CN205444311U CN201620150151.XU CN201620150151U CN205444311U CN 205444311 U CN205444311 U CN 205444311U CN 201620150151 U CN201620150151 U CN 201620150151U CN 205444311 U CN205444311 U CN 205444311U
Authority
CN
China
Prior art keywords
gate
water
lock
city river
main gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620150151.XU
Other languages
Chinese (zh)
Inventor
朱红耕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou University
Original Assignee
Yangzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou University filed Critical Yangzhou University
Priority to CN201620150151.XU priority Critical patent/CN205444311U/en
Application granted granted Critical
Publication of CN205444311U publication Critical patent/CN205444311U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/20Controlling water pollution; Waste water treatment

Landscapes

  • Barrages (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model provides a city river pump station that gate combines, includes water pump, work gate (19) and work gate hoist engine (15), work gate hoist engine (15) is used for opening and close work gate (19), and characterized by, the water pump is installed on the work gate (19), water pump pump shaft level sets up, and the water pump is including intaking loudspeaker (2), impeller wheel chamber (3) and diffuser (6), and the loudspeaker of intaking (2), impeller wheel chamber (3) and diffuser (6) are in order through the flange hookup. The utility model discloses can through installing at the full through -flow pump of work on the gate, arrange outside river to the city river excess water in flood season according to water drainage and running water engineering needs, the urban water environment also can outer river running water introduction city river, be improved in the winter -Spring dry season to guarantee city flood protection safety, maintains recreational activities water level on water, and it is multi -purpose to have a floodgate, a tractor serves several purposes, easy operation, simple to operate, occupation of land less, invest in advantage such as province.

Description

一种门闸结合的城市河道泵站An urban river pumping station with a combination of gates and gates

技术领域 technical field

本实用新型涉及一种门闸结合的城市河道泵站,属于水利水电工程和城市供排水工程技术领域。 The utility model relates to an urban river pumping station combined with gates and gates, which belongs to the technical field of water conservancy and hydropower engineering and urban water supply and drainage engineering.

背景技术 Background technique

随着我国农业人口不断进入城市,城市规模在不断扩大,城市水环境、城市排污、城市防洪问题日益突出。我国大多数城市在建设过程中,往往只注意地域的扩张,混凝土路面和沥青路面很普遍,地面硬质化问题很严重。对地下排水设施和地上防洪能力的规划不到位,投资也明显不足,现有的城市防洪标准大多在5年一遇的水平,能抵御10年~20年一遇洪水的城市少之又少。随着房地产的兴起,土地资源日益珍贵,原有的小型湖泊、池塘、小河、小沟等能滞、蓄水的地方越来越少,所有的雨水迅速排入河道,水位猛涨,在外河水位的顶托下,无法排出,使得一场暴雨、有时是一场普通的降水,也能造成损失较大的洪涝灾害。 As my country's agricultural population continues to enter the city, the scale of the city continues to expand, and the problems of urban water environment, urban sewage, and urban flood control are becoming increasingly prominent. During the construction process of most cities in our country, they often only pay attention to geographical expansion. Concrete and asphalt pavements are common, and the problem of ground hardening is very serious. The planning of underground drainage facilities and above-ground flood control capacity is not in place, and the investment is obviously insufficient. Most of the existing urban flood control standards are at the level of a 5-year flood, and there are very few cities that can withstand a 10-20-year flood. With the rise of real estate, land resources are becoming more and more precious, and the original small lakes, ponds, creeks, ditches and other places that can stagnate and store water are becoming less and less. All the rainwater is quickly discharged into the river, and the water level soars. Under the support of the water level, it cannot be discharged, so that a heavy rain, sometimes an ordinary precipitation, can also cause a large loss of flood disasters.

我国大多数地区的降水集中在夏秋季节,冬春季节降水较少。由于历史的原因,我国已建城市中实现雨污分流的城市很少,尽管现在有一些城市或新建城市在搞污水截流,向老百姓宣传环保理念,但向城市河道中抛洒垃圾和排污的问题仍然很严峻。在没有活水替换和循环的情况下,城市河道中的水体变质,发黑发臭,严重影响居民的日常生活和公共卫生,也影响到水上娱乐活动的正常开展,更严重的是影响到城市的形象和社会经济活动的正常运行。 Precipitation in most parts of my country is concentrated in summer and autumn, and less in winter and spring. Due to historical reasons, there are very few cities in our country that have realized the separation of rainwater and sewage. Although some cities or new cities are now engaged in sewage interception to promote the concept of environmental protection to the common people, the problem of throwing garbage and sewage into urban rivers is still a problem. very grim. In the absence of replacement and circulation of running water, the water in urban rivers deteriorates, turning black and smelly, which seriously affects the daily life and public health of residents, and also affects the normal development of water entertainment activities, and more seriously affects the urban environment. Image and normal functioning of socio-economic activities.

