CN205474168U - Cleaning device , drafting arrangement and spinning machine - Google Patents
Cleaning device , drafting arrangement and spinning machine Download PDFInfo
- Publication number
- CN205474168U CN205474168U CN201620152321.8U CN201620152321U CN205474168U CN 205474168 U CN205474168 U CN 205474168U CN 201620152321 U CN201620152321 U CN 201620152321U CN 205474168 U CN205474168 U CN 205474168U
- Authority
- CN
- China
- Prior art keywords
- cleaning
- band
- roller
- cleaning device
- rotary shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Spinning Or Twisting Of Yarns (AREA)
Abstract
The utility model relates to a cleaning device, drafting arrangement and spinning machine. Cleaning device (60) are used for drafting arrangement. Cleaning device (60) possess: clean area (68), carry clean area (68) a plurality of take conveying roller (66, 67) and will clean area (68) and take conveying roller (66, 67) supporting for can be respectively to the supporting mechanism (61) of primary importance and the second place removal different with the primary importance.
Description
Technical field
This utility model relates to cleaning device, drafting system and spinning machine.
Background technology
Exist drafting system be provided with possess with multiple on the cleaning band that contact of roller and conveying clean
The situation of the cleaning device of multiple band conveying rollers of band is (for example, referring to Japanese Unexamined Patent Publication 2014-105415
Number publication).According to such cleaning device, it is possible to remove the fibre plate (what is called being attached to roller
Flyings.Wherein, including the fibre plate of cotton, other natural fiber or synthetic fibers etc..With
Under identical.).
In the case of cleaning device as described above is installed on drafting system, upper roller periphery can
Reduce depending on property.Therefore, during the maintenance of the drafting system such as the confirmation of roller periphery on the implementation, need
The operating making drafting system stops, and is according to circumstances taken off from drafting system by cleaning device.In reality
The operating making drafting system is needed to stop too during the maintenance of the cleaning devices such as the replacing executing cleaning band
Only, and according to circumstances cleaning device is taken off from drafting system.
Utility model content
Therefore, this utility model purpose is to provide the sanitizer cartridge of the raising being capable of maintainability
Put and possess drafting system and the spinning machine of such cleaning device.
Cleaning device of the present utility model is the cleaning device for drafting system, and it possesses cleaning
Band, multiple band conveying roller and the first support.Multiple band conveying rollers conveying cleaning band.First
Bearing portion cleaning band and band conveying roller are supported for can respectively to primary importance and with first
Put the different second positions to move.
In this cleaning device, it is possible to contact with upper roller at primary importance cleaning band, at second
Put the mode that cleaning band separates from upper roller and the first support is installed on drafting system.Thus, pass through
Cleaning band and band conveying roller is made to move to the second position, it is possible to make the operating of drafting system continue also
And implement drafting system and/or the maintenance of cleaning device.Therefore, according to this cleaning device,
It is capable of the raising of maintainability.
In cleaning device of the present utility model, it is preferable that cleaning band and band conveying roller constitute cleaning
Module, the first support has the overhang bracket of cleaning module for can rotate more than 10 ° 150 °
First rotary shaft of following angle.Thus, from implementing drafting system and/or cleaning device
Maintenance from the viewpoint of, it is possible to make cleaning band and band conveying roller be sufficiently separated from upper roller.
In cleaning device of the present utility model, it is preferable that the first support has further second
Position keeps the maintaining part of cleaning module.Thereby, it is possible to implement drafting system at steady-state
And/or the maintenance of cleaning device.
In cleaning device of the present utility model, it is preferable that maintaining part has in the second position and cleaning
The rod unit of the first carrier engaging that module is had and by rod unit supporting for rotating
Second rotary shaft.Thus, instrument etc. is not used just can to keep cleaning module in the second position.
In cleaning device of the present utility model, it is preferable that the first rotary shaft and the second rotary shaft are clearly
Arrange at spaced intervals on the conveying direction of clean band.Thereby, it is possible to realize each parts of cleaning device
The optimization of layout.
In cleaning device of the present utility model, it is preferable that the first support has for rod unit engaging
The second carrier.Thus, when cleaning module is configured at primary importance, it is possible to make rod unit
Under stable state standby.
Drafting system of the present utility model possesses: above-mentioned cleaning device;Multiple rollers pair, they are respectively
There is lower roll and upper roller;And second support, it supports multiple upper rollers, the first support peace
Be loaded on the second support, primary importance cleaning band with multiple at least one of roller contact,
Two position cleaning bands separate from least one of multiple upper rollers.
In this drafting system, realized the raising of maintainability by above-mentioned cleaning device.
Drafting system of the present utility model possesses: above-mentioned cleaning device;Multiple rollers pair, they are respectively
There is lower roll and upper roller;Second support, it supports multiple upper rollers;And the 3rd rotary shaft,
Its by the second support supporting for can on multiple roller each with each of multiple lower rolls
Each separation separated with multiple lower rolls of each with multiple upper rollers of the contact position of contact
Rotating between position, the first support is installed on the second support, at primary importance cleaning band with many
At least one contact of individual upper roller, at second position cleaning band roller at least one point from multiple
From, the first rotary shaft is compared the second rotary shaft and is arranged on drawing-off direction near the 3rd rotary shaft
Position.
