CN204662950U - High tower hydraulic climbing scaffold main working platform installation suspension - Google Patents

High tower hydraulic climbing scaffold main working platform installation suspension Download PDF

Info

Publication number
CN204662950U
CN204662950U CN201520304693.3U CN201520304693U CN204662950U CN 204662950 U CN204662950 U CN 204662950U CN 201520304693 U CN201520304693 U CN 201520304693U CN 204662950 U CN204662950 U CN 204662950U
Authority
CN
China
Prior art keywords
high tower
hydraulic climbing
pin
hook
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520304693.3U
Other languages
Chinese (zh)
Inventor
葛伟青
卢立成
胡敏磊
陈春
蒋欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG XINJIE CONSTRUCTION CO Ltd
Original Assignee
ZHEJIANG XINJIE CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG XINJIE CONSTRUCTION CO Ltd filed Critical ZHEJIANG XINJIE CONSTRUCTION CO Ltd
Priority to CN201520304693.3U priority Critical patent/CN204662950U/en
Application granted granted Critical
Publication of CN204662950U publication Critical patent/CN204662950U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

High tower hydraulic climbing scaffold main working platform installation suspension; It is constructed as follows: embedded quit (1), hook (2), hook fixation kit (3), suspension pin (4); Wherein: embedded quit (1) is provided with and respectively carries two junction plates (12) arranged in pairs that is hung pin installing hole (11), two the two levels of suspension pin installing hole (11) on two junction plates (12) are coaxially arranged; Hang pin (4) and hang pin installing hole (11) through two simultaneously; Hook (2) is fixed on high tower hydraulic climbing scaffold (8) to be hung by hook fixation kit (3), hook (2) is provided with the semi-circular recesses (21) of opening downwards; Semi-circular recesses (21) is articulated in and hangs on pin (4).The utility model has the advantages that: be convenient to industrialization of construction industry construction, in-site installation is very convenient, fixing reliable, effective; It has expected comparatively huge economic worth and social value.

