CN204785424U - Electric power angle steel tower equipment box mounting base - Google Patents

Electric power angle steel tower equipment box mounting base Download PDF

Info

Publication number
CN204785424U
CN204785424U CN201520206063.2U CN201520206063U CN204785424U CN 204785424 U CN204785424 U CN 204785424U CN 201520206063 U CN201520206063 U CN 201520206063U CN 204785424 U CN204785424 U CN 204785424U
Authority
CN
China
Prior art keywords
angle steel
fixed
electric power
fixing
steel tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520206063.2U
Other languages
Chinese (zh)
Inventor
孙家新
王长河
纪德建
冯廷栋
鲁效停
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinxiandai Information Industry Co Ltd
Original Assignee
Jinxiandai Information Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinxiandai Information Industry Co Ltd filed Critical Jinxiandai Information Industry Co Ltd
Priority to CN201520206063.2U priority Critical patent/CN204785424U/en
Application granted granted Critical
Publication of CN204785424U publication Critical patent/CN204785424U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型公开了一种电力角钢塔设备箱安装基座,涉及输电铁塔用配件,它包括固定内板、固定外板和连接件,所述固定内板和固定外板均为角钢型,两者的角钢角度与待安装电力角钢塔角钢的角度相同;固定内板和固定外板分居电力角钢塔角钢内外两侧,固定内板和固定外板的宽度大于电力角钢塔角钢内外两侧的宽度,固定内板和固定外板在宽出角钢的部分分别设有至少一个固定孔,固定内板和固定外板上的固定孔位置相对应,两者通过穿过固定孔的连接件固定在电力角钢塔的角钢上;固定外板上安装设备箱的固定支架。本实用新型可实现主要安装过程在塔下进行,缩短了施工人员塔上安装设备箱的时间,降低了危险性。

The utility model discloses an installation base for an equipment box of a power angle steel tower, which relates to an accessory for a power transmission iron tower. The angle of the angle steel is the same as that of the angle steel of the power angle steel tower to be installed; the fixed inner plate and the fixed outer plate are separated from the inner and outer sides of the angle steel of the power angle steel tower, and the width of the fixed inner plate and the fixed outer plate is greater than the width of the inner and outer sides of the angle steel of the power angle steel tower , the fixed inner plate and the fixed outer plate are respectively provided with at least one fixing hole at the part of the wide angle steel, the positions of the fixing holes on the fixed inner plate and the fixed outer plate are corresponding, and the two are fixed on the electric power through the connecting piece passing through the fixing hole. On the angle steel of the angle steel tower; fix the fixing bracket for installing the equipment box on the outer plate. The utility model can realize that the main installation process is carried out under the tower, which shortens the time for construction personnel to install the equipment box on the tower and reduces the risk.