In this drafting system, side that cleaning module is opened centered by the first rotary shaft and supporting
The side that second support of upper roller is opened centered by the 3rd rotary shaft is identical, therefore, it is possible to from phase
Drafting system and/or the maintenance of cleaning device are implemented in the same side.
In drafting system of the present utility model, it is preferable that be configured at cleaning band and band conveying roller
By the drawing-off to carrying out fibre bundle of multiple rollers under the state of the second position.Thereby, it is possible to make drawing-off
The operating of device continues, and implements the maintenance of cleaning device.The feelings of the cleaning of roller on need not
Under condition, cleaning band and band conveying roller are configured at the second position, in this condition, it is possible to make to lead
Stretch device operating.
Spinning machine of the present utility model possesses: above-mentioned drafting system;Air spinning device, its to by
The fibre bundle of drafting system drawing-off carries out twisting and generating yarn;And devices for taking-up, it will be by sky
Gas spinning apparatus generate yarn winding and form package.
In this spinning machine, realized the raising of maintainability by above-mentioned cleaning device.
In spinning machine of the present utility model, it is preferable that be configured at cleaning band and band conveying roller
Under the state of two positions, drafting system carries out the drawing-off of fibre bundle, and air spinning device carries out yarn
Generation, devices for taking-up carries out the winding of yarn.Thereby, it is possible to make the operating of spinning machine continue,
And implement the maintenance of cleaning device.On need not in the case of the cleaning of roller, by cleaning band with
And band conveying roller is configured at the second position, in this condition, it is possible to make spinning machine operate.
According to this utility model, using the teaching of the invention it is possible to provide can realize the raising of maintainability cleaning device and
Possess drafting system and the spinning machine of such cleaning device.
Accompanying drawing explanation
Fig. 1 is the front view of the spinning machine of an embodiment of the present utility model.
Fig. 2 is the side view of the spinning unit of the spinning machine of Fig. 1.
Fig. 3 is the side view of the drafting system of the spinning unit of Fig. 2.
Cleaning when Fig. 4 is that cleaning module is configured at primary importance and cleaning band is in contact condition
The side view of device.
Cleaning when Fig. 5 is that cleaning module is configured at primary importance and cleaning band is in released state
The side view of device.
Fig. 6 is the top view of the cleaning device of Fig. 4.
Fig. 7 is the side view of cleaning module cleaning device when being configured at the second position.
Fig. 8 be cleaning module cleaning device when being configured at the second position with Fig. 7 opposite side
Side view.
Detailed description of the invention
Hereinafter, referring to the drawings embodiment of the present utility model is described in detail.Additionally,
To identically or comparably partly marking same reference numerals in each figure, the repetitive description thereof will be omitted.
As shown in Figure 1, spinning machine 1 possesses: multiple spinning units 2, adapter trolley 3,
Doff chassis (omit diagram), the first end-rack 4 and the second end-rack 5.Multiple spinning units 2
It is arranged as string.Each spinning unit 2 generates yarns Y and is wound in package P.Single in certain spinning
In the case of in unit 2, yarns Y is cut off or causes yarns Y to disconnect due to any reason, joint
Chassis 3 carries out joint action at this spinning unit 2.In certain spinning unit 2, package P becomes
In the case of full volume, the chassis that doffs makes package P doff, and new spool B is supplied this spinning list
Unit 2.
It is accommodated with in the first end-rack 4 and reclaims the Soft flocks produced in spinning unit 2 and yarn bits
Deng retracting device etc..The compressed air being accommodated with being supplied in spinning machine 1 in the second end-rack 5 is (empty
Gas) air be pressed into Row sum-equal matrix and to each portion of spinning machine 1 supply air air supply unit, with
And for the driving motor etc. that each portion of spinning unit 2 is powered.Arrange in the second end-rack 5
Board is had to control device 41, display picture 42 and input key 43.Board controls device 41 and collects
Middle management and each portion of control spinning machine 1.Display picture 42 can show relevant spinning unit 2
Setting content and/or the information etc. of state.Operator use input key 43 to fit
When operation, it is possible to carry out the setting operation of spinning unit 2.
As shown in Figure 1 and Figure 2, each spinning unit 2 on the direct of travel of yarns Y,
Possess in order from upstream side: drafting system 6, air spinning device 7, yarn monitoring device 8,
Tension pick-up 9, yarn accumulation device 11, waxing attachment 12 and devices for taking-up 13.Unit
Controller 10 is arranged at the spinning unit 2 of every ormal weight, controls the action of spinning unit 2.
Drafting system 6 carries out drawing-off to sliver (fibre bundle) S.Drafting system 6 is sliver S's
Possess in order from upstream side on direct of travel: back roller to the 14, the 3rd roller to 15, intermediate calender rolls pair
16 and preliminary roller to 17.Each roller has lower roll and upper roller to 14,15,16 and 17.Lower roll
By being arranged at driving motor or being arranged at the driving motor of each spinning unit 2 of the second end-rack 5
And rotate driving.Relative to intermediate calender rolls to 16 lower roll be provided with tengential belt (apron belt) 18a.
Relative to intermediate calender rolls to 16 upper roller be provided with tengential belt 18b.
Air spinning device 7 utilizes cycle air-flow to twist by the fiber bundle F of drafting system 6 drawing-off
And generate yarns Y.More specifically (but omit diagram), air spinning device 7 has and spins
Yarn room, fiber guide portion, cycle air-flow produce nozzle and hollow guide shaft body.Fiber guide portion
The fiber bundle F supplied from the drafting system 6 of upstream side is guided to spinning room.Cycle air-flow produces
Raw nozzle is configured at around the path that fiber bundle F is advanced, and produces cycle air-flow in making spinning room.
Utilize this cycle air-flow, make each fibre end reversion cycle of multiple fibers of composition fiber bundle F.In
Empty guiding axis body is by yarns Y exterior guiding to air spinning device 7 in spinning room.
Yarn monitoring device 8 monitors and advances between air spinning device 7 and yarn accumulation device 11
The information of yarns Y, and presence or absence based on the infomation detection yarn defect monitored.Yarn monitoring device 8
In the case of detection yarn defect, yarn defect detection signal is sent to cell controller 10.Yarn is supervised
View apparatus 8 is by the foreign body inspection contained by the thickness exception of such as yarns Y and/or yarns Y
Survey as yarn defect.Yarn monitoring device 8 also detects yarn disconnection etc..Tension pick-up 9 is at air
The tension force of the yarns Y advanced between spinning apparatus 7 and yarn accumulation device 11 is measured, and
Tension detection signal is sent to cell controller 10.Monitor based on yarn at cell controller 10
Device 8 and/or the testing result of tension pick-up 9 and being judged as have abnormal in the case of,
Yarns Y is cut off by spinning unit 2.Specifically, air is stopped towards air spinning device 7
Supply, interrupt yarns Y generation, thus by yarns Y cut off.Or, it is also possible to pass through
Yarns Y is cut off by the sickle additionally arranged.
Yarns Y is waxed between yarn accumulation device 11 and devices for taking-up 13 by waxing attachment 12.
Yarn accumulation device 11 between air spinning device 7 and devices for taking-up 13 by yarns Y
Relaxation absorption.Yarn accumulation device 11 has stablizes dilazep from air spinning device 7 by yarns Y
The function that goes out, make to send from air spinning device 7 when joint action based on adapter trolley 3 etc.
Yarns Y be detained and prevent function that yarns Y is lax and prevent than yarn accumulation device 11
The variation of the tension force of the yarns Y of side is transmitted to the function of air spinning device 7 farther downstream.
Yarns Y is wound in spool B and forms package P by devices for taking-up 13.Devices for taking-up 13 has
There are rocking arm 21, reel 22 and traverse guide 23.Spool B supporting is can by rocking arm 21
Rotate.Rocking arm 21 is supported to swing by fulcrum 24, makes surface or the volume of spool B
The surface of dress P contacts with the surface of suitable pressure with reel 22.It is arranged at the second end-rack 5
Motor (omitting diagram) is driven to make the reel 22 of multiple spinning unit 2 drive together.Thus,
In each spinning unit 2, spool B or package P rotates to take-up direction.Each spinning unit 2
Traverse guide 23 be arranged in multiple spinning unit 2 total axle 25.Second end-rack 5
Motor is driven to make axle 25 back and forth drive along the rotary shaft direction of reel 22, thus traverse guide 23
Make yarns Y relative to the spool B rotated or package P with Rack traversing.
Yarns Y feelings that are cut-off or that disconnect due to any reason yarns Y in certain spinning unit 2
Under condition, adapter trolley 3 marches to this spinning unit 2 and carries out joint action.Adapter trolley 3 has
Piecing devices 26, suction pipe 27 and suction nozzle 28.Suction pipe 27 is supported as rotating by fulcrum 31,
Yarns Y from air spinning device 7 is caught and guides to piecing devices 26.Suction nozzle 28 passes through
Fulcrum 32 is supported to rotate, and the yarns Y from devices for taking-up 13 is caught and guides to connecing
Head unit 26.Piecing devices 26 carry out directed yarns Y joint each other.Piecing devices 26
It is the compressed-air actuated splicer of use, uses the electric wire connecting junction of basic weft yarn or by yarns Y machinery
The wire twister etc. of ground joint.
When adapter trolley 3 carries out joint action, package P is made to rotate (reversion) to anti-take-up direction.
Now, cylinder (omitting diagram) is utilized to make rocking arm 21 in the way of reel 22 separation by package P
Mobile, make package P invert by being arranged at the reversion roller (omitting diagram) of adapter trolley 3.
Illustrate in more detail for above-mentioned drafting system 6.As it is shown on figure 3, back roller is to 14
There is the travel path across sliver S and mutually opposing rear lower roll 14a and rear upper roller 14b.
