[go: up one dir, main page]

CN204590038U - A kind of permanent foundation pit supporting construction - Google Patents

A kind of permanent foundation pit supporting construction Download PDF

Info

Publication number
CN204590038U
CN204590038U CN201520226791.XU CN201520226791U CN204590038U CN 204590038 U CN204590038 U CN 204590038U CN 201520226791 U CN201520226791 U CN 201520226791U CN 204590038 U CN204590038 U CN 204590038U
Authority
CN
China
Prior art keywords
foundation pit
support
wall
permanent
purlins
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520226791.XU
Other languages
Chinese (zh)
Inventor
钟国辉
龚胜
黄喜雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foundation Design Group Co Ltd Of Guangdong Province
Original Assignee
Foundation Design Group Co Ltd Of Guangdong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foundation Design Group Co Ltd Of Guangdong Province filed Critical Foundation Design Group Co Ltd Of Guangdong Province
Priority to CN201520226791.XU priority Critical patent/CN204590038U/en
Application granted granted Critical
Publication of CN204590038U publication Critical patent/CN204590038U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本实用新型公开了一种永久性基坑支护结构,包括环绕基坑施工的与主体结构全面结合的地下连续墙及紧贴地下连续墙外层的内衬墙,沿各内衬墙从上至下依次设有若干围檩及位于内衬墙底部的地下室底板,两相对的所述围檩间均设有水平支撑,位于两相交的水平支撑的底部设有用于支撑所述水平支撑的支撑柱。此永久性基坑支护结构通过地下连续墙和内衬墙的结合来增强连续墙的稳定和抗渗性能,多道围檩、水平支撑以及支撑柱的设置,有利于增强基坑支护结构的支护强度、刚度,从而使得基坑支护结构可以长时间使用,而用作永久性的基坑支护,从而有效避免资源浪费和造成的环境污染,此实用新型用于建筑结构领域。

The utility model discloses a permanent foundation pit supporting structure, which comprises an underground continuous wall which is constructed around the foundation pit and fully integrated with the main structure, and an inner lining wall close to the outer layer of the underground continuous wall. There are several purlins and the basement floor at the bottom of the lining wall in turn, horizontal supports are provided between the two opposite purlins, and supports for supporting the horizontal supports are provided at the bottom of the two intersecting horizontal supports column. The permanent foundation pit support structure enhances the stability and anti-seepage performance of the diaphragm wall through the combination of the underground diaphragm wall and the lining wall. The setting of multiple purlins, horizontal supports and support columns is conducive to strengthening the foundation pit support structure Excellent support strength and rigidity, so that the foundation pit support structure can be used for a long time, and used as a permanent foundation pit support, thereby effectively avoiding resource waste and environmental pollution. This utility model is used in the field of building structures.

Description

一种永久性基坑支护结构A permanent foundation pit support structure

技术领域 technical field

本实用新型涉及建筑结构领域,特别是涉及一种永久性基坑支护结构。 The utility model relates to the field of building structures, in particular to a permanent foundation pit supporting structure.

背景技术 Background technique

传统的基坑支护结构多为临时性结构形式,待地下室施工完毕即被废弃并永久置于地下,某些临时结构还须拆除,造成较大的资源浪费,存在施工风险大,施工周期长,环境污染等问题。 Traditional foundation pit support structures are mostly temporary structures, which will be abandoned and permanently placed underground after the basement construction is completed. Some temporary structures must be dismantled, resulting in a large waste of resources, high construction risks, and long construction periods. , environmental pollution and other issues.

为解决上述问题,积极发展基坑支护结构与永久结构相结合的支护形式,使基坑支护结构作为地下室主体结构的一部分,能避免资源浪费和环境污染,缩短施工周期,降低施工风险,减少工程造价。 In order to solve the above problems, actively develop the support form that combines the foundation pit support structure with the permanent structure, so that the foundation pit support structure can be used as a part of the main structure of the basement, which can avoid resource waste and environmental pollution, shorten the construction period, and reduce construction risks. , Reduce project cost.

实用新型内容 Utility model content

    为解决上述问题,本实用新型提供一种能起到永久支护从而避免资源浪费和环境污染的永久性基坑支护结构。 In order to solve the above problems, the utility model provides a permanent foundation pit support structure that can provide permanent support to avoid waste of resources and environmental pollution.

