[go: up one dir, main page]

CN204822002U - Device is built fast to emergent even bank passageway - Google Patents

Device is built fast to emergent even bank passageway Download PDF

Info

Publication number
CN204822002U
CN204822002U CN201520382519.0U CN201520382519U CN204822002U CN 204822002 U CN204822002 U CN 204822002U CN 201520382519 U CN201520382519 U CN 201520382519U CN 204822002 U CN204822002 U CN 204822002U
Authority
CN
China
Prior art keywords
platform body
main platform
seashore
deck
rear portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520382519.0U
Other languages
Chinese (zh)
Inventor
李进
卢亚斌
戴柯
张晓飞
刘源
施亮泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhenjiang Watercraft College of Pla
Original Assignee
Zhenjiang Watercraft College of Pla
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhenjiang Watercraft College of Pla filed Critical Zhenjiang Watercraft College of Pla
Priority to CN201520382519.0U priority Critical patent/CN204822002U/en
Application granted granted Critical
Publication of CN204822002U publication Critical patent/CN204822002U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The utility model discloses a device is built fast to emergent even bank passageway. It includes the platform main part, has the power device that can drive the navigation the seashore around of platform main part in the platform main part, and the front end of platform main part is articulated to have a prelude bank passageway even that can stretch to the seashore, and the rear end of platform main part is articulated to have the afterbody alongside passageway that can extend to seashore opposite direction. After the structure of the utility model is adopted, realized under the first destruction condition of fixed code or do not have the seashore condition of pier under the company's of buildding bank passageway fast, supply the handling operation of freight boats and ships alongside in order to carry out the goods of great tonnage, especially, the dress that rolls that is fit for carrying on the goods rolls and unloads the operation, the pill case and cell phone holder is reasonable in structural design, mobility is strong, and has high environment adaptability, the problem of traditional flotation tank pier self mobility poor is solved, the adaptability to complicated seashore condition has been improved simultaneously, the problem of erectting fast that links the bank passageway under the case of emergency has more effectively been solved, emergent transport of seashore and rescue supportability have been guaranteed, spreading value is higher.

