[go: up one dir, main page]

CN204609430U - Emergent repairing tower tractive hangs connection box - Google Patents

Emergent repairing tower tractive hangs connection box Download PDF

Info

Publication number
CN204609430U
CN204609430U CN201520151797.5U CN201520151797U CN204609430U CN 204609430 U CN204609430 U CN 204609430U CN 201520151797 U CN201520151797 U CN 201520151797U CN 204609430 U CN204609430 U CN 204609430U
Authority
CN
China
Prior art keywords
framework
frame
ear seat
tower
connection box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520151797.5U
Other languages
Chinese (zh)
Inventor
胡长胜
刘文武
胡长军
孙贤涛
裴国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology Shenzhen
Original Assignee
Harbin Institute of Technology Shenzhen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology Shenzhen filed Critical Harbin Institute of Technology Shenzhen
Priority to CN201520151797.5U priority Critical patent/CN204609430U/en
Application granted granted Critical
Publication of CN204609430U publication Critical patent/CN204609430U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型提供了一种抢修塔牵拉悬挂连接框,其在固定风缆时更加稳定、方便。其包括由4块框体依次固定连接组成的矩形框,所述矩形框外侧设置有外耳座,外耳座上具有耳孔,所述矩形框上还设置有伸向矩形框内的固定件。这样通过将内耳座和外耳座固定在框体上,内耳座与抢修塔标准节之间进行固定连接,外耳座用于固定风缆,同时将4块框体固定连接成一整体,这样不仅避免了使用标准节间的连接孔进行固定,保证了标准节之间固定稳定,同时风缆之间通过本实用新型的抢修塔牵拉悬挂连接框形成配合,对抢修塔的固定更加牢固。

The utility model provides a pulling suspension connection frame of a repair tower, which is more stable and convenient when fixing wind cables. It includes a rectangular frame composed of four frames fixedly connected in sequence. Outer ear seats are arranged on the outside of the rectangular frame, and ear holes are formed on the outer ear seats. Fixing pieces extending into the rectangular frame are also arranged on the rectangular frame. In this way, by fixing the inner ear seat and the outer ear seat on the frame, the inner ear seat is fixedly connected with the standard section of the emergency repair tower, the outer ear seat is used to fix the wind cable, and at the same time, the four frames are fixedly connected into a whole, which not only avoids The connection holes between the standard sections are used for fixing, which ensures the stability of the standard sections. At the same time, the wind cables are matched by pulling and hanging the connection frame through the emergency repair tower of the utility model, so that the repair tower is more firmly fixed.

Description

抢修塔牵拉悬挂连接框Emergency repair tower pulling suspension connection frame

技术领域technical field

本实用新型涉及电力设备领域,具体而言,涉及一种抢修塔牵拉悬挂连接框。The utility model relates to the field of electric equipment, in particular to a pulling suspension connection frame of a repair tower.

背景技术Background technique

现有的电力输送塔架高度高、跨度大,在安装时均需在塔架上安装风缆用于对塔架本体的固定,防止塔架在大风等恶劣天气条件下出现倾覆、倒塌的风险。现有的风缆固定方式是在塔架本体上设置一些连接耳座,将风缆与连接耳座连接通过地锚固定在地面,这样的固定方式连接耳座单独的固定在塔架上,相互之间没有形成配合,一旦某根风缆出现松动,塔架就会存在严重的安全隐患。同时,单独设置的连接耳座在安装时更加费时费力,影响工作效率,尤其是在紧急抢修电力输送塔的时候。The existing power transmission towers are high in height and large in span, and wind cables need to be installed on the towers during installation to fix the tower body to prevent the tower from overturning and collapsing in severe weather conditions such as strong winds. . The existing wind cable fixing method is to set some connecting ear seats on the tower body, and connect the wind cable and the connecting ear seats to the ground through ground anchors. In this fixing method, the connecting ear seats are separately fixed on the tower, mutually There is no cooperation between them. Once a certain wind cable becomes loose, there will be serious safety hazards in the tower. At the same time, the installation of the separately provided connecting lugs is more time-consuming and laborious, which affects work efficiency, especially when urgently repairing the power transmission tower.