在正常的水位组合情况下,沿江滨湖地区的城市河道在汛期和冬季节同时有自流排涝和引入活水的概率较低,因此,兴建泵站进行排涝和引入活水是目前的通行做法。面临的问题是如何充分发挥现有的水利设施的作用,减少工程建设用地,减少工程建设投资,发挥最大的经济效益、工程效益和社会效益。 Under the normal combination of water levels, the probability of artesian drainage and introduction of running water in urban rivers along riverside and lakeside areas is low during the flood season and winter season. Therefore, it is the current practice to build pumping stations for drainage and introduction of running water. The problem we are facing is how to give full play to the role of existing water conservancy facilities, reduce project construction land, reduce project construction investment, and maximize economic, engineering and social benefits.

实用新型内容 Utility model content

本实用新型的目的是针对目前城市建设中防洪能力低、水质差、无法自引和自排的实际情况,提供一种门闸结合的城市河道泵站,本实用新型把全贯流泵与城市河道中的闸门结合起来,把城市排涝与水质工程结合起来,把全贯流泵安装在工作闸门上,在汛期通过贯流泵提水,把城市河道的涝水排向外河,保障城市防洪安全;在冬春枯水季节,把贯流泵调头换向,即可把外河活水引入城市河道,达到城市河道换水,改善城市水环境,维持水上娱乐活动水位的目的,具有一闸多用,一机多用,操作简单,安装方便、占地少、投资省等优点。 The purpose of this utility model is to provide an urban river pumping station with a combination of gates and gates in view of the actual situation of low flood control capability, poor water quality, and inability to self-drain and self-drain in current urban construction. The gates in the river channel are combined to combine urban drainage and water quality engineering. The full through-flow pump is installed on the working gate. During the flood season, the through-flow pump is used to lift water and drain the waterlogged water of the urban river to the outer river to ensure urban flood control. Safe; in the winter and spring dry seasons, the tubular pump can be turned around and reversed, and the flowing water from the outer river can be introduced into the urban river, so as to achieve the purpose of changing water in the urban river, improving the urban water environment, and maintaining the water level for water entertainment activities. It has multiple functions with one gate , One machine with multiple functions, simple operation, convenient installation, less land occupation, low investment and so on.

本实用新型的目的是这样实现的,一种门闸结合的城市河道泵站,包括水泵、工作闸门和工作闸门卷扬机,工作闸门卷扬机用于升降工作闸门,其特征是,所述水泵安装在所述工作闸门上,水泵泵轴水平设置,水泵包括进水喇叭、叶轮室和导叶体,进水喇叭、叶轮室和导叶体顺次通过法兰联接。 The purpose of this utility model is achieved in this way, an urban river pumping station combined with gates and gates, including water pumps, working gates and working gate winches, and the working gate winches are used to lift and lower the working gates. It is characterized in that the water pump is installed on the On the above-mentioned working gate, the pump shaft of the water pump is arranged horizontally. The water pump includes a water inlet horn, an impeller chamber and a guide vane body, and the water inlet horn, impeller chamber and guide vane body are sequentially connected by flanges.

优选的,所述叶轮室两端设置法兰,叶轮室两端分别与进水喇叭和导叶体相联,叶轮室上进水喇叭端的法兰的直径小于叶轮室上导叶体端的法兰直径,叶轮室上的法兰上均布内外两道螺孔。 Preferably, flanges are provided at both ends of the impeller chamber, and the two ends of the impeller chamber are respectively connected to the water inlet horn and the guide vane body, and the diameter of the flange at the water inlet horn end of the impeller chamber is smaller than the flange at the end of the guide vane body on the impeller chamber The flange on the impeller chamber is evenly distributed with two screw holes inside and outside.

优选的,所述叶轮室为圆柱形结构,叶轮室与设置在工作闸门底部的水泵安装孔配合,在水泵安装孔外围的工作闸门上均布螺孔,所述叶轮室从工作闸门左侧或右侧将叶轮室装进水泵安装孔,叶轮室上直径较大的法兰紧贴工作闸门,螺栓穿过法兰与工作闸门上的螺孔联结。 Preferably, the impeller chamber is a cylindrical structure, the impeller chamber is matched with the water pump installation hole arranged at the bottom of the working gate, and screw holes are evenly distributed on the working gate around the water pump installation hole, and the impeller chamber is connected from the left side of the working gate or Put the impeller chamber into the water pump installation hole on the right side, the flange with larger diameter on the impeller chamber is close to the working gate, and the bolts pass through the flange and connect with the screw holes on the working gate.

