CN204643648U - Pylon and hanging basket thereof - Google Patents

Pylon and hanging basket thereof Download PDF

Info

Publication number
CN204643648U
CN204643648U CN201520252816.3U CN201520252816U CN204643648U CN 204643648 U CN204643648 U CN 204643648U CN 201520252816 U CN201520252816 U CN 201520252816U CN 204643648 U CN204643648 U CN 204643648U
Authority
CN
China
Prior art keywords
frame
tower
hanging basket
wire rope
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520252816.3U
Other languages
Chinese (zh)
Inventor
林勇传
叶世昌
谢夏琳
黄键友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi University
Original Assignee
Guangxi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi University filed Critical Guangxi University
Priority to CN201520252816.3U priority Critical patent/CN204643648U/en
Application granted granted Critical
Publication of CN204643648U publication Critical patent/CN204643648U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

本实用新型提供一种塔架及其吊篮,塔架包括支撑平台、连接在支撑平台上的下塔架、部分卡接在下塔架内部的上塔架、连接在上塔架一侧的桁架、连接在上塔架相对桁架另一侧的平衡架,滑接于整个桁架长度的线缆、与线缆自由端相连接的吊钩、以及利用钢丝绳组绕过品字形滑轮组后与平衡架相连接的吊篮;吊篮包括上框架、下框架、位于上框架上方的品字形滑轮组、横向连接在上框架上部的吊梁、安装在上框架的电磁块式制动器及卷筒、以及分别连接在电磁块式制动器及卷筒的轴心一端的手摇操作盘。本实用新型结构简单,安全可靠,适用于建筑工程、码头货运、钻孔灌注桩机等。

The utility model provides a tower frame and its hanging basket. The tower frame includes a support platform, a lower tower frame connected to the support platform, an upper tower frame partially clamped inside the lower tower frame, and a truss connected to one side of the upper tower frame. , the balance frame connected to the other side of the upper tower opposite to the truss, the cable slidingly connected to the entire length of the truss, the hook connected to the free end of the cable, and the balance frame connected with the balance frame after bypassing the square-shaped pulley block by using the steel wire group The connected hanging basket; the hanging basket includes an upper frame, a lower frame, a character-shaped pulley block located above the upper frame, a suspension beam connected to the upper part of the upper frame transversely, an electromagnetic block brake and a reel installed on the upper frame, and connected to the Electromagnetic block brake and manual operation panel at one end of the axis of the reel. The utility model has the advantages of simple structure, safety and reliability, and is suitable for construction projects, wharf freight, bored pile machines and the like.

Description

塔架及其吊篮Tower and its basket

【技术领域】 【Technical field】

本实用新型涉及建筑机械技术领域,具体涉及一种塔架及其吊篮。 The utility model relates to the technical field of construction machinery, in particular to a tower frame and a hanging basket thereof.

【背景技术】 【Background technique】

目前,随着楼房升高,塔架也得升高,跟着作为加重物容器的吊篮也随之升高了,这样的结构存在着安全隐患。另外,随着楼房的加高而升高塔架时,通常是将上塔架与下塔架采用焊接方式或螺栓穿接方式,无论是安装还是拆卸流程都比较繁琐。 At present, as the building rises, the tower frame also has to rise, and the hanging basket used as the weight container also rises thereupon. Such a structure has potential safety hazards. In addition, when the tower is raised as the height of the building is raised, the upper tower and the lower tower are usually welded or bolted through, and both the installation and disassembly procedures are cumbersome.

因此,有必要设计一种新的塔架及其吊篮。 Therefore, it is necessary to design a new tower frame and its hanging basket.

【实用新型内容】 【Content of utility model】

针对背景技术所述面临的种种问题,本实用新型的目的在于提供一种塔架,其可随着楼房加高而逐步加高,并且可避免吊篮在塔架升高时吊在空中的不安全隐患。 In view of the various problems faced in the background technology, the purpose of this utility model is to provide a tower frame, which can be gradually increased with the height of the building, and can avoid the inconvenience of hanging the hanging basket in the air when the tower frame is raised. Security risks.