Description

High tower hydraulic climbing scaffold main working platform installation suspension
Technical field
The utility model relates to structure design and the applied technical field of the suspension structure of high tower hydraulic climbing scaffold, specifically provides a kind of high tower hydraulic climbing scaffold main working platform installation suspension.
Background technology
In prior art, high tower hydraulic climbing scaffold is normally designed by professional, adopt standard configurations, (form surfacing and climbing frame platform can be designed to be applicable to difform king-post and gradient can to adapt to the actual needs of various engineering, when Sarasota cross sectional shape changes, only need do form surfacing and platform and adjust on a small quantity).High tower hydraulic climbing scaffold can be made up of multilayer platform.Multilayer operation platform is respectively linked with in each direction of pier shaft or high tower, constructor independently can carry out various constructing operation (as assembling reinforcement, installation form, modification tower body etc.) on every layer of platform in each direction, both the engineering time had been saved, also for high tower construction provides enough construction spaces.
The main working platform installation of existing high tower hydraulic climbing scaffold is generally bolt by suspension and connects, rivets, ties up the forms such as fixing, but its technique effect is comparatively limited, and during construction, human cost is high.People urgently wish to obtain the excellent high tower hydraulic climbing scaffold main working platform installation suspension of a kind of technique effect.
Utility model content
Order of the present utility model is to provide the excellent high tower hydraulic climbing scaffold main working platform installation suspension of a kind of technique effect.
High tower hydraulic climbing scaffold described in the utility model main working platform installation suspension; Stiff skeleton 9 is fixed on for being hung by high tower hydraulic climbing scaffold 8; It is characterized in that: being constructed as follows of high tower hydraulic climbing scaffold main working platform installation suspension: embeddedly quit 1, hook 2, hook fixation kit 3, hang pin 4; Wherein: embedded quitting 1 is fixed on stiff skeleton 9, embedded quitting to be provided with two of respectively carrying on two junction plates arranged in pairs, 12, two junction plates 12 hanging pin installing hole 11 on 1 to hang pin both installing holes 11 levels coaxially arranged; Hang pin 4 and hang pin installing hole 11 through two simultaneously; Hook 2 is fixed on high tower hydraulic climbing scaffold 8 to be hung by hook fixation kit 3, hook 2 is provided with the semi-circular recesses 21 of opening downwards; The semi-circular recesses 21 that in hook 2, Open Side Down is articulated in and hangs on pin 4.
Described high tower hydraulic climbing scaffold main working platform installation suspension, is characterized in that: embedded quitting 1 uses in pairs, and often couple embedded two of quitting in 1 are embedded to quit and 1 to be arranged in parallel in the horizontal direction; Each embedded quitting on 1 is provided with a junction plate 12, each junction plate 12 is provided with both suspension pin installing holes 11 level hung on the embedded respective junction plate 12 of quitting on 1 of pin installing hole 11, two coaxially arranged.
Described high tower hydraulic climbing scaffold main working platform installation suspension, it is characterized in that: in described high tower hydraulic climbing scaffold main working platform installation suspension, be also provided with safety pin 5, described high tower hydraulic climbing scaffold main working platform installation suspension also meets following requirement: junction plate 12 is also provided with safety pin mounting hole 13, and safety pin 5 is arranged in the safety pin mounting hole 13 on two junction plates 12 of horizontal pair layout.
The utility model has the advantages that: be convenient to industrialization of construction industry construction, in-site installation is very convenient, fixing reliable, effective; It has expected comparatively huge economic worth and social value.
Accompanying drawing explanation
Fig. 1 is high tower hydraulic climbing scaffold main working platform installation suspension principle of compositionality schematic diagram.
Detailed description of the invention
Embodiment 1
High tower hydraulic climbing scaffold main working platform installation suspension; Stiff skeleton 9 is fixed on for being hung by high tower hydraulic climbing scaffold 8; Being constructed as follows of high tower hydraulic climbing scaffold main working platform installation suspension: embeddedly quit 1, hook 2, hook fixation kit 3, hang pin 4; Wherein: embedded quitting 1 is fixed on stiff skeleton 9, embedded quitting to be provided with two of respectively carrying on two junction plates arranged in pairs, 12, two junction plates 12 hanging pin installing hole 11 on 1 to hang pin both installing holes 11 levels coaxially arranged; Hang pin 4 and hang pin installing hole 11 through two simultaneously; Hook 2 is fixed on high tower hydraulic climbing scaffold 8 to be hung by hook fixation kit 3, hook 2 is provided with the semi-circular recesses 21 of opening downwards; The semi-circular recesses 21 that in hook 2, Open Side Down is articulated in and hangs on pin 4, thus high tower hydraulic climbing scaffold 8 suspension is fixed on stiff skeleton 9.
In described high tower hydraulic climbing scaffold main working platform installation suspension, embedded quitting 1 uses in pairs, and often couple embedded two of quitting in 1 are embedded to quit and 1 to be arranged in parallel in the horizontal direction; Each embedded quitting on 1 is provided with a junction plate 12, each junction plate 12 is provided with both suspension pin installing holes 11 level hung on the embedded respective junction plate 12 of quitting on 1 of pin installing hole 11, two coaxially arranged.
Safety pin 5 is also provided with in described high tower hydraulic climbing scaffold main working platform installation suspension, described high tower hydraulic climbing scaffold main working platform installation suspension also meets following requirement: junction plate 12 is also provided with safety pin mounting hole 13, and safety pin 5 is arranged in the safety pin mounting hole 13 on two junction plates 12 of horizontal pair layout.
The advantage of the present embodiment is: be convenient to industrialization of construction industry construction, in-site installation is very convenient, fixing reliable, effective; It has expected comparatively huge economic worth and social value.

Claims (3)

1. high tower hydraulic climbing scaffold main working platform installation suspension; Stiff skeleton (9) is fixed on for being hung by high tower hydraulic climbing scaffold (8); It is characterized in that: being constructed as follows of high tower hydraulic climbing scaffold main working platform installation suspension: embedded quit (1), hook (2), hook fixation kit (3), suspension pin (4); Wherein: embedded quit (1) is fixed on stiff skeleton (9), embedded quit (1) is provided with and respectively carries two junction plates (12) arranged in pairs that is hung pin installing hole (11), two the two levels of suspension pin installing hole (11) on two junction plates (12) are coaxially arranged; Hang pin (4) and hang pin installing hole (11) through two simultaneously; Hook (2) is fixed on high tower hydraulic climbing scaffold (8) to be hung by hook fixation kit (3), hook (2) is provided with the semi-circular recesses (21) of opening downwards; Semi-circular recesses (21) in hook (2) is articulated in and hangs on pin (4).
2. according to high tower hydraulic climbing scaffold main working platform installation suspension described in claim 1, it is characterized in that: embedded quit (1) uses in pairs, often pair of embedded two of quitting in (1) embedded quit (1) is arranged in parallel in the horizontal direction; Each embedded quit (1) is provided with a junction plate (12), each junction plate (12) is provided with one and hangs pin installing hole (11), the two level of the suspension pin installing hole (11) on two embedded respective junction plates (12) of quitting on (1) is coaxially arranged.
3. according to high tower hydraulic climbing scaffold main working platform installation suspension described in claim 1 or 2, it is characterized in that: in described high tower hydraulic climbing scaffold main working platform installation suspension, be also provided with safety pin (5), described high tower hydraulic climbing scaffold main working platform installation suspension also meets following requirement: junction plate (12) is also provided with safety pin mounting hole (13), and safety pin (5) is arranged in the safety pin mounting hole (13) on two junction plates (12) of horizontal pair layout.
CN201520304693.3U 2015-05-12 2015-05-12 High tower hydraulic climbing scaffold main working platform installation suspension Expired - Fee Related CN204662950U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520304693.3U CN204662950U (en) 2015-05-12 2015-05-12 High tower hydraulic climbing scaffold main working platform installation suspension

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520304693.3U CN204662950U (en) 2015-05-12 2015-05-12 High tower hydraulic climbing scaffold main working platform installation suspension

Publications (1)

Publication Number Publication Date
CN204662950U true CN204662950U (en) 2015-09-23

Family

ID=54133345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520304693.3U Expired - Fee Related CN204662950U (en) 2015-05-12 2015-05-12 High tower hydraulic climbing scaffold main working platform installation suspension

Country Status (1)

Country Link
CN (1) CN204662950U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166752A (en) * 2017-11-23 2018-06-15 中国建筑股份有限公司 Scalable supporting body and its application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166752A (en) * 2017-11-23 2018-06-15 中国建筑股份有限公司 Scalable supporting body and its application method

Similar Documents

Publication Publication Date Title
CN104088227A (en) Rear pull rod
CN204662951U (en) High tower hydraulic climbing scaffold
CN104099877A (en) Connecting bar
CN204662950U (en) High tower hydraulic climbing scaffold main working platform installation suspension
CN206308702U (en) A kind of portable basis of derrick crane
CN205653104U (en) Movable crane for installing unit plate curtain wall
CN204342306U (en) A kind of novel roofing crane foundation
CN204529248U (en) Vehicle-mounted mobile platform is installed in gobo lifting
CN103266572B (en) A kind of Multifunctional construction platform for straining beam cast-in-place construction between double width bridge
CN203096620U (en) Steel pipe arch rib operation platform
CN202689588U (en) Safety rope cantilever support
CN205087776U (en) Can dismantle otic placode device
CN203654698U (en) Attached lifting scaffold structure provided with double guide rails
CN203684394U (en) Supporting device for framework structure
CN202865743U (en) Dragline device of large-scale bridge girder
CN205530326U (en) Tower crane landing leg anchor
CN204251217U (en) A kind of formwork hoisting strut bar
CN204703537U (en) To build a wall servicing unit
CN203320976U (en) Suspension device for safety plain net for construction of industrial factory buildings
CN204455846U (en) The hoisting appliance of the prefabricated pier of a kind of large-tonnage
CN204728722U (en) Construction formwork lifting device
CN204875557U (en) Rhombus false work
CN205500545U (en) Hoisting device for tower crane
CN204000615U (en) A kind of lifting climbing frame
CN205171385U (en) Rhombus false work for bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150923