[go: up one dir, main page]

CN205276753U - Wall and figure mosaic structure thereof - Google Patents

Wall and figure mosaic structure thereof Download PDF

Info

Publication number
CN205276753U
CN205276753U CN201520909875.3U CN201520909875U CN205276753U CN 205276753 U CN205276753 U CN 205276753U CN 201520909875 U CN201520909875 U CN 201520909875U CN 205276753 U CN205276753 U CN 205276753U
Authority
CN
China
Prior art keywords
wall
background
splicing
panel
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520909875.3U
Other languages
Chinese (zh)
Inventor
林志伟
翁开明
吴思
曾建明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WANFENG COMPOUND STONE TECHNOLOGY Co Ltd
Original Assignee
WANFENG COMPOUND STONE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WANFENG COMPOUND STONE TECHNOLOGY Co Ltd filed Critical WANFENG COMPOUND STONE TECHNOLOGY Co Ltd
Priority to CN201520909875.3U priority Critical patent/CN205276753U/en
Application granted granted Critical
Publication of CN205276753U publication Critical patent/CN205276753U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

本实用新型公开了一种背景墙及其图形的拼接结构,其特征在于,它是先将背景墙划分成多组模块组件,并事先将各模块组件通过加工设备加工好,运往现场后以干挂的方式将构成背景墙的各组模块组件依次安装到固定于建筑基层墙体的龙骨支架上,拼接成完整的背景墙。本实用新型通过巧妙的组合,极大减少了现场拼接缝隙,从而提升了背景墙的整体装饰效果,且施工时间短,施工成本更低。

The utility model discloses a splicing structure of a background wall and its graphics. In the way of hanging, each group of modular components that constitute the background wall is sequentially installed on the keel bracket fixed on the base wall of the building, and spliced into a complete background wall. The utility model greatly reduces on-site splicing gaps through ingenious combination, thereby improving the overall decoration effect of the background wall, and the construction time is short and the construction cost is lower.

Description

背景墙及其图形拼接结构Background wall and its graphic mosaic structure

技术领域technical field

本实用新型涉及建筑装饰技术领域,更具体的是涉及一种背景墙及其图形拼接结构。The utility model relates to the technical field of architectural decoration, in particular to a background wall and its graphic splicing structure.

背景技术Background technique

目前,由石材铺设的背景墙,逐渐应用于家庭客厅电视背景墙、沙发背景墙、玄关、卧室墙等的家庭装修装饰,也可以应用于旅馆、饭店、KTV、夜总会等娱乐场所的装修装饰,还可以应用于演艺厅、电影院、歌剧院、视听室、演播厅、录音室等吸音隔音要求专业的墙面装饰上。背景墙以其新颖的构思,不但满足了消费者装饰装修的需要,更体现了艺术的气质,使产品成为商业与艺术的完美结合。在石材背景墙传统加工工艺中,一幅背景墙是由众多按一定尺寸加工好的石材平板现场拼装粘贴到墙面上而成,由于现场施工条件的限制,经常出现接缝过多,缝隙大小不一等现象,需通过填缝胶填缝处理,不仅影响背景墙的图形拼接效果,对背景墙的整体装饰效果也造成很大的影响,而且施工时间长,施工成本较高。At present, the background wall laid by stone is gradually applied to the home decoration of the family living room TV background wall, sofa background wall, porch, bedroom wall, etc., and can also be applied to the decoration of hotels, restaurants, KTV, nightclubs and other entertainment places. It can also be used in performing arts halls, cinemas, opera houses, audio-visual rooms, studios, recording studios and other professional wall decorations that require sound absorption and sound insulation. With its novel idea, the background wall not only meets the decoration needs of consumers, but also reflects the artistic temperament, making the product a perfect combination of business and art. In the traditional processing technology of stone background wall, a background wall is composed of many stone slabs processed according to a certain size and pasted on the wall on site. Inequalities need to be treated with caulking glue, which not only affects the graphic splicing effect of the background wall, but also has a great impact on the overall decorative effect of the background wall, and the construction time is long and the construction cost is high.

发明内容Contents of the invention

本实用新型的目的就是为了解决现有技术之不足而提供的一种不仅提升了背景墙的整体装饰效果,而且操作简单方便,施工时间短,施工成本低的背景墙及其图形的拼接结构。The purpose of this utility model is to solve the deficiencies of the prior art and provide a background wall and its graphics splicing structure that not only improves the overall decorative effect of the background wall, but also is simple and convenient to operate, short in construction time and low in construction cost.

本实用新型是采用如下技术解决方案来实现上述目的:一种背景墙及其图形的拼接结构,其特征在于,它包括在建筑基层墙体上建立的龙骨支架、分成多组模块组件的背景墙主体,背景墙主体包括主背景石材面板、围绕主背景石材面板设置的护墙板、造型模块,造型模块背部加装背板安装块,背景石材面板、护墙板以及背板安装块上设置有挂件并通过挂件固定在龙骨支架上。The utility model adopts the following technical solutions to achieve the above object: a splicing structure of a background wall and its graphics, which is characterized in that it includes a keel bracket built on the base wall of the building, and a background wall divided into multiple groups of module components. Main body, background wall The main body includes the main background stone panel, the wall panels set around the main background stone panel, and the modeling module. The back panel installation block is installed on the back of the modeling module. The pendant is fixed on the keel bracket through the pendant.

