CN204967145U - Machine is put to communications cable engineering construction pipeline cable cloth - Google Patents
Machine is put to communications cable engineering construction pipeline cable cloth Download PDFInfo
- Publication number
- CN204967145U CN204967145U CN201520690369.XU CN201520690369U CN204967145U CN 204967145 U CN204967145 U CN 204967145U CN 201520690369 U CN201520690369 U CN 201520690369U CN 204967145 U CN204967145 U CN 204967145U
- Authority
- CN
- China
- Prior art keywords
- cable
- box
- engineering construction
- machine
- upper box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 238000004891 communication Methods 0.000 title claims abstract description 24
- 239000004744 fabric Substances 0.000 title abstract 4
- 230000005540 biological transmission Effects 0.000 claims abstract description 6
- 238000013461 design Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 abstract description 5
- 238000012423 maintenance Methods 0.000 abstract description 4
- 230000004224 protection Effects 0.000 abstract description 4
- 230000009977 dual effect Effects 0.000 abstract 1
- 230000001012 protector Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000008358 core component Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
- Electric Cable Installation (AREA)
Abstract
The utility model discloses a machine is put to communications cable engineering construction pipeline cable cloth, including box and delivery wheel and actuating mechanism, the level is provided with two pairs of principal and subordinate's complex cell type drive wheels in last box, actuating mechanism sets up internally at the nowel, and including motor and infinitely variable device, infinitely variable device output shaft is connected rather than initiative cell type drive wheel pivot transmission, go up the box around the side be provided with respectively and support cover and backup pad, install pinch roller and pinch roller down respectively in the upper and lower part of backup pad, the cable overlaps from supporting, between the two pairs of cell type drive wheels and pass through between the upper and lower pinch roller. Pipeline cable cloth is put the machine and is taked techniques such as modularized design, motor drive, infinitely variable speed adjustment, pressure intelligent control, trouble automatic protection, commercial power or the power supply of generator dual mode all can, small, be convenient for take and go and the maintenance, mainly used communication pipe's mediation and pipeline cable cloth are put. The reduction personnel drop into, alleviate intensity of labour, improve construction efficiency, ensure the engineering quality.
Description
Technical field
The utility model belongs to communications cable engineering construction equipment technical field, specifically a kind of communications cable engineering construction pipeline cable placing in machine.
Background technology
At present, communication pipe dredging is constructed with cable wiring, the artificial system of laying of main employing.Artificial system of laying possesses the construction ability under various complex environment, but this kind of mode exists the problems such as consumption manpower is many, efficiency of construction is low, coordinative command is difficult, can not meet modern construction requirement, specific as follows:
1. communication pipe is generally in underground, affects by objective environment, the inner easily water inlet of pore and alluvial earth.Before cable wiring, need at substantial manpower and time, planning pipeline is dredged.
2., during cable wiring, easily there is the phenomenon such as twisting, " killing button " in cable, affect efficiency of construction and project quality in people's well.
3. adopt manual type to lay pipeline cable, it is even that very difficult guarantee lays speed, and pulling force is difficult to control, and laying in process the tension stress be applied on cable cannot limit, particularly optical cable, easily occurs " fatigue " effect, thus shortening optical cable useful life.
4. adopt manual type tissue tract cable construction, need point dredge, lay, multiple steps such as dish of falling carry out, tissue accuse work in coordination with difficulty, labour intensity is large, efficiency of construction is low.
Utility model content
The purpose of this utility model is the many drawbacks laying pipeline cable in order to solve Traditional Man, reduces human input, reduces labour intensity, improves construction usefulness, provides a kind of communications cable engineering construction pipeline cable placing in machine.
Realize the technical scheme of foregoing invention object: a kind of communications cable engineering construction pipeline cable placing in machine, comprise casing and delivery wheel and driving mechanism, described casing comprises lower box and upper box, in upper box, be horizontally disposed with two to the grooved driving wheel coordinated, the rotating shaft of each grooved driving wheel is vertically arranged between the upper and lower plate of upper box; Driving mechanism is arranged in lower box, comprises motor and stepless speed change device, and stepless speed change device output shaft is connected with active grooved driving wheel rotating shaft transmission; Be respectively arranged with support set and supporting bracket in the side, front and back of described upper box, be separately installed with upper pressure wheel and lower pressure wheel in the upper and lower part of supporting bracket, cable is between support set, two pairs of grooved driving wheels and pass through between upper and lower pinch roller.
The governor motion that can regulate often pair of grooved driving wheel rotating shaft width is provided with in the side of described upper box.
Described governor motion arranges width adjustment mechanism in side grooved driving wheel roller end, and be provided with width adjusting screw rod, and the end of width adjusting screw rod stretches out upper box one rear flank and is provided with width adjusting wheel.
The upper middle side part of described upper box is provided with opening, and A/F is not less than and is transferred cable diameter.
The both sides of described lower box are provided with handle.
Beneficial effect: 1. intelligent pressure adjusting device.For guaranteeing to provide enough motive forces to dredging bars, and not damaging dredging bars again, needing to adopt pressure-regulating device, guaranteeing the coefficient of friction that each stress point keeps certain, 2 groups of driving wheels can equably by conducting power to dredging bars.
2. are automatic protector for faults.Pipeline cable placing in machine supports the use in process, when single device breaks down, can guarantee all the other two equipment auto-breaking protections.
3. make device miniaturization.Person well of communication pipeline diameter is generally at 55-60cm, and in people's well, space is very limited, and pipeline cable placing in machine needs to be placed on operation in people's well, and the utility model pipeline cable placing in machine volume is unsuitable excessive, miniaturized.
4. make EM equipment module.For ease of equipment portable and maintenance, power set, drive unit, speed change and servicing unit are carried out modularized design, very crucial.
5. the utility model can realize the synchronization mechanism equalization of communication pipe dredging and pipeline cable wiring, reduce human input, reduce labor intensity, guarantee project quality, improve construction usefulness, its economic benefit is comparatively large, present society does not also have the equipment of similar shaping, has certain application value.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the A-A cross-sectional view of Fig. 1;
Fig. 3 is using state schematic diagram of the present utility model.
In figure, label 1 is lower box, and 2 is upper box, and 3 is motor, 4 is stepless speed change device, and 5 is driving shaft, and 6 is driven shaft, and 7 is active grooved driving wheel, 8 is driven grooved driving wheel, and 9 is support set, and 10 is supporting bracket, and 11 is upper pressure wheel, 12 is lower pressure wheel, and 13 is terminal box, and 14 is width adjusting wheel, 15 is width adjustment mechanism, and 16 is cable, and 171,172,173 are respectively No. 1, No. 2 and No. 3 people's wells, 18 is ground, and 19 is underground communication pipeline, and 20 is take-up pulley.
Embodiment
See Fig. 1, communications cable engineering construction pipeline cable placing in machine comprises casing and delivery wheel and driving mechanism, described casing comprises lower box and upper box, in upper box, be horizontally disposed with two to the grooved driving wheel coordinated, the rotating shaft of each grooved driving wheel is vertically arranged between the upper and lower plate of upper box; Driving mechanism is arranged in lower box, comprises motor and stepless speed change device, and stepless speed change device output shaft is connected with active grooved driving wheel rotating shaft transmission; Be respectively arranged with support set and supporting bracket in the side, front and back of described upper box, be separately installed with upper pressure wheel and lower pressure wheel in the upper and lower part of supporting bracket, cable is between support set, two pairs of grooved driving wheels and pass through between upper and lower pinch roller.The upper middle side part of upper box is provided with opening, and A/F is not less than and is transferred cable diameter.The both sides of described lower box are provided with handle.
The governor motion that can regulate often pair of grooved driving wheel rotating shaft width is provided with in the side of upper box.For intelligent pressure adjusting device or manual regulating device.See Fig. 2, governor motion arranges width adjustment mechanism in side grooved driving wheel roller end, and be provided with width adjusting screw rod, and the end of width adjusting screw rod stretches out upper box one rear flank and is provided with width adjusting wheel.
See Fig. 3, pipeline cable placing in machine, supports the use by one group 3, can realize communication pipe dredging and pipeline cable wiring synchronization mechanism equalization, reduce human input, reduce labor intensity, and improves construction usefulness.
The core component of pipeline cable placing in machine is that motor drives propulsion system, mainly comprises motor, transmission device, driving wheel (2 groups), intelligent pressure adjusting device, stepless speed change device, direction-control apparatus, automatic protector for fault etc.Motor adopts 2KW/220V motor, can select civil power or generator two kinds of supply power modes; Power is evenly distributed on driving wheel by transmission device; Driving wheel adopts quality of rubber materials to make, and promotes dredging bars, cable advance or retreats; Intelligent pressure adjusting device controls driving wheel and dredging bars coefficient of friction; Stepless speed change device adjustment advances strength size and fltting speed; Direction-control apparatus controls advance and the retrogressing of driving wheel; Automatic protector for fault supports the use in process at pipeline cable placing in machine, when single device breaks down, carries out auto-breaking protection operation to all the other two equipment.
Intelligent pressure adjusting device.For guaranteeing to provide enough motive forces to dredging bars, and not damaging dredging bars again, needing to adopt pressure-regulating device, guaranteeing the coefficient of friction that each stress point keeps certain, 2 groups of driving wheels can equably by conducting power to dredging bars.
Automatic protector for fault.Pipeline cable placing in machine supports the use in process, and when single device breaks down, how guaranteeing all the other two equipment auto-breaking protections, is the Focal point and difficult point in design.
Device miniaturization.Person well of communication pipeline diameter is generally at 55-60cm, and in people's well, space is very limited, and pipeline cable placing in machine needs to be placed on operation in people's well, and this just requires that pipe line cable placing in machine volume is unsuitable excessive, makes every effort to miniaturized, and this is the difficult point of design.
EM equipment module.For ease of equipment portable and maintenance, power set, drive unit, speed change and servicing unit are carried out modularized design, very crucial.
Experiment is initial, and apparent volume and the weight of pipeline cable placing in machine are all larger, and particularly weight reaches more than 120 kilograms, is unfavorable for construction operation; Machine volume is excessive simultaneously, can not put in common communication manhole and carry out operation.Through Adjustment Tests repeatedly, current volume only has 0.057 cubic metre, and weight is 45 kilograms.Wherein second parts rectangular base of machine length is 52 centimetres, and wide is 39 centimetres, and height is 18 centimetres; First parts rectangular base of machine length is 40 centimetres, and wide is 36 centimetres, and height is 14 centimetres.
The technology such as pipeline cable placing in machine takes modularized design, motor driving, infinitely variable speeds adjustment, pressure intelligent controls, fault is protected automatically; civil power or generator two kinds of modes are powered; volume is little, is convenient to portable and maintenance, is mainly used in dredging and the pipeline cable wiring of communication pipe.One group 3, with the use of, realize communication pipe dredging and the synchronization mechanism equalization of pipeline cable wiring, reduce personnel and drop into, reduce labor intensity, improve construction usefulness, guarantee project quality.
Main performance assessment criteria
1. advance strength: 1000-3000N,
2. fltting speed: 15-30m/min,
3. pressure apparatus closes aperture: 8-20mm,
4. advance distance: > 150m,
5. supply power mode: civil power/generator (220V),
6. equipment volume: sectional area < 400mm*300mm, length < 600mm,
7. operating temperature :-20 DEG C ~+50 DEG C.
Claims (5)
1. a communications cable engineering construction pipeline cable placing in machine, comprise casing and delivery wheel and driving mechanism, it is characterized in that: described casing comprises lower box and upper box, in upper box, be horizontally disposed with two to the grooved driving wheel coordinated, the rotating shaft of each grooved driving wheel is vertically arranged between the upper and lower plate of upper box; Driving mechanism is arranged in lower box, comprises motor and stepless speed change device, and stepless speed change device output shaft is connected with active grooved driving wheel rotating shaft transmission; Be respectively arranged with support set and supporting bracket in the side, front and back of described upper box, be separately installed with upper pressure wheel and lower pressure wheel in the upper and lower part of supporting bracket, cable is between support set, two pairs of grooved driving wheels and pass through between upper and lower pinch roller.
2. communications cable engineering construction pipeline cable placing in machine according to claim 1, is characterized in that: be provided with the governor motion that can regulate often pair of grooved driving wheel rotating shaft width in the side of described upper box.
3. communications cable engineering construction pipeline cable placing in machine according to claim 2, it is characterized in that: described governor motion arranges width adjustment mechanism in side grooved driving wheel roller end, and being provided with width adjusting screw rod, the end of width adjusting screw rod stretches out upper box one rear flank and is provided with width adjusting wheel.
4. communications cable engineering construction pipeline cable placing in machine according to claim 1, is characterized in that: the upper middle side part of described upper box is provided with opening, and A/F is not less than and is transferred cable diameter.
5. communications cable engineering construction pipeline cable placing in machine according to claim 1, is characterized in that: the both sides of described lower box are provided with handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520690369.XU CN204967145U (en) | 2015-09-02 | 2015-09-02 | Machine is put to communications cable engineering construction pipeline cable cloth |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520690369.XU CN204967145U (en) | 2015-09-02 | 2015-09-02 | Machine is put to communications cable engineering construction pipeline cable cloth |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204967145U true CN204967145U (en) | 2016-01-13 |
Family
ID=55062186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520690369.XU Expired - Fee Related CN204967145U (en) | 2015-09-02 | 2015-09-02 | Machine is put to communications cable engineering construction pipeline cable cloth |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204967145U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108152908A (en) * | 2017-12-29 | 2018-06-12 | 周保中 | A kind of optical cable laying robot |
CN108493843A (en) * | 2018-05-31 | 2018-09-04 | 钦州学院 | The pipeline transporter of cable |
CN108599021A (en) * | 2018-06-11 | 2018-09-28 | 安徽理工大学 | A kind of mine cable laying apparatus |
CN110380365A (en) * | 2019-07-08 | 2019-10-25 | 武汉科技大学 | A kind of device installing cable insulation wrapper additional |
-
2015
- 2015-09-02 CN CN201520690369.XU patent/CN204967145U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108152908A (en) * | 2017-12-29 | 2018-06-12 | 周保中 | A kind of optical cable laying robot |
CN108493843A (en) * | 2018-05-31 | 2018-09-04 | 钦州学院 | The pipeline transporter of cable |
CN108599021A (en) * | 2018-06-11 | 2018-09-28 | 安徽理工大学 | A kind of mine cable laying apparatus |
CN110380365A (en) * | 2019-07-08 | 2019-10-25 | 武汉科技大学 | A kind of device installing cable insulation wrapper additional |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204967145U (en) | Machine is put to communications cable engineering construction pipeline cable cloth | |
CN203491611U (en) | Cable drawing device | |
CN206288794U (en) | Electric power cable retracting device | |
CN109019141B (en) | Optical fiber hoisting and laying device | |
CN103858732A (en) | Energy-saving hard hose traveler | |
CN106150920A (en) | A kind of high and medium wind energy terrestrial power generation power assembly and generating set | |
CN218415579U (en) | Submarine cable laying and drawing device for ocean engineering operation | |
CN106475492B (en) | A kind of practical automatic turning thread trimmer | |
CN211496403U (en) | Take-up device for cable production | |
CN105293167A (en) | Paying-off machine | |
CN209104628U (en) | A kind of distribution box for hydraulic engineering | |
CN207312846U (en) | A kind of twisted and released of the cable line apparatus | |
CN206615864U (en) | A kind of power transmission and distribution cable recovering apparatus | |
CN104773614B (en) | Cable pretightning force frock on ship | |
CN204304334U (en) | A kind of full-automatic hauling machine for small-sized cable | |
CN211524778U (en) | Intelligent stroke frequency adjusting servo control device for oil pumping unit | |
CN205921303U (en) | Thread guide | |
CN203761986U (en) | Energy-saving hard hose traveler | |
CN112234519B (en) | Hydraulic and hydroelectric engineering is with device of sunkening cord | |
CN204333789U (en) | A kind of self routing device | |
CN203474333U (en) | Towrope winch with guide roller | |
CN204290171U (en) | A kind of around leading method drum hydraulic tractor | |
CN202298695U (en) | Bulldozer | |
CN202754643U (en) | Hydraulic motor hose winding drum device | |
CN214169346U (en) | Landscape is with blind pipe laying device that permeates water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160113 Termination date: 20200902 |