优选的,所述工作闸门为矩形,工作闸门通过钢板焊接而成,工作闸门安装在工作闸门槽内,工作闸门通过安装在顶部的工作闸门卷扬机控制升降。 Preferably, the working gate is rectangular, the working gate is welded by steel plates, the working gate is installed in the working gate groove, and the working gate is lifted and lowered by the working gate winch installed on the top.

优选的,所述导叶体为金属结构,内置固定导叶和导水锥,导叶体出口呈喇叭状。 Preferably, the guide vane body is a metal structure with built-in fixed guide vanes and water guide cones, and the outlet of the guide vane body is trumpet-shaped.

优选的,设有检修闸门,检修闸门与工作闸门平行布置在靠近外河的一侧,检修闸门形状为矩形,检修闸门通过钢板焊接而成,检修闸门安装在检修闸门槽内,检修闸门通过安装在顶部的检修闸门卷扬机实现启闭。 Preferably, an inspection gate is provided. The inspection gate and the working gate are arranged in parallel on the side close to the outer river. The inspection gate is rectangular in shape. The inspection gate is welded by steel plates. The inspection gate is installed in the inspection gate groove. The hoist at the top inspection gate realizes the opening and closing.

优选的,所述工作闸门槽内靠近工作闸门卷扬机的位置安装闸门提升限位开关,检修闸门槽内靠近检修闸门卷扬机的位置安装闸门提升限位开关。 Preferably, a gate lift limit switch is installed in the working gate slot close to the working gate hoist, and a gate lift limit switch is installed in the maintenance gate slot close to the maintenance gate hoist.

优选的,闸室底板与闸室左侧边墙和闸室右侧边墙组成闸室,闸室连接城市河道和外河。 Preferably, the bottom plate of the lock chamber, the left side wall of the lock chamber and the right side wall of the lock chamber form a lock chamber, and the lock chamber is connected to the urban river and the outer river.

优选的,设有卷扬机室,卷扬机室布置在闸室上方,卷扬机室包括闸门维护层和卷扬机维护层。 Preferably, a hoisting machine room is provided, and the hoisting machine room is arranged above the lock chamber, and the hoisting machine room includes a gate maintenance layer and a hoisting machine maintenance layer.

优选的,所述在闸室的两端分别布置外河侧拦污栅槽、城市河道侧拦污栅槽,外河侧拦污栅槽中设置外河侧拦污栅,城市河道侧拦污栅槽中城市河道侧拦污栅。 Preferably, the trash rack grooves on the outer river side and the trash rack grooves on the urban river side are respectively arranged at the two ends of the sluice chamber, the trash racks on the outer river side are arranged in the trash rack grooves on the outer river side, and the trash rack on the urban river side The trash rack on the side of the urban river in the grid groove.

与现有技术相比,本实用新型具有以下有益效果: Compared with the prior art, the utility model has the following beneficial effects:

第一,进水喇叭、叶轮室和导叶体顺次法兰联接,组成全贯流抽水装置,固定安装在工作闸门上,城市河道与外河侧各设置拦污栅,可根据需要实现工作闸门、检修闸门和全贯流泵的联合运行,可把城市河道的涝水排入外河,保障城市防洪安全,也可把外河的活水引入城市河道,改善城市水环境,维持水上娱乐活动水位。 First, the water inlet horn, the impeller chamber and the guide vane body are flange-connected in sequence to form a full-flow pumping device, which is fixedly installed on the working gate. Trash racks are installed on the urban river and the outer river side, and the working gate, The combined operation of the overhaul gate and the full-through flow pump can discharge the waterlogged water of the urban river into the outer river to ensure the safety of urban flood control, and can also introduce the running water of the outer river into the urban river to improve the urban water environment and maintain the water level for water entertainment activities.

第二,可根据排涝和活水工程需要,通过安装在工作闸门上的全贯流泵,在汛期把城市河道涝水排向外河,保障城市防洪安全,也可在冬春枯水季节,把外河活水引入城市河道,改善城市水环境,维持水上娱乐活动水位,具有一闸多用,一机多用,操作简单,安装方便、占地少、投资省等优点。 Second, according to the needs of drainage and running water projects, through the full-flow pump installed on the working gate, the urban river water can be drained to the outer river during the flood season to ensure the safety of urban flood control. The running water from the outer river is introduced into the urban river course to improve the urban water environment and maintain the water level for water entertainment activities. It has the advantages of one gate with multiple functions, one machine with multiple functions, simple operation, convenient installation, less land occupation, and low investment.