作为上述方案的进一步说明,相邻的两组模块组件之间的拼接位采用的拼接方式包括:嵌入式结构,消除平面直接拼接产生的外露拼缝;As a further illustration of the above scheme, the splicing methods adopted for the splicing positions between two adjacent groups of module components include: embedded structure, eliminating the exposed splicing seams caused by direct splicing of planes;

和/或采用V槽拼接过渡方式,使模块组件之间的缝隙隐藏在V槽线条中,自然过渡,不易察觉;And/or adopt the V-groove splicing and transition method, so that the gap between the module components is hidden in the V-groove line, and the transition is natural and not easy to detect;

和/或是采用锁头覆盖方式,在模块组件之间的接缝外安装带有装饰盖的锁头,消除外露的接缝。And/or adopt the lock head covering method, install the lock head with decorative cover outside the seam between the module components, and eliminate the exposed seam.

进一步地,模块组件中有正面板材与侧面板材,正面板材与侧面板材的背部采用数块构成三角支撑结构的加强板或加强块固定,增加粘贴强度。Furthermore, there are front panels and side panels in the module assembly, and the backs of the front panels and side panels are fixed by several reinforcing plates or reinforcing blocks forming a triangular support structure to increase the bonding strength.

进一步地,模块组件中设置有带角位的装饰线条,装饰线条的角位拼接采用45度切角拼接方式,更加美观。Furthermore, the module assembly is provided with decorative lines with corners, and the corner splicing of the decorative lines adopts a 45-degree cut corner splicing method, which is more beautiful.

进一步地,主背景石材面板和/或护墙板包括外板框和芯板,采用镂空镶嵌方式,芯板嵌入外板框内,外板框的边角无接缝,装饰效果好。Furthermore, the main background stone panel and/or wall panel includes an outer frame and a core board, and adopts a hollow inlay method, the core board is embedded in the outer frame, and the corners of the outer frame have no joints, and the decorative effect is good.

进一步地,构成所述护墙板的相邻两护墙板模块采用嵌入式拼接结构,护墙板模块二的端部设置有容护墙板模块一的端部插入的凹位,使得两者之间的平面接缝隐藏在凹位上缘的线条背部。Further, two adjacent wall panel modules constituting the wall panel adopt an embedded splicing structure, and the end of the second wall panel module is provided with a concave position for inserting the end of the wall panel module one, so that both The flat seam between is hidden behind the line on the top edge of the recess.

进一步地,构成所述背景石材面板的背景石材面板模块采用多边形板块,边角连接的相互对应的多边形板块一和多边形板块二之间形成V槽,多边形板块三填充于V形槽内,使三者的拼接缝隙作为了整块背景石材面板的花纹的一部分,实现接缝自然过渡。Further, the background stone panel module constituting the background stone panel adopts a polygonal plate, and a V groove is formed between the corresponding polygonal plate 1 and the polygonal plate 2 connected at the corners, and the polygonal plate 3 is filled in the V-shaped groove, so that the three The splicing gap of the former is part of the pattern of the whole background stone panel, realizing the natural transition of the seam.

本实用新型采用上述技术解决方案所能达到的有益效果是:The beneficial effect that the utility model can reach by adopting above-mentioned technical solution is:

1、本实用新型采用背景墙及其图形以模块拼接安装的方式,对背景墙进行合理的分割,将背景墙分成一些模块组件,在工厂内事先将各模块组件通过先进设备加工好,通过巧妙的组合,极大减少了现场拼接缝隙,从而提升了背景墙的整体装饰效果,且施工时间短,施工成本更低。1. The utility model uses the background wall and its graphics to be spliced and installed in modules to reasonably divide the background wall, divide the background wall into some module components, and process each module component through advanced equipment in advance in the factory. The combination greatly reduces the on-site splicing gap, thereby improving the overall decorative effect of the background wall, and the construction time is short and the construction cost is lower.

2、本实用新型采用的拼接安装方式,安装一套背景墙只需1.5-2天的时间,与现有技术相比,大大缩短了施工时间。2. With the splicing installation method adopted by the utility model, it only takes 1.5-2 days to install a set of background walls. Compared with the prior art, the construction time is greatly shortened.

3、本实用新型的背景墙模块间具有一定的热变形空间,尺寸相对自由灵活,膨胀变形空间不受限,不易产生裂纹,对板材的尺寸无限制。3. There is a certain thermal deformation space between the background wall modules of the utility model, the size is relatively free and flexible, the expansion and deformation space is not limited, cracks are not easy to occur, and there is no limit to the size of the plate.