3rd roller there is the travel path across sliver S to 15 and the 3rd mutually opposing lower roll 15a with
And roller 15b on the 3rd.Intermediate calender rolls has across the travel path of sliver S mutually opposing to 16
Intermediate lower roller 16a and middle upper roller 16b.Set up at intermediate lower roller 16a and have tengential belt 18a.
On centre, roller 16b sets up tengential belt 18b.Preliminary roller has the traveling road across sliver S to 17
Footpath and mutually opposing front lower roll 17a and front upper roller 17b.
The sliver that 14,15,16 and 17 drawing-offs are supplied by multiple rollers from bar cylinder (omitting diagram)
S and make it enter from upstream side downstream skidding, supplies fiber bundle F to air spinning device 7.
Hereinafter, the direction of the travel path along sliver S is referred to as " drawing-off direction ".By drawing-off direction
Upstream side be only called " upstream side ", the downstream in drawing-off direction is only called " downstream ".
Each lower roll 14a, 15a, 16a and 17a are supported as rotating by pedestal 51.Under each
Roller 14a, 15a, 16a and 17a by the closer to downstream in the way of the fastest with mutually different rotation
Rotary speed is driven in rotation.Each upper roller 14b, 15b, 16b and 17b are by rocking arm (the second supporting
Portion) 52 supporting for rotating.Each upper roller 14b, 15b, 16b and 17b are with authorized pressure
Contact thus driven rotation with each lower roll 14a, 15a, 16a and 17a.Additionally, Rocker arm 52
The each upper roller 14b of the drafting system 6 that a pair spinning unit 2 that will abut against each is possessed, 15b,
16b and 17b supports as rotating.
On pedestal 51, the position of rear lower roll 14a and the 3rd lower roll 15a is along drawing-off direction
Can adjust.On Rocker arm 52, on rear upper roller 14b and the 3rd, the position of roller 15b is along leading
Stretch direction can adjust.Thereby, it is possible to the fiber according to the fiber bundle F of drawing-off is long, adjust adjacent
Roller to the distance between 14,15 and adjacent roller to the distance between 15,16.
The end of the upstream side of Rocker arm 52 is provided with the 3rd rotary shaft 53.3rd rotary shaft 53 will
Rocker arm 52 supporting for can on each roller 14b, 15b, 16b and 17b and each lower roll 14a,
The contact position of 15a, 16a and 17a contact and each upper roller 14b, 15b, 16b and 17b
Rotate between the separation point position that each lower roll 14a, 15a, 16a and 17a separate.At Rocker arm 52
The end in downstream be provided with the hands that operator carry out being used during the rotating operation of Rocker arm 52
Handle 54.If making Rocker arm 52 turn to contact position, then it is arranged at the hook portion of the bottom of handle 54
55 engage with the fixing roller 56 of the end in the downstream being arranged at pedestal 51, keep each upper roller 14b,
15b, 16b and 17b contact with each lower roll 14a, 15a, 16a and 17a with authorized pressure
State.Do not only have Rocker arm 52 to carry out whole upper roller 14b, 15b, 16b and 17b propping up
The example held, Rocker arm 52 also is able to support the upper roller of a part.Such as it also is able to be formed
For, Rocker arm 52 only supports roller 14b, 15b and 16b and front upper roller 17b is only with Rocker arm 52
On the spot move.
Drafting system 6 is provided with cleaning device 60.In the present embodiment, lead relative to one
Stretch device 6 and be provided with a cleaning device 60.In a spinning machine 1, a cleaning device
60 are provided independently from other cleaning devices 60.As shown in Fig. 4, Fig. 5 and Fig. 6, cleaning
Device 60 possesses: supporting device (the first support) 61 and cleaning module 64.Supporting device 61
It is installed on Rocker arm 52.Cleaning module 64 is supported by mechanism 61 and supports as rotating.
Supporting device 61 has mounting bracket 84 and the first rotary shaft 62.Mounting bracket 84 has
Diapire 84a and pair of sidewalls 84b, 84c.Pair of sidewalls 84b, 84c are in the way of mutually opposing
It is erected on diapire 84a (herein, being set to right angle relative to diapire 84a).Diapire 84a and side
Wall 84b, 84c form as one.Diapire 84a is fixed on the installation of Rocker arm 52 by bolt 85
Face 52a.First rotary shaft 62 is supported as energy by pair of sidewalls 84b, 84c in the end of upstream side
Enough rotations.
Cleaning module 64 have frame body the 65, first band conveying roller the 66, second band conveying roller 67,
Jockey pulley 71 and cleaning band 68.Frame body 65 have mutually opposing pair of side frames 65a,
65b and the connection framework 65c being set up between body side frame 65a, 65b.Body side frame 65b's
The end of upstream side is fixed with the first rotary shaft 62.Sidewall 84b and framework in mounting bracket 84
Spaced winding first rotary shaft 62 of the body side frame 65b of body 65 is provided with helical spring 63.By spiral
Spring 63 is configured to, by cleaning module 64 near upper roller 14b, 15b and tengential belt 18b
Direction exerts a force.