本实用新型解决其技术问题所采用的技术方案是: The technical scheme that the utility model solves its technical problem adopts is:

一种永久性基坑支护结构,包括环绕基坑施工的与主体结构全面结合的地下连续墙及紧贴地下连续墙外层的内衬墙,沿各内衬墙从上至下依次设有若干围檩及位于内衬墙底部的地下室底板,两相对的所述围檩间均设有水平支撑,位于两相交的水平支撑的底部设有用于支撑所述水平支撑的支撑柱。 A permanent foundation pit support structure, including an underground diaphragm wall that is fully integrated with the main structure around the foundation pit and an inner lining wall that is close to the outer layer of the underground diaphragm wall. A number of purlins and the basement floor at the bottom of the lining wall, horizontal supports are provided between the two opposite purlins, and support columns for supporting the horizontal supports are provided at the bottom of the two intersecting horizontal supports.

进一步作为本实用新型技术方案的改进,各支撑柱的底部设有支撑桩,支撑柱的底部嵌入支撑桩中。 As a further improvement of the technical solution of the utility model, support piles are provided at the bottom of each support column, and the bottom of the support column is embedded in the support pile.

进一步作为本实用新型技术方案的改进,支撑桩为钢筋混凝土灌注桩,支撑柱为钢格构柱。 As a further improvement of the technical solution of the utility model, the support piles are reinforced concrete cast-in-situ piles, and the support columns are steel lattice columns.

进一步作为本实用新型技术方案的改进,地下连续墙中预留有垂直于地下连续墙设置的预留钢筋,各围檩、地下室底板和水平支撑通过预留钢筋与内衬墙或者地下连续墙固定连接。 As a further improvement of the technical solution of the utility model, reserved steel bars perpendicular to the underground diaphragm wall are reserved in the underground diaphragm wall, and the purlins, basement floor and horizontal supports are fixed to the inner lining wall or the underground diaphragm wall through the reserved steel bars connect.

进一步作为本实用新型技术方案的改进,内衬墙为钢筋混凝土墙,内衬墙的厚度为200mm~400mm。 As a further improvement of the technical solution of the utility model, the inner lining wall is a reinforced concrete wall, and the thickness of the inner lining wall is 200mm-400mm.

本实用新型的有益效果:此永久性基坑支护结构通过地下连续墙和内衬墙的结合来增强连续墙的稳定和抗渗性能,多道围檩、水平支撑以及支撑柱的设置,有利于增强基坑支护结构的支护强度、刚度,从而使得基坑支护结构可以长时间使用,而用作永久性的基坑支护,从而有效避免资源浪费和造成的环境污染。 Beneficial effects of the utility model: the permanent foundation pit supporting structure enhances the stability and impermeability of the continuous wall through the combination of the underground continuous wall and the lining wall, and the setting of multiple purlins, horizontal supports and supporting columns has It is beneficial to enhance the support strength and rigidity of the foundation pit support structure, so that the foundation pit support structure can be used for a long time and used as a permanent foundation pit support, thereby effectively avoiding resource waste and environmental pollution.

附图说明 Description of drawings

下面结合附图对本实用新型作进一步说明: Below in conjunction with accompanying drawing, the utility model is further described:

图1是本实用新型实施例整体结构侧面剖视图; Fig. 1 is a side sectional view of the overall structure of the utility model embodiment;

图2是本实用新型实施例整体结构俯视图。 Fig. 2 is a top view of the overall structure of the embodiment of the utility model.

具体实施方式 Detailed ways

参照图1、图2,本实用新型为一种永久性基坑支护结构,包括环绕基坑施工的与主体结构全面结合的地下连续墙1及紧贴地下连续墙1外层的内衬墙2,沿各内衬墙2从上至下依次设有若干围檩3及位于内衬墙2底部的地下室底板7,两相对的所述围檩3间均设有水平支撑4,位于两相交的水平支撑4的底部设有用于支撑所述水平支撑4的支撑柱6。 Referring to Fig. 1 and Fig. 2, the utility model is a permanent foundation pit support structure, including an underground diaphragm wall 1 which is fully integrated with the main structure around the foundation pit and an inner lining wall close to the outer layer of the underground diaphragm wall 1 2. A number of purlins 3 and a basement floor 7 located at the bottom of the lining walls 2 are arranged in sequence from top to bottom along each lining wall 2. Horizontal supports 4 are provided between the two opposing purlins 3, located at the two intersections. The bottom of the horizontal support 4 is provided with a support column 6 for supporting the horizontal support 4 .