4、本实用新型采用的干挂法涉及的挂件与石材的拉拨力测试值均在3KN以上,高于国家标准要求,完全达到抗震能力要求,使用寿命较长。4. The test value of the pulling force of the pendant and the stone involved in the dry hanging method adopted by the utility model is above 3KN, which is higher than the requirements of the national standard, fully meets the requirements of earthquake resistance, and has a long service life.

5、防潮能力强,在南方一些梅雨季节较长的城市,也不受此影响。5. Strong moisture-proof ability, and some cities in the south with a long rainy season are not affected by this.

6、安装成本低,据统计,每套背景墙可节约安装成本近千元。6. The installation cost is low. According to statistics, each set of background wall can save nearly 1,000 yuan in installation cost.

附图说明Description of drawings

图1为本发明的背景墙的结构示意图;Fig. 1 is the structural representation of background wall of the present invention;

图2为本发明的背景墙拼接结构示意图;Fig. 2 is a schematic diagram of the splicing structure of the background wall of the present invention;

图3为本发明的龙骨支架安装结构示意图;Fig. 3 is a schematic diagram of the installation structure of the keel bracket of the present invention;

图4为本发明的建筑基层墙体划线定位图;Fig. 4 is the positioning diagram of the marking line of the building base wall body of the present invention;

图5为本发明的石材安装顺序图;Fig. 5 is a stone installation sequence diagram of the present invention;

图6为本发明的上、下两组模块组件的拼接前结构示意图;Fig. 6 is a schematic diagram of the structure before splicing of the upper and lower groups of module components of the present invention;

图7为本发明的上、下两组模块组件的拼接后结构示意图;Fig. 7 is a schematic diagram of the spliced structure of the upper and lower groups of module assemblies of the present invention;

图8为本发明的主背景石材面板拼接结构示意图;Fig. 8 is a schematic diagram of the mosaic structure of the main background stone panel of the present invention;

图9为本发明的主背景石材面板拼接结构示意图;Fig. 9 is a schematic diagram of the mosaic structure of the main background stone panel of the present invention;

图10为图1的A的放大图;Fig. 10 is an enlarged view of A of Fig. 1;

图11为模块组件的正面板材与侧面板材安装结构示意图;Figure 11 is a schematic diagram of the installation structure of the front panel and the side panel of the module assembly;

图12为本发明的背景墙模块组件的背面结构示意图;Fig. 12 is a schematic diagram of the back structure of the background wall module assembly of the present invention;

图13为本发明的挂件安装结构示意图;Fig. 13 is a schematic diagram of the installation structure of the pendant of the present invention;

图14本发明的护墙板拼接结构示意图。Fig. 14 is a schematic diagram of the splicing structure of the wall panels of the present invention.

附图标记说明:1、建筑基层墙体1-1、地面1-2、天花混凝土1-3、定位套筒或固定板1-4、定位线条1-5、背景墙外框框架线1-6、背景墙起始水平线2、龙骨支架3、模块组件3-1、主背景石材面板3-2、护墙板3-21、外板框3-22、芯板3-3、造型模块3-4、背板安装块3a、上模块组件3b、下模块组件3c、正面板材3d、侧面板材4、V槽线条5、锁头6、加强板7、挂件。Explanation of reference signs: 1. Building base wall 1-1, ground 1-2, ceiling concrete 1-3, positioning sleeve or fixing plate 1-4, positioning line 1-5, background wall frame line 1- 6. Starting horizontal line of background wall 2, keel bracket 3, module components 3-1, main background stone panel 3-2, wall panel 3-21, outer frame 3-22, core board 3-3, modeling module 3 -4. Back panel installation block 3a, upper module component 3b, lower module component 3c, front panel 3d, side panel 4, V-groove line 5, lock head 6, reinforcement plate 7, pendant.

具体实施方式detailed description

以下结合具体实施例对本技术方案作详细的描述。The technical solution will be described in detail below in conjunction with specific embodiments.

本实用新型是一种背景墙及其图形的拼接结构,它是根据以下方法进行配置的:The utility model is a splicing structure of a background wall and its graphics, which is configured according to the following method:

如图1和图2所示,先将背景墙划分成多组模块组件,并事先将各模块组件通过加工设备加工好,运往现场后以干挂的方式将构成背景墙的各组模块组件3依次安装到固定于建筑基层墙体1的龙骨支架上,拼接成完整的背景墙。背景墙的模块组件3一般是由通体石材经过包括切割、雕刻、粘接、打磨、抛光、钻孔工艺加工而成。As shown in Figure 1 and Figure 2, the background wall is first divided into multiple groups of module components, and each module component is processed by processing equipment in advance, and each group of module components that constitute the background wall is dry-hanged after being transported to the site. They are sequentially installed on the keel brackets fixed on the base wall 1 of the building, and spliced to form a complete background wall. The module component 3 of the background wall is generally made of whole body stone through processes including cutting, engraving, bonding, grinding, polishing and drilling.