Description

A kind of electric power angle steel tower equipment box mounting base
Technical field
The utility model relates to electric power pylon accessory, is specifically related to a kind of electric power angle steel tower equipment box mounting base.
Background technique
In order to solve the safe operation problem of electric transmission line, need to carry out various state-detection to electric transmission line, to carry out maintenance in time when abnormal state appears in electric transmission line.At present, the detection facility for electric transmission line needs to be arranged on electric power angle steel tower mostly, and adopts solar energy to power to it.But because the structural form of electric power angle steel tower is too diversified, so mounting structure on electric power angle steel tower is difficult to unified and installation process is complicated, workmen is installation and measuring equipment on steel tower for a long time, and risk factor is high.
Summary of the invention
For the problems referred to above, the utility model provides a kind of easy for installation, fixed pedestal that applicability is strong, can carry out most of installment work in advance, alleviate the workload on tower, reduce the danger of erection unit case on tower under tower.
For achieving the above object, the technical solution adopted in the utility model is:
A kind of electric power angle steel tower equipment box mounting base, comprise fixing inner panel, fixing outside plate and link, described fixing inner panel and fixing outside plate are angle steel type, and both angle steel angles are identical with the angle of electric power angle steel tower angle steel to be installed; Fix both sides inside and outside inner panel and fixing outside plate separation electric power angle steel tower angle steel, both length of sides are greater than the length of side of electric power angle steel tower angle steel, fixing inner panel and fixing outside plate wide go out the part of angle steel be respectively equipped with at least one fixed hole, fixing inner panel is corresponding with the fixed hole position on fixing outside plate, and both are by being fixed on the angle steel of electric power angle steel tower through the link of fixed hole; The fixed support of erection unit case on fixing outside plate.The utility model utilizes the fixed plate of angle steel shape to be fitted in the angle steel both sides of angle steel tower, and fixes with link, installs in this way, fully can mate with the polymorphic structure of angle steel, ensures the soundness of installing.
Preferably, fixing inner panel and fixing outside plate are provided with at least two fixed holes at its length direction, and are symmetric, and make fixing inner panel, fixing outside plate and angle steel uniform force, strengthen fixing soundness.
Further, fix each plane broad ways on inner panel and fixing outside plate and have two fixed holes at least.Link can be interted according to the fixed hole of the size Selection correct position of electric power angle steel tower angle steel like this, make this fixed pedestal be applicable to the angle steel of sizes.Preferably, described fixed hole is elongated hole.Therefore can finely tune in same hole, be applicable to the angle steel of a certain dimensional range, improve the utility model Applicable scope further.
The fixed support of fixing outside plate erection unit case is by welding manner, and also by the mode of removably connecting, recycling for ease of fixed pedestal, preferably adopts and removably connect.Now, can be symmetrically arranged with along its length for the support bracket fastened mounting hole of fixed equipment case at least one plane of fixing outside plate, be bolted equipment box.Wherein only in one plane can establish mounting hole, also can arrange on two planar simultaneously.The mounting hole of upper and lower both sides, preferably near top edge and the lower limb of place plane, can make the support bracket fastened more parts of equipment box be fixed on fixing outside plate 3 like this, thus improves suspension steadiness.
Preferably, described link is bolt.So not only fixed pedestal can be fixed on the angle steel of electric power angle steel tower very easily, and the position of fixed pedestal can be adjusted at any time or remove fixed pedestal, and and then reach the position adjusting equipment box at any time or the object of removing equipment box.
Equipment box can be installed on electric power angle steel tower by the utility model easily, and can adapt to the electric power angle steel tower of various sizes and structural form, has applicability widely; , can repeatedly dismantle, adjustment mounting point or replacing equipment box meanwhile.Utilize this fixed pedestal, main installation process can be realized and carry out under tower, shorten the time of erection unit case on workmen's tower, reduce danger.
Accompanying drawing explanation
Fig. 1 is that the utility model is installed to the structural representation after on angle steel tower;
Fig. 2 is the structural representation of fixing outside plate;
In figure, 1, angle steel, 2, fixing inner panel, 3, fixing outside plate, 4, fixed hole, 5, bolt, 6, mounting hole.
Embodiment
A kind of electric power angle steel tower equipment box mounting base, as shown in the figure, comprise fixing inner panel 2, fixing outside plate 3 and link, described link selects bolt 5.Described fixing inner panel 2 and fixing outside plate 3 are angle steel type, and both angle steel angles are identical with the angle of electric power angle steel tower angle steel 1 to be installed.Fix the width of width slightly larger than both sides inside and outside electric power angle steel tower angle steel 1 of inner panel 2 and fixing outside plate 3, fixing inner panel 2 and fixing outside plate 3 wide go out the part of angle steel be respectively equipped with two symmetrical along its length row's fixed holes 4, often row has two, fixing inner panel 2 is corresponding with fixed hole 4 position on fixing outside plate 3, and fixed hole 4 adopts elongated hole.Fixing inner panel 2 is close to the inner side of electric power angle steel tower angle steel, and fixing outside plate 3 is close to the outside of angle steel, and two plates are fixed on the angle steel 1 of electric power angle steel tower through the fixed hole of two plates by bolt 5.A plane of fixing outside plate 3 is symmetrically arranged with two row's mounting holes 6 along its length, is bolted the fixed support of equipment box.
Using process of the present utility model is as follows:
First, equipment box is fixed on its fixed support.Then, utilize bolt to be fixed on by fixed support on fixing outside plate and (also first can be fixed on fixing outside plate by fixed support, then be fixed on fixed support by equipment box), such equipment box and fixed support thereof and fixing outside plate are fixed together.Above-mentioned fixed installation step completes under tower.Finally, electric power angle steel tower completes installation process on tower, namely the setting height(from bottom) of equipment box is selected, place fixing inner panel and fixing outside plate and make both be close to angle steel two surface, with bolt through the fixed hole be arranged on fixing inner panel and fixing outside plate, thus fixing inner panel and fixing outside plate are fixed on the angle steel (i.e. the support girder of steel tower corner) of electric power angle steel tower, owing to being fixed on fixing outside plate by equipment box and fixed support thereof in advance, therefore equipment box is fixed on electric power angle steel tower.
Usually, equipment box is made up of multiple parts, in actual implementation process, all parts can be separately fixed on fixed pedestal, then according to the actual height of all parts, they is fixed on electric power angle steel tower by above-mentioned method.

Claims (6)

1. an electric power angle steel tower equipment box mounting base, comprise fixing inner panel (2), fixing outside plate (3) and link, it is characterized in that: described fixing inner panel (2) and fixing outside plate (3) are angle steel type, both angle steel angles are identical with the angle of electric power angle steel tower angle steel (1) to be installed; Fix both sides inside and outside inner panel (2) and fixing outside plate (3) separation electric power angle steel tower angle steel, the width of fixing inner panel (2) and fixing outside plate (3) is greater than the width of the inside and outside both sides of electric power angle steel tower angle steel (1), fixing inner panel (2) and fixing outside plate (3) wide go out the part of angle steel be respectively equipped with at least one fixed hole (4), fixing inner panel is corresponding with the fixed hole position on fixing outside plate, and both are by being fixed on the angle steel (1) of electric power angle steel tower through the link of fixed hole; The fixed support of the upper erection unit case of fixing outside plate (3).
2. electric power angle steel tower equipment box mounting base according to claim 1, is characterized in that: fixing inner panel and fixing outside plate are provided with at least two fixed holes (4) at its length direction, and are symmetric.
3. electric power angle steel tower equipment box mounting base according to claim 2, is characterized in that: fix each plane broad ways on inner panel and fixing outside plate and have two fixed holes (4) at least.
4. the electric power angle steel tower equipment box mounting base according to claim 1 or 2 or 3, is characterized in that: described fixed hole (4) is elongated hole.
5. electric power angle steel tower equipment box mounting base according to claim 4, it is characterized in that: at least one plane of fixing outside plate is symmetrically arranged with along its length for the support bracket fastened mounting hole of fixed equipment case (6), is bolted equipment box.
6. electric power angle steel tower equipment box mounting base according to claim 4, is characterized in that: described link is bolt (5).
CN201520206063.2U 2015-04-08 2015-04-08 Electric power angle steel tower equipment box mounting base Expired - Lifetime CN204785424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520206063.2U CN204785424U (en) 2015-04-08 2015-04-08 Electric power angle steel tower equipment box mounting base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520206063.2U CN204785424U (en) 2015-04-08 2015-04-08 Electric power angle steel tower equipment box mounting base

Publications (1)

Publication Number Publication Date
CN204785424U true CN204785424U (en) 2015-11-18

Family

ID=54525473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520206063.2U Expired - Lifetime CN204785424U (en) 2015-04-08 2015-04-08 Electric power angle steel tower equipment box mounting base

Country Status (1)

Country Link
CN (1) CN204785424U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107339587A (en) * 2017-07-18 2017-11-10 合肥康居人智能科技有限公司 A kind of Liftable type oxygenerator suspension system
CN107370070A (en) * 2017-07-27 2017-11-21 国网河南省电力公司内乡县供电公司 A kind of cross-arm hanging point device
CN107706805A (en) * 2017-09-23 2018-02-16 国网山东省电力公司菏泽市定陶区供电公司 A kind of attached material installation assistor of angle steel tower
CN109696195A (en) * 2019-03-07 2019-04-30 贵州电网有限责任公司 A kind of special tooling of angle steel thickness different on electric force pole tower
CN111577719A (en) * 2020-04-21 2020-08-25 杭州七友通信科技有限公司 Dovetail type hoop of fixing equipment for angle steel tower body
CN112134234A (en) * 2020-07-23 2020-12-25 阜康市国津电气有限公司 Clamping type double-layer drip irrigation preventing film external force damage device for power tower

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107339587A (en) * 2017-07-18 2017-11-10 合肥康居人智能科技有限公司 A kind of Liftable type oxygenerator suspension system
CN107370070A (en) * 2017-07-27 2017-11-21 国网河南省电力公司内乡县供电公司 A kind of cross-arm hanging point device
CN107370070B (en) * 2017-07-27 2024-02-13 国网河南省电力公司内乡县供电公司 Cross arm hanging point device
CN107706805A (en) * 2017-09-23 2018-02-16 国网山东省电力公司菏泽市定陶区供电公司 A kind of attached material installation assistor of angle steel tower
CN109696195A (en) * 2019-03-07 2019-04-30 贵州电网有限责任公司 A kind of special tooling of angle steel thickness different on electric force pole tower
CN111577719A (en) * 2020-04-21 2020-08-25 杭州七友通信科技有限公司 Dovetail type hoop of fixing equipment for angle steel tower body
CN111577719B (en) * 2020-04-21 2022-08-12 杭州七友通信科技有限公司 A dovetail clamp for fixing equipment on the tower body of an angle steel tower
CN112134234A (en) * 2020-07-23 2020-12-25 阜康市国津电气有限公司 Clamping type double-layer drip irrigation preventing film external force damage device for power tower
CN112134234B (en) * 2020-07-23 2022-05-17 阜康市国津电气有限公司 Clamping type double-layer drip irrigation preventing film external force damage device for power tower

Similar Documents

Publication Publication Date Title
CN204785424U (en) Electric power angle steel tower equipment box mounting base
CN203640309U (en) Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame
CN107649810B (en) A kind of fixed code installation auxiliary mould and fixed code installation method
CN103526907B (en) A kind of inclination stone material dry suspending structure and construction method thereof
CN103737235B (en) Case beam dividing plate positioning tool and localization method
WO2017161931A1 (en) Structure for integrated installation of wireless communication device
CN203878958U (en) Hanging basket
CN105317794B (en) Super extra-high voltage electric transmission and transformation equipment grading ring fixed structure
KR200459446Y1 (en) Improvement assembly type pipe supporting tool
CN105244827A (en) Fixing bracket and installation method of electrical end equipment
CN105202265A (en) Multilayer bridge framework bracket arm mounting locating device and method
CN104153501A (en) Energy-saving metal curtain wall
CN204760174U (en) Transformer base structure with adjustable
CN206116874U (en) Zero sequence current transformer installation device
CN203383457U (en) Board mounting system
CN204692971U (en) For the fixed pedestal of fixed equipment case inside electric power angle steel tower
CN207354162U (en) A kind of solar panel pole-and-tower type mounting bracket
CN106885112A (en) A kind of fixed pedestal on the inside of electric power pylon
CN204150976U (en) The simple and easy fixed bearing of a kind of detachable tower suspending bars
CN103590612B (en) Convenient purline correction device
CN207705626U (en) A kind of new structure being used for power supply box, distribution box, fiber-dividing box, optical cross box
CN205195193U (en) Electric end -equipment's fixed bolster
CN204565603U (en) Penstock stiffening ring mounting and adjusting means for correcting
CN205811479U (en) A kind of bus structure
CN109994941A (en) A kind of outdoor box quick installation mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant