[go: up one dir, main page]

CN205091004U - Coal petrography goes upward drilling gas parameter's survey system - Google Patents

Coal petrography goes upward drilling gas parameter's survey system Download PDF

Info

Publication number
CN205091004U
CN205091004U CN201520895354.7U CN201520895354U CN205091004U CN 205091004 U CN205091004 U CN 205091004U CN 201520895354 U CN201520895354 U CN 201520895354U CN 205091004 U CN205091004 U CN 205091004U
Authority
CN
China
Prior art keywords
pipe body
plugging
gas
borehole
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520895354.7U
Other languages
Chinese (zh)
Inventor
宋文成
赵春波
刘伟韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201520895354.7U priority Critical patent/CN205091004U/en
Application granted granted Critical
Publication of CN205091004U publication Critical patent/CN205091004U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

本实用新型公开了一种煤岩上行钻孔瓦斯参数的测定系统,其包括探收装置、封堵装置和测定装置,探收装置安装在钻孔内,封堵装置用于封闭钻孔,探收装置包括第一管体、第二管体和第三管体,第三管体伸入钻孔底部,第一管体位于钻孔的最外侧,第一管体与第二管体、第二管体与第三管体之间均为可拆卸式连接,第三管体的尾部上表面间隔均匀的设置有若干列管孔,相邻列数的管孔之间套置有圆柱铁环。本实用新型测定系统主要解决了松软煤岩中上行钻孔易塌陷,影响瓦斯参数的测量等问题;此外,由于该测定系统采用了电子装置,可以自动对瓦斯压力数据进行周期性的记录、存储和传输,减少了人工数据记录的次数。

The utility model discloses a measuring system for gas parameters of an upward drilling of coal and rock, which comprises a detecting device, a blocking device and a measuring device. The collection device includes a first pipe body, a second pipe body and a third pipe body, the third pipe body extends into the bottom of the borehole, the first pipe body is located at the outermost side of the borehole, the first pipe body and the second pipe body, the second pipe body Both the second pipe body and the third pipe body are detachably connected. The upper surface of the tail of the third pipe body is evenly spaced with several rows of pipe holes, and cylindrical iron rings are set between adjacent rows of pipe holes. . The measurement system of the utility model mainly solves the problems that the upward drilling in the soft coal rock is easy to collapse and affects the measurement of gas parameters; in addition, because the measurement system uses an electronic device, it can automatically record and store the gas pressure data periodically and transmission, reducing the number of manual data records.

Description

煤岩上行钻孔瓦斯参数的测定系统Measuring System of Gas Parameters in Upstream Drilling of Coal and Rock

技术领域technical field

本实用新型属于矿山煤岩上行钻孔瓦斯参数的测定技术领域,具体涉及一种煤岩上行钻孔瓦斯参数的测定系统。The utility model belongs to the technical field of measuring gas parameters of coal and rock upward drilling, and in particular relates to a measuring system for gas parameters of coal and rock upward drilling.

背景技术Background technique

瓦斯压力和瓦斯含量是标志煤层瓦斯赋存状态的重要参数。在研究矿井煤与瓦斯突出、瓦斯涌出、瓦斯抽放时,它是一个关键性的基础参数,因此为研究煤层瓦斯的赋存及涌出的规律,有必要进行煤层瓦斯压力和瓦斯含量的测定。根据煤炭行业标准MT/T638-1996《煤矿井下煤层瓦斯压力的直接测定方法》的规定,测压钻场应选在邻近煤层的巷道中,一般应选择在完整坚硬的煤岩中打上行钻孔,如果在松软煤岩中打孔测量,易出现钻孔塌陷,压埋瓦斯测量孔,无法抽采瓦斯,导致瓦斯参数测量不准确,影响瓦斯参数的测定效果。Gas pressure and gas content are important parameters to indicate the state of coal seam gas occurrence. It is a key basic parameter in the study of coal and gas outburst, gas gushing, and gas drainage in mines. Therefore, in order to study the law of coal seam gas occurrence and gushing, it is necessary to carry out coal seam gas pressure and gas content. Determination. According to the provisions of the coal industry standard MT/T638-1996 "Direct Measurement Method of Coal Seam Gas Pressure in Underground Coal Mine", the pressure measurement drilling site should be selected in the roadway adjacent to the coal seam, and generally the upward drilling should be drilled in the complete and hard coal rock If the measurement is drilled in soft coal rocks, the drill hole will easily collapse, and the gas measurement hole will be buried, making it impossible to extract gas, resulting in inaccurate measurement of gas parameters and affecting the measurement effect of gas parameters.