以下是背景墙及其图形的拼接、安装的具体步骤:The following are the specific steps for the splicing and installation of the background wall and its graphics:

a、建筑基层墙体划线定位;在此之前,还需要做好以下准备:a. Marking and positioning of the base wall of the building; before that, the following preparations need to be made:

a1、首先要分析施工图:把握背景墙整体尺寸,具体安装位置,考虑背景墙与两边的衔接,收边关系;根据平面图(如图1)及剖面图明确各板材拼接位的拼接关系,是平接还是压边,图2所示;a1. First, analyze the construction drawing: grasp the overall size of the background wall, the specific installation location, consider the connection between the background wall and both sides, and the edge closing relationship; clarify the splicing relationship of each panel splicing position according to the plan (as shown in Figure 1) and the section drawing. Flat joint or crimping, as shown in Figure 2;

a2、分析基层墙体:若基层墙体是红砖或是水泥墙,可以承受背景墙安全拉力,则选用直接将U型材按施工图所示位置安装紧固;a2. Analyze the base wall: If the base wall is red brick or cement wall, which can withstand the safety tension of the background wall, then choose to install and fasten the U-shaped material directly according to the position shown in the construction drawing;

如若基层墙体强度不够,如图3所示,则必须采取在U型材两头加装定位套筒或固定板1-3,与地面1-1和天花混凝土1-2联接,从而保证强度要求;If the strength of the base wall is not enough, as shown in Figure 3, it is necessary to install positioning sleeves or fixing plates 1-3 at both ends of the U profile to connect with the ground 1-1 and the ceiling concrete 1-2, so as to ensure the strength requirements;

如若背景墙安装位置无墙面或非紧贴墙面安装,依据现场情况制做相应钢架,背景墙U型材固定在钢架上;If the installation position of the background wall has no wall or is not installed close to the wall, the corresponding steel frame shall be made according to the site conditions, and the U-profile of the background wall shall be fixed on the steel frame;

在建筑基层墙体划线定位过程中,是根据木工做天花时候确定的水平线,用红外线水平仪、墨斗在基层墙体弹出龙骨支架的定位线条1-4,定出背景墙外框框架线1-5及背景墙起始水平线1-6,如图4所示;弹完U型材定位图及背景墙框架图后进行复测单个尺寸和整体尺寸有无偏差;其中,整体尺寸的复测一般是通过斜对角拉线来复测尺寸有无偏差,并进行相应的调整;In the process of scribing and positioning the base wall of the building, according to the horizontal line determined by the carpenter when making the ceiling, the positioning lines 1-4 of the keel bracket are popped up on the base wall with an infrared level and an ink fountain, and the frame line 1-4 of the outer frame of the background wall is determined. 5 and the starting horizontal line 1-6 of the background wall, as shown in Figure 4; after the U-profile positioning diagram and the background wall frame diagram are played, retest whether there is any deviation in the individual size and the overall size; among them, the retesting of the overall size is generally Re-test whether there is any deviation in size by pulling the wire diagonally, and make corresponding adjustments;

b、安装龙骨支架,根据基层墙体的划线定位,将龙骨支架固定于基层墙体上;安装时要确保U型材与地面垂直,用红外线的投射仪在正面与侧面检查,若墙面不平整加垫片校正;b. Install the keel bracket, and fix the keel bracket on the base wall according to the marking line of the base wall; when installing, make sure that the U profile is perpendicular to the ground, and check the front and side with an infrared projector. Flattening and shim correction;

c、在所述龙骨支架上设置角码构件,在背景墙的各模块组件背面安装挂件;其中,角码构件在安装前,根据挂件安装高度,用墨斗在U型材上弹出安装基准线(每排挂件顶部高度基准线),然后将一定数量的角码构件及挂件安装固定在U型材上;c, set the corner code member on the keel bracket, and install the pendant on the back of each module assembly of the background wall; wherein, before the corner code member is installed, according to the height of the pendant installation, pop up the installation reference line on the U profile with an ink fountain (per Row hanger top height reference line), and then install and fix a certain number of corner code components and hangers on the U profile;

d、石材安装,如图5所示,根据背景墙整体划分布局,依次安装各模块组件,各模块组件的挂件与相应的角码构件钩挂配合;其中,背景墙背面与建筑基层墙面的标准间距是115mm,由于受墙面平整度、板材厚薄偏差、加工偏差等因素影响,前后预留调节量是±10mm;d. Stone installation, as shown in Figure 5, according to the overall layout of the background wall, each module assembly is installed in turn, and the pendant of each module assembly is hooked and matched with the corresponding corner code member; wherein, the back of the background wall is connected to the base wall of the building The standard spacing is 115mm. Due to the influence of factors such as wall flatness, plate thickness deviation, and processing deviation, the reserved adjustment amount before and after is ±10mm;

确定石材安装基准面:为方便检测背景墙正面是否安装在统一平面上或平行面上,用墨斗在距背景墙最外立面90-120mm处弹一直线,作为背景墙安装时的参照线,安装时对每块板材用卷尺测量两端到基准线的距离是否一致,防止安装好的背景墙饰面成扭曲状,影响美观;Determine the reference surface for stone installation: In order to facilitate the detection of whether the front of the background wall is installed on a uniform plane or a parallel surface, use an ink fountain to bounce a straight line at a distance of 90-120mm from the outermost facade of the background wall, as a reference line for the installation of the background wall. When installing, use a tape measure to measure whether the distance between the two ends of each plate and the reference line is consistent, so as to prevent the installed background wall from being distorted and affecting the appearance;