Description

A kind of emergent even bank passage fast construction device
Technical field
The utility model relates to a kind of lane device for construction company's bank, and specifically a kind of emergent even bank passage fast construction device, belongs to port engineering technical field.
Background technology
The frequent natural calamity such as earthquake threatens human security, can destroy seashore fixed quay when disaster occurs, and brings water transportation traffic and have a strong impact on, and causes goods transport boats and ships cannot to pull in shore to carry out loading and unloading operation; And after fixed quay destroys, the problem of pulling in shore how solving boats and ships under emergency condition becomes a technical barrier all the time; General, alongside ability can be formed by building buoyancy tank harbour temporarily.
Traditional buoyancy tank harbour is steel, and erection more for convenience, but also exists some problems, and such as volume is comparatively large, and heavier-weight, self does not have maneuverability etc.Especially under emergency conditions, urgent to time requirement, the motor-driven problem of buoyancy tank harbour self just significantly limit the performance of its effect; In addition, more crucially, the condition of building of buoyancy tank harbour is higher, has clear and definite requirement to the gradient of seashore and geology, when seashore situation complicated all if any abrupt slope or tableland landform time, buoyancy tank harbour cannot set up; Therefore, also there is a lot of adaptability problem in the meet an urgent need support facility of alongside of existing ship, this have impact on the emergent conveying of seashore and rescue supportability to a certain extent greatly.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of maneuverability, builds conveniently and effectively can ensures that seashore is met an urgent need carries and rescues the emergent even bank passage fast construction device of supportability.
In order to solve the problems of the technologies described above, emergent even bank passage fast construction device of the present utility model, comprise main platform body, there is in main platform body the engine installation that main platform body can be driven to navigate by water around seashore, the front end of main platform body is hinged with the stem can stretching to seashore and connects bank passage, and the rear end of main platform body is hinged with the afterbody alongside passage that can extend to seashore opposite sense.
The middle part of described main platform body is provided with superstructure, has the porte-cochere that can pass through for vehicle in described superstructure.
Described main platform body has deck, and the deck of main platform body comprises deck, stem region, central region deck, tail region deck; Described stem connect bank passage folding after can be placed on deck, stem region, can be placed on tail region deck after afterbody alongside passage is folding, superstructure is arranged on central region deck.
Described stem connects bank passage and comprises the mainboard frame hinged with the deck, stem region of main platform body and can be overlapped on the ground extension grillage of seashore, be articulated and connected between described mainboard frame and extension grillage, the pin jointed end of described mainboard frame and extension grillage is provided with hydraulic gear.
The anterior drag-line described main platform body being provided with anterior electric capstan and being wrapped on anterior electric capstan, main platform body is also provided with the anterior column being positioned at main platform body front portion, the top of anterior column is provided with pulley, described anterior drag-line one end is connected to mainboard frame and extends the middle part of grillage, and the other end is connected with anterior electric capstan through after the pulley at anterior column top.
Described main platform body is provided with rear portion electric capstan and is wrapped in the rear portion drag-line on the electric capstan of rear portion, main platform body is also provided with the rear portion column being positioned at main platform body rear portion, the top of rear portion column is provided with pulley, drag-line one end, described rear portion is connected to the afterbody of afterbody alongside passage, and the other end is connected with rear portion electric capstan through after the pulley at column top, rear portion.
After adopting above-mentioned structure, because the main platform body of navigating by water around seashore that arranges and the stem that is hinged on main platform body rear and front end connect bank passage and afterbody alongside passage, thus achieve and connect bank passage in fixed quay destruction situation or without fast construction under the seashore condition of harbour, for the alongside of large tonnage goods transport boats and ships to carry out the loading and unloading operation of goods, especially the dress that rolls being applicable to carrying out goods rolls and unloads operation, its reasonable in design, mobility strong, good environmental adaptability, solve the problem of self manoevreability difference of traditional buoyancy tank harbour, improve the comformability to complicated seashore condition simultaneously, the fast erecting problem of bank passage is connected under more efficiently solving emergency condition, ensure that the emergent conveying of seashore and rescue supportability, promotional value is higher.
Accompanying drawing explanation
Fig. 1 is that the utility model is met an urgent need and connected the deployed condition structural representation of bank passage fast construction device;
Fig. 2 is that the utility model is met an urgent need and connected the collapsed state structural representation of bank passage fast construction device;
Fig. 3 is that the utility model is met an urgent need and connected the plan structure schematic diagram of bank passage fast construction device;
Fig. 4 is that the utility model is met an urgent need and connected the side-looking structural representation of bank passage fast construction device.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the emergent bank passage fast construction device that connects of the present utility model is described in further detail.
As shown in the figure, emergent even bank passage fast construction device of the present utility model, comprise the main platform body 1 of ship type structure, there is in main platform body 1 engine installation that main platform body can be driven to navigate by water around seashore, main platform body 1 has deck, and the deck of main platform body is divided into deck, stem region, central region deck and tail region deck; The front end of main platform body 1 is hinged with the stem can stretching to seashore 2 and connects bank passage 3, and the rear end of main platform body 1 is hinged with the afterbody alongside passage 4 that can extend to seashore opposite sense, and afterbody alongside passage 4 is afterbody grillage; Stem connect bank passage 3 folding after can be placed on deck, stem region, can be placed on tail region deck after afterbody alongside passage 4 is folding, superstructure 5 is arranged on central region deck, the middle part of main platform body 1 is provided with superstructure 5, has the porte-cochere 6 that can pass through for vehicle in superstructure 5.
Further, said stem connects bank passage 3 and comprises the mainboard frame 7 hinged with the stem deck of main platform body and can be overlapped on the ground extension grillage 8 of seashore, be articulated and connected between mainboard frame 7 and extension grillage 8, the pin jointed end of mainboard frame 7 and extension grillage 8 is provided with hydraulic gear 9, and mainboard frame 7 and extension grillage 8 can trail to seashore under hydraulic gear 9 acts on, the anterior drag-line 10 main platform body 1 being provided with anterior electric capstan 11 and being wrapped on anterior electric capstan 11, main platform body 1 is also provided with the anterior column 12 being positioned at main platform body 1 front portion, the top of anterior column is provided with pulley, anterior drag-line 10 one end is connected to mainboard frame 7 and extends the middle part of grillage 8, and the other end is connected with anterior electric capstan 11 through after the pulley at anterior column 12 top, main platform body 1 is provided with rear portion electric capstan and is wrapped in the rear portion drag-line 13 on the electric capstan of rear portion, main platform body 1 is also provided with the rear portion column 14 being positioned at main platform body 1 rear portion, the top of rear portion column 14 is provided with pulley, rear portion drag-line 13 one end is connected to the afterbody that afterbody connects bank platform 4, the other end is connected with rear portion electric capstan through after the pulley at rear portion column 14 top, afterbody alongside passage 4 one end is made to be articulated and connected on afterbody deck and main platform body 1 thus, the other end is free end, launch rear overhang and stretch out afterbody, strengthened by the rear portion drag-line at rear portion simultaneously.
In device gathering situation, stem connects bank passage 3 can be placed on stem deck area, and afterbody alongside passage 4 can be placed on tail region deck, as shown in Figure 2, in this condition, emergent connect bank passage fast unit can be motor-driven, navigate by water the job task that to carry out to marine site, destination; Under self power device drives, can have the higher speed of a ship or plane, manoevreability is stronger; Harbour destruction or without under the seashore condition of harbour, this device is when seashore certain distance, and stem connects bank passage 3 onshore and stretches; One end and main platform body hinged, namely the other end is overlapped on seashore away from main platform body end, afterbody alongside passage 4 stretches out to offshore end, the platform grillage that head and the tail extend is strengthened respectively by anterior drag-line and rear portion drag-line, the company's of being formed bank passage together with the vertical passage of main platform body deck, utilize this device can connect bank passage by fast construction actv., roll dress for large tonnage ship berthing and roll cargo.
After the disasteies such as earthquake to produce the fixed quay of seashore and destroy, common shipping boats and ships then cannot alongside carry out loading and unloading operation.The emergent bank passage fast construction device that connects of the present utility model due to self mobility strong, can fast reserve within a short period of time to waters, destination, and adjusted position is placed in offshore a distance awaits orders, and its rounding state is as shown in Figure 2.After determining position, emergent even bank passage fast construction apparatus platform main body 1 bow subtend seashore, the mainboard frame 7 that stem connects bank passage 3 is drawn by anterior drag-line with extension grillage 8, tilt to bank, along with continuous inclination, hydraulic gear 9 starts, and two-segment type framed plate structure is transformed into " one " font from " people " font, and be overlapped on seashore away from main platform body end, form and connect bank passage.The afterbody alongside passage 4 of main platform body under the effect of rear portion drag-line and rear portion electric capstan, is converted to deployed condition by rounding state, forms the alongside passage of afterbody, stop for relatively large goods transport boats and ships equally; Superstructure due to this device is gantry type, there is in the middle part of deck porte-cochere 6, like this, company's bank passage of stem, the alongside passage of afterbody add the deck passages of main platform body, together form goods roll dress roll the passage unloaded, the roll-on-roll-off ship of transport vehicle can rest in the afterbody alongside passage of this device, the springboard of roll-on-roll-off ship rides on the afterbody alongside passage of device, vehicle on roll-on-roll-off ship then can the company's of reaching bank passage, and finally arrives seashore land, and the dress that rolls realizing goods rolls and unloads.

Claims (6)

1. an emergent even bank passage fast construction device, it is characterized in that: comprise main platform body (1), described main platform body has the engine installation that main platform body can be driven to navigate by water around seashore in (1), the front end of described main platform body (1) is hinged with the stem can stretching to seashore (2) and connects bank passage (3), and the rear end of described main platform body (1) is hinged with the afterbody alongside passage (4) that can extend to seashore opposite sense.
2., according to emergent even bank passage fast construction device according to claim 1, it is characterized in that: the middle part of described main platform body (1) is provided with superstructure (5) that there is in described superstructure (5) porte-cochere (6) that can pass through for vehicle.
3., according to emergent even bank passage fast construction device according to claim 2, it is characterized in that: (1) has deck to described main platform body, described main platform body main deck comprises deck, stem region, central region deck, tail region deck; Described stem connect bank passage folding after can be placed on deck, stem region, can be placed on tail region deck after afterbody alongside passage is folding, superstructure is arranged on central region deck.
4. according to emergent even bank passage fast construction device according to claim 3, it is characterized in that: described stem connects bank passage (3) and comprises the mainboard frame (7) hinged with the deck, stem region of main platform body and can be overlapped on the ground extension grillage (8) of seashore, be articulated and connected between described mainboard frame (7) and extension grillage (8), the pin jointed end of described mainboard frame (7) and extension grillage (8) is provided with hydraulic gear (9).
5. according to emergent even bank passage fast construction device according to claim 4, it is characterized in that: described main platform body (1) is provided with anterior electric capstan (11) and is wrapped in the anterior drag-line (10) on anterior electric capstan (11), main platform body (1) is also provided with and is positioned at the anterior anterior column (12) of main platform body (1), the top of anterior column is provided with pulley, described anterior drag-line (10) one end is connected to mainboard frame (7) and extends the middle part of grillage (8), the other end is connected with anterior electric capstan (11) through after the pulley at anterior column (12) top.
6. according to emergent even bank passage fast construction device according to claim 4, it is characterized in that: described main platform body (1) is provided with rear portion electric capstan and is wrapped in the rear portion drag-line (13) on the electric capstan of rear portion, main platform body (1) is also provided with the rear portion column (14) being positioned at main platform body (1) rear portion, the top of rear portion column (14) is provided with pulley, drag-line (13) one end, described rear portion is connected to the afterbody of afterbody alongside passage (4), and the other end is connected with rear portion electric capstan through after the pulley at rear portion column (14) top.
CN201520382519.0U 2015-06-04 2015-06-04 Device is built fast to emergent even bank passageway Expired - Fee Related CN204822002U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520382519.0U CN204822002U (en) 2015-06-04 2015-06-04 Device is built fast to emergent even bank passageway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520382519.0U CN204822002U (en) 2015-06-04 2015-06-04 Device is built fast to emergent even bank passageway

Publications (1)

Publication Number Publication Date
CN204822002U true CN204822002U (en) 2015-12-02

Family

ID=54679629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520382519.0U Expired - Fee Related CN204822002U (en) 2015-06-04 2015-06-04 Device is built fast to emergent even bank passageway

Country Status (1)

Country Link
CN (1) CN204822002U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104908892A (en) * 2015-06-04 2015-09-16 中国人民解放军镇江船艇学院 Rapid building device for emergency shore connecting channel
CN107460819A (en) * 2017-08-28 2017-12-12 南京理工大学 A kind of detachable emergency survival bridge
CN108502108A (en) * 2018-05-29 2018-09-07 马鞍山海明船舶配件有限公司 A kind of vessel berth pulls in shore device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104908892A (en) * 2015-06-04 2015-09-16 中国人民解放军镇江船艇学院 Rapid building device for emergency shore connecting channel
CN107460819A (en) * 2017-08-28 2017-12-12 南京理工大学 A kind of detachable emergency survival bridge
CN108502108A (en) * 2018-05-29 2018-09-07 马鞍山海明船舶配件有限公司 A kind of vessel berth pulls in shore device
CN108502108B (en) * 2018-05-29 2023-10-31 威海昱霖船舶技术有限公司 Ship berthing and landing device

Similar Documents

Publication Publication Date Title
US20190135384A1 (en) Autonomous maritime container system
CN101920766B (en) A method of building a ship
US9567045B2 (en) Marine lifting vessel
US12083564B2 (en) Sequestering biomass in water
WO2018074977A1 (en) System and method for reconfiguring a mobile docking apparatus for transporting, removal, installation, housing and transferring assets
JP2011057218A (en) Rescue ship for disabled vessel, vessel rescue method and use of rescue ship
CN108407984A (en) A kind of construction method of open seashore transportation system
CN204822002U (en) Device is built fast to emergent even bank passageway
CN104203739A (en) Ship with a detachable hull
CN208559704U (en) A kind of pontoon bridge ro-ro transport system of open seashore
CN204210703U (en) A kind of air sac water transportation platform
CN107249978A (en) Using can floating offshore warehouse method
CN201816726U (en) Structure of floating type multifunctional refuge harbor
CN108674595A (en) The big deck plane carrying of sliceable type shallow draft is floating to refute and its longitudinal spliced method
CN108216502A (en) A kind of pontoon bridge ro-ro transport system of open seashore
CN104908892A (en) Rapid building device for emergency shore connecting channel
CN207045637U (en) A kind of floating ship terminals
CN104097750A (en) Multifunctional maintenance ship
CN106314707A (en) Gasbag type anti-sinking overturn-preventing device
CN204802046U (en) Anti sinking prevents toppling gasbag device
CN102963509A (en) Traction method for enabling parallel built ships of 300,000 dry docks to undock
CN103482032B (en) A kind of mini engineering ship
CN206337543U (en) A kind of off-lying sea harbour
CN205602059U (en) Foldable motor -driven landing stage
CN2846285Y (en) Movable wharf

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20180604