附图说明 Description of drawings

图1为本实用新型排涝工况泵站立面剖视图。 Fig. 1 is the vertical sectional view of the pump station in the flood drainage working condition of the utility model.

图2为本实用新型排涝工况泵站平面剖视图。 Fig. 2 is a plane sectional view of the pumping station in the flood drainage working condition of the utility model.

图3为本实用新型活水工况泵站立面剖视图。 Fig. 3 is a section view of the elevation of the pumping station in the running water working condition of the utility model.

图4为本实用新型工作闸门水泵安装孔示意图 Fig. 4 is a schematic diagram of the installation hole of the working gate water pump of the utility model

图中:1、闸室底板;2、进水喇叭;3、叶轮室;4、定子;5、叶轮;6、导叶体;7、外河侧拦污栅;8、外河侧拦污栅槽;9、配电房;10、卷扬机室;11、检修闸门;12、闸门维护层;13、检修闸门槽;14、检修闸门卷扬机;15、工作闸门卷扬机;16、卷扬机维护层;17、工作闸门槽;18、限位开关;19、工作闸门;20、城市河道侧拦污栅槽;21、城市河道侧拦污栅;22、闸室右侧边墙;23、闸室左侧边墙;24、水泵安装孔。 In the figure: 1. The bottom plate of the lock chamber; 2. The water inlet horn; 3. The impeller chamber; 4. The stator; 5. The impeller; 6. The guide vane body; Grid groove; 9. Power distribution room; 10. Hoist room; 11. Inspection gate; 12. Gate maintenance layer; 13. Inspection gate groove; 14. Inspection gate hoist; 15. Working gate hoist; 16. Hoist maintenance layer; 17 1. Working gate slot; 18. Limit switch; 19. Working gate; 20. Trash rack slot on the urban river side; 21. Trash rack on the urban river side; 22. Right side wall of the lock chamber; 23. Left side of the lock chamber Side wall; 24. Water pump installation hole.

具体实施方式 detailed description

如图1-4所示,一种门闸结合的城市河道泵站,由闸室底板1;进水喇叭2;叶轮室3;定子4;叶轮5;导叶体6;外河侧拦污栅7;外河侧拦污栅槽8;配电房9;卷扬机室10;检修闸门11;闸门维护层12;检修闸门槽13;检修闸门卷扬机14;工作闸门卷扬机15;卷扬机维护层16;工作闸门槽17;限位开关18;工作闸门19;城市河道侧拦污栅槽20;城市河道侧拦污栅21;闸室右侧边墙22;闸室左侧边墙23;水泵安装孔24等组成。 As shown in Figure 1-4, an urban river pumping station with a combination of gates and gates consists of a gate chamber bottom plate 1; water inlet horn 2; impeller chamber 3; stator 4; impeller 5; guide vane body 6; Gate 7; trash rack slot 8 on the outer river side; power distribution room 9; hoist room 10; inspection gate 11; gate maintenance layer 12; inspection gate slot 13; inspection gate hoist 14; working gate hoist 15; hoist maintenance layer 16; Working gate slot 17; limit switch 18; working gate 19; urban river side trash rack slot 20; urban river side trash rack 21; sluice chamber right side wall 22; sluice chamber left side wall 23; water pump installation hole 24 and so on.

叶轮室3两端设置法兰,分别与进水喇叭2和导叶体6相联,与进水喇叭2相联的法兰直径较小,靠近定子与导叶体相联的法兰直径较大,法兰上均布风内外两道螺孔。 Flanges are arranged at both ends of the impeller chamber 3, which are connected with the water inlet horn 2 and the guide vane body 6 respectively. Large, two screw holes inside and outside are evenly distributed on the flange.

叶轮室3为圆柱形结构,与设置在工作闸门底部的水泵安装孔配合,运用螺栓通过法兰与工作闸门联结。 The impeller chamber 3 is a cylindrical structure, which is matched with the water pump installation hole arranged at the bottom of the working gate, and is connected with the working gate through a flange by using bolts.