抢修塔是一种用于输电线路发生倒塔事故后,临时恢复供电的特殊杆塔。快装抢修塔是一种采用螺栓连接的标准节结构,在标准节连接成一整体结构后,往往需要在整体机构上安装一些其他结构,而这些结构均需要利用标准节间连接的螺纹孔进行安装,如将风缆与标准节间的螺纹孔进行固定,会造成标准节连接时螺栓预紧力不足的情况。The emergency repair tower is a special tower used for temporarily restoring power supply after a tower collapse accident occurs on a transmission line. The quick repair tower is a standard section structure connected by bolts. After the standard sections are connected into an integral structure, it is often necessary to install some other structures on the overall structure, and these structures need to be installed using the threaded holes connected by the standard intersections. , If the threaded holes between the wind cable and the standard section are fixed, the pre-tightening force of the bolts will be insufficient when the standard section is connected.

实用新型内容Utility model content

本实用新型提供了一种抢修塔牵拉悬挂连接框,旨在提供一种固定风缆更加稳定的抢修塔牵拉悬挂连接框。The utility model provides a pulling and hanging connection frame of a repair tower, aiming at providing a pulling and hanging connecting frame of a repair tower with a more stable fixed wind cable.

本实用新型是这样实现的:The utility model is achieved in that:

一种抢修塔牵拉悬挂连接框,包括由4块框体依次固定连接组成的矩形框,所述矩形框外侧设置有外耳座,外耳座上具有耳孔,所述矩形框上还设置有伸向矩形框内的固定件。A pulling and hanging connection frame for emergency repair towers, comprising a rectangular frame composed of four frames that are sequentially fixed and connected, outer ear seats are arranged on the outer side of the rectangular frame, ear holes are provided on the outer ear seats, and the rectangular frame is also provided with a Fixtures within a rectangular frame.

现有的抢修塔风缆均是直接利用抢修塔标准节间的连接孔进行固定的,这样操作一方面对于标准节之间的连接和固定不利,容易造成标准节间预紧力不足的情况;另一方面,抢修塔普遍高度很高,多是采用吊装方式安装,而为了将风缆固定在标准节的连接孔上,需拆下两标准节之间连接的螺栓,高空进行操作非常危险,尤其在大风等恶劣天气下,拆掉螺栓的标准节易发生晃动,严重时还会倒塌。The existing repair tower wind cables are directly fixed by the connection holes between the standard sections of the repair tower. On the one hand, this operation is not good for the connection and fixation between the standard sections, and it is easy to cause insufficient pre-tightening force between the standard sections; On the other hand, emergency repair towers are generally very high, and they are mostly installed by hoisting. In order to fix the wind cable to the connection hole of the standard section, the bolts connecting the two standard sections need to be removed. It is very dangerous to operate at a high altitude. Especially in severe weather such as strong winds, the standard joint with bolts removed is prone to shaking, and even collapses in severe cases.

而本实用新型提供的抢修塔牵拉悬挂连接框可以直接设置在标准节上,不需利用标准节间的连接螺孔,整个连接框由4块框体固定连接构成,框体上的固定件将整个连接框牢固的固定在标准节上,使用外耳座上的耳孔固定风缆,除了固定方便以外,还可以使风缆的拉力均匀的分散在标准节上,使整个抢修塔塔体更加稳定。However, the pulling and hanging connection frame of the emergency repair tower provided by the utility model can be directly arranged on the standard joint without using the connection screw holes between the standard joints. The whole connection frame is composed of 4 frames fixedly connected. Firmly fix the entire connection frame on the standard joint, and use the ear holes on the outer ear seat to fix the wind cable. In addition to the convenience of fixing, it can also make the tension of the wind cable evenly distributed on the standard joint, making the entire emergency repair tower body more stable. .

进一步的,所述外耳座为多个,所述外耳座垂直于框体设置。Further, there are multiple outer ear seats, and the outer ear seats are arranged perpendicular to the frame.

外耳座的作用是用于固定风缆,通常在风缆的设计位置需要固定2根或4根风缆,两根或4根风缆对称设置,为了尽可能的保持抢修塔塔体稳定,将外耳座设置为多个,这样同一根风缆与多个外耳座连接,将风缆对抢修塔塔体的拉力分散到抢修塔塔体的各个部位,增加抢修塔塔体的稳定性。The function of the outer ear seat is to fix the wind cables. Usually, 2 or 4 wind cables need to be fixed at the design position of the wind cables. The two or 4 wind cables are arranged symmetrically. In order to keep the tower body as stable as possible, the There are multiple ear seats, so that the same wind cable is connected to a plurality of ear seats, so that the pulling force of the wind cable on the emergency repair tower body is distributed to various parts of the emergency repair tower body, and the stability of the emergency repair tower body is increased.

进一步的,所述同一框体上的外耳座耳孔同轴设置。Further, the ear holes of the outer ear seat on the same frame are coaxially arranged.