然而,在地层构造形态复杂或巷道布置在松软岩层的情况下,有必要采用在松软煤岩中打上行钻孔进行瓦斯参数的抽采测量,而传统的瓦斯测量装置不能有效的解决的松软煤岩中瓦斯测量问题。However, in the case of complex stratum structures or roadways arranged in soft rock formations, it is necessary to use upward drilling in soft coal rocks for gas extraction measurement, and traditional gas measurement devices cannot effectively solve the problem of soft coal. Problems of gas measurement in rocks.

实用新型内容Utility model content

本实用新型的目的在于提供一种煤岩上行钻孔瓦斯参数的测定系统,该系统主要解决了松软煤岩中上行钻孔易塌陷,影响瓦斯参数的测量等问题;此外,由于该测定系统采用了电子装置,可以自动对瓦斯压力数据进行周期性的记录、存储和传输,减少了人工数据记录的次数。The purpose of this utility model is to provide a gas parameter measurement system for upward drilling of coal rocks. This system mainly solves the problems that the upward drilling in soft coal rocks is easy to collapse and affects the measurement of gas parameters. In addition, because the measurement system uses The electronic device can automatically record, store and transmit the gas pressure data periodically, reducing the number of manual data recording.

其技术解决方案包括:Its technical solutions include:

一种煤岩上行钻孔瓦斯参数的测定系统,其包括探收装置、封堵装置和测定装置,所述探收装置安装在所述钻孔内,所述封堵装置用于封闭所述钻孔,A system for measuring gas parameters in an upward drilling of coal rocks, which includes a detection device, a plugging device and a measurement device, the detection device is installed in the borehole, and the plugging device is used to seal the drill hole,

所述探收装置包括第一管体、第二管体和第三管体,所述第三管体伸入所述钻孔底部,所述第一管体位于所述钻孔的最外侧,所述第一管体与第二管体、第二管体与第三管体之间均为可拆卸式连接,所述第三管体的尾部上表面间隔均匀的设置有若干列管孔,相邻列数的管孔之间套置有圆柱铁环;The detecting device includes a first pipe body, a second pipe body and a third pipe body, the third pipe body extends into the bottom of the borehole, the first pipe body is located at the outermost side of the borehole, The first pipe body and the second pipe body, the second pipe body and the third pipe body are all detachably connected, and the upper surface of the tail of the third pipe body is provided with a plurality of tube holes evenly spaced, Cylindrical iron rings are set between adjacent rows of pipe holes;

所述封堵装置包括封堵胶囊、胶囊连接管和胶囊操作台,所述封堵胶囊有若干个,每个封堵胶囊间隔排列套置在所述第三管体的前部和中部,相邻的封堵胶囊与钻孔之间形成封堵室,所述封堵室通过高压胶管连接有封堵操作台,所述封堵操作台用于向所述封堵室内提供封堵液;The blocking device includes a blocking capsule, a capsule connecting pipe, and a capsule operating platform. There are several blocking capsules, and each blocking capsule is arranged at intervals and nested in the front and middle of the third pipe body, correspondingly A plugging chamber is formed between the adjacent plugging capsule and the borehole, and the plugging chamber is connected with a plugging operation table through a high-pressure rubber hose, and the plugging operation table is used to provide the blocking liquid to the blocking chamber;

所述第一管体的前部连接所述测定装置,所述测定装置用于测定钻孔内的瓦斯参数。The front part of the first pipe body is connected with the measuring device, and the measuring device is used for measuring gas parameters in the borehole.