弹好线后,便可将石材逐块通过挂件挂到U型材挂件上,安装石材时,必须根据其施工的安装图所示顺序进行安装,否则会导致安装偏差较大及一些模块无法镶嵌;After the wire is played, the stone can be hung on the U-shaped pendant one by one through the pendant. When installing the stone, it must be installed according to the order shown in the installation diagram of its construction, otherwise it will cause large installation deviation and some modules cannot be inlaid;

首件石材安装时,必须检查校正其正确位置,其他模块则以其位置为基准进行拼装,防止背景墙整体尺寸超出预设的安装位置;When the first piece of stone is installed, its correct position must be checked and corrected, and other modules are assembled based on its position to prevent the overall size of the background wall from exceeding the preset installation position;

对于较重的石材组件,可通过手泵吸盘或玻璃吸盘吸附在石材表面,再以搬运安装;安装时候出现高低差或高低缝隙可以通过挂件顶部的不锈钢微调螺栓来做上下微调;For heavier stone components, it can be adsorbed on the surface of the stone with a hand pump suction cup or a glass suction cup, and then transported and installed; when there is a height difference or gap during installation, it can be fine-tuned up and down through the stainless steel fine-tuning bolt on the top of the pendant;

如果出现板材正面不平整则用可调式吸盘进行调平,调平后在两块板材交界处粘贴背板进行固定;If the front of the board is uneven, use an adjustable suction cup for leveling, and after leveling, paste the backboard at the junction of the two boards to fix it;

安装过程中每安装一块石材需用红外线水平仪从正面及侧面检测其垂直度,防止整体尺寸变形导致拼接缝过大和一些模块无法安装;During the installation process, each piece of stone needs to be installed with an infrared level to detect its verticality from the front and side, so as to prevent the deformation of the overall size and cause the seam to be too large and some modules cannot be installed;

e、填缝处理,背景墙安装好后,先将各模块组件之间的缝隙内的灰尘杂质清理干净,然后用填缝胶进行填缝;进一步地,在清理干净夹缝内的灰尘杂质后,在板材边缘粘贴美纹纸以防填缝胶污染石材表面,然后根据板材的型号配用相同色调的填缝胶来填缝,打胶后,要求胶缝光滑顺直。e. Filling treatment. After the background wall is installed, first clean the dust and impurities in the gaps between the module components, and then fill the gaps with caulking glue; further, after cleaning the dust and impurities in the gaps, Paste masking paper on the edge of the board to prevent the caulking glue from polluting the surface of the stone, and then use the same color of caulking glue to fill the seam according to the model of the board. After glueing, the glued seam is required to be smooth and straight.

具体地,在拼接背景墙的过程中,对于相邻的两组模块组件之间的拼接位采用的拼接方式包括:Specifically, in the process of splicing the background wall, the splicing methods used for the splicing positions between two adjacent groups of module components include:

1、嵌入式结构,消除平面直接拼接产生的外露拼缝,上、下两组模块组件的拼接,如图所示6所示,是拼接前的结构图;图7所示,是拼接后的结构图;通过将上模块组件3a嵌入下模块组件3b接合位线条底部,使得平面接缝隐藏在线条背部,实现自然过渡,背景墙表面无接缝,更美观;1. The embedded structure eliminates the exposed joints caused by the direct splicing of planes. The splicing of the upper and lower sets of module components is shown in Figure 6, which is the structural diagram before splicing; as shown in Figure 7, it is after splicing. Structural diagram: By embedding the upper module component 3a into the lower module component 3b to join the bottom of the line, the plane seam is hidden behind the line, realizing a natural transition, and the surface of the background wall has no seam, which is more beautiful;

2、用V槽拼接过渡方式,使模块组件之间的缝隙隐藏在V槽线条4中,自然过渡工,不易察觉,如图8和图9所示,模块拼接缝在V型槽底部,自然过渡,不易察觉,起到较好装饰效果;2. Use the V-groove splicing transition method to hide the gap between the module components in the V-groove line 4. The transition is natural and difficult to detect. As shown in Figure 8 and Figure 9, the module splicing seam is at the bottom of the V-groove. Natural transition, not easy to detect, and has a good decorative effect;

3、如图10所示,采用锁头覆盖方式,在模块组件之间的接缝外安装带有装饰盖的锁头5,消除外露的接缝。3. As shown in Fig. 10, the lock head 5 with a decorative cover is installed outside the seam between the module components by using the lock head covering method, so as to eliminate the exposed seam.