前述已经说明,设置在框体外的外耳座为多个,同一框体上的外耳座均同时与风缆进行连接,为了保持风缆拉力的稳定,将同一框体上的外耳座耳孔同轴设置,这样外耳座在与风缆进行连接时,不会对风缆产生额外的应力。It has been explained above that there are multiple ear seats arranged outside the frame, and the ear seats on the same frame are all connected to the wind cable at the same time. In order to maintain the stability of the wind cable tension, the ear holes of the ear seats on the same frame are coaxially arranged , so that when the ear seat is connected with the wind cable, no additional stress will be generated on the wind cable.

进一步的,所述固定件为内耳座,所述内耳座包括固定板和加强筋,所述固定板上设置有螺孔,所述固定板垂直于框体,所述加强筋分别与固定板和框体固定连接。Further, the fixing part is an inner ear seat, and the inner ear seat includes a fixing plate and a reinforcing rib, screw holes are arranged on the fixing plate, the fixing plate is perpendicular to the frame body, and the reinforcing rib is connected with the fixing plate and the reinforcing rib respectively. The frame is fixedly connected.

固定件用于将整个连接框固定在抢修塔的标准节上,固定件的结构或者设置方式有很多,只要能将连接框固定稳定即可。在本技术方案中,固定件为内耳座,其包括固定板和加强筋,固定板上设置螺孔,通过该螺孔将连接框和标准节固定,同时,为了增强固定板与框体间连接的稳定性,在固定板上设置加强筋,加强筋分别与固定板和框体固定连接,这样固定板不会出现变形或者弯折等现象。The fixing piece is used to fix the entire connection frame on the standard section of the emergency repair tower. There are many structures or setting methods of the fixing piece, as long as the connection frame can be fixed stably. In this technical solution, the fixing part is an inner ear seat, which includes a fixing plate and a reinforcing rib, and a screw hole is set on the fixing plate, through which the connecting frame and the standard section are fixed, and at the same time, in order to strengthen the connection between the fixing plate and the frame In order to ensure the stability of the frame, reinforcing ribs are provided on the fixing plate, and the reinforcing ribs are fixedly connected with the fixing plate and the frame respectively, so that the fixing plate will not be deformed or bent.

进一步的,所述框体包括第一框体和第二框体,所述第一框体和第二框体分别为2块,所述第一框体和第二框体上均设置有内耳座。Further, the frame body includes a first frame body and a second frame body, the first frame body and the second frame body are two pieces respectively, and the inner ear is arranged on the first frame body and the second frame body seat.

将内耳座分散的设置在第一框体和第二框体上,使整个连接框均匀的与标准节之间进行连接固定,固定更加稳定,同时操作人员在操作时可以将框体一块一块的安装在标准节上后再将框体固定起来,操作更加方便。The inner ear seats are scattered on the first frame body and the second frame body, so that the entire connection frame can be evenly connected and fixed with the standard joints, and the fixation is more stable. At the same time, the operator can connect the frames one by one during operation. After installing on the standard section, fix the frame body, which is more convenient to operate.

进一步的,所述内耳座设置在第一框体和第二框体的上部边缘。Further, the inner ear seat is arranged on the upper edge of the first frame body and the second frame body.

将内耳座设置在第一框体和第二框体的上部边缘,在将框体固定在标准节上的过程中,相当于整个框体挂靠在标准节上,操作人员在拧螺栓时能更加方便。The inner ear seat is arranged on the upper edge of the first frame body and the second frame body. In the process of fixing the frame body on the standard joint, it is equivalent to the whole frame body hanging on the standard joint. The operator can tighten the bolt more easily. convenient.

进一步的,所述第一框体和第二框体两端均具有相互配合的耳板,所述耳板上设置有螺孔。Further, both ends of the first frame body and the second frame body have ear plates that cooperate with each other, and screw holes are provided on the ear plates.

第一框体和第二框体之间是通过螺栓连接起来的,这样方便拆卸和组装,连接的方式有很多,在本技术方案中,第一框体和第二框体的两端均具有相互配合的耳板,耳板上设置螺孔,这样在安装时将第一框体和第二框体上的耳板螺孔对其,用螺栓即可方便的将整个连接框组装起来。The first frame body and the second frame body are connected by bolts, which is convenient for disassembly and assembly, and there are many ways of connection. In this technical solution, both ends of the first frame body and the second frame body have The lug plates that cooperate with each other are provided with screw holes, so that the lug plate screw holes on the first frame body and the second frame body are aligned during installation, and the entire connection frame can be easily assembled with bolts.

进一步的,所述耳板由框体向外弯折形成。Further, the ear plate is formed by bending the frame body outward.

耳板既可以直接设置在框体上,如直接焊接在框体的两端。也可以与框体一体加工成型制成,在本技术方案中,耳板由框体向外弯折形成,这样可以节省材料,降低成本。The ear plates can be directly arranged on the frame body, such as being directly welded to both ends of the frame body. It can also be formed integrally with the frame body. In this technical solution, the lug plate is formed by bending the frame body outward, which can save materials and reduce costs.

进一步的,所述耳板上设置有通孔,所述相邻的耳板上的通孔配合设置。Further, through holes are provided on the lug plates, and the through holes on the adjacent lug plates are arranged in cooperation.

利用外框上的外耳座和相邻外框耳板上的通孔可以连接牵拉钢丝绳和风缆,对抢修塔塔体进行固定。除此之外,本实用新型提供的抢修塔牵拉悬挂连接框也可以连接绝缘子支架、踏步等其他部件,非常实用。Utilize the outer lug seat on the outer frame and the through hole on the ear plate of the adjacent outer frame to connect the pulling steel wire rope and the wind cable, and fix the tower body of the emergency repair tower. In addition, the pulling and hanging connection frame of the emergency repair tower provided by the utility model can also be connected with other components such as insulator brackets and steps, which is very practical.

进一步的,所述框体由碳素钢制成。Further, the frame body is made of carbon steel.

框体可以采用多种材质制成,相应的为了加工时更加方便,采用与抢修塔相同的材料来制成,这样在抢修塔标准节加工时就可一起进行加工。现有的抢修塔多采用铝合金、碳素钢等材料制成,由于铝合金材料在加工时内部容易出现缺陷,因此本实用新型中采用碳素钢来制成框体。The frame body can be made of various materials, correspondingly, for more convenience in processing, it is made of the same material as the emergency repair tower, so that it can be processed together when processing the standard section of the emergency repair tower. Most of the existing repair towers are made of materials such as aluminum alloy and carbon steel. Because aluminum alloy materials are prone to defects during processing, carbon steel is used to make the frame in the utility model.

本实用新型的有益效果是:本实用新型通过将内耳座和外耳座固定在框体上,内耳座与抢修塔标准节之间进行固定连接,外耳座用于固定风缆,同时将4块框体固定连接成一整体,这样不仅避免了使用标准节间的连接孔进行固定,保证了标准节之间固定稳定,同时风缆之间通过本实用新型的抢修塔牵拉悬挂连接框形成配合,对抢修塔的固定更加牢固。The beneficial effects of the utility model are: the utility model fixes the inner ear seat and the outer ear seat on the frame body, the inner ear seat is fixedly connected with the standard section of the emergency repair tower, the outer ear seat is used for fixing the wind cable, and the four frame The body is fixedly connected as a whole, which not only avoids the use of connection holes between standard nodes for fixing, but also ensures the stability of the standard nodes. The fixation of the repair tower is more firm.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本实用新型的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following drawings will be briefly introduced in the embodiments. It should be understood that the following drawings only show some embodiments of the present invention. Therefore, it should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can also be obtained according to these drawings without creative work.

图1是本实用新型提供的抢修塔牵拉悬挂连接框的结构示意图;Fig. 1 is the structural representation of the pulling suspension connection frame of the emergency repair tower provided by the utility model;

图2是本实用新型提供的抢修塔牵拉悬挂连接框中内耳座示意图。Fig. 2 is a schematic diagram of the inner ear seat in the pulling suspension connection frame of the emergency repair tower provided by the utility model.

图中标记分别为:The marks in the figure are:

第一框体301;第二框体302;外耳座303;内耳座304;The first frame body 301; the second frame body 302; the outer ear seat 303; the inner ear seat 304;

固定板305;加强筋306;通孔307;耳板308。Fixed plate 305 ; rib 306 ; through hole 307 ; ear plate 308 .

具体实施方式Detailed ways

现有的电力输送塔架高度高、跨度大,在安装时均需在塔架上安装风缆用于对塔架本体的固定,防止塔架在大风等恶劣天气条件下出现倾覆、倒塌的风险。现有的风缆固定方式是在塔架本体上设置一些连接耳座,将风缆与连接耳座连接通过地锚固定在地面,这样的固定方式连接耳座单独的固定在塔架上,相互之间没有形成配合,一旦某根风缆出现松动,塔架就会存在严重的安全隐患。同时,单独设置的连接耳座在安装时更加费时费力,影响工作效率,尤其是在紧急抢修电力输送塔的时候。The existing power transmission towers are high in height and large in span, and wind cables need to be installed on the towers during installation to fix the tower body to prevent the tower from overturning and collapsing in severe weather conditions such as strong winds. . The existing wind cable fixing method is to set some connecting ear seats on the tower body, and connect the wind cable and the connecting ear seats to the ground through ground anchors. In this fixing method, the connecting ear seats are separately fixed on the tower, mutually There is no cooperation between them. Once a certain wind cable becomes loose, there will be serious safety hazards in the tower. At the same time, the installation of the separately provided connecting lugs is more time-consuming and laborious, which affects work efficiency, especially when urgently repairing the power transmission tower.

抢修塔是一直用用于输电线路发生倒塔事故后,临时恢复供电的特殊杆塔。快装抢修塔是一种采用螺栓连接的标准节结构,在标准节连接成一整体结构后,往往需要在整体机构上安装一些其他结构,而这些结构均需要利用标准节间连接的螺纹孔进行安装,如将风缆与标准节间的螺纹孔进行固定,会造成标准节连接时螺栓预紧力不足的情况。The emergency repair tower is a special tower that has been used to temporarily restore power supply after a tower collapse accident occurs on a transmission line. The quick repair tower is a standard section structure connected by bolts. After the standard sections are connected into an integral structure, it is often necessary to install some other structures on the overall structure, and these structures need to be installed using the threaded holes connected by the standard intersections. , If the threaded holes between the wind cable and the standard section are fixed, the pre-tightening force of the bolts will be insufficient when the standard section is connected.

本领域技术人员长期以来一直在寻求一种改善该问题的工具或方法。Those skilled in the art have been looking for a tool or method to improve this problem for a long time.

鉴于此,本实用新型的设计者通过长期的探索和尝试,以及多次的实验和努力,不断的改革创新,通过一系列巧妙的构思设计出了一种抢修塔牵拉悬挂连接框,该抢修塔牵拉悬挂连接框通过将内耳座304和外耳座303固定在框体上,内耳座304与抢修塔标准节之间进行固定连接,外耳座303用于固定风缆,同时将4块框体固定连接成一整体,这样不仅避免了使用标准节间的连接孔进行固定,保证了标准节之间固定稳定,同时风缆之间通过本实用新型的抢修塔牵拉悬挂连接框形成配合,对抢修塔的固定更加牢固。In view of this, the designer of the utility model through long-term exploration and trial, as well as many experiments and efforts, continuous reform and innovation, through a series of ingenious ideas designed a kind of emergency repair tower pulling suspension connection frame, the emergency repair The tower pulling suspension connection frame fixes the inner ear seat 304 and the outer ear seat 303 on the frame body, the inner ear seat 304 is fixedly connected with the standard section of the emergency repair tower, the outer ear seat 303 is used to fix the wind cable, and the four frame bodies It is fixedly connected as a whole, which not only avoids the use of connecting holes between standard sections for fixing, but also ensures the stability of the standard sections. At the same time, the wind cables are matched by pulling the suspension connection frame through the emergency repair tower of the present utility model, which is very convenient for emergency repairs. The fixing of the tower is more solid.

为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。因此,以下对在附图中提供的本实用新型的实施例的详细描述并非旨在限制要求保护的本实用新型的范围,而是仅仅表示本实用新型的选定实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the utility model more clear, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the utility model. Obviously, the described The embodiments are some embodiments of the present utility model, but not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model. Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.

在本实用新型的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该实用新型产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”、“第三”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" The orientation or positional relationship indicated by etc. is based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship that is usually placed when the product of the utility model is used. It is only for the convenience of describing the utility model and simplifying the description, rather than Any indication or implication that a referenced device or element must have a particular orientation, be constructed, and operate in a particular orientation should not be construed as limiting the invention. In addition, the terms "first", "second", "third", etc. are only used for distinguishing descriptions, and should not be construed as indicating or implying relative importance.

在本实用新型的描述中,还需要说明的是,除非另有明确的规定和限定,术语“设置”、“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should also be noted that, unless otherwise specified and limited, the terms "setting", "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection , can also be detachably connected, or integrally connected; can be mechanically connected, can also be electrically connected; can be directly connected, can also be indirectly connected through an intermediary, and can be internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.

如图1和图2所示的一种抢修塔牵拉悬挂连接框,包括由4块框体依次固定连接组成的矩形框,在本实施例中,所述框体包括第一框体301和第二框体302,所述第一框体301和第二框体302分别为2块,2块第一框体301和2块第二框体302依次连接组成连接框的主体结构。第一框体301和第二框体302之间是通过螺栓进行连接的,这样方便拆卸和组装,螺栓连接的方式可以有很多,只要能将第一框体301和第二框体302稳定固定即可。As shown in Fig. 1 and Fig. 2, a kind of drawing suspension connecting frame of emergency repair tower includes a rectangular frame composed of 4 frames which are sequentially fixedly connected. In this embodiment, the frame includes a first frame 301 and a The second frame body 302, the first frame body 301 and the second frame body 302 are two pieces respectively, and the two first frame bodies 301 and the two second frame bodies 302 are sequentially connected to form the main structure of the connection frame. The first frame body 301 and the second frame body 302 are connected by bolts, which is convenient for disassembly and assembly. There are many ways of bolt connection, as long as the first frame body 301 and the second frame body 302 can be stably fixed That's it.

在本实施例中,所述第一框体301和第二框体302两端均具有相互配合的耳板308,所述耳板308上设置有螺孔。在将第一框体301和第二框体302进行连接时,将第一框体301和第二框体302上的耳板308上的螺孔对齐,通过螺栓将相邻的第一框体301和第二框体302固定连接。In this embodiment, both ends of the first frame body 301 and the second frame body 302 have ear plates 308 that cooperate with each other, and screw holes are provided on the ear plates 308 . When the first frame body 301 and the second frame body 302 are connected, the screw holes on the ear plates 308 on the first frame body 301 and the second frame body 302 are aligned, and the adjacent first frame bodies are connected by bolts. 301 and the second frame body 302 are fixedly connected.

耳板308既可以直接设置在第一框体301和第二框体302上,如直接焊接在第一框体301和第二框体302的两端。也可以通过对第一框体301和第二框体302进行加工制成,在本实施例中,耳板308由第一框体301和第二框体302向外弯折形成,这样可以节省材料,降低成本。The ear plate 308 can be directly arranged on the first frame body 301 and the second frame body 302 , such as directly welded to both ends of the first frame body 301 and the second frame body 302 . It can also be made by processing the first frame body 301 and the second frame body 302. In this embodiment, the ear plate 308 is formed by bending the first frame body 301 and the second frame body 302 outward, which can save materials, reducing costs.

第一框体301和第二框体302可以采用多种材质制成,相应的为了加工时更加方便,采用与抢修塔相同的材料来制成,这样在抢修塔标准节加工时就可一起进行加工。现有的抢修塔多采用铝合金、碳素钢等材料制成,而由于铝合金材料在加工时内部容易出现微小的缺陷,因此本实用新型中采用碳素钢来制成第一框体301和第二框体302。The first frame body 301 and the second frame body 302 can be made of various materials. Correspondingly, in order to make the processing more convenient, they are made of the same material as the emergency repair tower, so that they can be processed together when processing the standard section of the emergency repair tower. processing. Existing emergency repair towers are mostly made of aluminum alloy, carbon steel and other materials, and because aluminum alloy materials tend to have tiny defects inside during processing, carbon steel is used to make the first frame body 301 in the utility model and the second frame body 302 .

所述第一框体301和第二框体302上还设置有伸向矩形框内的固定件。固定件用于将整个连接框固定在抢修塔的标准节上,固定件的结构或者设置方式可以有很多,只要能将连接框固定稳定即可。The first frame body 301 and the second frame body 302 are also provided with fixing pieces extending into the rectangular frame. The fixing piece is used to fix the entire connecting frame on the standard section of the emergency repair tower, and there are many structures or setting methods of the fixing piece, as long as the connecting frame can be fixed stably.

具体的说,在本实施例中,固定件为内耳座304,其包括固定板305和加强筋306,固定板305上设置螺孔,通过该螺孔将连接框整体与标准节固定,同时,为了增强固定板305与框体间连接的稳定性,在固定板305上设置加强筋306,加强筋306分别与固定板305和框体固定连接,这样固定板305不会出现变形或者弯折等现象。Specifically, in this embodiment, the fixing part is the inner ear seat 304, which includes a fixing plate 305 and a reinforcing rib 306, and a screw hole is set on the fixing plate 305, through which the whole connecting frame and the standard joint are fixed, and at the same time, In order to enhance the stability of the connection between the fixed plate 305 and the frame, reinforcing ribs 306 are provided on the fixed plate 305, and the reinforcing ribs 306 are fixedly connected with the fixed plate 305 and the frame respectively, so that the fixed plate 305 will not be deformed or bent, etc. Phenomenon.

同时,为了方便安装人员进行操作,将内耳座304设置在第一框体301和第二框体302的上部边缘,这样,在将第一框体301和第二框体302固定在标准节上的过程中,固定板305靠近标准节连接处的上表面,相当于整个框体挂靠在标准节上,操作人员在拧螺栓时能更加方便。At the same time, in order to facilitate the installation personnel to operate, the inner ear seat 304 is arranged on the upper edge of the first frame body 301 and the second frame body 302, so that when the first frame body 301 and the second frame body 302 are fixed on the standard section During the process, the fixing plate 305 is close to the upper surface of the joint of the standard section, which is equivalent to the whole frame hanging on the standard section, and it is more convenient for the operator to tighten the bolts.

通过上述方式将连接框固定在标准节上,固定板305上的螺孔与标准节上的连接孔可以尽可能靠近标准节的主舷杆,连接可靠,连接螺栓受力更加合理。The connection frame is fixed on the standard section through the above method, the screw holes on the fixing plate 305 and the connection holes on the standard section can be as close as possible to the main stern of the standard section, the connection is reliable, and the force of the connecting bolts is more reasonable.

所述第一框体301和第二框体302外侧设置有外耳座303,所述外耳座303垂直于第一框体301和第二框体302设置。外耳座303上具有耳孔,外耳座303的作用是用于固定风缆,通常在风缆的同一设计位置需要固定2根风缆,两根风缆对称设置,为了尽可能的保持抢修塔塔体稳定,将外耳座303设置为多个,这样同一根风缆与多个外耳座303连接,将风缆对抢修塔塔体的拉力分散到抢修塔塔体的各个部位,增加抢修塔塔体的稳定性。Outer sides of the first frame body 301 and the second frame body 302 are provided with outer ear seats 303 , and the outer ear seats 303 are arranged perpendicular to the first frame body 301 and the second frame body 302 . There are ear holes on the outer ear seat 303, and the function of the outer ear seat 303 is to fix the wind cable. Usually, two wind cables need to be fixed at the same design position of the wind cable, and the two wind cables are arranged symmetrically. Stable, a plurality of outer lugs 303 are set, so that the same wind cable is connected with multiple outer lugs 303, and the pulling force of the wind cable to the emergency repair tower body is distributed to various parts of the emergency repair tower body, increasing the emergency repair tower body. stability.

为了保持风缆拉力的稳定,将同一框体上的外耳座303耳孔同轴设置,这样外耳座303在与风缆进行连接时,不会对风缆产生额外的应力。需要说明的是,外耳座303既可以是单耳座结构,也可以是多耳座结构。In order to keep the tension of the wind cable stable, the earholes of the ear sockets 303 on the same frame are arranged coaxially, so that when the ear sockets 303 are connected to the wind cables, no additional stress will be generated on the wind cables. It should be noted that the outer lug seat 303 can be either a single ear seat structure or a multi-ear seat structure.

与此同时,所述耳板308上设置有通孔307,所述相邻的耳板308上的通孔307配合设置。这样,利用框体上的外耳座303和相邻框体耳板308上的通孔307连接牵拉钢丝绳和风缆,对抢修塔塔体进行固定。风缆对连接框产生的拉力均匀的分散,抢修塔塔体固定更加稳固。At the same time, through-holes 307 are provided on the ear plates 308 , and the through-holes 307 on the adjacent ear plates 308 are arranged in cooperation. In this way, the pull steel wire rope and the wind cable are connected by the outer lug seat 303 on the frame body and the through hole 307 on the ear plate 308 of the adjacent frame body, so as to fix the emergency repair tower body. The pulling force generated by the wind cable on the connection frame is evenly distributed, and the repair tower body is more firmly fixed.

除此之外,本实用新型提供的抢修塔牵拉悬挂连接框也可以用于连接绝缘子支架、踏步等其他部件,使用时,将相应的部件连接固定在外耳座303上即可,非常实用。In addition, the emergency repair tower traction suspension connection frame provided by the utility model can also be used to connect other components such as insulator brackets and steps. When in use, the corresponding components can be connected and fixed on the outer ear seat 303, which is very practical.

以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the utility model, and are not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (10)

1. an emergent repairing tower tractive hangs connection box, it is characterized in that, comprise and to be fixedly connected sequentially the rectangle frame formed by 4 pieces of frameworks, outside described rectangle frame, be provided with external ear seat, external ear seat has earhole, described rectangle frame is also provided with the fixture stretched in rectangle frame.
2. emergent repairing tower tractive according to claim 1 hangs connection box, and it is characterized in that, described external ear seat is multiple, and described external ear seat is arranged perpendicular to framework.
3. emergent repairing tower tractive according to claim 2 hangs connection box, and it is characterized in that, the external ear seat earhole in described same framework is coaxially arranged.
4. emergent repairing tower tractive according to claim 1 hangs connection box, it is characterized in that, described fixture is inner ear seat, described inner ear seat comprises fixed head and reinforcing rib, described fixed head is provided with screw, described fixed head is perpendicular to framework, and described reinforcing rib is fixedly connected with framework with fixed head respectively.
5. emergent repairing tower tractive according to claim 4 hangs connection box, and it is characterized in that, described framework comprises the first framework and the second framework, and described first framework and the second framework are respectively 2 pieces, and described first framework and the second framework are provided with inner ear seat.
6. emergent repairing tower tractive according to claim 5 hangs connection box, and it is characterized in that, described inner ear seat is arranged on the top edge of the first framework and the second framework.
7. emergent repairing tower tractive according to claim 6 hangs connection box, and it is characterized in that, described first framework and the second framework two ends all have the otic placode cooperatively interacted, and described otic placode is provided with screw.
8. emergent repairing tower tractive according to claim 7 hangs connection box, and it is characterized in that, described otic placode is outwards bent to form by framework.
9. emergent repairing tower tractive according to claim 8 hangs connection box, and it is characterized in that, described otic placode is provided with through hole, the through hole on described adjacent otic placode is equipped with.
10. emergent repairing tower tractive as claimed in any of claims 1 to 9 hangs connection box, and it is characterized in that, described framework is made up of carbon steel.
CN201520151797.5U 2015-03-17 2015-03-17 Emergent repairing tower tractive hangs connection box Expired - Fee Related CN204609430U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520151797.5U CN204609430U (en) 2015-03-17 2015-03-17 Emergent repairing tower tractive hangs connection box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520151797.5U CN204609430U (en) 2015-03-17 2015-03-17 Emergent repairing tower tractive hangs connection box

Publications (1)

Publication Number Publication Date
CN204609430U true CN204609430U (en) 2015-09-02

Family

ID=53961997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520151797.5U Expired - Fee Related CN204609430U (en) 2015-03-17 2015-03-17 Emergent repairing tower tractive hangs connection box

Country Status (1)

Country Link
CN (1) CN204609430U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372315A (en) * 2018-11-30 2019-02-22 江苏神马电力股份有限公司 A cross arm assembly and transmission pole
CN112081719A (en) * 2019-06-13 2020-12-15 北京金风科创风电设备有限公司 Tower barrel section, stay cable type tower frame, forming method and wind generating set

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372315A (en) * 2018-11-30 2019-02-22 江苏神马电力股份有限公司 A cross arm assembly and transmission pole
CN112081719A (en) * 2019-06-13 2020-12-15 北京金风科创风电设备有限公司 Tower barrel section, stay cable type tower frame, forming method and wind generating set

Similar Documents

Publication Publication Date Title
CN104158120B (en) Ground wire lifter for high-tension transmission line
CN105914646A (en) Live-line working method for replacing 35kV strain insulator strings
CN204609430U (en) Emergent repairing tower tractive hangs connection box
CN203716508U (en) Fork lug pin type anchoring pull cable tensioning device
CN103332624B (en) A kind of pulley for high-altitude circuit or caliber and installation method thereof
CN105317794A (en) Fixing structure for extra ultra high voltage electric transmission and transformation equipment grading ring
CN204258160U (en) Change transmission tower insulator instrument
CN105442935B (en) Helicopter laterally docks assembled iron tower suite of tools and assembled iron tower method
CN204030438U (en) A kind of ground wire raiser of ultra-high-tension power transmission line
CN203222417U (en) Special hanging tool for sleeving rotor of large direct-driven wind turbine generator
CN203022328U (en) Climbing operation platform
CN205170234U (en) Cantilever crane
CN212085763U (en) Easy dismouting light power supply bus duct
CN204212531U (en) Limit maintenance tool is faced at a kind of hole
CN108979290B (en) Detachable device and method for manually assembling steel column
CN203810679U (en) Screw parallel unit frame and screw parallel unit with same
CN110137830B (en) Docking dust-proof device for high-voltage bushings in substations
CN209413406U (en) A kind of electric power tower main material bracing means
CN220203377U (en) Novel connecting piece for climbing frame
CN204876739U (en) Salvage accurate festival of tower beacon
CN205908585U (en) Hexagonal joint member
CN211772756U (en) Coal conveying trestle convenient to butt joint in air
CN220537264U (en) Connecting beam for attaching construction electric lifter
CN101232158A (en) Equipotential working curved ladder
CN106762341B (en) A kind of intersecting parallels ocean power generating device universal bracket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150902

Termination date: 20170317

CF01 Termination of patent right due to non-payment of annual fee