First band conveying roller 66 be set up in the end in the downstream of frame body 65 body side frame 65a,
Between 65b.Second band conveying roller 67 is set up in body side frame in the end of the upstream side of frame body 65
Between 65a, 65b.Each band conveying roller 66,67 is can by body side frame 65a, 65b supporting
Rotate.Jockey pulley 71 is supported to rotate by a pair arm member 69.A pair arm member 69
It is supported to rotate between body side frame 65a, 65b.A pair arm member 69 is by helical spring
72 towards the direction force separated from upper roller 14b, 15b and tengential belt 18b.
Cleaning band 68 is set up in first band conveying roller the 66, second band conveying roller 67 and jockey pulley
71.Cleaning band 68 is when being given tension force by jockey pulley 71, at the first band conveying roller 66
And carry along drawing-off direction between the second band conveying roller 67.
On centre, the rotary shaft of roller 16b is fixed with driver part 57.At the first band conveying roller 66
Rotary shaft be fixed with the slave unit 73 engaged with driver part 57.If driver part 57 with in
On between, roller 16b jointly revolves and turns around, then make slave unit 73 rotate predetermined angular.Thus,
One band conveying roller 66 rotates predetermined angular, and cleaning band 68 carries ormal weight.Now, cleaning module
First rotary shaft 62 is carried out action by 64 as center, cleaning band 68 from upper roller 14b, 15b with
And tengential belt 18b be temporarily separated after (with reference to Fig. 5) again with upper roller 14b, 15b and tengential belt 18b
Contact (with reference to Fig. 4).So, cleaning band 68 often carry ormal weight and off and on upper roller 14b,
15b and tengential belt 18b contact.Thus, from upper roller 14b, 15b and tengential belt 18b by fiber
Sheet removes, and this fibre plate is attached to cleaning band 68.
Via mounting bracket 76, suction device 75 is installed at the body side frame 65b of frame body 65.Inhale
Leading-in device 75 is connected via the retracting device of pipe arrangement 77 with the first end-rack 4.Suction device 75 every
Gap opposed with cleaning band 68, the fibre plate that will attach to cleaning band 68 is total to attracting air stream
With reclaiming.
The cleaning module 64 constituted as described above is supported to be able to by supporting device 61
Mobile to primary importance and the second position different from primary importance.More specifically, cleaning mould
Block 64 is supported to turn between the first location and the second location by the first rotary shaft 62
Dynamic.
Primary importance is clear when cleaning device 60 is installed on Rocker arm 52 as shown in FIG. 4 and 5
The cleaning position that clean band 68 contacts with upper roller 14b, 15b and tengential belt 18b.The second position such as figure
Shown in 7 and Fig. 8 be when cleaning device 60 is installed on Rocker arm 52 cleaning band 68 from roller 14b,
The position of readiness that 15b and tengential belt 18b separates.Preferably, the first rotary shaft 62 is by cleaning module
The overhang bracket of the upstream side of 64 is to rotate the angle of more than 10 ° less than 150 °, more preferably props up
Hold the angle for more than 10 ° less than 90 ° can be rotated.
As shown in Figure 7 and Figure 8, supporting device 61 is further equipped with at position of readiness that is
Two positions keep the maintaining part 78 of cleaning module 64.Maintaining part 78 has rod unit 79 and second
Rotary shaft 81.Second rotary shaft 81 on the conveying direction of cleaning band 68 with the first rotary shaft 62
Arrange at spaced intervals.Second rotary shaft 81 is fixed on the sidewall 84b of mounting bracket 84, by bar
The base end part 79a of parts 79 supports as rotating.Additionally, the first rotary shaft 62 compares second
Rotary shaft 81 is arranged at the position on drawing-off direction closer to the 3rd rotary shaft 53.
When cleaning module 64 is configured at position of readiness that is the second position, the front end of rod unit 79
The first carrier 82 that portion 79b is had with cleaning module 64 engages.First carrier 82 with
The body side frame 65b of frame body 65 forms as one.Additionally, by cleaning device 60 from rocking arm
52 when taking off, and the first carrier 82 contacts with the sidewall 84b of mounting bracket 84, thus passes through
Helical spring 63 prevents cleaning module 64 from rotating more than necessary degree.
Supporting device 61 has the second carrier 86 for rod unit 79 engaging further.Second holds
Meet portion 86 there is the pin 87 of the sidewall 84b being fixed on mounting bracket 84 and be installed on the O of pin 87
Type ring 88.When cleaning position that is primary importance are configured with cleaning module 64, or by clear
Clean device 60, when Rocker arm 52 takes off, is formed at the otch 79c of the leading section 79b of rod unit 79
Engage with pin 87.Now, o-ring 88 is between sidewall 84b before supporting rod parts 79
End 79b, thus prevent loosening of rod unit 79.
Additionally, need not on each in the case of the cleaning of roller 14b, 15b and tengential belt 18b,
Cleaning module 64 is configured, in this condition, it is possible to make spinning list at position of readiness that is the second position
The operating of unit 2 continues.In other words, in each spinning unit 2 of spinning machine 1, at standby position
Put that is under state that the second position is configured with cleaning module 64, drafting system 6 can carry out yarn
The drawing-off of bar S, air spinning device 7 can carry out the generation of yarns Y, devices for taking-up 13 energy
Enough carry out batching of yarns Y.