为达到上述目的,本实用新型所采用的技术方案如下: In order to achieve the above object, the technical scheme adopted in the utility model is as follows:

1.一种塔架,包括支撑平台、连接在支撑平台上的下塔架、部分卡接在下塔架内部的上塔架、连接在上塔架一侧的桁架、连接在上塔架相对桁架另一侧的平衡架,滑接于整个桁架长度的线缆、与线缆自由端相连接的吊钩、以及利用钢丝绳组绕过品字形滑轮组后与平衡架相连接的吊篮;上塔架内部间隔设置有卡紧空间,下塔架上端的四个外侧面均连接有导向钢板,并在其中一块导向钢板内侧的下塔架一侧设有可进入卡紧空间的一自动卡,自动卡下端通过轴承枢接在下塔架的两根钢柱之间,自动卡与外侧的导向钢板之间通过一弹簧相连接,在自然状态下,自动卡向下塔架内部倾斜;在上塔架升高过程中,上塔架通过其钢柱向外推开自动卡以收缩弹簧得以向上移动,在上塔架的卡紧空间刚好对正自动卡时,自动卡在弹簧复位作用力下自动卡入卡紧空间,然后利用螺栓穿过导向钢板及自动卡的螺纹孔旋紧固定,从而使上塔架固定在下塔架上;支撑平台上连接四条围栏柱,供吊篮在其中上下活动;吊篮包括上框架、下框架、位于上框架上方的品字形滑轮组、横向连接在上框架上部的吊梁、安装在上框架的电磁块式制动器及卷筒、以及分别连接在电磁块式制动器及卷筒的轴心一端的手摇操作盘,吊梁长度方向的两端分别安装有横向小滚筒,下框架用于安放多层加重水泥板;钢丝绳组包括第一钢丝绳、第二钢丝绳及第三钢丝绳,第一钢丝绳中部绕过品字形滑轮组的上滑轮后两端固定在平衡架的不同位置上;第二钢丝绳一端固定在电磁块式制动器轴心上, 并缠绕电磁块式制动器数圈,另一端向上经过电磁块式制动器上方的横向小滚筒及品字形滑轮组的左滑轮后固定在吊篮的上框架上;第三钢丝绳一端固定在卷筒轴心上,并缠绕卷筒数圈,另一端向上经过卷筒上方的横向小滚筒及品字形滑轮组的右滑轮后固定在吊篮的上框架上。 1. A tower, comprising a support platform, a lower tower connected to the support platform, an upper tower partially clamped inside the lower tower, a truss connected to one side of the upper tower, and a relative truss connected to the upper tower The balance frame on the other side, the cable slidingly connected to the entire length of the truss, the hook connected to the free end of the cable, and the hanging basket connected to the balance frame after bypassing the zigzag pulley block by the wire rope group; the upper tower There is a clamping space in the internal interval, and the four outer sides of the upper end of the lower tower are connected with guide steel plates, and an automatic card that can enter the clamping space is provided on the side of the lower tower inside one of the guide steel plates. The lower end is pivotally connected between the two steel columns of the lower tower through bearings, and the automatic card is connected with the outer guide steel plate through a spring. In the natural state, the automatic card is tilted inside the lower tower; During the process of raising, the upper tower pushes the automatic card outward through its steel column to move upward by contracting the spring. When the clamping space of the upper tower is just aligned with the automatic card, the automatic card is automatically locked in under the force of the spring reset Clamp the space, and then use bolts to pass through the guide plate and the threaded hole of the automatic card to tighten and fix, so that the upper tower is fixed on the lower tower; four fence columns are connected to the support platform for the hanging basket to move up and down; the hanging basket It includes the upper frame, the lower frame, the pin-shaped pulley block located above the upper frame, the suspension beam connected to the upper part of the upper frame transversely, the electromagnetic block brake and the reel installed on the upper frame, and the electromagnetic block brake and the reel connected respectively. There is a hand-operated operation panel at one end of the axis of the hanging beam, and horizontal small rollers are respectively installed at both ends of the suspension beam. The middle part of the first steel wire rope bypasses the upper pulley of the square-shaped pulley block, and then the two ends are fixed on different positions of the balance frame; one end of the second steel wire rope is fixed on the axis of the electromagnetic block brake, and is wound around the electromagnetic block brake for several laps, and the other end is upward After passing through the small horizontal drum above the electromagnetic block brake and the left pulley of the square-shaped pulley block, it is fixed on the upper frame of the hanging basket; one end of the third steel wire rope is fixed on the axis of the drum, and it is wound around the drum several times, and the other end passes upwards. The horizontal small drum above the reel and the right pulley of the character-shaped pulley block are fixed on the upper frame of the hanging basket.

进一步地,吊梁上设置有两个吊环。 Further, two suspension rings are arranged on the suspension beam.

进一步地,塔架还包括千斤顶及用于承载千斤顶的可移动槽钢,千斤顶及可移动槽钢位于四条围栏柱围成的空间内,并位于吊篮下方。 Further, the tower frame also includes a jack and a movable channel steel for carrying the jack, and the jack and the movable channel steel are located in the space surrounded by the four fence posts and are located under the hanging basket.

