CN205116749U - 用于大跨度钢结构整体滑移的轨道支撑装置 - Google Patents
用于大跨度钢结构整体滑移的轨道支撑装置 Download PDFInfo
- Publication number
- CN205116749U CN205116749U CN201520548647.8U CN201520548647U CN205116749U CN 205116749 U CN205116749 U CN 205116749U CN 201520548647 U CN201520548647 U CN 201520548647U CN 205116749 U CN205116749 U CN 205116749U
- Authority
- CN
- China
- Prior art keywords
- ground
- bailey bracket
- track
- split heads
- formula base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 24
- 239000010959 steel Substances 0.000 title claims abstract description 24
- 238000010276 construction Methods 0.000 title abstract description 9
- 230000002146 bilateral effect Effects 0.000 claims abstract description 4
- 229910000679 solder Inorganic materials 0.000 claims description 3
- 239000000463 material Substances 0.000 abstract description 3
- 235000015170 shellfish Nutrition 0.000 abstract 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000005484 gravity Effects 0.000 description 2
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520548647.8U CN205116749U (zh) | 2015-07-27 | 2015-07-27 | 用于大跨度钢结构整体滑移的轨道支撑装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520548647.8U CN205116749U (zh) | 2015-07-27 | 2015-07-27 | 用于大跨度钢结构整体滑移的轨道支撑装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205116749U true CN205116749U (zh) | 2016-03-30 |
Family
ID=55572368
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520548647.8U Expired - Fee Related CN205116749U (zh) | 2015-07-27 | 2015-07-27 | 用于大跨度钢结构整体滑移的轨道支撑装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205116749U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107090984A (zh) * | 2017-05-07 | 2017-08-25 | 中铁十八局集团有限公司 | 一种用于运行线上轻轨车站异形钢结构安装的牵引装置 |
CN114232481A (zh) * | 2021-11-25 | 2022-03-25 | 中交路桥华南工程有限公司 | 一种梁段滑移轨道系统 |
CN117052156A (zh) * | 2023-08-01 | 2023-11-14 | 上海宝冶集团有限公司 | 模块化可复用的滑移轨道梁装置 |
-
2015
- 2015-07-27 CN CN201520548647.8U patent/CN205116749U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107090984A (zh) * | 2017-05-07 | 2017-08-25 | 中铁十八局集团有限公司 | 一种用于运行线上轻轨车站异形钢结构安装的牵引装置 |
CN114232481A (zh) * | 2021-11-25 | 2022-03-25 | 中交路桥华南工程有限公司 | 一种梁段滑移轨道系统 |
CN114232481B (zh) * | 2021-11-25 | 2023-10-20 | 中交路桥华南工程有限公司 | 一种梁段滑移轨道系统 |
CN117052156A (zh) * | 2023-08-01 | 2023-11-14 | 上海宝冶集团有限公司 | 模块化可复用的滑移轨道梁装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9279260B2 (en) | Modular panel concrete form for self-lifting concrete form system | |
CN204326548U (zh) | 一种建筑地面找平装置 | |
RU2012102977A (ru) | Система опалубки перекрытий | |
CN103306208A (zh) | 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法 | |
CN205116749U (zh) | 用于大跨度钢结构整体滑移的轨道支撑装置 | |
CN204139569U (zh) | 滑移脚手架 | |
CN203729319U (zh) | 一种预埋环形分布地脚螺栓群的定位钢架 | |
CN203334664U (zh) | 超长悬挑桁架结构高空模板支撑系统 | |
CN106641461A (zh) | 一种可敷设三根石油管道的支架 | |
CN201924284U (zh) | 一种螺杆座管双拼贝雷架 | |
CN204475182U (zh) | 一种铁路桥墩墩顶吊篮的安装工装 | |
CN204510806U (zh) | 建筑清水模板托架系统的纵向边缘补位托架 | |
CN104499435B (zh) | 一种用于自锚式悬索桥散索鞍底座安装的托架 | |
CN203430009U (zh) | 一种施工悬挂挂篮 | |
CN204000632U (zh) | 一种基于反力架的沙箱预压装置 | |
CN203257080U (zh) | 一种建筑施工可调式悬挑支撑装置 | |
CN204919565U (zh) | 基坑支撑拆除使用的钢平台 | |
CN204418027U (zh) | 一种用于自锚式悬索桥散索鞍底座安装的托架 | |
CN204826727U (zh) | 一种可拆卸、周转的钢筋加工防护棚 | |
CN205259622U (zh) | 一种用于安装网架的操作平台 | |
CN203430006U (zh) | 一种用于建筑外墙施工的快速拆装悬挑支架 | |
CN209509487U (zh) | 一种可调节高度的支架及使用可调节高度的支架的支撑装置 | |
CN210324715U (zh) | 高强度电缆终端培训教学实验平台 | |
CN210888010U (zh) | 施工操作架 | |
RU150737U1 (ru) | Строительная вышка и настил с люком |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469 Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd. Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469 Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190801 Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469 Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd. Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd. Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469 Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160330 |
|
CF01 | Termination of patent right due to non-payment of annual fee |