工作闸门19为矩形,钢板焊接,安装在工作闸门槽17内,通过安装在顶部的启闭机控制升降,其特征是在底部开设水泵安装孔,闸门两侧在水泵安装孔外围均布螺孔,所述的叶轮室可从工作闸门左侧或右侧将叶轮室装进水泵安装孔,叶轮室上直径较大的法兰紧贴工作闸门,螺栓穿过法兰与工作闸门上的螺孔联结。 The working gate 19 is rectangular, welded with steel plates, installed in the working gate groove 17, and controlled by the hoist installed on the top. , the impeller chamber can be installed into the pump installation hole from the left or right side of the working gate, the flange with a larger diameter on the impeller chamber is close to the working gate, and the bolts pass through the screw holes on the flange and the working gate coupling.

导叶体6为金属结构,内置固定导叶和导水锥,通过法兰与叶轮室联结,出口呈喇叭状。 The guide vane body 6 is a metal structure with a built-in fixed guide vane and a water guide cone, connected to the impeller chamber through a flange, and the outlet is trumpet-shaped.

检修闸门11与工作闸门19平行布置在靠近外河的一侧,形状为矩形,钢板焊接,安装在检修闸门槽内,通过安装在顶部的启闭机实现启闭。 The maintenance gate 11 is arranged parallel to the working gate 19 on the side close to the outer river. It is rectangular in shape and welded with steel plates.

在工作闸门槽17和检修闸门槽13内靠近启闭机的位置安装闸门提升限位开关18。 In the working gate groove 17 and the maintenance gate groove 13, the position close to the hoist is installed to lift the limit switch 18 of the gate.

闸室底板1与闸室左侧边墙23和闸室右侧边墙22组成闸室,连接城市河道和外河。 The lock chamber base plate 1, the left side wall 23 of the lock chamber and the right side wall 22 of the lock chamber form a lock chamber, which connects the urban river course and the outer river.

卷扬机室10布置在闸室上方,设闸门维护层12和卷扬机维护层16。 The hoist chamber 10 is arranged above the lock chamber, and a gate maintenance layer 12 and a hoist maintenance layer 16 are provided.

在闸室的两端分别布置拦污门槽,安装拦污栅。 Trash gate slots are arranged at both ends of the sluice chamber, and trash racks are installed.

闸室由闸室底板1与闸室左侧边墙23和闸室右侧边墙22组成。 The lock chamber is composed of the lock chamber bottom plate 1, the left side wall 23 of the lock chamber and the right side wall 22 of the lock chamber.

在闸室边墙上分别设置工作闸门槽17和检修闸门槽13,在工作闸门槽17中安装工作闸门19,在检修闸门槽13中安装检修闸门11。 A working gate slot 17 and an inspection gate slot 13 are respectively set on the lock chamber side wall, and a working gate 19 is installed in the working gate slot 17, and an inspection gate 11 is installed in the inspection gate slot 13.

在工作闸门槽17顶部安装工作闸门卷扬机15,在检修闸门槽13顶部安装检修闸门卷扬机14。 Work gate winch 15 is installed on work gate groove 17 tops, and maintenance gate winch 14 is installed on maintenance gate groove 13 tops.

根据工作闸门和检修闸门的提升高度,在工作闸门槽17和检修闸门槽13中分别安装限位开关18。 According to the lifting height of the working gate and the overhauling gate, limit switches 18 are respectively installed in the working gate groove 17 and the overhauling gate groove 13 .

在闸室边墙上分别设置外河侧拦污栅槽8和城市河道侧拦污栅槽20。在外河侧拦污栅槽8中设置外河侧拦污栅7,在城市河道侧拦污栅槽20中设置城市河道侧拦污栅21。 Trash rack grooves 8 on the outer river side and trash rack grooves 20 on the urban river side are respectively arranged on the side walls of the sluice chamber. The outer river side trash rack 7 is arranged in the outer river side trash rack groove 8 , and the urban river side trash rack 21 is arranged in the urban river side trash rack groove 20 .

叶轮室3穿过工作闸门19上的水泵安装孔24,通过法兰固定在工作闸门19上。 The impeller chamber 3 passes through the water pump installation hole 24 on the working gate 19 and is fixed on the working gate 19 by a flange.

进水喇叭2、叶轮室3、导叶体6顺次法兰联结,组成全贯流泵。定子4的线圈固定安装在叶轮5的外周,接通交流电源后,在定子4的线圈中产生交变旋转磁场,叶轮5在电磁力驱动下旋转,把电能转变为机械能,再转换成输送水体的动能和势能。 The water inlet horn 2, the impeller chamber 3, and the guide vane body 6 are sequentially connected by flanges to form a full through-flow pump. The coil of the stator 4 is fixedly installed on the outer periphery of the impeller 5. After the AC power is turned on, an alternating rotating magnetic field is generated in the coil of the stator 4, and the impeller 5 rotates under the drive of electromagnetic force, converting electrical energy into mechanical energy, and then converting it into water transport kinetic energy and potential energy.