Above, as described, in cleaning device 60, supporting device 61 is installed on and leads
Stretch device 6, to enable at primary importance cleaning band 68 and upper roller 14b, 15b and tengential belt
18b contacts, and second position cleaning band 68 from roller 14b, 15b and tengential belt 18b point
From.Thus, by making cleaning module 64 move to the second position, it is possible to make drafting system 6
Operating continues and implements drafting system 6 and/or the maintenance of cleaning device 60.Therefore, root
According to cleaning device 60, it is possible to realize the raising of maintainability.By making cleaning module 64 move to
Two positions, it is also possible to make the visual raising of roller 14b, 15b and tengential belt 18b.
Additionally, an example of the maintenance as cleaning device 60, have cleaning band 68 and/or
Person's replacing with conveying roller 66,67.Be cleaned carrying 68 and/or band conveying roller 66,
In the case of the replacing of 67, make cleaning module 64 move to the second position, make clearly in the second position
Clean module 64 is held in maintaining part 78.In this condition, make a pair arm member 69 near framework
The direction of the connection framework 65c of body 65 rotates, and is released by the tension force giving cleaning band 68, carries out
Cleaning band 68 and/or the replacing of band conveying roller 66,67.Supporting multiple on roller 14b,
Spin under the state that the Rocker arm 52 of 15b, 16b and 17b is in separation point position and cannot be carried out.So
And, spinning can also be implemented when making cleaning module 64 move to the second position.That is,
In spinning, do not interrupt spinning and make cleaning module 64 move to the second position from primary importance,
It is possible to implement the maintenance of cleaning device 60.After the maintenance finishing cleaning device 60, energy
Spinning is enough kept to continue to make cleaning module 64 move to contact position.According to the above, make to shake
Arm 52 between contact position and separation point position mobile with make cleaning module 64 in primary importance and the
The meaning of movement between two positions is different.
In cleaning device 60, supporting device 61 has and by the overhang bracket of cleaning module 64 is
The first rotary shaft 62 of the angle of more than 10 ° less than 150 ° can be rotated.Thus, from implementing drawing-off
From the viewpoint of the maintenance of device 6 and/or cleaning device 60, it is possible to make cleaning module 64
It is sufficiently separated from upper roller 14b, 15b and tengential belt 18b.
In cleaning device 60, supporting device 61 has at second position holding cleaning module 64
Maintaining part 78.Thereby, it is possible to implement drafting system 6 and/or clear at steady-state
The maintenance of clean device 60.
In cleaning device 60, maintaining part 78 has and is had with cleaning module 64 in the second position
The rod unit 79 of the first carrier 82 engaging having and rod unit 79 being supported for rotating
Second rotary shaft 81.Thus, fixture etc. is not used just can to keep cleaning module in the second position
64。
In cleaning device 60, the first rotary shaft 62 and the second rotary shaft 81 are at cleaning band 68
Arrange at spaced intervals on conveying direction.Thereby, it is possible to realize each parts of cleaning device 60
The optimization of layout.
In cleaning device 60, supporting device 61 has the second undertaking for rod unit 79 engaging
Portion 86.Thus, when cleaning module 64 is configured at primary importance, it is possible to make rod unit 79 with surely
Fixed state is standby.
In drafting system 6, the first rotary shaft 62 is compared the second rotary shaft 81 and is arranged at drawing-off side
Upwards closer to the position of the 3rd rotary shaft 53.Thus, cleaning module 64 is with the first rotary shaft 62
Centered by the side opened identical with the side that Rocker arm 52 is opened centered by the 3rd rotary shaft 53.
Therefore, it is possible to from same side (the operation access side from identical) implement drafting system 6 and/or
The maintenance of person's cleaning device 60.
In each spinning unit 2 of spinning machine 1, it is configured at the second position at cleaning module 64
Under state, drafting system 6 can carry out the drawing-off of sliver S, and air spinning device 7 can be carried out
The generation of yarns Y, devices for taking-up 13 can carry out the winding of yarns Y.Thereby, it is possible to make to spin
The operating of yarn machine 1 continues, and implements the maintenance of cleaning device 60.On need not roller 14b,
In the case of the cleaning of 15b and tengential belt 18b, cleaning module 64 is configured at the second position,
In this condition, it is possible to make spinning machine 1 operate.
Above, an embodiment of the present utility model is illustrated, but this utility model does not limits
Due to above-mentioned embodiment.
In a spinning machine 1, cleaning device 60 can be set relative to whole drafting systems 6,
Or cleaning device 60 can also be set only with respect to the drafting system 6 of a part.In above-mentioned enforcement
In mode, the cleaning of cleaning device 60 goes up roller 14b, 15b and tengential belt 18b to liking, but clearly
Clean device 60 can be using at least one (the including tengential belt) of multiple upper rollers as cleaning object.Should
In the case of, cleaning device 60 is configured to, at least one of primary importance cleaning band 68 and upper roller
Contact and second position cleaning band 68 from roller at least one separate.
In the above-described embodiment, cleaning module 64 is supported to first by supporting device 61
Can rotate between position and the second position, if cleaning module 64 is in primary importance and the second position
Between can move, then can also be supported to rotate by supporting device 61 beyond
Action.
Cleaning module 64 keeps in second position maintained portion 78 in the above-described embodiment, but
Cleaning module 64 can also be kept by instruments such as pins in the second position.
In the above-described embodiment, the first carrier 82 has at cleaning device 60 by from Rocker arm 52
Prevent cleaning module 64 from rotating the function of more than necessary degree by helical spring 63 when taking off,
First carrier 82 can also be distinguished with the retainer with this function and arrange.
In the above-described embodiment, be attached to the fibre plate of cleaning band 68 by suction device 75 with
Attracting air stream to be jointly recovered, the fibre plate being attached to cleaning band 68 can also be by brush etc.
Remove.
Air spinning device 7 is transferred to air spinning device 7 to prevent the turn of fiber bundle F
Upstream side, it is also possible to be further equipped with being configured to being held in fiber guide portion and prominent in spinning room
Pin.It addition, air spinning device 7 can also be replaced by the end of downstream side in fiber guide portion
Such pin prevents the turn of fiber bundle F to be transferred to the upstream side of air spinning device 7.And,
Air spinning device 7 can also replace above-mentioned structure to be possessed along mutual rightabout fiber bundle F
Apply a pair jet nozzle of turn.
In spinning unit 2, yarn accumulation device 11 has and pulls out yarn from air spinning device 7
The function of Y but it also may by conveying roller and niproll by yarns Y from air spinning device 7
Pull-out.By conveying roller and niproll in the case of yarns Y is pulled out by air spinning device 7,
Yarn accumulation device 11 can also be replaced arrange by attracting air stream to absorb the lax of yarns Y
Song Shiguan (ス ラ ッ Network チ ュ Block) or mechanical compensator etc..
In spinning unit 2, in board short transverse, so that the yarns Y that upside is supplied exists
The mode of downside winding configures each device, but each device can also be so that the yarns Y that supplied of downside
Mode at upside winding configures.
In drafting system 6, the 3rd rotary shaft 53 is configured at back roller to 14 sides (that is, upstream side),
But the 3rd rotary shaft 53 can also be configured at preliminary roller to 17 sides (that is, downstream).
In spinning machine 1, at least one and traverse guide 23 of the lower roll of drafting system 6
By being driven from the power of the second end-rack 5 (that is, multiple spinning unit 2 share), but spin
Each device (such as, drafting system 6, air spinning device 7, devices for taking-up 13 of yarn unit 2
Deng) can also be driven independently at each spinning unit 2.
On the direct of travel of yarns Y, tension pick-up 9 can also be configured at yarn monitoring device
The upstream side of 8.Cell controller 10 can also be arranged at each spinning unit 2.At spinning unit
In 2, it is also possible to omit waxing attachment 12, tension pick-up 9 and yarn monitoring device 8.
In FIG, spinning machine 1 illustrates in the way of the package P of wind parallel shape, but also can
Enough wind the package P of conical by its shape.In the case of the package P of conical by its shape, due to yarns Y
Cross winding and produce the lax of yarns Y, but this lax also is able to be inhaled by yarn accumulation device 11
Receive.The material of each structure and shape are not limited to above-mentioned material and shape, it is possible to use each
Plant material and shape.
Claims (11)
1. a cleaning device, it is for drafting system, and this cleaning device is characterised by possessing:
Cleaning band;
Multiple band conveying rollers, the plurality of band conveying roller carries described cleaning band;And
First support, its described cleaning band and described band conveying roller are supported for can respectively to
Primary importance and the second position different from described primary importance move.
Cleaning device the most according to claim 1, it is characterised in that
Described cleaning band and described band conveying roller constitute cleaning module,
Described first support have by the overhang bracket of described cleaning module for can rotate 10 ° with
First rotary shaft of the angle of upper less than 150 °.
Cleaning device the most according to claim 2, it is characterised in that
Described first support has further at the described second position described cleaning module of holding
Maintaining part.
Cleaning device the most according to claim 3, it is characterised in that
Described maintaining part has:
Rod unit, its first carrier card being had at the described second position and described cleaning module
Close;And
Second rotary shaft, described rod unit is supported as rotating by it.
Cleaning device the most according to claim 4, it is characterised in that
Described first rotary shaft and described second rotary shaft on the conveying direction of described cleaning band every
Open and be positioned apart from.
6. according to the cleaning device described in claim 4 or 5, it is characterised in that
Described first support has the second carrier for the engaging of described rod unit.
7. a drafting system, it is characterised in that possess:
Cleaning device, its cleaning device according to any one of claim 1~6,
Multiple rollers pair, the plurality of roller is to being respectively provided with lower roll and upper roller;And
Second support, multiple described upper rollers support by it,
Described first support is installed on described second support,
In described primary importance, described cleaning band contacts with at least one of multiple described upper rollers,
In the described second position, described cleaning band separates from least one of multiple described upper rollers.