进一步地,吊篮的框架由若干条冷弯方管焊接而成。 Furthermore, the frame of the hanging basket is welded by several cold-bent square tubes.

进一步地,下塔架设置有用于放置手拉葫芦的压板。 Further, the lower tower is provided with a pressing plate for placing chain hoists.

进一步地,卡紧空间的顶板焊接有角钢,角钢槽内焊接有方管。 Further, the top plate of the clamping space is welded with angle steel, and a square pipe is welded in the angle steel groove.

2.一种吊篮,吊篮包括上框架、下框架、位于上框架上方的品字形滑轮组、横向连接在上框架上部的吊梁、安装在上框架的电磁块式制动器及卷筒、以及分别连接在电磁块式制动器及卷筒的轴心一端的手摇操作盘;吊梁长度方向的两端分别安装有横向小滚筒,下框架用于安放多层加重水泥板;第一钢丝绳中部绕过品字形滑轮组的上滑轮后两端固定在平衡架的不同位置上;第二钢丝绳一端固定在电磁块式制动器轴心上,并缠绕电磁块式制动器数圈,另一端向上经过电磁块式制动器上方的横向小滚筒及品字形滑轮组的左滑轮后固定在吊篮的上框架上;第三钢丝绳一端固定在卷筒轴心上,并缠绕卷筒数圈,另一端向上经过卷筒上方的横向小滚筒及品字形滑轮组的右滑轮后固定在吊篮的上框架上。 2. A hanging basket, the hanging basket includes an upper frame, a lower frame, a character-shaped pulley block positioned above the upper frame, a suspension beam transversely connected to the upper part of the upper frame, an electromagnetic block brake and a reel installed on the upper frame, and respectively The manual operation panel connected to the electromagnetic block brake and one end of the axis of the reel; the two ends of the length direction of the hanging beam are respectively equipped with small horizontal rollers, and the lower frame is used to place multi-layered weighted cement boards; the middle part of the first steel wire rope is bypassed The rear two ends of the upper pulley of the character-shaped pulley block are fixed on different positions of the balance frame; one end of the second steel wire rope is fixed on the axis of the electromagnetic block brake, and is wound around the electromagnetic block brake for several turns, and the other end passes upwards above the electromagnetic block brake. The horizontal small drum and the left pulley of the character-shaped pulley block are fixed on the upper frame of the hanging basket; one end of the third steel wire rope is fixed on the axis of the drum, and is wound around the drum several times, and the other end passes upward through the small horizontal pulley above the drum. The drum and the right pulley of the zigzag pulley block are fixed on the upper frame of the hanging basket.

进一步地,吊梁上设置有两个吊环。 Further, two suspension rings are arranged on the suspension beam.

进一步地,吊篮的框架由若干条冷弯方管焊接而成。 Furthermore, the frame of the hanging basket is welded by several cold-bent square tubes.

本实用新型的塔架在升高时,通过设置品字形滑轮组放长钢丝绳而达到放低吊篮,保持吊篮在围栏柱的空间内活动,解决背景技术中吊篮随着塔升高而吊在空中的不安全问题,前景广阔;在楼房增高时,塔架也需要相应增高,这时,只需要拧开自动卡上锁紧的螺栓,再利用起重机或手拉葫芦向上拉上塔架,当自动卡遇到上塔架下一个卡紧空间时,自动卡会在弹簧的复位作用力下卡入卡紧空间内,如果升高的高度还不够,则继续向上拉上塔架,使自动卡卡入再下一个卡空间内,最后旋紧螺栓,上塔架和下塔架就牢固地固定在一起了。这样设计,结构简单,可以省去很多繁琐的拆装环节,提高工作效率。 When the tower frame of the utility model is raised, the hanging basket can be lowered by arranging a zigzag-shaped pulley group to extend the length of the steel wire rope, so as to keep the hanging basket moving in the space of the fence column, and solve the problem of hanging the hanging basket as the tower rises in the background technology. The problem of insecurity in the air has broad prospects; when the height of the building is increased, the tower needs to be increased accordingly. At this time, it is only necessary to unscrew the bolts that are automatically locked and locked, and then use a crane or chain hoist to pull up the tower. When the automatic card meets the next clamping space of the upper tower, the automatic card will be clamped into the clamping space under the reset force of the spring. If the raised height is not enough, continue to pull up the tower to make the automatic The card is inserted into the space of the next card, and finally the bolts are tightened, and the upper tower and the lower tower are firmly fixed together. This design has a simple structure, which can save a lot of cumbersome disassembly and assembly links and improve work efficiency.