卷扬机的维护在卷扬机维护层16进行;闸门与贯流泵的维护在闸门维护层12进行。 The maintenance of the hoist is carried out at the hoist maintenance layer 16; the maintenance of the gate and the tubular pump is carried out at the gate maintenance layer 12.

根据城市河道和外河水位组合和运行要求,通过贯流泵与工作闸门和检修闸门的组合运行,可实现城市河道排涝和城市河道引水二种运行模式。 According to the water level combination and operation requirements of urban rivers and outer rivers, two operation modes of urban river drainage and urban river diversion can be realized through the combined operation of tubular pumps, working gates and maintenance gates.

城市河道排涝模式:在汛期,外河水位高于城市河道水位,城市河道内的涝水无法通过闸门自排。当城市河道内的水位达到最低排涝运行水位,或为了在大暴雨来临前需提前开机预降城市河道水位,此时先关闭工作闸门19,检修闸门11保持在关闭状态。启动贯流泵,叶轮5旋转,把水体从城市河道经进水喇叭2、叶轮室3、导叶体6,流向检修闸门11。贯流泵启动后,检修闸门11与贯流泵联动,缓缓开启,然后进行正常排涝运行。当贯流泵正常停机或事故停机时,检修闸门11在重力作用下自由下落,完成断流操作。 Urban river drainage mode: During the flood season, the water level of the outer river is higher than that of the urban river, and the waterlogged water in the urban river cannot be self-drained through the gate. When the water level in the urban river channel reaches the minimum waterlogging operation water level, or in order to start in advance to pre-lower the urban river water level before the heavy rain comes, the working gate 19 is closed earlier, and the maintenance gate 11 remains in the closed state. Start the tubular pump, the impeller 5 rotates, and the water body flows from the urban river to the maintenance gate 11 through the water inlet horn 2, the impeller chamber 3, and the guide vane body 6. After the tubular-flow pump is started, the maintenance gate 11 is linked with the tubular-flow pump, opened slowly, and then performs normal drainage operation. When the tubular pump is shut down normally or in an accident, the overhaul gate 11 falls freely under the action of gravity to complete the shut-off operation.

城市河道引水模式:在冬春枯水季节,外河水位常常低于城市河道水位,城市河道内的水体得不到替换和循环,开始发黑变质,散发气味,由于降水少,城市河道水位也在不断降低,严重时可能不能满足水上娱乐必需的水位,此时需要从外河引入活水,改善城市河道水质,维持水上娱乐水位。此时检修闸门11保持在关闭状态,提升工作闸门19,在闸门维护层12,先拧下进水喇叭2与叶轮室3之间的法兰联结螺栓,拆下进水喇叭2,再拧下叶轮室3与工作闸门19之间的法兰联结螺栓,把叶轮室3和导叶体6整体从水泵安装孔24中取出;接着叶轮室3和导叶体6整体从水泵安装孔24旋转180度掉头后,再从另一侧插入水泵安装孔24叶轮室3法兰与工作闸门19之间的联结螺栓,把进水喇叭与叶轮室3法兰联结,关闭工作闸门19。在启动贯流泵的同时,检修闸门11也同步提升,叶轮5旋转,把水体从外河经检修闸门11、进水喇叭2、叶轮室3、导叶体6,流向城市河道,进入城市河道引水模式。当贯流泵正常停机或事故停机时,检修闸门11在重力作用下自由下落,完成断流操作。 Urban river water diversion mode: In the dry season of winter and spring, the water level of the outer river is often lower than the water level of the urban river, and the water in the urban river cannot be replaced and circulated, and it begins to turn black and deteriorate and emit odors. Due to the lack of precipitation, the water level of the urban river also decreases In severe cases, it may not be able to meet the necessary water level for water entertainment. At this time, it is necessary to introduce running water from outer rivers to improve the water quality of urban rivers and maintain the water level for water entertainment. At this time, the maintenance gate 11 remains in the closed state, and the working gate 19 is lifted. On the gate maintenance layer 12, first unscrew the flange connecting bolts between the water inlet horn 2 and the impeller chamber 3, remove the water inlet horn 2, and then unscrew the The flange connection bolt between the impeller chamber 3 and the working gate 19 takes the impeller chamber 3 and the guide vane body 6 out of the water pump installation hole 24 as a whole; After turning around, insert the connecting bolt between the pump installation hole 24 and the flange of the impeller chamber 3 and the working gate 19 from the other side, connect the water inlet horn with the flange of the impeller chamber 3, and close the working gate 19. While starting the tubular pump, the maintenance gate 11 is also lifted synchronously, and the impeller 5 rotates, and the water body flows from the outer river through the maintenance gate 11, the water inlet horn 2, the impeller chamber 3, and the guide vane body 6 to the urban river and enters the urban river. Diversion mode. When the tubular pump is shut down normally or in an accident, the overhaul gate 11 falls freely under the action of gravity to complete the shut-off operation.

Claims (10)

1. the city river pumping plant that a door lock combines, including water pump, main gate (19) and main gate hoist engine (15), main gate hoist engine (15) is used for lifting work gate (19), it is characterized in that, described water pump is arranged on described main gate (19), Pump Axle is horizontally disposed with, and water pump includes that water-inlet horn (2), blade wheel chamber (3) and diffuser (6), water-inlet horn (2), blade wheel chamber (3) and diffuser (6) sequentially pass through flange and couple.
The city river pumping plant that a kind of lock the most according to claim 1 combines, it is characterized in that, described blade wheel chamber (3) two ends arrange flange, blade wheel chamber (3) two ends are connected with water-inlet horn (2) and diffuser (6) respectively, the flange diameter that the diameter of the flange of blade wheel chamber (3) upper water inlet trumpet end is held less than the upper diffuser (6) of blade wheel chamber (3), uniform inside and outside twice screw on the flange in blade wheel chamber (3).
The city river pumping plant that a kind of lock the most according to claim 1 combines, it is characterized in that, described blade wheel chamber (3) is cylindrical structural, blade wheel chamber (3) coordinates with the water pump mounting hole (24) being arranged on main gate (19) bottom, at the upper uniform screw of the main gate (19) that water pump mounting hole (24) is peripheral, described blade wheel chamber (3) is on the left of main gate or blade wheel chamber (3) is put into water pump mounting hole by right side, the flange being relatively large in diameter in blade wheel chamber (3) is close to main gate, and bolt is through flange and the screw connection on main gate (19).
The city river pumping plant that a kind of lock the most according to claim 3 combines, it is characterized in that, described main gate (19) is rectangle, main gate (19) is formed by Plate Welding, main gate (19) is arranged in main gate groove (17), and main gate (19) controls lifting by being arranged on the main gate hoist engine (15) at top.
5. the city river pumping plant combined according to a kind of lock described in claim 1 or 4, is characterized in that, described diffuser (6) is metal structure, built-in fixed guide vane and water guide cone, and diffuser (6) exports in horn-like.
The city river pumping plant that a kind of lock the most according to claim 5 combines, it is characterized in that, it is provided with bulkhead gate (11), bulkhead gate (11) and main gate (19) are arranged in parallel in the side near outer river, bulkhead gate (11) is shaped as rectangle, bulkhead gate (11) is formed by Plate Welding, and bulkhead gate (11) is arranged in bulkhead gate groove (13), and bulkhead gate (11) realizes opening and closing by being arranged on the bulkhead gate hoist engine (14) at top.
The city river pumping plant that a kind of lock the most according to claim 6 combines, it is characterized in that, near the position of main gate hoist engine (15), gate lifting limit switch for vertical is installed in described main gate groove (17), in bulkhead gate groove (13), near the position of bulkhead gate hoist engine (14), gate lifting limit switch for vertical (18) is installed.
The city river pumping plant that a kind of lock the most according to claim 7 combines, is characterized in that, abutment wall (22) composition lock chamber, lock chamber connection city river and Wai He on the right side of abutment wall (23) and lock chamber on the left of lock floor (1) and lock chamber.
The city river pumping plant that a kind of lock the most according to claim 8 combines, is characterized in that, being provided with hoisting room (10), hoisting room (10) is arranged in above lock chamber, and hoisting room (10) includes gate maintenance level (12) and hoist engine maintenance level (16).
The city river pumping plant that a kind of lock the most according to claim 9 combines, it is characterized in that, the described two ends at lock chamber are respectively arranged Wai He side trash rack groove (8), city river side trash rack groove (20), Wai He side trash rack groove (8) arranges Wai He side trash rack (7), city river side trash rack (21) in city river side trash rack groove (20).
CN201620150151.XU 2016-02-29 2016-02-29 City river pump station that gate combines Expired - Fee Related CN205444311U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620150151.XU CN205444311U (en) 2016-02-29 2016-02-29 City river pump station that gate combines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620150151.XU CN205444311U (en) 2016-02-29 2016-02-29 City river pump station that gate combines