作为本实用新型的一个优选方案,所述测定装置包括依次连接的瓦斯压力表、电子压力测量仪和瓦斯收集分析罐,所述瓦斯压力表与第一管体的前部连接。As a preferred solution of the present invention, the measuring device includes a gas pressure gauge, an electronic pressure measuring instrument and a gas collection and analysis tank connected in sequence, and the gas pressure gauge is connected to the front of the first pipe body.

作为本实用新型的另一个优选方案,所述第三管体的尾部上表面间隔均匀的设置有3~6列管孔,并且每列的管孔设置有3个。As another preferred solution of the present invention, 3 to 6 rows of tube holes are evenly spaced on the upper surface of the tail of the third tube body, and each row of tube holes is provided with 3 tube holes.

优选的,所述第二管体的两端均设置有螺纹,所述第一管体和第二管体、第二管体和第三管体通过螺纹配合连接。Preferably, both ends of the second pipe body are provided with threads, and the first pipe body and the second pipe body, and the second pipe body and the third pipe body are connected by thread fitting.

在上述第一管体和第二管体,第二管体和第三管体的连接处由内置式橡胶垫圈进行密封并且封堵胶囊设置有两个,分别套置在第三管体的前部和中部。The connection between the first pipe body and the second pipe body, the second pipe body and the third pipe body is sealed by a built-in rubber gasket and there are two plugging capsules, which are respectively sleeved in front of the third pipe body. Ministry and Central.

本实用新型所带来的有益技术效果:Beneficial technical effects brought by the utility model:

本实用新型煤岩上行钻孔瓦斯参数测定系统,与现有技术相比,一方面,探收装置由可拆卸的第一管体、第二管体和第三管体组成,三段管体可实现快速拆卸与连接,且通过螺纹连接安装方便,根据钻孔深度可选择探收装置的长度;另一方面,在第三管体的尾部上表面沿长度方向间隔均匀的设置有若干列管孔,相邻列数的管孔之间套置有圆柱铁环,将第三管体安装在钻孔中,圆柱铁环的作用可抑制钻孔塌陷,可保证瓦斯顺畅的流入管孔中,确保瓦斯抽采效果。Compared with the prior art, the utility model coal and rock upward drilling gas parameter measurement system, on the one hand, the detecting device is composed of a detachable first pipe body, a second pipe body and a third pipe body, and the three-section pipe body Quick disassembly and connection can be realized, and the installation is convenient through threaded connection. The length of the detection device can be selected according to the drilling depth; There are cylindrical iron rings set between adjacent rows of pipe holes, and the third pipe body is installed in the boreholes. The function of the cylindrical iron rings can suppress the collapse of the boreholes and ensure the smooth flow of gas into the pipe holes. Ensure gas extraction effect.

封堵装置用于封闭钻孔,封堵松软煤岩裂隙,防止瓦斯从裂隙中散逸,影响瓦斯参数的测定。The plugging device is used to seal the borehole, plug the fissures of soft coal and rock, prevent gas from escaping from the fissures, and affect the measurement of gas parameters.

本实用新型在探收装置与封堵装置的结合下,进而选用测定装置进行瓦斯参数测定,能够较好的克服传统松软煤岩上行钻孔易塌陷对瓦斯参数测定的影响,尤其适用于松软煤岩上行钻孔中对瓦斯参数的测定,确保了松软煤岩瓦斯抽采及其瓦斯参数的精确测定。The utility model combines the detection device and the plugging device, and then selects the measuring device to measure the gas parameters, which can better overcome the influence of the traditional soft coal rock upward drilling that is easy to collapse on the gas parameter measurement, and is especially suitable for soft coal The determination of gas parameters in the upward drilling of rocks ensures the gas drainage of soft coal rocks and the accurate determination of gas parameters.