为便于贵审查委员能对本实用新型的目的、形状、构造、特征及其功效皆能有进一步的认识与了解,并结合实施例作详细说明。 In order to make it easier for your examiner to have a further understanding of the purpose, shape, structure, features and effects of the utility model, it will be described in detail in conjunction with the embodiments.

【附图说明】 【Description of drawings】

图1为本实用新型塔架的结构示意图。 Fig. 1 is the structure schematic diagram of the utility model tower.

图2为本实用新型上塔架与下塔架卡紧固定时的局部结构示意图。 Fig. 2 is a schematic diagram of the local structure when the upper tower and the lower tower of the utility model are clamped and fastened.

图3为本实用新型吊篮吊在平衡架下的结构示意图。 Fig. 3 is a structural schematic diagram of the hanging basket of the utility model hanging under the balance frame.

具体实施方式的附图标号说明: Description of the accompanying drawings for specific embodiments:

支撑平台1 Support platform 1 围栏柱11 Fence Post 11 千斤顶12 jack 12 可移动槽钢13 Removable channel steel 13 下塔架2 lower tower 2 导向钢板21 Guide plate 21 自动卡22 Automatic card 22 轴承23 Bearing 23 弹簧24 spring 24 螺栓25 Bolt 25 螺纹孔26 Threaded hole 26 压板27 Platen 27 上塔架3 upper tower 3 卡紧空间31 Clamping space 31 桁架4 Truss 4 平衡架5 gimbal 5 线缆6 cable 6 吊钩7 Hook 7 吊篮8 Basket 8 上框架81 upper frame 81 下框架82 lower frame 82 品字形滑轮组83 Product-shaped pulley block 83 吊梁84 Hanging beam 84 电磁块式制动器85 Electromagnetic block brake 85 卷筒86 Reel 86 吊环87 Ring 87 横向小滚筒88 Horizontal small roller 88 钢丝绳组9 Wire Rope Set 9 第一钢丝绳91 The first wire rope 91 第二钢丝绳92 Second wire rope 92 第三钢丝绳93 The third wire rope 93 方管0 Square tube 0   the

【具体实施方式】 【Detailed ways】

下面结合附图和具体实施例对本实用新型一种塔架及其吊篮作进一步说明。 A tower frame and its hanging basket of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

请参阅图1,为本实用新型的塔架,其包括支撑平台1、连接在支撑平台1上的下塔架2、部分卡接在下塔架2内部的上塔架3、连接在上塔架3一侧的桁架4、连接在上塔架3相对桁架4另一侧的平衡架5,滑接于整个桁架4长度的线缆6、与线缆6自由端相连接的吊钩7、以及利用钢丝绳组9绕过品字形滑轮组83后与平衡架5相连接的吊篮8。 Please refer to Fig. 1, which is a tower frame of the present utility model, which includes a support platform 1, a lower tower frame 2 connected to the support platform 1, an upper tower frame 3 partly clamped inside the lower tower frame 2, and a lower tower frame connected to the upper tower frame. The truss 4 on one side of the truss 4, the gimbal 5 connected to the opposite side of the truss 4 on the upper tower 3, the cable 6 slidingly connected to the entire length of the truss 4, the hook 7 connected to the free end of the cable 6, and Utilize wire rope group 9 to walk around the hanging basket 8 that is connected with balance frame 5 after the character-shaped pulley block 83.

支撑平台1上连接四条围栏柱11,供吊篮8在其中上下活动。 Four fence columns 11 are connected on the supporting platform 1, and the hanging basket 8 can move up and down therein.

请参阅图2,上塔架3内部间隔设置有卡紧空间31。卡紧空间31的顶板焊接有角钢,角钢槽内焊接有方管0。 Please refer to FIG. 2 , there are clamping spaces 31 arranged at intervals inside the upper tower 3 . The top plate of the clamping space 31 is welded with angle steel, and the square pipe O is welded in the angle steel groove.

下塔架2上端的四个外侧面均连接有导向钢板21,并在其中一块导向钢板21内侧的下塔架2一侧设有可进入卡紧空间31的一自动卡22,自动卡22下端通过轴承23枢接在下塔架2的两根钢柱之间,自动卡22与外侧的导向钢板21之间通过一弹簧24相连接,在自然状态下,自动卡22向下塔架2内部倾斜;在上塔架3升高过程中,上塔架3通过其钢柱向外推 开自动卡22以收缩弹簧24得以向上移动,在上塔架3的卡紧空间31刚好对正自动卡22时,自动卡22在弹簧24复位作用力下自动卡22入卡紧空间31,然后利用螺栓25穿过导向钢板21及自动卡22的螺纹孔26旋紧固定,从而使上塔架3固定在下塔架2上。 The four outer sides of the upper end of the lower tower 2 are connected with guide steel plates 21, and one side of the lower tower 2 inside one of the guide steel plates 21 is provided with an automatic clamp 22 that can enter the clamping space 31, and the lower end of the automatic clamp 22 is The bearing 23 is pivotally connected between the two steel columns of the lower tower 2, and the automatic card 22 is connected with the outer guide steel plate 21 through a spring 24. In the natural state, the automatic card 22 is inclined to the inside of the lower tower 2. ; During the rising process of the upper tower 3, the upper tower 3 pushes the automatic card 22 outwards by its steel column to move upwards with the contraction spring 24, and the clamping space 31 of the upper tower 3 just aligns with the automatic card 22 , the automatic clamp 22 automatically clamps 22 into the clamping space 31 under the reset force of the spring 24, and then uses the bolt 25 to pass through the guide plate 21 and the threaded hole 26 of the automatic clamp 22 to be screwed and fixed, so that the upper tower 3 is fixed on the lower tower. on pylon 2.

下塔架2设置有用于放置手拉葫芦的压板27。 The lower tower frame 2 is provided with a pressing plate 27 for placing chain hoists.

塔架还包括千斤顶12及用于承载千斤顶12的可移动槽钢13(如图3所示),千斤顶12及可移动槽钢13位于四条围栏柱11围成的空间内,并位于吊篮8下方。 The tower frame also includes a jack 12 and a movable channel steel 13 (as shown in Figure 3 ) for carrying the jack 12. The jack 12 and the movable channel steel 13 are located in the space surrounded by four fence posts 11, and are located in the hanging basket 8. below.

请参阅图3,吊篮8包括上框架81、下框架82、位于上框架81上方的品字形滑轮组83、横向连接在上框架81上部的吊梁84、安装在上框架81的电磁块式制动器85及卷筒86、以及分别连接在电磁块式制动器85及卷筒86的轴心一端的手摇操作盘。 Referring to Fig. 3, the hanging basket 8 includes an upper frame 81, a lower frame 82, a character-shaped pulley block 83 positioned above the upper frame 81, a suspension beam 84 transversely connected to the top of the upper frame 81, and an electromagnetic block brake installed on the upper frame 81 85 and reel 86, and the hand-operated panel that is connected to the axle center one end of electromagnetic block brake 85 and reel 86 respectively.

吊篮8的框架由若干条冷弯方管焊接而成。 The frame of hanging basket 8 is welded by several cold-formed square tubes.

吊梁84上设置有两个吊环87。当塔架用在其他场合不需要把它升高时,可直接从平衡架5上吊下二根短钢绳扎在两个吊环87上,也就不需要用到下面所述的品字形滑轮组83。 Two suspension rings 87 are arranged on the suspension beam 84 . When the tower is used in other occasions and it is not necessary to raise it, two short steel ropes can be directly hung from the balance frame 5 and tied to the two suspension rings 87, so that the character-shaped pulley block 83 described below is not needed. .

吊梁84长度方向的两端分别安装有横向小滚筒88。 Horizontal small rollers 88 are installed respectively at the two ends of the suspension beam 84 in the longitudinal direction.

下框架82用于安放多层加重水泥板,每块水泥板重在50-75kg左右,必要时可适当添加或减轻水泥板重量,便于人工搬运。 Lower frame 82 is used for laying multi-layered weighted cement boards, and every cement board weighs about 50-75kg, can appropriately add or reduce cement board weight when necessary, is convenient to manual handling.

钢丝绳组9包括第一钢丝绳91、第二钢丝绳92及第三钢丝绳93,第一钢丝绳91中部绕过品字形滑轮组83的上滑轮后两端固定在平衡架5的不同位置上。 Steel rope group 9 comprises the first steel rope 91, the second steel rope 92 and the 3rd steel rope 93, and first steel rope 91 middle parts are fixed on the different positions of gimbal 5 after the upper pulley of character-shaped pulley block 83 is walked around.

第二钢丝绳92一端固定在电磁块式制动器85轴心上,并缠绕电磁块式制动器85数圈,另一端向上经过电磁块式制动器85上方的横向小滚筒88及品字形滑轮组83的左滑轮后固定在吊篮8的上框架81上。 One end of the second wire rope 92 is fixed on the electromagnetic block type brake 85 axle centers, and is wound around the electromagnetic block type brake 85 several turns, and the other end passes through the horizontal small cylinder 88 above the electromagnetic block type brake 85 and the left pulley of the character-shaped pulley block 83 upwards Be fixed on the upper frame 81 of hanging basket 8.

第三钢丝绳93一端固定在卷筒86轴心上,并缠绕卷筒86数圈,另一端向上经过卷筒86上方的横向小滚筒88及品字形滑轮组83的右滑轮后固定在吊篮8的上框架81上。 One end of the third steel wire rope 93 is fixed on the axis of the reel 86, and is wound around the reel 86 for several turns. On the frame 81.

假如此吊篮8不平衡或者多放了钢丝绳,此时就需要把钢丝绳重新卷回去,吊篮8即可上升。但吊篮8上升的方法不能两端同时升起,这样会危及塔架的安全,只能先升起吊篮8低一端,然后再升起吊篮8另一端,这样对塔架的平衡影响会小一点。品字形滑轮组83的设置,使得吊篮8受力中心偏移较小,故平衡架5上两边的边管受力也差不多,不会影响塔架的平衡。 If the hanging basket 8 is unbalanced or more steel wire ropes are placed, at this moment, the steel wire ropes need to be rolled back again, and the hanging basket 8 can rise. However, the lifting method of the hanging basket 8 cannot be raised at both ends at the same time, which will endanger the safety of the tower. We can only raise the lower end of the hanging basket 8 first, and then raise the other end of the hanging basket 8, which will have little impact on the balance of the tower. a little. The setting of the character-shaped pulley block 83 makes the stress center deviation of the hanging basket 8 smaller, so the force of the side tubes on both sides on the gimbal 5 is also similar, which will not affect the balance of the tower.

上述说明是针对本实用新型较佳可行实施例的详细说明,但实施例并非用以限定本实用新型的专利申请范围,凡本实用新型所提示的技术精神下所完成的同等变化或修饰变更,均应属于本实用新型所涵盖专利范围。 The above description is a detailed description of the preferred feasible embodiments of the present utility model, but the embodiments are not used to limit the scope of the patent application of the present utility model. All equivalent changes or modifications completed under the technical spirit suggested by the utility model, All should belong to the patent scope covered by the utility model.

Claims (9)