此永久性基坑支护结构通过地下连续墙1和内衬墙2的结合来增强连续墙的稳定和抗渗性能,多道围檩3、水平支撑4以及支撑柱6的设置,有利于增强基坑支护结构的支护强度、刚度,从而使得基坑支护结构可以长时间使用,而用作永久性的基坑支护,从而有效避免资源浪费和造成的环境污染。 This permanent foundation pit support structure enhances the stability and anti-seepage performance of the diaphragm wall through the combination of the underground diaphragm wall 1 and the lining wall 2. The support strength and rigidity of the foundation pit support structure enable the foundation pit support structure to be used for a long time and be used as a permanent foundation pit support, thereby effectively avoiding resource waste and environmental pollution.

地下连续墙1作为基坑围护结构的止水墙和挡土墙,同时可兼作地下室永久外墙。地下连续墙1需满足基坑支护强度、刚度、稳定性及抗渗漏要求,同时还需满足规范对永久地下连续墙的其他要求。地下连续墙1中预留与后续施工的围檩3、水平支撑4、地下室底板7及内衬墙2的连接钢筋。 The underground diaphragm wall 1 is used as a water stop wall and a retaining wall of the foundation pit enclosure structure, and can also be used as a permanent outer wall of the basement simultaneously. The underground diaphragm wall 1 needs to meet the strength, stiffness, stability and anti-leakage requirements of foundation pit support, and also meet other requirements of the code for permanent underground diaphragm walls. The connecting steel bars for purlin 3, horizontal support 4, basement floor 7 and lining wall 2 reserved in the underground diaphragm wall 1 for subsequent construction.

内衬墙2可保证地下室墙面平整和防水效果良好,内衬墙2浇筑前需对地下连续墙1进行凿毛,提高二者结合紧密性。 The lining wall 2 can ensure the smoothness of the basement wall surface and good waterproof effect. Before the lining wall 2 is poured, the underground diaphragm wall 1 needs to be chiseled to improve the tightness of the two.

作为本实用新型优选的实施方式,各支撑柱6的底部设有支撑桩5,支撑柱6的底部嵌入支撑桩5中。 As a preferred embodiment of the present invention, the bottom of each support column 6 is provided with a support pile 5 , and the bottom of the support column 6 is embedded in the support pile 5 .

各水平支撑4通过支撑柱6和支撑桩5结合的组成的竖直支撑形式进行支撑,方便竖直支撑的施工,通过支撑桩5的底部嵌入地下深层结构中,有利于增强基坑支护结构整体的稳定性。 Each horizontal support 4 is supported by the vertical support form composed of the support column 6 and the support pile 5, which facilitates the construction of the vertical support. The bottom of the support pile 5 is embedded in the deep underground structure, which is conducive to strengthening the foundation pit support structure overall stability.

水平支撑4采用楼板带与梁结合的T型梁形式,必要时设纯楼板带。水平支撑4端头可设八字撑,支撑之间可设联系杆撑。 The horizontal support 4 is in the form of T-beams combined with floor belts and beams, and pure floor belts are provided when necessary. Figure-of-eight supports can be set at the 4 ends of the horizontal support, and connecting rod supports can be set between the supports.

此基坑支护结构中,配筋和混凝土强度不低于永久结构要求,支撑间距、作为水平支撑4的楼板宽度满足施工操作及土方开挖空间需求,支撑的强度、刚度和稳定性满足基坑支护要求。 In this foundation pit support structure, the strength of reinforcement and concrete shall not be lower than the requirements of the permanent structure, the spacing of the supports and the width of the slab as the horizontal support 4 shall meet the requirements of construction operations and earthwork excavation space, and the strength, stiffness and stability of the supports shall meet the requirements of the foundation pit. Pit support requirements.

水平支撑4预留与后续施工的楼板、梁及结构柱的连接钢筋。水平支撑4与立柱交接部分预留好混凝土浇筑孔,该混凝土浇筑孔的内径为100mm~150mm。 Horizontal support 4 is reserved for connecting steel bars with subsequent construction floors, beams and structural columns. A concrete pouring hole is reserved at the junction of the horizontal support 4 and the column, and the inner diameter of the concrete pouring hole is 100 mm to 150 mm.

作为本实用新型优选的实施方式,支撑桩5为钢筋混凝土灌注桩,支撑柱6为钢格构柱。 As a preferred embodiment of the present invention, the support pile 5 is a reinforced concrete pouring pile, and the support column 6 is a steel lattice column.

作为本实用新型优选的实施方式,地下连续墙1中预留有垂直于地下连续墙1设置的预留钢筋,各围檩3、地下室底板7和水平支撑4通过预留钢筋与内衬墙2或者地下连续墙1固定连接。 As a preferred embodiment of the present invention, the underground diaphragm wall 1 is reserved with reserved steel bars perpendicular to the underground diaphragm wall 1, and each purlin 3, basement floor 7 and horizontal support 4 pass through the reserved steel bars and the lining wall 2 Or the underground diaphragm wall 1 is fixedly connected.

作为本实用新型优选的实施方式,内衬墙2为钢筋混凝土墙,内衬墙2的厚度为200mm~400mm。 As a preferred embodiment of the present invention, the inner lining wall 2 is a reinforced concrete wall, and the thickness of the inner lining wall 2 is 200mm-400mm.

围檩3采用靠墙处楼板带和分段内衬墙构成的T型构件,围檩3中配筋和混凝土强度、分段内衬墙的厚度不低于永久结构要求,围檩3可在基坑转角及与支撑连接处的楼板设置掖角,分段内衬墙、楼板带和掖角满足基坑支护强度、刚度和稳定性要求。 The purlin 3 is a T-shaped member composed of the floor belt near the wall and the segmented lining wall. The reinforcement and concrete strength in the purlin 3 and the thickness of the segmented lining wall are not lower than the requirements of the permanent structure. The purlin 3 can be The corners of the foundation pit and the floor at the connection with the support are provided with tuck angles, and the segmented lining walls, floor belts and tuck angles meet the strength, stiffness and stability requirements of the foundation pit support.

围檩3预留与后续施工楼板、内衬墙2的连接钢筋,同时分段内衬墙做好施工缝的防水措施。围檩3预留好后续内衬墙混凝土浇筑孔,内径100mm~150mm,间距为2m~3m。 The purlin 3 is reserved for the connection reinforcement with the subsequent construction floor slab and the lining wall 2, and at the same time, waterproof measures are taken for the construction joints of the lining wall in sections. Concrete pouring holes for the subsequent lining wall shall be reserved for the surrounding purlin 3, with an inner diameter of 100mm to 150mm and a spacing of 2m to 3m.

支撑桩5采用主体结构钢筋混凝土灌注桩,支撑柱6采用钢格构柱,在无法利用永久桩柱位置情况下,增设临时下部灌注桩和钢格构柱作为支撑桩柱。 The supporting pile 5 adopts the reinforced concrete cast-in-place pile of the main structure, and the supporting column 6 adopts the steel lattice column. When the position of the permanent pile cannot be used, a temporary lower cast-in-place pile and a steel lattice column are added as the supporting pile.

钢格构柱采用角钢与钢板焊制,截面为方形,边长一般不大于600mm,钢格构柱插入下部钢筋混凝土灌注桩一定深度。支撑桩5和支撑柱6满足基坑支护强度、刚度和稳定性要求。水平支撑4与支撑柱6结合处采用井型抱箍增强其整体稳定性,井型抱箍为角钢和钢板加劲肋紧贴钢格构柱焊接而成。 The steel lattice column is welded with angle steel and steel plate, the cross section is square, and the side length is generally not more than 600mm. The steel lattice column is inserted into the lower reinforced concrete pouring pile to a certain depth. The supporting piles 5 and the supporting columns 6 meet the strength, rigidity and stability requirements of foundation pit support. The joint of the horizontal support 4 and the support column 6 adopts a well-shaped hoop to enhance its overall stability, and the well-shaped hoop is welded by angle steel and steel plate stiffeners close to the steel lattice column.

在地下室主体结构施工过程中,先对钢格构柱内泥土清理干净,然后根据后期主体结构柱的截面尺寸安装柱钢筋,安装模板并浇筑混凝土,使钢格构柱成为结构柱的一部分。对于无法利用永久桩柱位置情况下增设的临时支撑桩柱,在地下室主体结构完工后可对钢格构柱进行切割拆除。 During the construction of the main structure of the basement, the soil in the steel lattice column is cleaned first, then the column reinforcement is installed according to the section size of the main structural column in the later stage, the formwork is installed and concrete is poured, so that the steel lattice column becomes a part of the structural column. For the temporary support piles added when the permanent piles cannot be used, the steel lattice columns can be cut and removed after the main structure of the basement is completed.

基坑土方开挖及地下室施工采用顺作法,即开挖一层土方施工一道支撑,当开挖至坑底时,施工地下室底板7。由于工程桩已提前施工完毕,缩短了基坑使用时间,地下室底板7先施工基坑四周部分,后施工中间部分,进一步降低了施工风险,有力地保障了基坑安全。 The earthwork excavation of the foundation pit and the construction of the basement adopt the straight method, that is, a layer of earthwork is excavated to construct a support, and when the excavation reaches the bottom of the pit, the basement floor 7 is constructed. Since the construction of the engineering piles has been completed in advance, the use time of the foundation pit has been shortened. The basement floor 7 is firstly constructed around the foundation pit, and then the middle part, which further reduces the construction risk and effectively guarantees the safety of the foundation pit.

当然,本发明创造并不局限于上述实施方式,熟悉本领域的技术人员在不违背本实用新型精神的前提下还可作出等同变形或替换,这些等同的变型或替换均包含在本申请权利要求所限定的范围内。 Of course, the present invention is not limited to the above-mentioned embodiments. Those skilled in the art can also make equivalent modifications or replacements without violating the spirit of the present utility model. These equivalent modifications or replacements are all included in the claims of this application. within the limited range.

Claims (5)

1.一种永久性基坑支护结构,其特征在于:包括环绕基坑施工的与主体结构全面结合的地下连续墙(1)及紧贴所述地下连续墙(1)外层的内衬墙(2),沿各所述内衬墙(2)从上至下依次设有若干围檩(3)及位于内衬墙(2)底部的地下室底板(7),两相对的所述围檩(3)间均设有水平支撑(4),位于两相交的所述水平支撑(4)的底部设有用于支撑所述水平支撑(4)的支撑柱(6)。 1. A permanent foundation pit support structure, characterized in that: it includes an underground diaphragm wall (1) that is fully integrated with the main structure around the foundation pit and an inner lining that is close to the outer layer of the underground diaphragm wall (1) Walls (2), a number of purlins (3) and a basement floor (7) located at the bottom of the lining walls (2) are arranged in turn along each of the lining walls (2) from top to bottom. Horizontal supports (4) are provided between the purlins (3), and support columns (6) for supporting the horizontal supports (4) are provided at the bottom of two intersecting horizontal supports (4). 2.根据权利要求1所述的永久性基坑支护结构,其特征在于:各所述支撑柱(6)的底部设有支撑桩(5),所述支撑柱(6)的底部嵌入支撑桩(5)中。 2. The permanent foundation pit support structure according to claim 1, characterized in that: the bottom of each support column (6) is provided with a support pile (5), and the bottom of the support column (6) is embedded in the support pile (5). 3.根据权利要求2所述的永久性基坑支护结构,其特征在于:所述支撑桩(5)为钢筋混凝土灌注桩,所述支撑柱(6)为钢格构柱。 3. The permanent foundation pit support structure according to claim 2, characterized in that: the support piles (5) are reinforced concrete pouring piles, and the support columns (6) are steel lattice columns. 4.根据权利要求1~3中任意一项所述的永久性基坑支护结构,其特征在于:所述地下连续墙(1)中预留有垂直于地下连续墙(1)设置的预留钢筋,各所述围檩(3)、地下室底板(7)和水平支撑(4)通过预留钢筋与内衬墙(2)或者地下连续墙(1)固定连接。 4. The permanent foundation pit support structure according to any one of claims 1 to 3, characterized in that: the underground diaphragm wall (1) is reserved with a pre-set vertical to the underground diaphragm wall (1). Steel bars are reserved, and the purlins (3), basement floor (7) and horizontal support (4) are fixedly connected to the lining wall (2) or the underground diaphragm wall (1) through the reserved steel bars. 5.根据权利要求1~3中任意一项所述的永久性基坑支护结构,其特征在于:所述内衬墙(2)为钢筋混凝土墙,所述内衬墙(2)的厚度为200mm~400mm。 5. The permanent foundation pit support structure according to any one of claims 1-3, characterized in that: the inner lining wall (2) is a reinforced concrete wall, and the thickness of the inner lining wall (2) is 200mm ~ 400mm.
CN201520226791.XU 2015-04-15 2015-04-15 A kind of permanent foundation pit supporting construction Expired - Lifetime CN204590038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520226791.XU CN204590038U (en) 2015-04-15 2015-04-15 A kind of permanent foundation pit supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520226791.XU CN204590038U (en) 2015-04-15 2015-04-15 A kind of permanent foundation pit supporting construction

Publications (1)

Publication Number Publication Date
CN204590038U true CN204590038U (en) 2015-08-26

Family

ID=53926207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520226791.XU Expired - Lifetime CN204590038U (en) 2015-04-15 2015-04-15 A kind of permanent foundation pit supporting construction

Country Status (1)

Country Link
CN (1) CN204590038U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071118A (en) * 2018-01-12 2018-05-25 上海岩土工程勘察设计研究院有限公司 A kind of supporting construction and its construction method and the overlapping piling wall for also serving as supporting construction
CN108149707A (en) * 2017-12-07 2018-06-12 成都新艺置业有限公司 A kind of basement building structure and its construction method
CN108457300A (en) * 2018-01-19 2018-08-28 中国建筑第八工程局有限公司 The construction method of cap excavation method underground longspan structure support replacement
CN109440774A (en) * 2018-12-27 2019-03-08 上海建工七建集团有限公司 A kind of foundation pit structure and its construction method
CN110158630A (en) * 2019-05-31 2019-08-23 广西路桥工程集团有限公司 A kind of deep covering layer area large-span arch bridge annular ground continuous wall base
CN112962616A (en) * 2021-02-05 2021-06-15 中冶成都勘察研究总院有限公司 Construction method of large-span foundation pit inner support structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149707A (en) * 2017-12-07 2018-06-12 成都新艺置业有限公司 A kind of basement building structure and its construction method
CN108071118A (en) * 2018-01-12 2018-05-25 上海岩土工程勘察设计研究院有限公司 A kind of supporting construction and its construction method and the overlapping piling wall for also serving as supporting construction
CN108457300A (en) * 2018-01-19 2018-08-28 中国建筑第八工程局有限公司 The construction method of cap excavation method underground longspan structure support replacement
CN109440774A (en) * 2018-12-27 2019-03-08 上海建工七建集团有限公司 A kind of foundation pit structure and its construction method
CN110158630A (en) * 2019-05-31 2019-08-23 广西路桥工程集团有限公司 A kind of deep covering layer area large-span arch bridge annular ground continuous wall base
CN112962616A (en) * 2021-02-05 2021-06-15 中冶成都勘察研究总院有限公司 Construction method of large-span foundation pit inner support structure

Similar Documents

Publication Publication Date Title
CN102635118B (en) Square steel pipe concrete supporting structure for foundation pit support
CN105735325B (en) A kind of intensive permanent support assembled basement structure system and construction method
CN204590038U (en) A kind of permanent foundation pit supporting construction
CN104264688A (en) Manual hole digging non-uniform pile support construction technology
CN101775844A (en) Connecting joint of ring beam of steel core concrete column used for topdown construction method foundation pit engineering
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN105714831A (en) Abnormal-shape double-row pile for supporting foundation pit side wall and construction method of abnormal-shape double-row pile
CN106759462A (en) A kind of prefabricated piping lane and its construction method suitable for narrow construction site
CN203741996U (en) Beam column node for foundation pit project adopting top-down excavation method
CN108775084B (en) Steel-concrete composite prefabricated beam and prefabricated column connection structure and construction method
KR101187170B1 (en) Application of under pinning method in remodeling
CN110387889A (en) A Supporting Method for Multi-Arch Foundation Pit Used in Long and Deep Foundation Pit
CN105040810B (en) Suitable for the connecting node of frame supported shear wall structure reverse construction
CN105735352A (en) Fabricated structure based on foundation pit retaining pile for basement exterior walls, and construction method
CN103993672A (en) Tenon type connecting joint structure of low-rise fabricated composite wall house
CN104947687A (en) Integrated vertical load-bearing structure of underground structure external wall and enclosure row piles
CN107268675A (en) Laying method and structure of combined multi-bin underground comprehensive pipe gallery
CN205636751U (en) Assembled forming structures system towards secret building of multilayer
CN204825920U (en) Underground structure outer wall with go along with sb. to guard him vertical load -bearing of campshed integration structure
CN204456131U (en) A kind of structural floor that utilizes is as the structural system of horizontal support
CN201598734U (en) A Connecting Node of Concrete Steel Tube Column and Ring Beam Used in Foundation Pit Engineering of Upside-Down Method
CN207525906U (en) A kind of assembled frame-shear structure wall splitlevel connection structure
CN205502069U (en) Basement outer wall fabricated construction based on excavation supporting stake
CN105804086A (en) Construction method for support change joints in foundation trench reverse building method construction