Publications (1)

Publication Number Publication Date
CN205444311U true CN205444311U (en) 2016-08-10

Family

ID=56604274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620150151.XU Expired - Fee Related CN205444311U (en) 2016-02-29 2016-02-29 City river pump station that gate combines

Country Status (1)

Country Link
CN (1) CN205444311U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106764442A (en) * 2016-12-26 2017-05-31 江苏龙腾工程设计股份有限公司 Diversion activation system and its diversion activation method
CN107653974A (en) * 2017-09-19 2018-02-02 中山市水利水电勘测设计咨询有限公司 A kind of Bidirectional sluice gate movable pump station
CN109371922A (en) * 2018-11-22 2019-02-22 浙江省水利水电勘测设计院 A pump-sluice combined drainage structure
CN109594526A (en) * 2017-09-30 2019-04-09 格兰富控股联合股份公司 Gate pumping station system
CN113265977A (en) * 2021-04-09 2021-08-17 宁波市鄞州区水利水电勘测设计院 Water gate and pump station combined drainage system
CN114197423A (en) * 2021-12-24 2022-03-18 中建生态环境集团有限公司 Basin integration pump floodgate based on automatic clearance of deer horn reamer

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106764442A (en) * 2016-12-26 2017-05-31 江苏龙腾工程设计股份有限公司 Diversion activation system and its diversion activation method
CN107653974A (en) * 2017-09-19 2018-02-02 中山市水利水电勘测设计咨询有限公司 A kind of Bidirectional sluice gate movable pump station
CN109594526A (en) * 2017-09-30 2019-04-09 格兰富控股联合股份公司 Gate pumping station system
CN109371922A (en) * 2018-11-22 2019-02-22 浙江省水利水电勘测设计院 A pump-sluice combined drainage structure
CN109371922B (en) * 2018-11-22 2023-09-26 浙江省水利水电勘测设计院有限责任公司 Pump brake combines drainage structures
CN113265977A (en) * 2021-04-09 2021-08-17 宁波市鄞州区水利水电勘测设计院 Water gate and pump station combined drainage system
CN113265977B (en) * 2021-04-09 2022-05-10 宁波市鄞州区水利水电勘测设计院 Sluice and pump station combined drainage system
CN114197423A (en) * 2021-12-24 2022-03-18 中建生态环境集团有限公司 Basin integration pump floodgate based on automatic clearance of deer horn reamer

Similar Documents

Publication Publication Date Title
CN205444311U (en) City river pump station that gate combines
CN106801448A (en) A kind of system generated electricity using multiple high-rise energy storage water pipes
CN206667365U (en) A kind of underground pump station structure of well formula installation
CN207314279U (en) It is a kind of to take into account small river flood control water drainage pump brake system integrated with moisturizing demand in city
CN110775024A (en) A car washing system for deep foundation pit and narrow site and its construction method
CN206110073U (en) Multi -functional full through -flow lock chamber pump station
CN109469153B (en) Double-flow-pipe rainwater collecting, treating and utilizing system
CN105735399A (en) Irrigation and drainage complete device of multifunctional submersible sewage pump station
CN108265686A (en) A kind of van-type steel blocks dirty drift
CN209653088U (en) A kind of novel transformer substation flood control drainage arrangement
CN206667364U (en) A kind of novel submerged pumping plant
CN113788572B (en) An underground sewage pretreatment system connected to a deep drainage tunnel
CN211873239U (en) Concealed automatic lifting and sewage interception maintenance system for the water inlet of the drainage project
CN206581236U (en) A kind of drainage arrangement of storage station
CN215977119U (en) Damaged dry chamber cabin of concrete under water restores intelligent stagnant water and equips
CN215406396U (en) An automatic power generation sewer with dredging and water storage function
CN117287331A (en) Rural brook water purification power generation system
CN210857472U (en) Bury formula dispersion regulation storage battery system
CN209277121U (en) Pump lock double-layer drainage structure
CN114607031A (en) Facility for quickly draining accumulated water and collecting and utilizing rainwater on urban low-lying roads and operation method thereof
CN204401774U (en) Underground open type storage pond
CN220685977U (en) Gate and tubular pump integrated pumping device
CN207701337U (en) Deep well pump sand control check three-port structure
CN218757719U (en) Multifunctional rainwater collection system for alumina plant
CN216787295U (en) Hybrid water taking system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810