8. a drafting system, it is characterised in that possess:
Cleaning device, its cleaning device according to any one of claim 4~6;
Multiple rollers pair, the plurality of roller is to being respectively provided with lower roll and upper roller;
Second support, it supports multiple described upper rollers;
3rd rotary shaft, its by described second support supporting for can multiple described on roller every
One each with each contact position contacted of multiple described lower rolls and multiple described upper rollers
Individual rotation between each separation point position separated of multiple described lower rolls,
Described first support is installed on described second support,
In described primary importance, described cleaning band contacts with at least one of multiple described upper rollers,
In the described second position, described cleaning band separates from least one of multiple described upper rollers,
Described first rotary shaft compare described second rotary shaft be arranged on drawing-off direction closer to
The position of described 3rd rotary shaft.
9. according to the drafting system described in claim 7 or 8, it is characterised in that
When described cleaning band and described band conveying roller are configured at the described second position, logical
Cross the drawing-off to carrying out fibre bundle of multiple described roller.
10. a spinning machine, it is characterised in that possess:
Drafting system, its drafting system according to any one of claim 7~9;
Air spinning device, its to being twisted by fibre bundle obtained by described drafting system drawing-off and
Generate yarn;And
Devices for taking-up, the described yarn winding generated at described air spinning device is formed volume by it
Dress.
11. spinning machines according to claim 10, it is characterised in that
When described cleaning band and described band conveying roller are configured at the described second position, institute
Stating drafting system and carry out the drawing-off of fibre bundle, described air spinning device carries out the generation of yarn, institute
State devices for taking-up and carry out the winding of yarn.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015-069070 | 2015-03-30 | ||
JP2015069070A JP2016188444A (en) | 2015-03-30 | 2015-03-30 | Cleaning device, draft machine, and spinning machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205474168U true CN205474168U (en) | 2016-08-17 |
Family
ID=56658621
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620152321.8U Active CN205474168U (en) | 2015-03-30 | 2016-02-29 | Cleaning device , drafting arrangement and spinning machine |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP2016188444A (en) |
CN (1) | CN205474168U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948091A (en) * | 2017-04-19 | 2017-07-14 | 佛山市南海必得福无纺布有限公司 | A kind of simple tension elastic non-woven cloth production equipment |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107435174A (en) * | 2017-09-19 | 2017-12-05 | 陈樊娟 | A kind of high energy-conservation broken end collecting negative pressure control apparatus of spinning frame |
JP2020066820A (en) | 2018-10-24 | 2020-04-30 | 村田機械株式会社 | Traverse device, draft device and spinning machine |
CN111607872B (en) * | 2020-06-22 | 2024-10-29 | 沈阳新区弘曲棉纺织有限公司 | Roller fixing device of scutcher for sewing thread |
-
2015
- 2015-03-30 JP JP2015069070A patent/JP2016188444A/en active Pending
-
2016
- 2016-02-29 CN CN201620152321.8U patent/CN205474168U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948091A (en) * | 2017-04-19 | 2017-07-14 | 佛山市南海必得福无纺布有限公司 | A kind of simple tension elastic non-woven cloth production equipment |
Also Published As
Publication number | Publication date |
---|---|
JP2016188444A (en) | 2016-11-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103010816B (en) | yarn winding machine | |
TWI513869B (en) | Device and method of manufacturing a knit fabric | |
CN205474168U (en) | Cleaning device , drafting arrangement and spinning machine | |
CN101994172A (en) | Airflow spinning device and spinning machine comprising the same | |
CN103014941B (en) | Open-end spinning frame and the manufacture method of spun yarn | |
CN103010848A (en) | Yarn winding unit, yarn winding apparatus and spinning machine | |
JP2013049932A (en) | Spinning machine | |
CN110468474A (en) | Yarn winding apparatus and yarn winding method | |
CN106048789A (en) | Draft device and spinning machine | |
CN106241495B (en) | Yarn winding machine and spinning machinery | |
CN103014952B (en) | Drafting system and spinning machinery | |
CN110158207A (en) | Air spinning machine and air spinning method | |
CN106167201A (en) | Yarn winding machine | |
CN109385702B (en) | Rotor spinning machine and display control method | |
JP2014125714A (en) | Spinning machine | |
CN105648591B (en) | Fibrous recovery unit, drafting system and weaving loom | |
CN111663210B (en) | Air consumption amount calculation device, spinning machine, spinning system, and air consumption amount calculation method | |
CN105734741B (en) | Fiber is mechanical | |
CN106560535A (en) | Drafting Device, Spinning Machine And Spinning Method | |
CN205874615U (en) | Air weaving device and cap spare | |
CN205603752U (en) | Drafting arrangement and spinning machine | |
CN105525396B (en) | Yarn winding apparatus | |
JP2017002431A (en) | Spinning machine and spinning method | |
CN109137162A (en) | Air spinning machine | |
CN108977945A (en) | Roller unit, drafting system and spinning machinery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |