CN204627414U - A kind of drill bit for quadruple high-pressure rotary-spray - Google Patents
A kind of drill bit for quadruple high-pressure rotary-spray Download PDFInfo
- Publication number
- CN204627414U CN204627414U CN201520195048.2U CN201520195048U CN204627414U CN 204627414 U CN204627414 U CN 204627414U CN 201520195048 U CN201520195048 U CN 201520195048U CN 204627414 U CN204627414 U CN 204627414U
- Authority
- CN
- China
- Prior art keywords
- adapter sleeve
- cutter head
- drill bit
- connecting sleeve
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000007921 spray Substances 0.000 title claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 5
- 239000010959 steel Substances 0.000 claims abstract description 5
- 238000012856 packing Methods 0.000 claims 2
- 238000005553 drilling Methods 0.000 abstract description 17
- 238000005507 spraying Methods 0.000 abstract description 7
- 230000002093 peripheral effect Effects 0.000 abstract description 6
- 238000010276 construction Methods 0.000 abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 7
- 239000002002 slurry Substances 0.000 description 5
- 239000002689 soil Substances 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 4
- 239000003570 air Substances 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000009918 complex formation Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
一种用于四重高压旋喷的钻头,包括钻头体,钻头体内部从外到内依次套装有第一连接套、第二连接套、第三连接套;还包括芯管,芯管的左端安装在第三连接套内,芯管的右端连接刀头,刀头的头部安装接头,刀头中部开有阶梯孔,阶梯孔内安装有固定座,固定座中部开孔中安装弹簧,弹簧头部与钢球抵接;芯管的外部套装有外管,外管的两端分别与钻头体和刀头卡接;位于钻头体的圆周壁上开有孔,孔内固定有底座,底座上通过第一垫圈安装有第一喷嘴组件,孔的内圆周壁面上固定有安装座,安装座的内壁面与第一喷嘴组件的外壁面形成有间隙;刀头的圆周壁上开有沉孔,沉孔内通过第二垫圈安装有第二喷嘴组件。提高钻机施工效率,提高钻进效率。
A drill bit for quadruple high-pressure jet spraying, including a drill body, which is sequentially fitted with a first connecting sleeve, a second connecting sleeve, and a third connecting sleeve from outside to inside; it also includes a core tube, the left end of which is Installed in the third connecting sleeve, the right end of the core tube is connected to the cutter head, and the head of the cutter head is installed with a joint. The head is in contact with the steel ball; the core tube is covered with an outer tube, and the two ends of the outer tube are respectively clamped with the drill body and the cutter head; a hole is opened on the peripheral wall of the drill body, and a base is fixed in the hole, and the base The first nozzle assembly is installed on the top through the first gasket, and the mounting seat is fixed on the inner peripheral wall of the hole. , A second nozzle assembly is installed in the counterbore through a second gasket. Improve drilling rig construction efficiency and improve drilling efficiency.
Description
技术领域 technical field
本实用新型涉及旋喷钻具技术领域,尤其是一种用于四重高压旋喷的钻头。 The utility model relates to the technical field of rotary spraying drilling tools, in particular to a drill bit for quadruple high-pressure rotary spraying.
背景技术 Background technique
工程施工中的软土地基处理是保证工程质量的关键,实践表明,高压喷射技术经过多年的研究和发展应用已日趋成熟。高压喷射注浆是一种处理软土地基的技术,广泛运用于建筑物的地基补强、防沉陷、防倾斜、防渗透、防砂基液化及地基隆起等。该技术的原理是利用工程钻机,将钻杆钻到预计的地基深度,在灌浆管的下部装有特制的喷嘴,可在平面或下倾方向喷射30MPa以上的高压水、气、浆细射流。灌浆不断提升,同时还可摆动或旋转,对土体进行切割和搅拌,并充填水泥浆,带土体固化后,便在地下形成符合要求的板块或桩体。板墙厚度可为0.07~1.00m,桩体直径最大可达2米多。数个板或桩相交,便形成地下连续墙。 The soft soil foundation treatment in engineering construction is the key to ensure the quality of the project. The practice shows that the high-pressure injection technology has become increasingly mature after years of research, development and application. High-pressure jet grouting is a technology for treating soft soil foundations. It is widely used in building foundation reinforcement, anti-subsidence, anti-tilt, anti-seepage, anti-sand foundation liquefaction and foundation uplift, etc. The principle of this technology is to use an engineering drilling rig to drill the drill pipe to the expected depth of the foundation, and a special nozzle is installed at the bottom of the grouting pipe, which can spray high-pressure water, air, and slurry jets above 30MPa in the plane or downward direction. The grouting is continuously promoted, and at the same time, it can also swing or rotate, cut and mix the soil, and fill it with cement slurry. After the soil is solidified, a plate or pile that meets the requirements will be formed underground. The thickness of the slab wall can be 0.07-1.00m, and the maximum diameter of the pile body can reach more than 2 meters. Several plates or piles intersect to form an underground continuous wall.
现有技术中的钻头通常只有一个通道,一次只能传输一种介质(如泥浆),要传输其它介质(水)需要停机换管,不仅更换不便,还容易造成堵塞,且成孔直径小,工作效率低。 The drill bit in the prior art usually has only one channel, and can only transmit one medium (such as mud) at a time. To transmit other mediums (water), it needs to be stopped and replaced, which is not only inconvenient to replace, but also easy to cause blockage, and the hole diameter is small. Work efficiency is low.
实用新型内容 Utility model content
本申请人针对上述现有生产技术中的缺点,提供一种用于四重高压旋喷的钻头,从而提高钻机施工效率,提高钻进效率。 Aiming at the above-mentioned shortcomings in the existing production technology, the applicant provides a drill bit for quadruple high-pressure rotary spraying, thereby improving the construction efficiency of the drilling rig and improving the drilling efficiency.
本实用新型所采用的技术方案如下: The technical scheme adopted in the utility model is as follows:
一种用于四重高压旋喷的钻头,包括钻头体,所述钻头体内部套装有第一连接套,所述第一连接套内部套装有第二连接套,所述第二连接套内部套装有第三连接套,所述第一连接套通过第一挡圈固定,所述第二连接套和第三连接套均通过第二挡圈固定;还包括芯管,所述芯管的左端安装在第三连接套内,所述芯管的右端连接刀头,所述刀头的头部安装接头,所述刀头中部开有阶梯孔,所述阶梯孔内安装有固定座,所述固定座中部开孔中安装弹簧,所述弹簧头部与钢球抵接;所述芯管的外部套装有外管,所述外管的两端分别与钻头体和刀头卡接;位于钻头体的圆周壁上开有孔,所述孔内固定有底座,所述底座上通过第一垫圈安装有第一喷嘴组件,所述孔的内圆周壁面上固定有安装座,所述安装座的内壁面与所述第一喷嘴组件的外壁面形成有间隙;所述刀头的圆周壁上开有沉孔,所述沉孔内通过第二垫圈安装有第二喷嘴组件。 A drill bit for quadruple high-pressure rotary spraying, including a drill body, a first connecting sleeve is set inside the drill bit body, a second connecting sleeve is set inside the first connecting sleeve, and a second connecting sleeve is set inside the second connecting sleeve. There is a third connecting sleeve, the first connecting sleeve is fixed by the first retaining ring, the second connecting sleeve and the third connecting sleeve are fixed by the second retaining ring; a core tube is also included, and the left end of the core tube is installed In the third connection sleeve, the right end of the core tube is connected to the cutter head, and the head of the cutter head is installed with a joint. A spring is installed in the hole in the middle of the seat, and the head of the spring is in contact with the steel ball; an outer tube is set on the outside of the core tube, and the two ends of the outer tube are respectively clamped with the drill body and the cutter head; A hole is opened on the circumferential wall of the hole, a base is fixed in the hole, a first nozzle assembly is installed on the base through a first gasket, a mounting seat is fixed on the inner circumferential wall of the hole, and the inner surface of the mounting seat A gap is formed between the wall surface and the outer wall surface of the first nozzle assembly; a counterbore is opened on the peripheral wall of the cutter head, and a second nozzle assembly is installed in the counterbore through a second washer.
其进一步技术方案在于: Its further technical scheme is:
所述第一连接套的结构为:所述第一连接套中间外壁面开有圆弧槽; The structure of the first connecting sleeve is: an arc groove is opened on the middle outer wall of the first connecting sleeve;
所述第二连接套的结构为:所述第二连接套中间外壁面开有阶梯槽; The structure of the second connecting sleeve is: a stepped groove is opened on the middle outer wall of the second connecting sleeve;
所述第三连接套的结构为:中间外壁面上开有凹槽。 The structure of the third connecting sleeve is: a groove is formed on the middle outer wall surface.
本实用新型的有益效果如下: The beneficial effects of the utility model are as follows:
本实用新型结构紧凑、合理,操作方便,在钻头上设置有四个出口,四个出口分别与四重分流器的四个通道连通,具有适用范围广,既能打液动锤又能打潜孔锤;同时,提高钻机施工效率、提高钻进效率以及钻具强度。本实用新型适用于复杂地层钻进。 The utility model has a compact and reasonable structure and is easy to operate. The drill bit is provided with four outlets, which are respectively connected with the four channels of the quadruple diverter. Hole hammer; at the same time, improve the construction efficiency of the drilling rig, improve the drilling efficiency and the strength of the drilling tool. The utility model is suitable for drilling in complex formations.
附图说明 Description of drawings
图1为本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.
图2为图1中A部的局部放大图。 Fig. 2 is a partial enlarged view of part A in Fig. 1 .
图3为本实用新型第一连接套的结构示意图。 Fig. 3 is a schematic structural diagram of the first connecting sleeve of the present invention.
图4为本实用新型第二连接套的结构示意图。 Fig. 4 is a schematic structural diagram of the second connecting sleeve of the present invention.
图5为本实用新型第三连接套的结构示意图。 Fig. 5 is a schematic structural view of the third connection sleeve of the present invention.
其中:1、钻头体;2、第一连接套;3、第二连接套;4、第三连接套;5、芯管;6、外管;7、刀头;8、固定座;9、接头;10、弹簧;11、钢球;12、第二喷嘴组件;13、第二垫圈;14、第一挡圈;15、第二挡圈;16、安装座;17、第一喷嘴组件;18、第一垫圈;19、底座;20、圆弧槽;21、阶梯槽;22、凹槽。 Among them: 1. Drill bit body; 2. First connecting sleeve; 3. Second connecting sleeve; 4. Third connecting sleeve; 5. Core tube; 6. Outer tube; 7. Cutter head; 8. Fixing seat; 9. Joint; 10, spring; 11, steel ball; 12, second nozzle assembly; 13, second washer; 14, first retaining ring; 15, second retaining ring; 16, mounting seat; 17, first nozzle assembly; 18. First washer; 19. Base; 20. Arc groove; 21. Step groove; 22. Groove.
具体实施方式 Detailed ways
下面结合附图,说明本实用新型的具体实施方式。 Below in conjunction with accompanying drawing, illustrate the specific embodiment of the present utility model.
如图1和图2所示,本实施例的用于四重高压旋喷的钻头,包括钻头体1,钻头体1内部套装有第一连接套2,第一连接套2内部套装有第二连接套3,第二连接套3内部套装有第三连接套4,第一连接套2通过第一挡圈14固定,第二连接套3和第三连接套4均通过第二挡圈15固定;还包括芯管5,芯管5的左端安装在第三连接套4内,芯管5的右端连接刀头7,刀头7的头部安装接头9,刀头7中部开有阶梯孔,阶梯孔内安装有固定座8,固定座8中部开孔中安装弹簧10,弹簧10头部与钢球11抵接;芯管5的外部套装有外管6,外管6的两端分别与钻头体1和刀头7卡接;位于钻头体1的圆周壁上开有孔,孔内固定有底座19,底座19上通过第一垫圈18安装有第一喷嘴组件17,孔的内圆周壁面上固定有安装座16,安装座16的内壁面与第一喷嘴组件17的外壁面形成有间隙;刀头7的圆周壁上开有沉孔,沉孔内通过第二垫圈13安装有第二喷嘴组件12。 As shown in Figure 1 and Figure 2, the drill bit used for quadruple high-pressure rotary spraying in this embodiment includes a drill body 1, a first connecting sleeve 2 is set inside the drill bit body 1, and a second connecting sleeve 2 is set inside the first connecting sleeve 2. The connecting sleeve 3, the second connecting sleeve 3 is fitted with the third connecting sleeve 4, the first connecting sleeve 2 is fixed by the first retaining ring 14, the second connecting sleeve 3 and the third connecting sleeve 4 are fixed by the second retaining ring 15 Also includes a core tube 5, the left end of the core tube 5 is installed in the third connecting sleeve 4, the right end of the core tube 5 is connected to the cutter head 7, the head of the cutter head 7 is equipped with a joint 9, and the middle part of the cutter head 7 has a stepped hole, A fixed seat 8 is installed in the stepped hole, and a spring 10 is installed in the middle opening of the fixed seat 8. The head of the spring 10 abuts against the steel ball 11; The drill bit body 1 and the cutter head 7 are clamped; there is a hole on the peripheral wall of the drill bit body 1, and a base 19 is fixed in the hole, and a first nozzle assembly 17 is installed on the base 19 through a first gasket 18, and the inner peripheral wall of the hole There is a mounting seat 16 fixed on it, and a gap is formed between the inner wall surface of the mounting seat 16 and the outer wall surface of the first nozzle assembly 17; a counterbore is opened on the peripheral wall of the cutter head 7, and a second gasket 13 is installed in the counterbore. Nozzle assembly 12.
如图3所示,第一连接套2的结构为:第一连接套2中间外壁面开有圆弧槽20。 As shown in FIG. 3 , the structure of the first connecting sleeve 2 is: an arc groove 20 is formed on the middle outer wall of the first connecting sleeve 2 .
如图4所示,第二连接套3的结构为:第二连接套3中间外壁面开有阶梯槽21。 As shown in FIG. 4 , the structure of the second connecting sleeve 3 is: a stepped groove 21 is formed on the middle outer wall of the second connecting sleeve 3 .
如图5所示,第三连接套4的结构为:中间外壁面上开有凹槽22。 As shown in FIG. 5 , the structure of the third connection sleeve 4 is: a groove 22 is formed on the middle outer wall surface.
本实用新型所述的四重高压旋喷的钻头上形成有四个出口,分别是:安装座16的内壁面与第一喷嘴组件17的外壁面形成有间隙处为第一出口,第一喷嘴组件17形成第二出口,第二喷嘴组件12形成第三出口,接头9形成第四出口。第一出口用来通空气。上述四个出口分别与四重分流器的四重通道联通分别用来喷出气、高压水、浆、水(液动锤)或气(潜孔锤)。 Four outlets are formed on the drill bit of the quadruple high-pressure rotary spraying described in the utility model, which are respectively: the first outlet is formed at the gap between the inner wall surface of the mounting seat 16 and the outer wall surface of the first nozzle assembly 17, and the first nozzle Assembly 17 forms the second outlet, second nozzle assembly 12 forms the third outlet, and adapter 9 forms the fourth outlet. The first outlet is used for ventilation. The above four outlets are respectively connected with the quadruple passages of the quadruple diverter to eject gas, high-pressure water, slurry, water (hydraulic hammer) or gas (down-the-hole hammer).
钻机施工时,在钻进过程中,第四重通道输送大流量介质水或气至钻头第四出口出。 During the construction of the drilling rig, during the drilling process, the fourth channel transports large flow medium water or gas to the fourth outlet of the drill bit.
待钻进到预计的地基深度后,停止大流量钻进介质的输送(第四通道停止输送),钻机动力头携带钻具上提并做回转运动,此时后台输送水泥浆、水、压缩空气经过四重分流器的一重、二重、三重通道经钻杆直至四重钻头,在四重钻头的下部装有特制的喷嘴,在平面或下倾方向喷射高压水、气、浆细射流。随着钻具的不断提升,对土体进行切割和搅拌,最终在地下形成符合要求的板块或桩体。 After drilling to the expected foundation depth, stop the delivery of large flow drilling medium (the fourth channel stops the delivery), the power head of the drilling rig carries the drilling tool up and makes a rotary motion, at this time the background is delivering cement slurry, water, compressed air The primary, secondary, and triple passages of the quadruple splitter pass through the drill pipe to the quadruple drill bit, and a special nozzle is installed at the lower part of the quadruple drill bit to spray high-pressure water, air, and slurry fine jets in the plane or downward direction. With the continuous lifting of the drilling tool, the soil is cut and stirred, and finally a slab or pile that meets the requirements is formed underground.
以上描述是对本实用新型的解释,不是对实用新型的限定,本实用新型所限定的范围参见权利要求,在本实用新型的保护范围之内,可以作任何形式的修改。 The above description is an explanation of the utility model, not a limitation of the utility model. For the scope limited by the utility model, please refer to the claims. Within the protection scope of the utility model, any form of modification can be made.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520195048.2U CN204627414U (en) | 2015-04-02 | 2015-04-02 | A kind of drill bit for quadruple high-pressure rotary-spray |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520195048.2U CN204627414U (en) | 2015-04-02 | 2015-04-02 | A kind of drill bit for quadruple high-pressure rotary-spray |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204627414U true CN204627414U (en) | 2015-09-09 |
Family
ID=54046454
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520195048.2U Expired - Fee Related CN204627414U (en) | 2015-04-02 | 2015-04-02 | A kind of drill bit for quadruple high-pressure rotary-spray |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204627414U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948767A (en) * | 2017-04-27 | 2017-07-14 | 高伯明 | A kind of churning drilling rod |
-
2015
- 2015-04-02 CN CN201520195048.2U patent/CN204627414U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948767A (en) * | 2017-04-27 | 2017-07-14 | 高伯明 | A kind of churning drilling rod |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108547604B (en) | Drilling and stamping integrated device and method | |
CN110748300B (en) | Drill bit with combined action of induced load and abrasive jet and drilling method | |
Yong et al. | Technical improvements and application of air-lift reverse circulation drilling technology to ultra-deep geothermal well | |
CN202380976U (en) | Mechanical automatic-switching type high-pressure water jet slotting drill | |
CN104033100A (en) | Major-diameter pneumatic downhole hammer impactor | |
CN104563099A (en) | Porous pipe method large-diameter high-pressure jet grouting pile construction method | |
CN103821452B (en) | A kind of frequency low-amplitude axial impact device | |
CN203978273U (en) | Carbonate rock and the boring of ragstone underground pipe and provisions for grouting | |
CN105221073A (en) | Long horizontal sections horizontal well water attack impulse oscillation pressurizing tool | |
CN203145829U (en) | Small-bore piercing and hydraulic slotting integrated device based on anchor cable drilling machine | |
CN103758130A (en) | Multi-medium ultrahigh pressure nozzle | |
CN204626390U (en) | A kind of drilling tool current divider for quadruple high-pressure rotary-spray | |
CN104612137A (en) | Perforated pipe method super-deep, fast, and super-large diameter high pressure chemical churning pile construction method | |
CN203925323U (en) | A kind of large diameter combined down-hole hammer drilling rod | |
CN204627414U (en) | A kind of drill bit for quadruple high-pressure rotary-spray | |
CN109578058B (en) | Method for improving gas extraction concentration of extraction borehole through auxiliary drilling | |
CN202787268U (en) | High-pressure jet grouting, drilling and jetting combined drilling tool | |
CN210858590U (en) | Double-pipe rotary spraying drill bit capable of preventing slurry return | |
CN205297350U (en) | From booster -type PDC drill bit | |
CN207795050U (en) | A kind of frequency low-amplitude complex vibration impactor | |
CN203716154U (en) | Multi-medium ultrahigh-pressure sprayer | |
CN114809904A (en) | Rotary drilling bit and drilling construction process | |
CN219886795U (en) | Double spray head | |
CN209742794U (en) | Efficient drilling equipment that engineering construction used | |
CN203066078U (en) | Drilling and spraying integrated device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150909 |