附图说明Description of drawings

下面结合附图对本实用新型做进一步说明:Below in conjunction with accompanying drawing, the utility model is further described:

图1为本实用新型煤岩上行钻孔瓦斯参数测定系统的结构示意图;Fig. 1 is the structure schematic diagram of the gas parameter measuring system of the coal rock upward drilling of the utility model;

图2为煤岩上行钻孔瓦斯参数测定系统中钻孔施工图;Fig. 2 is a drilling construction diagram in the gas parameter measurement system for coal and rock upward drilling;

图3为煤岩上行钻孔瓦斯参数测定系统中探收装置结构示意图;Fig. 3 is a schematic diagram of the structure of the detection device in the gas parameter measurement system for coal and rock uphole drilling;

图4为煤岩上行钻孔瓦斯参数测定系统中封堵装置部分结构示意图;Fig. 4 is a schematic diagram of the partial structure of the plugging device in the gas parameter measurement system for coal and rock uphole drilling;

图中,1、钻孔,2、第三管体,3、封堵胶囊,4、第二管体,5、封堵室,6、封堵液,7、胶囊连接管,8、高压胶管,9、胶囊操作台,10、封堵操作台,11、开关,12、瓦斯压力表,13、电子压力测量仪,14、瓦斯收集分析罐,15、圆柱铁环,16、管孔,17、内置式橡胶垫圈,18、第一管体,19、钻机,20、混凝土封堵料,21、煤层。In the figure, 1. drilling, 2. third pipe body, 3. plugging capsule, 4. second pipe body, 5. plugging chamber, 6. plugging liquid, 7. capsule connecting pipe, 8. high-pressure hose , 9. Capsule operating table, 10. Blocking operating table, 11. Switch, 12. Gas pressure gauge, 13. Electronic pressure measuring instrument, 14. Gas collection and analysis tank, 15. Cylindrical iron ring, 16. Tube hole, 17 , Built-in rubber gasket, 18, the first pipe body, 19, drilling rig, 20, concrete sealing material, 21, coal seam.

具体实施方式detailed description

下面结合具体实施例对本实用新型做进一步清楚、完整的说明。The utility model is further clearly and completely described below in conjunction with specific embodiments.

本实用新型煤岩上行钻孔瓦斯参数测定系统,结合图1和图2所示,主要包括探收装置、封堵装置和测定装置。The utility model gas parameter measurement system for upward drilling of coal rocks, as shown in Fig. 1 and Fig. 2, mainly includes a detection device, a plugging device and a measurement device.

探收装置,包括依次连接的第一管体18、第二管体4和第三管体2,其中,第三管体2伸入钻孔1底部,第一管体18位于钻孔1的最外侧,第一管体18可以为现有技术中的钻杆等,第二管体4的两端设置有螺纹,其两端分别与第一管体、第三管体内的结构相匹配,可实现快速可拆卸连接,结合图3和图4所示,为了连接更加紧密,可优选在第一管体18和第二管体4、第二管体4和第三管体2的连接处由内置式橡胶垫圈17进行密封,可拆卸式连接的第一管体、第二管体和第三管体可以满足实际测定过程中对于不同深度钻孔的需求,如钻孔较深的情况下,可以选择更换较长的第二管体,可酌情增减。The detection device includes a first pipe body 18, a second pipe body 4 and a third pipe body 2 connected in sequence, wherein the third pipe body 2 extends into the bottom of the borehole 1, and the first pipe body 18 is located at the bottom of the borehole 1 Outermost, the first pipe body 18 can be the drilling rod etc. in the prior art, and the two ends of the second pipe body 4 are provided with threads, and its two ends are respectively matched with the structure in the first pipe body and the third pipe body, Quick and detachable connection can be realized, as shown in Figure 3 and Figure 4, in order to connect more closely, it can be preferably at the connection between the first pipe body 18 and the second pipe body 4, the second pipe body 4 and the third pipe body 2 Sealed by the built-in rubber gasket 17, the detachable connection of the first pipe body, the second pipe body and the third pipe body can meet the needs of different depths of drilling in the actual measurement process, such as the case of deep drilling , you can choose to replace the longer second tube body, which can be increased or decreased as appropriate.

在上述第三管体的尾部沿长度方向间隔均匀的设置有若干列管孔16,本实用新型优选设置有4列,此数量的管孔16可以满足本实用新型测定要求,在相邻列数的管孔之间套置有圆柱铁环15,圆柱铁环为实心结构可以防止钻孔塌陷,每列管孔优选为3个,圆柱铁环将相邻列的管孔隔开,并且不会阻挡管孔。At the afterbody of the above-mentioned third pipe body, several tube holes 16 are evenly spaced along the length direction. The utility model is preferably provided with 4 rows. The tube holes 16 of this number can meet the measurement requirements of the utility model. A cylindrical iron ring 15 is sleeved between the pipe holes, and the cylindrical iron ring is a solid structure that can prevent the borehole from collapsing. Each row of pipe holes is preferably 3, and the cylindrical iron ring separates the pipe holes of adjacent rows, and will not Block the tube hole.

封堵装置,包括封堵胶囊3、胶囊连接管7、胶囊操作台9、封堵操作台10和高压胶管8,封堵胶囊根据实际情况可以设置有多个,或根据第三管体以及钻孔的深度设置,本实用新型优选封堵胶囊有两个,两个封堵胶囊依次间隔套置在第三管体的前部和中部,两个封堵胶囊通过胶囊连接管7与胶囊操作台10连接,通过胶囊操作台10向封堵胶囊内注入封堵液6,两个注满封堵液的封堵胶囊3与钻孔之间形成封堵室5,封堵室5通过高压胶管8与封堵操作台10连接,通过封堵操作台10向封堵室5内提供封堵液6。The plugging device includes a plugging capsule 3, a capsule connecting pipe 7, a capsule operation table 9, a plugging operation table 10 and a high-pressure rubber hose 8, and a plurality of plugging capsules can be provided according to the actual situation, or according to the third pipe body and the drill The depth of the hole is set. The utility model preferably has two plugging capsules, and the two plugging capsules are sequentially placed in the front and middle of the third pipe body at intervals. The two plugging capsules are connected to the capsule operating table through the capsule connecting pipe 7 10 connection, through the capsule operating table 10 to inject the plugging fluid 6 into the plugging capsule, the plugging chamber 5 is formed between the two plugging capsules 3 filled with the plugging fluid and the drilled hole, and the plugging chamber 5 passes through the high-pressure rubber hose 8 It is connected with the plugging operation platform 10, and the plugging fluid 6 is provided into the blocking chamber 5 through the plugging operation table 10.

上述用于提供封堵液的胶囊操作台9和封堵操作台10的结构可采用现有技术中的结构,此处不再做详细冗述。The structures of the capsule operation console 9 and the plugging operation console 10 for providing the plugging fluid above can adopt the structures in the prior art, and will not be described in detail here.

测定装置,包括开关11、瓦斯压力表12、电子压力测量仪13和瓦斯收集分析罐14,其中,瓦斯压力表12与第一管体连接,开关11用于控制瓦斯流的开启与关闭,瓦斯压力表12为机械式压力表,用于检测瓦斯压力,电子压力测量仪13可连接计算机获取监测到的实时瓦斯压力数据,形成电子数据,并与瓦斯压力表12相互监测纠正。The measurement device includes a switch 11, a gas pressure gauge 12, an electronic pressure measuring instrument 13 and a gas collection and analysis tank 14, wherein the gas pressure gauge 12 is connected to the first pipe body, and the switch 11 is used to control the opening and closing of the gas flow. The pressure gauge 12 is a mechanical pressure gauge for detecting gas pressure. The electronic pressure measuring instrument 13 can be connected to a computer to obtain the monitored real-time gas pressure data, form electronic data, and monitor and correct each other with the gas pressure gauge 12 .

胶囊操作台9向封堵胶囊3输入封堵液6的压力应大于瓦斯压力和封堵室5中封堵液6的压力。The pressure of the plugging fluid 6 input by the capsule operating platform 9 to the plugging capsule 3 should be greater than the gas pressure and the pressure of the plugging fluid 6 in the plugging chamber 5 .

上述测定系统的具体测定方法,具体包括以下步骤:The concrete assay method of above-mentioned assay system specifically comprises the following steps:

(1)打钻孔:用常规的煤矿钻机19在煤岩巷道中向煤层21打上行钻孔,孔深达到煤层;(1) Drilling: use a conventional coal mine drilling rig 19 to drill an upward borehole to the coal seam 21 in the coal rock roadway, and the hole depth reaches the coal seam;

(2)安装瓦斯探收装置:清理钻孔1中的杂物,在钻孔1中安装第三管体2,将第三管体2与第二管体4通过螺纹快速连接,并利用钻机19和第一管体18将其送达钻孔1深部;(2) Install the gas detection device: clean up the debris in the borehole 1, install the third pipe body 2 in the borehole 1, quickly connect the third pipe body 2 and the second pipe body 4 through threads, and use the drilling rig 19 and the first pipe body 18 deliver it to the deep part of the borehole 1;

(3)封闭钻孔:首先将封堵胶囊3通过高压胶管8与封堵操作台10连接,通过封堵操作台10向封堵胶囊3内注入封堵液,当封堵胶囊3内的封堵液达到一定量时膨胀,与钻孔形成封堵室,然后将封堵室通过高压胶管与封堵操作台连接,并通过封堵操作台向封堵室内提供封堵液,其中,控制封堵胶囊中的封堵液压力稍高于瓦斯气体压力和封堵室中封堵液的压力,最后利用混凝土封堵料20将剩余部分进行封口处理;(3) Sealing the borehole: first, the plugging capsule 3 is connected to the plugging console 10 through the high-pressure rubber hose 8, and the plugging fluid is injected into the plugging capsule 3 through the plugging console 10. When the plugging liquid reaches a certain amount, it expands and forms a plugging chamber with the drilled hole. Then the plugging chamber is connected to the plugging operation table through a high-pressure rubber hose, and the plugging liquid is supplied to the plugging chamber through the plugging operation table. The pressure of the plugging fluid in the plugging capsule is slightly higher than the gas pressure and the pressure of the plugging fluid in the plugging chamber, and finally the remaining part is sealed with concrete plugging material 20;

(4)耐压试验:封孔完毕后,做耐压试验对封孔效果进行检验,若封孔不合格,则需重新封孔;(4) Pressure test: After the sealing is completed, do a pressure test to check the sealing effect. If the sealing is unqualified, you need to re-seal the hole;

(5)测定瓦斯参数:耐压试验完毕后,进行瓦斯参数测定,即打开开关,待压力表12稳定后,读取压力表12示数,压力表12读数显示封孔内瓦斯压力的数值,电子压力测量仪13将瓦斯压力数值周期性的记录、存储、传输,最后将瓦斯收集至瓦斯收集分析罐14中,进行成分和含量分析。(5) Measuring gas parameters: After the withstand voltage test is completed, measure the gas parameters, that is, turn on the switch, and read the reading of the pressure gauge 12 after the pressure gauge 12 is stable. The reading of the pressure gauge 12 shows the value of the gas pressure in the sealed hole. The electronic pressure measuring instrument 13 periodically records, stores, and transmits the gas pressure value, and finally collects the gas into the gas collection and analysis tank 14 for component and content analysis.

上述未述及的部分采用或借鉴已有技术即可实现。The parts not mentioned above can be realized by adopting or referring to existing technologies.

上述实施例仅是对本实用新型的一个说明,而并非限定,封堵胶囊以及每个管体所测钻孔长度均可根据现场实际情况来改变,本领域技术人员在本实用新型的启示下,得出的可拆卸式连接的其它管体也应在本实用新型的保护范围之内。The above-mentioned embodiment is only an illustration of the utility model, but not a limitation. The length of the plugging capsule and the measured borehole of each pipe body can be changed according to the actual situation on site. Those skilled in the art, under the inspiration of the utility model, The obtained detachably connected other pipe bodies should also fall within the protection scope of the present utility model.

Claims (4)

1.一种煤岩上行钻孔瓦斯参数的测定系统,其包括探收装置、封堵装置和测定装置,所述探收装置安装在所述钻孔内,所述封堵装置用于封闭所述钻孔,其特征在于:1. A measurement system for coal and rock upward drilling gas parameters, which includes a detection device, a plugging device and a measurement device, the detection device is installed in the borehole, and the plugging device is used to seal the Said borehole is characterized in that: 所述探收装置包括第一管体、第二管体和第三管体,所述第三管体伸入所述钻孔底部,所述第一管体位于所述钻孔的最外侧,所述第一管体与第二管体、第二管体与第三管体之间均为可拆卸式连接,所述第三管体的尾部上表面间隔均匀的设置有若干列管孔,相邻列数的管孔之间套置有圆柱铁环;The detecting device includes a first pipe body, a second pipe body and a third pipe body, the third pipe body extends into the bottom of the borehole, the first pipe body is located at the outermost side of the borehole, The first pipe body and the second pipe body, the second pipe body and the third pipe body are all detachably connected, and the upper surface of the tail of the third pipe body is provided with a plurality of tube holes evenly spaced, Cylindrical iron rings are set between adjacent rows of pipe holes; 所述封堵装置包括封堵胶囊、胶囊连接管和胶囊操作台,所述封堵胶囊有若干个,每个封堵胶囊间隔排列套置在所述第三管体的前部和中部,相邻的封堵胶囊与钻孔之间形成封堵室,所述封堵室通过高压胶管连接有封堵操作台,所述封堵操作台用于向所述封堵室内提供封堵液;The blocking device includes a blocking capsule, a capsule connecting pipe, and a capsule operating platform. There are several blocking capsules, and each blocking capsule is arranged at intervals and nested in the front and middle of the third pipe body, correspondingly A plugging chamber is formed between the adjacent plugging capsule and the borehole, and the plugging chamber is connected with a plugging operation table through a high-pressure rubber hose, and the plugging operation table is used to provide the blocking liquid to the blocking chamber; 所述第一管体的前部连接所述测定装置,所述测定装置用于测定钻孔内的瓦斯参数。The front part of the first pipe body is connected with the measuring device, and the measuring device is used for measuring gas parameters in the borehole. 2.根据权利要求1所述的煤岩上行钻孔瓦斯参数的测定系统,其特征在于:所述测定装置包括依次连接的瓦斯压力表、电子压力测量仪和瓦斯收集分析罐,所述瓦斯压力表与第一管体的前部连接。2. The measuring system for gas parameters of upward drilling of coal and rock according to claim 1, characterized in that: said measuring device comprises a gas pressure gauge, an electronic pressure measuring instrument and a gas collection and analysis tank connected in sequence, and said gas pressure The table is connected to the front of the first pipe body. 3.根据权利要求1所述的煤岩上行钻孔瓦斯参数的测定系统,其特征在于:所述第三管体的尾部上表面间隔均匀的设置有3~6列管孔,并且每列的管孔设置有3个。3. The system for measuring gas parameters in upward drilling of coal and rock according to claim 1, characterized in that: the upper surface of the tail of the third pipe body is evenly spaced with 3 to 6 rows of pipe holes, and each row There are 3 tube holes. 4.根据权利要求1所述的煤岩上行钻孔瓦斯参数的测定系统,其特征在于:所述第二管体的两端均设置有螺纹,所述第一管体和第二管体、第二管体和第三管体通过螺纹配合连接。4. The system for measuring gas parameters in upward drilling of coal and rock according to claim 1, characterized in that: both ends of the second pipe body are provided with threads, and the first pipe body and the second pipe body, The second pipe body and the third pipe body are connected through thread fitting.
CN201520895354.7U 2015-11-11 2015-11-11 Coal petrography goes upward drilling gas parameter's survey system Expired - Fee Related CN205091004U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520895354.7U CN205091004U (en) 2015-11-11 2015-11-11 Coal petrography goes upward drilling gas parameter's survey system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520895354.7U CN205091004U (en) 2015-11-11 2015-11-11 Coal petrography goes upward drilling gas parameter's survey system

Publications (1)

Publication Number Publication Date
CN205091004U true CN205091004U (en) 2016-03-16

Family

ID=55481679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520895354.7U Expired - Fee Related CN205091004U (en) 2015-11-11 2015-11-11 Coal petrography goes upward drilling gas parameter's survey system

Country Status (1)

Country Link
CN (1) CN205091004U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105333905A (en) * 2015-11-11 2016-02-17 山东科技大学 Coal rock upward borehole gas parameter measurement system
CN109296361A (en) * 2018-10-25 2019-02-01 平顶山天安煤业股份有限公司 A gas pressure measurement system in coal seam mining fracture field

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105333905A (en) * 2015-11-11 2016-02-17 山东科技大学 Coal rock upward borehole gas parameter measurement system
CN109296361A (en) * 2018-10-25 2019-02-01 平顶山天安煤业股份有限公司 A gas pressure measurement system in coal seam mining fracture field

Similar Documents

Publication Publication Date Title
CN105333904B (en) The assay method of the up drilling gas parameter of coal petrography
CN109372581B (en) Roof stratum horizontal extrusion force monitoring device and use method
CN104132761A (en) Multipoint coal and rock mass stress real-time monitoring device and method
CN105804787B (en) The method of coal petrography cranny development height is covered on a kind of measurement stope working surface of coal mines
CN201671622U (en) Coal mine overlying strata water-conducting crack belt upward hole observer
CN103147737A (en) Drilling detection method for disclosing law of overburden failure in ascending mining
CN102445710B (en) Detecting drilling device for monitoring system of cover-rock water flowing fractured zone
CN103147741B (en) Coal bed roadside pressure relief zone width measuring method based on drill hole gas leakage
CN102944906B (en) The fine search observation procedure of crack of coal-mine roof form and evolutionary process thereof
CN109296361A (en) A gas pressure measurement system in coal seam mining fracture field
CN110107284B (en) Drilling and testing system and method for detecting height of water flowing fractured zone through water pressure
CN105386754A (en) Observation system used for ascending drilling gas pressure of mine soft coal rock
CN107503727A (en) A kind of layer hydraulic fracturing scope of wearing based on in-situ stress monitoring investigates method
CN110056342A (en) A kind of drilling gas injection determines the gas injection device and method of hollow mining feasibility
CN104405372A (en) Method for testing vertical three zone heights of stope cover rock based on high level borehole flow
CN104391042B (en) Method of Ultrasonic Detecting Cracks in Deep Rocks of Roof and Floor in Goaf of Mine
CN106401557B (en) A method for jointly testing coal seam gas content and gas pressure to determine effective drilling radius
CN106405678A (en) Mining overlying strata water flowing fracture zone height detection method based on stress monitoring
CN106988738B (en) A Detecting Method for Determining the Characteristics of In-situ Stress Distribution
CN105333905B (en) The measurement system of the up drilling gas parameter of coal petrography
CN107227954B (en) A fast observation and analysis method for coal spontaneous combustion three zones in goaf
CN104763406A (en) Method for measuring extraction influence radius based on bedding drilling gas emission characteristics
CN205091004U (en) Coal petrography goes upward drilling gas parameter's survey system
CN203669931U (en) Multipoint stress detector for testing roadway surrounding rock broken rock zone
CN107725029A (en) A kind of underground coal mine long drilled holes gas flow test device and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160316

Termination date: 20161111