如图11所示,对模块组件中的上下垂直设置的正面板材3c与侧面板材3d的直角拼接,是先将正面板材3c与侧面板材3d两者的连接端经过45度磨边后再进行拼接处理,消除正面接缝。如图12所示,正面板材与侧面板材的背部采用数块构成三角支撑结构的加强板6或加强块固定,增加粘贴强度。As shown in Figure 11, for the right-angle splicing of the vertically arranged front panel 3c and side panel 3d in the module assembly, the connection ends of the front panel 3c and the side panel 3d are first ground at 45 degrees and then spliced. treatment to eliminate the front seam. As shown in Figure 12, the backs of the front panel and the side panel are fixed by several reinforcing plates 6 or reinforcing blocks forming a triangular support structure to increase the sticking strength.

进一步地,对模块组件中的装饰线条的角位拼接采用45度切角拼接方式,更加美观。Furthermore, the corner splicing of the decorative lines in the module components is spliced at 45 degrees, which is more beautiful.

以下是所述背景墙及其图形的拼接结构,如图13所示,它包括在建筑基层墙体1上建立的龙骨支架2、分成多组模块组件3的背景墙主体,背景墙主体包括主背景石材面板3-1、围绕主背景石材面板设置的护墙板3-2、造型模块3-3,造型模块背部加装背板安装块3-4,背景石材面板3-1、护墙板3-2以及背板安装块3-4上设置有挂件7并通过挂件固定在龙骨支架上。其中,挂件7采用背栓挂件,挂件7的背栓螺栓安装孔采用专用钻头及CNC数控雕刻机钻孔,钻孔定位准确,孔质量优于传统拓孔机拓孔,背栓螺栓与孔的接合度更高。The following is the splicing structure of the background wall and its graphics, as shown in Figure 13, it includes the keel bracket 2 established on the building base wall 1, the background wall body divided into multiple groups of module components 3, the background wall body includes the main body Background stone panel 3-1, wall panel 3-2 set around the main background stone panel, modeling module 3-3, back panel installation block 3-4 on the back of the modeling module, background stone panel 3-1, wall panel 3-2 and the backboard installation block 3-4 are provided with a pendant 7 and are fixed on the keel bracket by the pendant. Among them, the pendant 7 is a back bolt pendant, and the mounting hole of the back bolt of the pendant 7 is drilled with a special drill bit and a CNC numerical control engraving machine. Higher engagement.

本实施例中,护墙板3-2采用镂空镶嵌方式,如图14所示,包括外板框3-21和芯板3-22。如图所示11,护墙板3-2的外板框3-21为矩形框,内部嵌入一矩形的芯板3-22,并且外板框的边角无接缝,装饰效果好。In this embodiment, the wall panel 3-2 adopts a hollow inlay method, as shown in FIG. 14 , including an outer frame 3-21 and a core board 3-22. As shown in Figure 11, the outer panel frame 3-21 of the clapboard 3-2 is a rectangular frame, and a rectangular core panel 3-22 is embedded inside, and the corners of the outer panel frame have no joints, and the decorative effect is good.

进一步地,构成所述护墙板的相邻两护墙板模块采用嵌入式拼接结构,护墙板模块二的端部设置有容护墙板模块一的端部插入的凹位,使得两者之间的平面接缝隐藏在凹位上缘的线条背部。Further, two adjacent wall panel modules constituting the wall panel adopt an embedded splicing structure, and the end of the second wall panel module is provided with a concave position for inserting the end of the wall panel module one, so that both The flat seam between is hidden behind the line on the top edge of the recess.

进一步地,构成所述背景石材面板的背景石材面板模块采用多边形板块,边角连接的相互对应的多边形板块一和多边形板块二之间形成V槽,多边形板块三填充于V形槽内,使三者的拼接缝隙作为了整块背景石材面板的花纹的一部分,实现接缝自然过渡。Further, the background stone panel module constituting the background stone panel adopts a polygonal plate, and a V groove is formed between the corresponding polygonal plate 1 and the polygonal plate 2 connected at the corners, and the polygonal plate 3 is filled in the V-shaped groove, so that the three The splicing gap of the former is part of the pattern of the whole background stone panel, realizing the natural transition of the seam.

进一步地,构成所述造型模块的模块组件之间的接缝外安装带有装饰盖的锁头,采用锁头覆盖方式,消除外露的接缝。Further, lock heads with decorative covers are installed outside the seams between the module components constituting the modeling module, and the exposed seams are eliminated by adopting the lock head covering method.

另外,本实用新型对于造型模块为复杂造型的情况,采用仿型一体成型工艺,对造型模块中的弯线、复杂线条、弧型板也是采用一体成型工艺,区别于一般厂的多件板拼接打磨工艺,不仅生产加工方便,而且装饰效果好。In addition, the utility model adopts the imitation integrated molding process for the complex modeling of the modeling module, and also adopts the integrated molding process for the curved lines, complex lines, and arc-shaped plates in the modeling module, which is different from the splicing of multiple boards in general factories. The grinding process is not only convenient for production and processing, but also has a good decorative effect.

本实用新型与现有技术相比,第一,采用背景墙及其图形以模块拼接安装的方式,对背景墙进行合理的分割,将背景墙分成一些模块组件,在工厂内事先将各模块组件通过先进设备加工好,通过巧妙的组合,极大减少了现场拼接缝隙,从而提升了背景墙的整体装饰效果,且施工时间短,施工成本更低,安装一套背景墙只需1.5-2天的时间,大大缩短了施工时间。背景墙模块间具有一定的热变形空间,尺寸相对自由灵活,膨胀变形空间不受限,不易产生裂纹,对板材的尺寸无限制;Compared with the prior art, the utility model has the following advantages: firstly, the background wall and its graphics are spliced and installed in modules to reasonably divide the background wall, and the background wall is divided into some module components, and each module component is pre-assembled in the factory. It is processed by advanced equipment, and through ingenious combination, the splicing gaps on site are greatly reduced, thereby improving the overall decorative effect of the background wall, and the construction time is short and the construction cost is lower. It only takes 1.5-2 days to install a set of background walls time, greatly reducing the construction time. There is a certain thermal deformation space between the background wall modules, the size is relatively free and flexible, the expansion and deformation space is not limited, cracks are not easy to occur, and there is no limit to the size of the plate;

第二,本实用新型采用的干挂法涉及的挂件与石材的拉拨力测试值均在3KN以上,高于国家标准要求,完全达到抗震能力要求,使用寿命较长;防潮能力强,在南方一些梅雨季节较长的城市,也不受此影响;安装成本低,据统计,每套背景墙可节约安装成本近千元,产生一定的经济效益。Second, the test value of the pulling force of the pendant and the stone involved in the dry hanging method adopted by the utility model is above 3KN, which is higher than the requirements of the national standard, fully meets the requirements of earthquake resistance, and has a long service life; Some cities with a long rainy season are not affected by this; the installation cost is low. According to statistics, each set of background walls can save nearly 1,000 yuan in installation costs and produce certain economic benefits.

以上所述的仅是本实用新型的优选实施方式,应当指出,对于本领域的普通技术人员来说,在不脱离本实用新型创造构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。What is described above is only the preferred embodiment of the utility model, it should be pointed out that, for those of ordinary skill in the art, without departing from the premise of the utility model creative concept, some deformations and improvements can also be made. Belong to the protection scope of the utility model.

Claims (8)

1.一种背景墙及其图形拼接结构,其特征在于,它包括在建筑基层墙体上建立的龙骨支架、分成多组模块组件的背景墙主体,背景墙主体包括主背景石材面板、围绕主背景石材面板设置的护墙板、造型模块,造型模块背部加装背板安装块,背景石材面板、护墙板以及背板安装块上设置有挂件并通过挂件固定在龙骨支架上。 1. A background wall and its pattern splicing structure, is characterized in that, it comprises the keel support that builds on building base wall body, is divided into the background wall main body of many groups of module assemblies, and background wall main body comprises main background stone material panel, surrounds main The wall panel and modeling module set on the background stone panel, the back panel installation block is installed on the back of the modeling module, and the background stone panel, wall panel and back panel installation block are provided with pendants and fixed on the keel bracket through the pendant. 2.根据权利要求1所述的背景墙及其图形拼接结构,其特征在于,相邻的两组模块组件之间的拼接位采用的拼接方式包括:嵌入式结构,和/或采用V槽拼接过渡方式,和/或是采用锁头覆盖方式。 2. The background wall and its graphic splicing structure according to claim 1, characterized in that, the splicing methods adopted for the splicing positions between two adjacent groups of module components include: embedded structure, and/or V-groove splicing Transition, and/or use lock cover. 3.根据权利要求1所述的背景墙及其图形拼接结构,其特征在于,模块组件中有正面板材与侧面板材,正面板材与侧面板材的背部采用数块构成三角支撑结构的加强板或加强块固定。 3. The background wall and its graphic splicing structure according to claim 1, characterized in that, there are front panels and side panels in the module components, and the backs of the front panels and side panels are reinforced by several reinforcing plates or reinforcements forming a triangular support structure. block fixed. 4.根据权利要求1所述的背景墙及其图形拼接结构,其特征在于,模块组件中设置有带角位的装饰线条,装饰线条的角位拼接采用45度切角拼接方式。 4. The background wall and its graphic splicing structure according to claim 1, characterized in that, the modular components are provided with decorative lines with corners, and the corner splicing of the decorative lines adopts a 45-degree corner cutting splicing method. 5.根据权利要求1所述的背景墙及其图形拼接结构,其特征在于,主背景石材面板和/或护墙板包括外板框和芯板,采用镂空镶嵌方式,芯板嵌入外板框内,外板框的边角无接缝。 5. The background wall and its graphic splicing structure according to claim 1, characterized in that the main background stone panels and/or wall panels include an outer frame and a core board, and the hollow inlay method is adopted, and the core board is embedded in the outer frame The corners of the inner and outer frame are seamless. 6.根据权利要求1所述的背景墙及其图形拼接结构,其特征在于,构成所述护墙板的相邻两护墙板模块采用嵌入式拼接结构,护墙板模块二的端部设置有容护墙板模块一的端部插入的凹位,使得两者之间的平面接缝隐藏在凹位上缘的线条背部。 6. The background wall and its graphic splicing structure according to claim 1, characterized in that, the adjacent two clapboard modules constituting the clapboard adopt an embedded splicing structure, and the ends of the clapboard modules two are arranged There is a concave position for inserting the end of wall panel module one, so that the plane seam between the two is hidden behind the line on the upper edge of the concave position. 7.根据权利要求1所述的背景墙及其图形拼接结构,其特征在于,构成所述背景石材面板的背景石材面板模块采用多边形板块,边角连接的相互对应的多边形板块一和多边形板块二之间形成V槽,多边形板块三填充于V形槽内,使三者的拼接缝隙作为了整块背景石材面板的花纹的一部分。 7. The background wall and its graphic splicing structure according to claim 1, wherein the background stone panel module constituting the background stone panel adopts a polygonal plate, and the corresponding polygonal plate one and polygonal plate two connected by the corners A V-groove is formed between them, and three polygonal plates are filled in the V-shaped groove, so that the splicing gap between the three becomes part of the pattern of the entire background stone panel. 8.根据权利要求1或2所述的背景墙及其图形拼接结构,其特征在于,构成所述造型模块的模块组件之间的接缝外安装带有装饰盖的锁头,采用锁头覆盖方式,消除外露的接缝。 8. The background wall and its graphic splicing structure according to claim 1 or 2, characterized in that locks with decorative covers are installed outside the joints between the module components constituting the modeling modules, and the locks are used to cover way, eliminating exposed seams.
CN201520909875.3U 2015-11-13 2015-11-13 Wall and figure mosaic structure thereof Expired - Fee Related CN205276753U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520909875.3U CN205276753U (en) 2015-11-13 2015-11-13 Wall and figure mosaic structure thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520909875.3U CN205276753U (en) 2015-11-13 2015-11-13 Wall and figure mosaic structure thereof

Publications (1)

Publication Number Publication Date
CN205276753U true CN205276753U (en) 2016-06-01

Family

ID=56061337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520909875.3U Expired - Fee Related CN205276753U (en) 2015-11-13 2015-11-13 Wall and figure mosaic structure thereof

Country Status (1)

Country Link
CN (1) CN205276753U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108286319A (en) * 2018-03-16 2018-07-17 丰屋蔀家科技(深圳)有限公司 Furring tile cladding system and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108286319A (en) * 2018-03-16 2018-07-17 丰屋蔀家科技(深圳)有限公司 Furring tile cladding system and construction method

Similar Documents

Publication Publication Date Title
CN113323261A (en) Assembly type suspension rod-free suspended ceiling structure and mounting method thereof
CN104047406A (en) Construction process for ultra-thin stone-facing heat-preserving decorative plate
CN101131002A (en) Mould-locking assembled water-proof heat-insulating slab and construction method thereof
CN105064588A (en) A brand-new composite suspended ceiling and its installation method
CN205276753U (en) Wall and figure mosaic structure thereof
CN111075072A (en) The same frame and different sides unit curtain wall system
CN216616638U (en) A light-weight assembled decorative wall panel for kitchen and bathroom that can replace ceramic tiles
CN111139964B (en) An installation structure for an assembled prefabricated drop ceiling
CN105256969A (en) Installation method and structure of background wall
CN205077634U (en) Structure is handled to seam of wall
CN205077800U (en) Mounting structure of wall
CN205077805U (en) Dry pendant mounting structure of wall
CN105256966A (en) Background wall and graph splicing method and structure thereof
CN206418716U (en) A glass-ceramic plate
KR100899581B1 (en) Joining member for prefabricated wall finishing
CN205296504U (en) Refute glass curtain wall who connects claw stealthy
CN204456543U (en) Carry keel assembling curtain wall circuit board
CN204804136U (en) Mounting structure of inclined plane buckle and compound furred ceiling medium dip face
CN107237485B (en) Application method of board paving device
CN204781759U (en) House outer wall stand decorative aluminum buckle
CN107882289A (en) The bamboo line building decoration cladding panel structure and preparation method made using traditional rammed earth
CN209799074U (en) Curtain wall plugging integral encapsulation structure
CN206016169U (en) A kind of decoration line system and curtain wall
CN209194781U (en) A kind of Light-duty Quick-installation precast wall body system for exempting from coating
CN207686203U (en) The bamboo line building decoration cladding panel structure made using traditional rammed earth

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 517583 Guangdong Xian Heyuan Dongyuan Xian Tang Town Industrial Park (Guangdong high micro crystal technology Co., Ltd. factory building)

Patentee after: WANFENG COMPOUND STONE TECHNOLOGY Co.,Ltd.

Address before: 528300 Wan Feng, stone road, three Road revitalization Road, Shunde District, Foshan, Guangdong, 15, China.

Patentee before: WANFENG COMPOUND STONE TECHNOLOGY Co.,Ltd.

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160601

CF01 Termination of patent right due to non-payment of annual fee