CN204703179U - 一种复合土工膜斜墙围堰 - Google Patents
一种复合土工膜斜墙围堰 Download PDFInfo
- Publication number
- CN204703179U CN204703179U CN201520396420.6U CN201520396420U CN204703179U CN 204703179 U CN204703179 U CN 204703179U CN 201520396420 U CN201520396420 U CN 201520396420U CN 204703179 U CN204703179 U CN 204703179U
- Authority
- CN
- China
- Prior art keywords
- weir
- anchoring
- membrane
- composite geo
- weir body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002131 composite material Substances 0.000 title claims abstract description 27
- 239000012528 membrane Substances 0.000 title claims abstract description 27
- 238000004873 anchoring Methods 0.000 claims abstract description 28
- 239000000463 material Substances 0.000 claims abstract description 8
- 230000008878 coupling Effects 0.000 claims abstract description 4
- 238000010168 coupling process Methods 0.000 claims abstract description 4
- 238000005859 coupling reaction Methods 0.000 claims abstract description 4
- 230000007704 transition Effects 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000004744 fabric Substances 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000004078 waterproofing Methods 0.000 claims description 6
- 239000004746 geotextile Substances 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 6
- 230000000694 effects Effects 0.000 description 7
- 230000002265 prevention Effects 0.000 description 4
- 238000004062 sedimentation Methods 0.000 description 2
- 240000007643 Phytolacca americana Species 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
本实用新型公开了一种复合土工膜斜墙围堰,包括堰体,所述堰体设有堰体堆石料,所述堰体堆石料上依次设有堰体过渡料、堰体垫层料和混凝土挤压边墙,所述堰体的顶部设锚固混凝土,所述堰体的表面铺设有复合土工膜,所述复合土工膜的顶部采用机械锚固方式与堰体顶部的锚固混凝土锚固;所述复合土工膜底部采用机械锚固方式与堰体下部的防渗结构锚固混凝土锚固,所述防渗结构锚固混凝土的上面铺盖有粘土层,所述堰体的堰顶及堰底均预留伸缩节,所述堰体的堰顶部锚固沟浇筑混凝土堰顶防浪墙;本实用新型的优点在于:结构牢固,防渗效果好,使用寿命长。
Description
技术领域
本实用新型涉及一种围堰,具体地说是一种复合土工膜斜墙围堰,属于围堰领域。
背景技术
由于水利水电工程的特殊性,围堰及其防渗体系必须在一个枯水期内完工,即在截流后的第一个汛期就要发挥挡水度汛作用,围堰及其防渗体系施工周期很短,工期十分紧张。如不能按期完成围堰及其防渗体系施工,大坝建设工期将推迟一年,延迟发电,造成巨大的经济损失;同时,如围堰及其防渗体系无法在汛前完工,汛期面临着巨大的工程安全风险,危及下游人民生命财产安全。
实用新型内容
为了解决上述问题,本实用新型设计了一种复合土工膜斜墙围堰,结构牢固,防渗效果好。
本实用新型的技术方案为:
一种复合土工膜斜墙围堰,包括堰体,所述堰体设有堰体堆石料,所述堰体堆石料上依次设有堰体过渡料、堰体垫层料和混凝土挤压边墙,所述堰体的顶部设锚固混凝土,所述堰体的表面铺设有复合土工膜,所述复合土工膜的顶部采用机械锚固方式与堰体顶部的锚固混凝土锚固;所述复合土工膜底部采用机械锚固方式与堰体下部的防渗结构锚固混凝土锚固,所述防渗结构锚固混凝土的上面铺盖有粘土层,起压重及辅助防渗效果,所述堰体的堰顶及堰底均预留伸缩节,以适应围堰沉降变形,减少堰顶部及堰底部锚固部位的应力,在复合土工膜表面喷混凝土封闭防护,所述堰体的堰顶部锚固沟浇筑混凝土堰顶防浪墙。
进一步地,所述防渗结构包括内侧管桩和外侧防护桩,该内侧管桩为间隔设置的多根,该外侧防护桩亦为间隔设置的多根,且均插入至地面内,从而起到基础定位作用,所述内侧管桩的内侧设有钢板桩,所述的钢板桩和外侧防护桩之间填充有土工膜袋,所述土工膜袋填充有粉砂土。
进一步地,所述土工膜袋按由长到短顺序依次上下交错层叠形成横端面为梯形的闭合的围合体,提高了防渗效果。
进一步地,所述复合土工膜包括上下两个防水层和中间基布,所述防水层为氯化聚乙烯膜,所述中间基布为由纬线和经线相互编织而成的机织土工布,在经线和纬线之间间隔均匀分布有若干加筋绳,强度高、抗拉强度高,延伸率低、抗顶破撕裂性能好、耐戳破性能好、不易被石渣戳破,能有效的防水,有效疏通道床排水,减缓道床脏污。
本实用新型的优点在于:结构牢固,防渗效果好,使用寿命长。
下面结合附图和实施例对本实用新型作进一步说明。
附图说明
图1为本实用新型实施例的结构示意图。
具体实施方式
以下对本实用新型的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本实用新型,并不用于限定本实用新型。
实施例1
如图1所示,一种复合土工膜斜墙围堰,包括堰体,所述堰体设有堰体堆石料6,所述堰体堆石料6上依次设有堰体过渡料7、堰体垫层料8和混凝土挤压边墙9,所述堰体的顶部设锚固混凝土13,所述堰体的表面铺设有复合土工膜10,所述复合土工膜的顶部采用机械锚固方式与堰体顶部的锚固混凝土13锚固;所述复合土工膜底部采用机械锚固方式与堰体下部的防渗结构3锚固混凝土锚固,所述防渗结构锚固混凝土的上面铺盖有粘土层14,起压重及辅助防渗效果,所述堰体的堰顶及堰底均预留伸缩节11,以适应围堰沉降变形,减少堰顶部及堰底部锚固部位的应力,在复合土工膜表面喷混凝土封闭防护,所述堰体的堰顶部锚固沟浇筑混凝土堰顶防浪墙15。
所述复合土工膜包括上下两个防水层和中间基布,所述防水层为氯化聚乙烯膜,所述中间基布为由纬线和经线相互编织而成的机织土工布,在经线和纬线之间间隔均匀分布有若干加筋绳。
其中,所述防渗结构3包括内侧管桩和外侧防护桩,该内侧管桩为间隔设置的多根,该外侧防护桩亦为间隔设置的多根,且均插入至地面内,从而起到基础定位作用,所述内侧管桩的内侧设有钢板桩,所述的钢板桩和外侧防护桩之间填充有土工膜袋,所述土工膜袋填充有粉砂土。
另外,所述土工膜袋3按由长到短顺序依次上下交错层叠形成横端面为梯形的闭合的围合体,提高了防渗效果。
Claims (3)
1.一种复合土工膜斜墙围堰,其特征在于:包括堰体,所述堰体设有堰体堆石料,所述堰体堆石料上依次设有堰体过渡料、堰体垫层料和混凝土挤压边墙,所述堰体的顶部设锚固混凝土,所述堰体的表面铺设有复合土工膜,所述复合土工膜的顶部采用机械锚固方式与堰体顶部的锚固混凝土锚固;所述复合土工膜底部采用机械锚固方式与堰体下部的防渗结构锚固混凝土锚固,所述防渗结构锚固混凝土的上面铺盖有粘土层,所述堰体的堰顶及堰底均预留伸缩节,所述堰体的堰顶部锚固沟浇筑混凝土堰顶防浪墙;所述防渗结构包括内侧管桩和外侧防护桩,该内侧管桩为间隔设置的多根,该外侧防护桩亦为间隔设置的多根,且均插入至地面内,所述内侧管桩的内侧设有钢板桩,所述的钢板桩和外侧防护桩之间填充有土工膜袋,所述土工膜袋填充有粉砂土。
2.根据权利要求1所述的一种复合土工膜斜墙围堰,其特征在于:所述复合土工膜包括上下两个防水层和中间基布,所述防水层为氯化聚乙烯膜,所述中间基布为由纬线和经线相互编织而成的机织土工布,在经线和纬线之间间隔均匀分布有若干加筋绳。
3.根据权利要求1所述的一种复合土工膜斜墙围堰,其特征在于:所述土工膜袋按由长到短顺序依次上下交错层叠形成横端面为梯形的闭合的围合体。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520396420.6U CN204703179U (zh) | 2015-06-10 | 2015-06-10 | 一种复合土工膜斜墙围堰 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520396420.6U CN204703179U (zh) | 2015-06-10 | 2015-06-10 | 一种复合土工膜斜墙围堰 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204703179U true CN204703179U (zh) | 2015-10-14 |
Family
ID=54282805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520396420.6U Expired - Fee Related CN204703179U (zh) | 2015-06-10 | 2015-06-10 | 一种复合土工膜斜墙围堰 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204703179U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106150098A (zh) * | 2016-08-30 | 2016-11-23 | 中国葛洲坝集团三峡建设工程有限公司 | 一种大高差斜坡面薄层无砂混凝土快速施工方法 |
CN107460863A (zh) * | 2017-07-21 | 2017-12-12 | 中铁二院工程集团有限责任公司 | 一种适用于岩溶路基加固的高强复合土工布 |
CN108487310A (zh) * | 2018-03-15 | 2018-09-04 | 济南市市政工程设计研究院(集团)有限责任公司 | 减小管道与建筑物水平净距要求的土工膜隔离施工工艺 |
CN109295930A (zh) * | 2018-10-12 | 2019-02-01 | 中国电建集团西北勘测设计研究院有限公司 | 一种面板坝防渗方法 |
CN111197300A (zh) * | 2020-01-09 | 2020-05-26 | 中电建十一局工程有限公司 | 一种土石围堰背坡式防渗坝及逆作施工方法 |
-
2015
- 2015-06-10 CN CN201520396420.6U patent/CN204703179U/zh not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106150098A (zh) * | 2016-08-30 | 2016-11-23 | 中国葛洲坝集团三峡建设工程有限公司 | 一种大高差斜坡面薄层无砂混凝土快速施工方法 |
CN106150098B (zh) * | 2016-08-30 | 2019-01-01 | 中国葛洲坝集团三峡建设工程有限公司 | 一种大高差斜坡面薄层无砂混凝土快速施工方法 |
CN107460863A (zh) * | 2017-07-21 | 2017-12-12 | 中铁二院工程集团有限责任公司 | 一种适用于岩溶路基加固的高强复合土工布 |
CN108487310A (zh) * | 2018-03-15 | 2018-09-04 | 济南市市政工程设计研究院(集团)有限责任公司 | 减小管道与建筑物水平净距要求的土工膜隔离施工工艺 |
CN108487310B (zh) * | 2018-03-15 | 2020-06-30 | 济南市市政工程设计研究院(集团)有限责任公司 | 减小管道与建筑物、管道之间水平净距的土工膜隔离工艺 |
CN109295930A (zh) * | 2018-10-12 | 2019-02-01 | 中国电建集团西北勘测设计研究院有限公司 | 一种面板坝防渗方法 |
CN111197300A (zh) * | 2020-01-09 | 2020-05-26 | 中电建十一局工程有限公司 | 一种土石围堰背坡式防渗坝及逆作施工方法 |
CN111197300B (zh) * | 2020-01-09 | 2022-02-18 | 中电建十一局工程有限公司 | 一种土石围堰背坡式防渗坝及逆作施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204703179U (zh) | 一种复合土工膜斜墙围堰 | |
CN206722878U (zh) | 一种矿用轻型充填挡墙 | |
CN207633352U (zh) | 一种用于快速抢险施工的边坡加固结构 | |
CN113073656B (zh) | 一种支护桩桩间土防护结构及其施工方法 | |
CN103233444B (zh) | 水下抛石基床和边坡防冲刷结构及其施工方法 | |
CN103526724A (zh) | 一种水库库底土工膜与库周排水廊道周边缝连接的锚固防渗结构 | |
CN201581510U (zh) | 一种基础底板超前止水后浇带 | |
CN104314089A (zh) | 一种复合土工膜斜墙围堰的方法 | |
CN105019466A (zh) | 一种土石围堰防渗体系的构筑方法及结构 | |
CN208981282U (zh) | 一种高地震区混凝土面板堆石坝坝顶结构 | |
CN109629609A (zh) | 利用稻壳灰混凝土的填埋场衬垫层锚固结构 | |
CN115538495B (zh) | 一种海上风电多边形基础防冲刷系统施工方法 | |
CN204898609U (zh) | 一种下沉式面板缝止水防护结构 | |
CN114753313B (zh) | 一种小型水库坝体防渗结构 | |
CN209429053U (zh) | 一种面板坝的防渗结构 | |
CN207176628U (zh) | 一种土石坝防渗止水结构 | |
CN209129039U (zh) | 一种桩头防水构造 | |
CN105970882A (zh) | 解决面板坝施工期坝体反渗水问题的结构及其构造方法 | |
CN110331701A (zh) | 一种软土地基上的整体预制型水闸闸室结构及其施工方法 | |
CN206768831U (zh) | 一种钢管前撑、锚索后拉hu型围护结构 | |
CN212452502U (zh) | 面膜堆石坝面膜-趾板柔性防渗连接结构 | |
CN206015619U (zh) | 一种降低面板应力应变水平的面板堆石坝 | |
CN214783691U (zh) | 坝体心墙土工膜与基础混凝土结构的双防线柔性锚固结构及大坝 | |
CN204551378U (zh) | 一种堆石坝上游面表层的防渗结构 | |
CN203188174U (zh) | 水下抛石基床和边坡防冲刷结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151014 Termination date: 20170610 |