CN204715364U - A kind of foundation pit support device - Google Patents
A kind of foundation pit support device Download PDFInfo
- Publication number
- CN204715364U CN204715364U CN201520286815.0U CN201520286815U CN204715364U CN 204715364 U CN204715364 U CN 204715364U CN 201520286815 U CN201520286815 U CN 201520286815U CN 204715364 U CN204715364 U CN 204715364U
- Authority
- CN
- China
- Prior art keywords
- support
- steel
- bottom plate
- corbel
- foundation pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
Abstract
本实用新型涉及一种基坑支护装置,属于建筑结构施工技术领域,包括周边支护桩上设置的冠梁牛腿和地下室基础底板顶面设置的底板牛腿,以及在冠梁牛腿和底板牛腿之间设置的双拼H型钢,该基坑支护装置适用于基坑周边已施工支护桩的非圆形大面积不规则深基坑工程施工,结合已施工支护桩与地下结构(桩+地下室底板)形成平行于支护体的坑内“带状”支撑结构形式,有效避免了传统混凝土内支撑体系支护成本高,施工周期长的缺点,而且降低了支护体系的造价,适合于1至2层地下室的大面积深基坑。
The utility model relates to a support device for a foundation pit, which belongs to the technical field of building structure construction, and comprises crown beam corbels set on peripheral support piles and bottom plate corbels set on the top surface of a basement foundation floor, and crown beam corbels and The double H-shaped steel set between the corbels of the bottom plate, the foundation pit support device is suitable for the construction of non-circular large-area irregular deep foundation pits with support piles around the foundation pit, combining the constructed support piles with the underground The structure (pile + basement floor) forms a "belt" support structure in the pit parallel to the support body, which effectively avoids the disadvantages of high support cost and long construction period of the traditional concrete internal support system, and reduces the cost of the support system , suitable for large-area deep foundation pits in basements with 1 to 2 floors.
Description
技术领域 technical field
本实用新型涉及一种基坑支护装置,属于建筑结构施工技术领域,尤其适用于周边已施工围护结构而需要内部支撑的大面积不规则深基坑工程。 The utility model relates to a support device for foundation pits, which belongs to the technical field of building structure construction, and is especially suitable for large-area irregular deep foundation pit projects with built-up enclosure structures around and requiring internal support.
背景技术 Background technique
基坑支护是为保证地下结构施工及基坑周边环境的安全,对基坑侧壁及周边环境采用的支挡、加固与保护措施。常见的基坑支护型式主要有排桩支护、地下连续墙支护、水泥挡土墙、钢板桩、土钉墙、基坑内支撑或其两种或两种以上的组合方式。 The foundation pit support is to ensure the safety of the underground structure construction and the surrounding environment of the foundation pit, and the support, reinforcement and protection measures are adopted for the side wall of the foundation pit and the surrounding environment. Common foundation pit support types mainly include row pile support, underground diaphragm wall support, cement retaining wall, steel sheet pile, soil nail wall, foundation pit support or a combination of two or more.
对于传统的基坑支护技术来说,对于基坑土质不良,基坑开挖比较深,特别是基坑平面尺寸比较大的情况下,如果按照常见的混凝土内支撑形式,支护措施成本较高,施工周期比较长,而且内支撑的方式会使得基坑里面密密麻麻,不方便施工。例如申请公布号为CN101892667的中国实用新型专利申请公开了一种基坑支护装置及施工方法,综合采用了SMW工法桩体系、内支撑体系、混凝土护坡体系和土钉墙护坡体系中两者或两者以上结合,既适合大面积基坑的支护,同时也有效降低基坑支护的成本和造价。但是不适合土质分层和周边场地地下水情况复杂的工程。 For the traditional foundation pit support technology, if the soil quality of the foundation pit is poor and the excavation of the foundation pit is relatively deep, especially when the plane size of the foundation pit is relatively large, if the common concrete internal support form is used, the cost of support measures will be relatively high. High, the construction period is relatively long, and the way of internal support will make the foundation pit densely packed, which is inconvenient for construction. For example, the Chinese utility model patent application whose publication number is CN101892667 discloses a foundation pit support device and a construction method, which comprehensively adopts both of the SMW construction method pile system, the internal support system, the concrete slope protection system and the soil nail wall slope protection system. The combination of the above two is not only suitable for the support of large-area foundation pits, but also effectively reduces the cost and cost of foundation pit support. However, it is not suitable for projects with complex soil stratification and groundwater conditions in the surrounding sites.
实用新型内容 Utility model content
本实用新型的目的是克服上述技术问题,提供一种适合大面积基坑支护,且周边土质分层和场地地下水情况复杂的工程,有效降低了基坑支护的成本和造价。 The purpose of the utility model is to overcome the above technical problems, provide a project suitable for large-area foundation pit support, and the surrounding soil stratification and site groundwater conditions are complex, and effectively reduce the cost and cost of foundation pit support.
本实用新型的上述技术目的是通过以下技术方案得以实现的: The above-mentioned technical purpose of the utility model is achieved through the following technical solutions:
一种基坑支护装置,包括周边支护桩顶端处设置的冠梁牛腿,在所述冠梁牛腿下方靠近顶端处设置的钢围檩和在地下室基础底板顶面设置的底板牛腿,底板牛腿锚入底板。在支护桩内插入双拼H型钢,桩体内所插型钢长度相等。其中一条双拼H型钢一端支撑在钢围檩上,另一端支撑在底板牛腿上;另一条双拼H型钢一端支撑在冠梁牛腿上,另一端支撑在底板牛腿上。 A support device for a foundation pit, comprising crown beam corbels set at the top of peripheral support piles, steel purlins set below the crown beam corbels near the top, and bottom plate corbels set on the top surface of the basement bottom plate , the bottom plate corbel is anchored into the bottom plate. Insert double H-shaped steel into the support pile, and the length of the inserted steel in the pile body is equal. One end of one pair of H-shaped steel is supported on the steel purlin, and the other end is supported on the corbel of the bottom plate; the other end of the double H-shaped steel is supported on the corbel of the crown beam, and the other end is supported on the corbel of the bottom plate.
作为优选,所述的冠梁牛腿的迎坑面斜向预埋钢板和钢筋网,垂直于所述的钢板设置H型钢。 Preferably, the pit-facing surface of the crown beam corbel is oblique to the pre-embedded steel plate and reinforcement mesh, and H-shaped steel is arranged perpendicular to the steel plate.
作为优选,所述的底板牛腿背坑面斜向预埋钢板和钢筋网,垂直于所述钢板设置H型钢。 As a preference, the back pit surface of the corbel of the bottom plate is oblique to the pre-embedded steel plate and reinforcement mesh, and H-shaped steel is arranged perpendicular to the steel plate.
作为优选,所述的底板牛腿背坑面包括垂直于所述地下室基础底板的垂直底板段和与所述的垂直底板段斜向连接的斜向连接段,所述的垂直底板段和斜向连接段均垂直设置有H型钢。 Preferably, the floor corbel back pit surface includes a vertical floor section perpendicular to the basement foundation floor and an oblique connecting section obliquely connected to the vertical floor section, and the vertical floor section and the oblique The connecting sections are all vertically provided with H-shaped steel.
综上所述,使用本实用新型中所述的基坑支护装置进行的基坑支护实施方法适用于周边环境为三个方向已施工支护桩,一个方向无支护装的大面积深基坑工程的施工,有效避免了传统混凝土内支撑体系支护成本高,施工周期长的缺点,而且降低了支护体系的造价,适合用于周边土质分层和场地地下水情况复杂的工程。 In summary, the foundation pit support implementation method carried out using the foundation pit support device described in the utility model is suitable for large-area deep piles that have been constructed in three directions in the surrounding environment and have no support in one direction. The construction of the foundation pit project effectively avoids the disadvantages of high support cost and long construction period of the traditional concrete internal support system, and reduces the cost of the support system. It is suitable for projects with surrounding soil stratification and complex groundwater conditions.
附图说明 Description of drawings
图1是本实用新型基坑支护装置的结构示意图; Fig. 1 is the structural representation of the utility model foundation pit supporting device;
图2是冠梁牛腿的放大示意图; Fig. 2 is the enlarged schematic diagram of crown beam corbel;
图3是底板牛腿的放大示意图; Figure 3 is an enlarged schematic view of the base plate corbel;
图中,1、周边支护桩;2、冠梁牛腿;3、底板牛腿;4、钢围檩;5、地下室基础底板;6、双拼H型钢;7、钢板;8、钢筋网;9、H型钢。 In the figure, 1. Peripheral support piles; 2. Crown beam corbels; 3. Bottom plate corbels; 4. Steel purlins; 5. Basement foundation floor; 6. Double H-shaped steel; 7. Steel plates; ; 9, H-shaped steel.
具体实施方式 Detailed ways
以下结合附图对本实用新型作进一步详细说明。 Below in conjunction with accompanying drawing, the utility model is described in further detail.
使用该实用新型一个典型实施工程:工程地块面积1.4万方,建筑面积1.03万方,基坑周长约350米,含支护桩部分270米,土方开挖2万立方,土质以砂为主,具体分为6层,地基土自上而下分层的工程特性指标如下: A typical implementation project using this utility model: the project site area is 14,000 square meters, the construction area is 10,300 square meters, the circumference of the foundation pit is about 350 meters, the part including the support pile is 270 meters, the earth excavation is 20,000 cubic meters, and the soil quality is sand. Mainly, it is specifically divided into 6 layers, and the engineering characteristic indexes of foundation soil layered from top to bottom are as follows:
层高为3.8米-6.0米,基础形式为桩筏基础,筏板厚度400毫米-500毫米;顶板厚度为150毫米-200毫米,降水井共25口,井深20米。本工程基坑周边均已经施工支护桩,基坑距离海边直线距离约100米,地下水位埋深约1米左右。地下水类型主要赋存于砂土层中,无承压性,水头埋深在5米左右,同区域海洋水体联系密切,水量丰富,对地下工程施工及维护影响大。 The storey height is 3.8m-6.0m, the foundation form is a piled raft foundation, the thickness of the raft is 400mm-500mm; the thickness of the roof is 150mm-200mm, and there are 25 precipitation wells with a depth of 20m. Supporting piles have been constructed around the foundation pit of this project. The straight-line distance from the foundation pit to the sea is about 100 meters, and the groundwater level is about 1 meter deep. The type of groundwater mainly exists in the sandy soil layer without pressure bearing, and the buried depth of the water head is about 5 meters. It is closely connected with the regional marine water body, and the water volume is abundant, which has a great impact on the construction and maintenance of underground projects.
如图1所示,一种基坑支护装置,包括周边支护桩1,在周边支护桩1顶端处设有冠梁牛腿2,在所述冠梁牛腿2下方靠近顶端处设有钢围檩4,地下室基础底板5顶面设置底板牛腿3,底板牛腿3锚入底板。在周边支护桩1内插500*30*11*28的双拼H型钢6,桩体内所插型钢长度相等;其中一条双拼H型钢6斜向钢管支撑一端支撑在钢围檩4上,另一端支撑在底板牛腿3上;另一条双拼H型钢6斜向钢管支撑一端支撑在冠梁牛腿2上,另一端支撑在底板牛腿3上。 As shown in Figure 1, a foundation pit support device includes a peripheral support pile 1, a crown beam corbel 2 is provided at the top of the peripheral support pile 1, and a crown beam corbel 2 is provided below the crown beam corbel 2 near the top. There are steel purlins 4, basement corbels 3 are arranged on the top surface of basement base plate 5, and base plate corbels 3 are anchored into the base plate. A pair of H-shaped steel 6 of 500*30*11*28 is inserted in the peripheral support pile 1, and the length of the inserted steel in the pile body is equal; The other end is supported on the corbel 3 of the bottom plate; the other end is supported on the corbel 2 of the crown beam, and the other end is supported on the corbel 3 of the bottom plate.
如图2所示,冠梁牛腿2的迎坑面斜向预埋钢板7和钢筋网8,垂直于所述的钢板7设置H型钢9。 As shown in FIG. 2 , the pit-facing surface of crown beam corbel 2 obliquely embeds steel plate 7 and steel mesh 8 , and H-shaped steel 9 is arranged perpendicular to said steel plate 7 .
如图3所示,底板牛腿3背坑面斜向预埋钢板7和钢筋网8,包括垂直于地下室基础底板的垂直底板段和与垂直底板段斜向连接的斜向连接段,垂直底板段和斜向连接段均垂直于钢板7设置H型钢9。 As shown in Fig. 3, the steel plate 7 and steel mesh 8 are embedded obliquely on the back pit surface of the corbel 3 of the floor, including the vertical floor section perpendicular to the foundation floor of the basement and the oblique connecting section connected obliquely to the vertical floor section, and the vertical floor Both the section and the oblique connection section are perpendicular to the steel plate 7 and the H-shaped steel 9 is arranged.
根据以上基坑的周边环境,使用该基坑支护装置进行基坑支护施工方法如下: According to the surrounding environment of the above foundation pit, the foundation pit support construction method using the foundation pit support device is as follows:
(一) 中心区域盆式开挖,采用预留土方式层层向外推进; (1) Basin-type excavation in the central area, using the method of reserved soil to advance layer by layer;
(二) 中心区域地下室基础底板5及结构施工; (2) Basement foundation floor 5 and structural construction in the central area;
(三) 在中心区域地下室基础底板5及结构施工完成后,在周边支护桩1向内施工钢支撑,支撑于中心区域地下室基础底板5上; (3) After the foundation floor 5 and structure construction of the basement in the central area is completed, steel supports shall be built inwards on the surrounding support piles 1 and supported on the basement floor 5 of the basement in the central area;
(四) 开挖该区域土方; (4) Excavating the earthwork in the area;
(五) 施工该区域地下室基础底板5及结构; (5) Construction of basement foundation floor 5 and structure in this area;
(六) 待地下室基础底板5混凝土强度达到要求后拆除钢结构支撑 。 (6) Remove the steel structure support after the concrete strength of the foundation floor 5 of the basement meets the requirements.
其中步骤三中施工钢支撑之前,先将钢支撑按照基坑内净尺寸长度拼接完成,然后采用两吊点吊法,整体吊装到位,安装到位后用钢楔子填充所述钢支撑空挡,并敲密实。所述的钢支撑设置为两道双拼H型钢6支撑,两道双拼H型钢6支撑之间的水平间距为9m。钢支撑施工完后,支撑与腰梁及冠梁牛腿2和底板牛腿3之间的缝隙须用细石砼嵌满保证端面全部受力。 Before constructing the steel support in step 3, the steel support is spliced according to the net size and length of the foundation pit, and then the two lifting point hoisting method is used to hoist it in place as a whole. . The steel support is set as two double H-shaped steel 6 supports, and the horizontal distance between the two double H-shaped steel 6 supports is 9m. After the construction of the steel support is completed, the gap between the support and the waist beam, the crown beam corbel 2 and the floor corbel 3 must be filled with fine stone concrete to ensure that the end faces are fully stressed.
步骤三中的双拼H型钢6支撑施工与所述步骤四中的开挖该区域土方交替进行 。 The construction of double H-shaped steel 6 supports in step 3 and the excavation of the earthwork in this area in step 4 are carried out alternately.
步骤三中的双拼H型钢6支撑施工与步骤五中的地下室基础底板5及结构施工交替进行。 The construction of double H-shaped steel 6 supports in step 3 and the construction of basement foundation floor 5 and structure in step 5 are carried out alternately.
本具体实施例仅仅是对本实用新型的解释,其并不是对本实用新型的限制,本领域技术人员在阅读完本说明书后可以根据需要对本实施例做出没有创造性贡献的修改,但只要在本实用新型的权利要求范围内都受到专利法的保护。 This specific embodiment is only an explanation of the utility model, and it is not a limitation of the utility model. After reading this description, those skilled in the art can make modifications to the embodiment without creative contribution according to needs, but as long as it is within the utility model All new claims are protected by patent law.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520286815.0U CN204715364U (en) | 2015-05-06 | 2015-05-06 | A kind of foundation pit support device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520286815.0U CN204715364U (en) | 2015-05-06 | 2015-05-06 | A kind of foundation pit support device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204715364U true CN204715364U (en) | 2015-10-21 |
Family
ID=54314368
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520286815.0U Expired - Fee Related CN204715364U (en) | 2015-05-06 | 2015-05-06 | A kind of foundation pit support device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204715364U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104947682A (en) * | 2015-05-06 | 2015-09-30 | 中国地质大学(武汉) | Foundation pit support construction method and device thereof |
CN106978812A (en) * | 2017-03-09 | 2017-07-25 | 中国建筑第八工程局有限公司 | The support-replacing system and support replacement method of the outer existing structures of foundation ditch in foundation pit construction |
CN111119198A (en) * | 2020-01-15 | 2020-05-08 | 中建铁路投资建设集团有限公司 | A reinforced structure that is used for SMW worker method stake to strut system |
CN113846651A (en) * | 2021-11-08 | 2021-12-28 | 珠海市建筑设计院 | A kind of foundation pit supporting structure and construction method thereof |
-
2015
- 2015-05-06 CN CN201520286815.0U patent/CN204715364U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104947682A (en) * | 2015-05-06 | 2015-09-30 | 中国地质大学(武汉) | Foundation pit support construction method and device thereof |
CN106978812A (en) * | 2017-03-09 | 2017-07-25 | 中国建筑第八工程局有限公司 | The support-replacing system and support replacement method of the outer existing structures of foundation ditch in foundation pit construction |
CN111119198A (en) * | 2020-01-15 | 2020-05-08 | 中建铁路投资建设集团有限公司 | A reinforced structure that is used for SMW worker method stake to strut system |
CN113846651A (en) * | 2021-11-08 | 2021-12-28 | 珠海市建筑设计院 | A kind of foundation pit supporting structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104947682A (en) | Foundation pit support construction method and device thereof | |
CN104453274B (en) | Method for supporting existing building underground with support structure and underpinning structure | |
CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
CN103195085B (en) | Downward story-adding basement and construction method thereof | |
CN100455731C (en) | Guide pit type manual pot holing pile reinforing and underpinning method for building foundation and composite supporting pile | |
CN103938634B (en) | A kind of deep foundation pit supporting structure and construction method | |
CN204715364U (en) | A kind of foundation pit support device | |
CN103741706B (en) | A kind of deep water open type combination foundation harbour and construction method thereof | |
CN207092107U (en) | A kind of anti-subsidence structure using diaphram wall | |
CN105240018A (en) | Vertical shaft construction device and method | |
CN109183838A (en) | A kind of high anti-floating cracking resistance basement floor constructions and its design method | |
CN105421477A (en) | Construction method for tower crane foundation | |
CN202559368U (en) | Subsidence-reducing pile structure of capped steel pipe of immersed tunnel | |
CN101314942A (en) | Inverted T-shaped conduit wall pile foundation breakwater | |
CN205382942U (en) | Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility | |
CN102220764B (en) | Construction method of deep foundation pit bracing system | |
CN211646415U (en) | Prefabricated enclosure structure for narrow deep foundation pit | |
CN202644589U (en) | Soft soil geology pre-stress tube pile static pressing anti-soil-squeezing structure | |
CN104727289B (en) | A kind of construction method controlling multi-layered aquifer leakage-releasing water protection surrounding | |
CN204370417U (en) | A kind of for base pit engineering external corner or the road place of going along with sb. to guard him to drawing cable bolting structure | |
CN203821399U (en) | Deep foundation pit supporting structure | |
CN205502069U (en) | Basement outer wall fabricated construction based on excavation supporting stake | |
CN211446904U (en) | Prestressed pipe pile foundation structure containing deep boulder | |
CN203603162U (en) | Construction elevator load basic system based on foundation pit edge | |
CN202007407U (en) | Deep foundation pit supporting system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151021 Termination date: 20160506 |