1.一种塔架,其特征在于:包括支撑平台、连接在支撑平台上的下塔架、部分卡接在下塔架内部的上塔架、连接在上塔架一侧的桁架、连接在上塔架相对桁架另一侧的平衡架,滑接于整个桁架长度的线缆、与线缆自由端相连接的吊钩、以及利用钢丝绳组绕过品字形滑轮组后与平衡架相连接的吊篮;1. A kind of tower frame, it is characterized in that: comprise support platform, the lower tower frame that is connected on the support platform, the upper tower frame that part is clamped in lower tower frame interior, the truss that is connected on one side of upper tower frame, connects on upper tower frame The balance frame on the other side of the tower opposite to the truss, the cable slidingly connected to the entire length of the truss, the hook connected to the free end of the cable, and the hanging basket connected to the balance frame after passing around the square pulley block by the wire rope group ; 上塔架内部间隔设置有卡紧空间,下塔架上端的四个外侧面均连接有导向钢板,并在其中一块导向钢板内侧的下塔架一侧设有可进入卡紧空间的一自动卡,自动卡下端通过轴承枢接在下塔架的两根钢柱之间,自动卡与外侧的导向钢板之间通过一弹簧相连接,在自然状态下,自动卡向下塔架内部倾斜;在上塔架升高过程中,上塔架通过其钢柱向外推开自动卡以收缩弹簧得以向上移动,在上塔架的卡紧空间刚好对正自动卡时,自动卡在弹簧复位作用力下自动卡入卡紧空间,然后利用螺栓穿过导向钢板及自动卡的螺纹孔旋紧固定,从而使上塔架固定在下塔架上;Clamping spaces are provided at intervals inside the upper tower, and guide steel plates are connected to the four outer sides of the upper end of the lower tower, and an automatic locking device that can enter the clamping space is provided on one side of the lower tower inside one of the guide steel plates. , the lower end of the automatic card is pivotally connected between the two steel columns of the lower tower through bearings, and the automatic card is connected with the outer guide steel plate through a spring. In the natural state, the automatic card is inclined inside the lower tower; When the tower is rising, the upper tower pushes the automatic card outward through its steel column to move upward by contracting the spring. When the clamping space of the upper tower is just aligned with the automatic card, the automatic card is under the spring reset force Automatically snap into the clamping space, and then use bolts to pass through the guide plate and the threaded hole of the automatic clip to tighten and fix, so that the upper tower is fixed on the lower tower; 支撑平台上连接四条围栏柱,供吊篮在其中上下活动;Four fence columns are connected to the support platform for the hanging basket to move up and down; 吊篮包括上框架、下框架、位于上框架上方的品字形滑轮组、横向连接在上框架上部的吊梁、安装在上框架的电磁块式制动器及卷筒、以及分别连接在电磁块式制动器及卷筒的轴心一端的手摇操作盘,吊梁长度方向的两端分别安装有横向小滚筒,下框架用于安放多层加重水泥板;The hanging basket includes an upper frame, a lower frame, a pin-shaped pulley block located above the upper frame, a suspension beam connected horizontally to the upper part of the upper frame, an electromagnetic block brake and a drum installed on the upper frame, and an electromagnetic block brake and a reel respectively connected to the upper frame. There is a hand-operated operation panel at one end of the axis of the reel, horizontal small rollers are installed at both ends of the hanging beam in the length direction, and the lower frame is used to place multi-layer weighted cement boards; 钢丝绳组包括第一钢丝绳、第二钢丝绳及第三钢丝绳,第一钢丝绳中部绕过品字形滑轮组的上滑轮后两端固定在平衡架的不同位置上;第二钢丝绳一端固定在电磁块式制动器轴心上,并缠绕电磁块式制动器数圈,另一端向上经过电磁块式制动器上方的横向小滚筒及品字形滑轮组的左滑轮后固定在吊篮的上框架上;第三钢丝绳一端固定在卷筒轴心上,并缠绕卷筒数圈,另一端向上经过卷筒上方的横向小滚筒及品字形滑轮组的右滑轮后固定在吊篮的上框架上。The steel wire rope group includes the first steel wire rope, the second steel wire rope and the third steel wire rope. The middle part of the first steel wire rope bypasses the upper pulley of the square-shaped pulley block and the two ends are fixed on different positions of the balance frame; one end of the second steel wire rope is fixed on the shaft of the electromagnetic block brake. center, and wind the electromagnetic block brake several times, and the other end is fixed on the upper frame of the hanging basket after passing through the small horizontal roller above the electromagnetic block brake and the left pulley of the character-shaped pulley block; one end of the third wire rope is fixed on the drum On the axis, and wind the reel several times, the other end is fixed on the upper frame of the hanging basket after passing through the small horizontal roller above the reel and the right pulley of the character-shaped pulley block. 2.如权利要求1所述的塔架,其特征在于:吊梁上设置有两个吊环。2. The tower according to claim 1, characterized in that: two suspension rings are arranged on the suspension beam. 3.如权利要求1所述的塔架,其特征在于:塔架还包括千斤顶及用于承载千斤顶的可移动槽钢,千斤顶及可移动槽钢位于四条围栏柱围成的空间内,并位于吊篮下方。3. The tower frame as claimed in claim 1, characterized in that: the tower frame also includes a jack and a movable channel steel for carrying the jack, the jack and the movable channel steel are located in the space surrounded by four fence posts, and are located Below the basket. 4.如权利要求1所述的塔架,其特征在于:吊篮的框架由若干条冷弯方管焊接而成。4. The tower according to claim 1, characterized in that: the frame of the hanging basket is welded by several cold-bent square tubes. 5.如权利要求1所述的塔架,其特征在于:下塔架设置有用于放置手拉葫芦的压板。5. The tower according to claim 1, characterized in that: the lower tower is provided with a pressing plate for placing chain hoists. 6.如权利要求1所述的塔架,其特征在于:卡紧空间的顶板焊接有角钢,角钢槽内焊接有方管。6. The tower according to claim 1, characterized in that: angle steel is welded on the top plate of the clamping space, and square pipes are welded in the angle steel channel. 7.一种吊篮,其特征在于:吊篮包括上框架、下框架、位于上框架上方的品字形滑轮组、横向连接在上框架上部的吊梁、安装在上框架的电磁块式制动器及卷筒、以及分别连接在电磁块式制动器及卷筒的轴心一端的手摇操作盘;7. A hanging basket, which is characterized in that: the hanging basket includes an upper frame, a lower frame, a character-shaped pulley block located above the upper frame, a hanging beam connected to the upper part of the upper frame transversely, an electromagnetic block brake installed on the upper frame and a coil drum, and the manual operation panel connected to the electromagnetic block brake and one end of the axis of the drum respectively; 吊梁长度方向的两端分别安装有横向小滚筒,下框架用于安放多层加重水泥板;Horizontal small rollers are respectively installed at both ends of the hanging beam in the length direction, and the lower frame is used to place multi-layer weighted cement boards; 第一钢丝绳中部绕过品字形滑轮组的上滑轮后两端固定在平衡架的不同位置上;The middle part of the first steel wire rope bypasses the upper pulley of the square-shaped pulley block, and the two ends are fixed on different positions of the balance frame; 第二钢丝绳一端固定在电磁块式制动器轴心上,并缠绕电磁块式制动器数圈,另一端向上经过电磁块式制动器上方的横向小滚筒及品字形滑轮组的左滑轮后固定在吊篮的上框架上;One end of the second steel wire rope is fixed on the axis of the electromagnetic block brake, and is wound around the electromagnetic block brake several times, and the other end is fixed on the upper part of the hanging basket after passing through the small horizontal roller above the electromagnetic block brake and the left pulley of the square pulley block. on the frame; 第三钢丝绳一端固定在卷筒轴心上,并缠绕卷筒数圈,另一端向上经过卷筒上方的横向小滚筒及品字形滑轮组的右滑轮后固定在吊篮的上框架上。One end of the third steel wire rope is fixed on the axis of the reel, and wound around the reel several times, and the other end is fixed on the upper frame of the hanging basket after passing through the small horizontal drum above the reel and the right pulley of the zigzag pulley block. 8.如权利要求7所述的吊篮,其特征在于:吊梁上设置有两个吊环。8. The hanging basket according to claim 7, wherein two hanging rings are arranged on the hanging beam. 9.如权利要求7所述的吊篮,其特征在于:吊篮的框架由若干条冷弯方管焊接而成。9. The hanging basket according to claim 7, characterized in that: the frame of the hanging basket is welded by several cold-bent square tubes.
CN201520252816.3U 2015-04-23 2015-04-23 Pylon and hanging basket thereof Expired - Lifetime CN204643648U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520252816.3U CN204643648U (en) 2015-04-23 2015-04-23 Pylon and hanging basket thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520252816.3U CN204643648U (en) 2015-04-23 2015-04-23 Pylon and hanging basket thereof

Publications (1)

Publication Number Publication Date
CN204643648U true CN204643648U (en) 2015-09-16

Family

ID=54096415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520252816.3U Expired - Lifetime CN204643648U (en) 2015-04-23 2015-04-23 Pylon and hanging basket thereof

Country Status (1)

Country Link
CN (1) CN204643648U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104773658A (en) * 2015-04-23 2015-07-15 广西大学 Tower truss and hanging basket thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104773658A (en) * 2015-04-23 2015-07-15 广西大学 Tower truss and hanging basket thereof

Similar Documents

Publication Publication Date Title
CN107697818B (en) Construction method and special construction equipment for wall of prestressed concrete wind power tower
CN105621280B (en) The apparatus and method for mounting and dismounting crane arm
CN202187601U (en) Single-twisting-grinder double-pole iron tower erecting device of high-voltage power transmission line
CN103630416B (en) Test platform of hoisting mechanism
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN104695752A (en) Rapid repairing tower system and erection method thereof
CN201647834U (en) Device for installing tower type equipment in confined spaces
CN109626249B (en) A simple three-dimensional positioning installation and load-bearing device and using method
CN204643648U (en) Pylon and hanging basket thereof
CN215160450U (en) Quick installation device of pipeline
CN108775196A (en) Lifting and self-climbing combined mechanism for erecting power transmission tower
CN104773658B (en) Tower truss and hanging basket thereof
CN204609435U (en) The auxiliary tower that hoists of emergent repairing tower
CN216807824U (en) Pipeline mobile device for hydraulic engineering
CN107651594B (en) Support load testing device for winch and testing method thereof
CN202594664U (en) Mast type hoisting device for electromechanical equipment of super high-rise building
CN101845914B (en) Installation method of three-tube steel chimney
CN204277366U (en) For the hydraulic lifting apparatus of vertical type tubular equipment upside-down mounting
CN209276035U (en) A kind of self-supporting superelevation Lift-on/Lift-off System
CN216141154U (en) Large-scale steel construction factory building material hoisting device
CN205773026U (en) Jacking apparatus
CN103072904B (en) Self-stabilization double-rocker arm lifting device for installing high-rise tower
CN220184583U (en) Novel huge column steel constructs operation platform
CN219259348U (en) Deep well pump hoisting overhauls device
CN221680586U (en) Hoisting device convenient for installing strip plate walls with different elevations

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant