5
- 238000007596 consolidation process Methods 0.000 description 4
- 239000011148 porous material Substances 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 3
- 238000005056 compaction Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000007599 discharging Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000007423 decrease Effects 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 229920006395 saturated elastomer Polymers 0.000 description 2
- 230000006641 stabilisation Effects 0.000 description 2
- 238000011105 stabilization Methods 0.000 description 2
- 239000004927 clay Substances 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 230000006837 decompression Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000000280 densification Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000003651 drinking water Substances 0.000 description 1
- 235000020188 drinking water Nutrition 0.000 description 1
- 239000010419 fine particle Substances 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model belongs to the technical field of pile foundation engineering, foundation ditch engineering and foundation treatment and specifically relates to prevent blockking up multi -functional precast tubular pile, its characterized in that: including precast tubular pile, precast tubular pile is last to have seted up a plurality of holes that permeate water, the hole internal fixation that permeates water is provided with the body that permeates water. The utility model has the advantages that: when the construction pile foundation for the dissipation of pressing of super hole, reduced pile sinking squeezing effect, utilize built -in immersible pump to draw water, with higher speed the drainage of stake zhou tuti solidify, increase soil body intensity, accomplish the foundation treatment in the pile foundation construction, can effectively reduce foundation treatment part expense, speed and the effect handled of ground is better simultaneously, when the foundation ditch excavates, carry out foundation pit dewatering, reduction precipitation construction work volume as the precipitation well, in the foundation ditch engineering, also can be alone as the precipitation well, can extensively be used for soft soil layer's foundation treatment and need the foundation ditch engineering of precipitation, the construction is simple, and the time limit for a project is short, the cost is low, the facilitate promotion.
Description
Technical field
This utility model relates to pile foundation engineering, base pit engineering and field of foundation treatment, especially blockage resisting multifunctional precast pile tube.
Background technology
Prefabricated tubular pile has a wide range of applications in pile foundation engineering and foundation stabilization.But during piling construction, owing to the volume of pile tube self occupies the original space of the soil body, make the soil body in stake week arrange to surrounding.When soil around pile is saturated soft soil, after the soil body is squeezed, volume will not shrink or amount of contraction is the least, and now soil compaction effect is very notable, thus results in the biggest negative effect, is mainly manifested in the following aspects:
(1) during piling, excess pore water pressure raises, and for saturated clay, dissipation of excess pore-water pressure is relatively slow, under the soil-squeezing action of continuous piling, can cause damage of soil body, causes pile peripheral earth protuberance and the displacement in occurred level direction;
(2) during large area pile sinking, due to pile peripheral earth by densification, squeeze, the soil body produces the displacement of vertical and horizontal directions, the neighbouring stake being pressed into can be caused to be extruded, cause an end " unsettled ", will also result in deflected file or pile body warpage, the quality accident such as fracture;
(3) soil compaction effect during large area pile sinking is obvious, and the buildings or structures closing on periphery produce impact, must arrange isolating trenches if desired.
In conventional foundation reinforcement method, such as vacuum method or preloading etc., owing to upper load or the energy affect degree of depth are limited, soil body discharging consolidation speed is relatively slow, and the basement process time cycle is the longest, according to soil layer situation, it is generally required to 2-3 month, even more than half a year.Basement process carries out pile foundation construction after completing again, and the integral construction cycle is greatly increased;The most existing method for processing foundation is affected by the factor such as construction quality and construction equipment, and Foundation Treatment Effect is the most undesirable, and soil solidifying degree reaches and do not reaches design requirement with bearing capacity, and normal use for follow-up buildings or structures brings certain risk.
When the area that level of ground water is higher carries out excavation of foundation pit, generally require and first carry out soil body precipitation.For digging the most shallower foundation ditch, typically use Application of light well point precipitation, and digging deeper foundation ditch or cheating in the foundation ditch that the end is artesian aquifer, generally use dewatering well and carry out precipitation, dewatering construction workload is relatively big, and precipitation complete after well point or pipe well all throw aside, cause the waste of resource.
Summary of the invention
The purpose of this utility model is according to above-mentioned the deficiencies in the prior art, it is provided that blockage resisting multifunctional precast pile tube, by offering permeable hole on prefabricated tubular pile, makes prefabricated tubular pile realize the effect of precipitation, decompression and foundation stabilization simultaneously.
This utility model purpose realizes being completed by techniques below scheme:
A kind of blockage resisting multifunctional precast pile tube, it is characterised in that: include prefabricated tubular pile, described prefabricated tubular pile offers some permeable holes, in described permeable hole, is fixedly installed Water permeable body.
Some described permeable holes are that quincuncial arrangement is on described prefabricated tubular pile.
Described Water permeable body can be permeable stone.
Pile foundation is combined by blockage resisting multifunctional precast pile tube with basement process, base pit dewatering.In pile driving process, subsoil water can penetrate into inside pile tube, accelerates super pore pressure dissipation, reduces soil compaction effect, improve construction quality, may utilize the immersible pump arranged in pile tube to draw water simultaneously, accelerate pile peripheral earth discharging consolidation, increase soil strength, reduce settlement after construction, make pile foundation combine with basement process, base pit dewatering can be assisted again simultaneously, play the effect of relief well.Utilizing works stake also serves as basement process, its processing speed and the more conventional technique of effect are good, can use as dewatering well again, basement process is completed while pile foundation construction, compared to pile foundation construction after traditional first basement process, duration is greatly improved, decreases the expense of basement process and base pit dewatering, better economy.
The utility model has the advantages that: when constructing pile foundation, accelerate the dissipation of super pore pressure, decrease effect of driving pile, built-in water plug is utilized to draw water, accelerate pile peripheral earth discharging consolidation, increase soil strength, while pile foundation construction, complete basement process, can effectively reduce basement process part expense, speed and the effect of basement process are preferable simultaneously;When excavation of foundation pit, carry out base pit dewatering as dewatering well, reduce dewatering construction workload;In base pit engineering, it is possible to separately as dewatering well;Can be widely used for the basement process to soft layer and need the base pit engineering of precipitation, construction is simple, and the duration is short, cost is low, it is simple to promote.
Accompanying drawing explanation
Fig. 1 is cross-section structure of the present utility model;
Fig. 2 is sectional structure chart of the present utility model;
Fig. 3 is the structural representation of prefabricated tubular pile in this utility model;
Fig. 4 is arrangement schematic diagram of the present utility model.
Detailed description of the invention
This utility model feature and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, in order to the understanding of technical staff of the same trade:
As Figure 1-4, in figure, labelling 1-8 is expressed as: prefabricated tubular pile 1, immersible pump 2, outlet pipe 3, permeable hole 4, building enclosure 5, blockage resisting multifunctional precast pile tube 6, basement 7, permeable stone 8.
Embodiment: as it is shown in figure 1, the blockage resisting multifunctional precast pile tube in the present embodiment includes prefabricated tubular pile 1.As it is shown on figure 3, offer some permeable holes 4 on the pile body of prefabricated tubular pile 1, some permeable holes 4 are in quincuncial arrangement on the pile body of prefabricated tubular pile 1, and permeable hole 4 can make inside the stake holes that subsoil water passed through and entered prefabricated tubular pile 1.Shown in Fig. 1 and Fig. 3, being fixedly installed permeable stone 8 in each permeable hole 4, the effect of permeable stone 8 is to stop quicksand, drift sand is avoided to enter inside the stake holes of prefabricated tubular pile 1, thus reduce the surface subsidence caused by precipitation, reduce surrounding enviroment impact, improve effect of drawing water.
As in figure 2 it is shown, in order to be drawn into the subsoil water within prefabricated tubular pile 1 stake holes, the water plug being made up of immersible pump 2 and outlet pipe 3 can be arranged in its stake holes.Immersible pump 2 is arranged on bottom the stake holes of prefabricated tubular pile 1, and outlet pipe 3 is connected in the stake holes of prefabricated tubular pile 1, subsoil water to be pumped to ground, so with immersible pump 2, pile peripheral earth pore pressure dissipation can be accelerated, accelerate soil solidifying speed, increase soil strength, base pit dewatering can be assisted simultaneously.
Blockage resisting multifunctional precast pile tube 6 in the present embodiment is when arranging, as shown in Figure 4, blockage resisting multifunctional precast pile tube 6 is squeezed into below ground and its bottom is positioned at below the basement 7 of required excavation, i.e. at the end, hole, so, blockage resisting multifunctional precast pile tube 6 is made can to play the effect of consolidated subsoil.Meanwhile, the water plug being made up of immersible pump 2 and drinking-water pipe 4 is set inside the stake holes of prefabricated tubular pile 1, makes blockage resisting multifunctional precast pile tube 6 can play the effect of precipitation.In order to protect basement 7, it is provided around building enclosure 5 at basement 7.Now, blockage resisting multifunctional precast pile tube 6, as engineering pile, has the effect of soil mass consolidation and base pit dewatering concurrently simultaneously.
In actual use, blockage resisting multifunctional precast pile tube 6 also can be implemented as the dewatering well of base pit dewatering effect and uses.Now, the situation needing base area to survey report and supporting condition separately as the blockage resisting multifunctional precast pile tube 6 of dewatering well effect uses, and it arranges quantity and stake is long also should survey report and the concrete condition of supporting condition with being adapted to.When blockage resisting multifunctional precast pile tube 6 is used only as precipitation effect, permeable hole 4 that can be only reserved in pervious bed region puts into permeable stone, to reduce cost.
The present embodiment is in the specific implementation: pile tube model, length and the supporting course of the blockage resisting multifunctional precast pile tube 6 being made up of prefabricated tubular pile 1 and permeable stone 8 must determine according to upper load situation, construction of prefabricated piles can use static pressure method or hammering method, pile sinking and pile extension technology can refer to related specifications and standard performs, piling construction should be conducted batch-wise, and interval is jumped and beaten.
Blockage resisting multifunctional precast pile tube 6 is according to design reinforcement or precipitation requirement, can be used alone, when also can combine with conventional pile tube, when being applied in combination, one section of blockage resisting multifunctional precast pile tube 6 can be connected, it is possible between the two conventional pile tubes of joint, connect one section of blockage resisting multifunctional precast pile tube 6 in conventional pile tube bottom.
Permeable stone 8 is the one in Water permeable body, other kinds of Water permeable body can also be selected according to actual needs, but needing when selecting to meet to make subsoil water through entering into from permeable hole 4 inside the stake holes of prefabricated tubular pile 1 from Water permeable body, can stop again the requirement that drift sand or some other fine particle enter.
Although design and the embodiment of this utility model purpose is elaborated by above example referring to the drawings, but those of ordinary skill in the art will be consequently realised that, under the precondition limiting scope without departing from claim, still this utility model can be made various modifications and variations, as: the selection of water plug, the construction technology etc. of blockage resisting multifunctional precast pile tube 6, therefore repeat the most one by one at this.
Claims (3)
1. a blockage resisting multifunctional precast pile tube, it is characterised in that: include prefabricated tubular pile, described prefabricated tubular pile offers some permeable holes, in described permeable hole, is fixedly installed Water permeable body.
A kind of blockage resisting multifunctional precast pile tube the most according to claim 1, it is characterised in that: some described permeable holes are that quincuncial arrangement is on described prefabricated tubular pile.
A kind of blockage resisting multifunctional precast pile tube the most according to claim 1, it is characterised in that: described Water permeable body can be permeable stone.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620219560.0U CN205501991U (en) | 2016-03-22 | 2016-03-22 | Prevent blockking up multi -functional precast tubular pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620219560.0U CN205501991U (en) | 2016-03-22 | 2016-03-22 | Prevent blockking up multi -functional precast tubular pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205501991U true CN205501991U (en) | 2016-08-24 |
Family
ID=56731819
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620219560.0U Active CN205501991U (en) | 2016-03-22 | 2016-03-22 | Prevent blockking up multi -functional precast tubular pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205501991U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110552361A (en) * | 2018-06-04 | 2019-12-10 | 中冶天工集团有限公司 | Pipe pile structure used as dewatering well |
-
2016
- 2016-03-22 CN CN201620219560.0U patent/CN205501991U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110552361A (en) * | 2018-06-04 | 2019-12-10 | 中冶天工集团有限公司 | Pipe pile structure used as dewatering well |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021027025A1 (en) | High-rise building settling reinforcing and lifting correcting construction method | |
CN101806055B (en) | Vacuum pre-pressed joint rigid pile composite foundation reinforcing method | |
CN101082216B (en) | Soft soil foundation pipe-embedded vacuum drainage method | |
CN205591212U (en) | Multi -functional precast tubular pile | |
CN107964969A (en) | Stake film is combined cofferdam and its construction method with soil | |
CN106368219A (en) | Supporting reinforcing structure of deep foundation pit and construction method | |
CN114108597A (en) | Vacuum drainage grouting method | |
CN107059849A (en) | A kind of driven cast-in-place pile and its construction technology | |
WO2007129693A1 (en) | Soil improvement method | |
CN201436323U (en) | Drainage structure of dynamic compaction foundation | |
CN101691760B (en) | Composite foundation combining anchor rods with excavation and construction method thereof | |
CN208586605U (en) | A kind of drainage type basement process stake | |
CN205501983U (en) | Decompression drainage tubular pile | |
CN201214787Y (en) | Rigid water drain pile | |
CN205242391U (en) | Back slip casting precast pile that permeates water | |
CN102966109A (en) | Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation | |
CN205501991U (en) | Prevent blockking up multi -functional precast tubular pile | |
CN201202114Y (en) | Bearing pile | |
CN109339027B (en) | A high frequency drainage stake for sandy soil liquefaction | |
CN105155505B (en) | Construction method for rigid pile composite foundation | |
CN204510259U (en) | There is the comprehensive retaining wall of anti-filter function | |
CN208803456U (en) | A kind of structure for reinforcing peat soil using sand pile and drain bar | |
CN208545745U (en) | Gravel grouting pile with graded expansion head | |
CN109914392A (en) | Upper section drainage and lower section undrained combined prefabricated pipe pile and construction method | |
CN201232181Y (en) | Permeable structure of rigid drainage pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 200032 18, building 681, Xiao Mu Qiao Road, Xuhui District, Shanghai. Patentee after: Shanghai Survey, Design and Research Institute (Group) Co.,Ltd. Country or region after: China Address before: 200032, 18th Floor, No. 681 Xiaomuqiao Road, Xuhui District, Shanghai Patentee before: SHANGHAI GEOTECHNICAL INVESTIGATIONS & DESIGN INSTITUTE Co.,Ltd. Country or region before: China |