[go: up one dir, main page]

CN204571915U - Double acting thermal production well special cementing instrument assembly - Google Patents

Double acting thermal production well special cementing instrument assembly Download PDF

Info

Publication number
CN204571915U
CN204571915U CN201520210458.XU CN201520210458U CN204571915U CN 204571915 U CN204571915 U CN 204571915U CN 201520210458 U CN201520210458 U CN 201520210458U CN 204571915 U CN204571915 U CN 204571915U
Authority
CN
China
Prior art keywords
sleeve
ground anchor
sliding sleeve
connecting rod
prestressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520210458.XU
Other languages
Chinese (zh)
Inventor
王浩
王文涛
颜斌
李勇龙
向欣
郭瑞祥
范庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Xibu Drilling Engineering Co Ltd
Original Assignee
CNPC Xibu Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Xibu Drilling Engineering Co Ltd filed Critical CNPC Xibu Drilling Engineering Co Ltd
Priority to CN201520210458.XU priority Critical patent/CN204571915U/en
Application granted granted Critical
Publication of CN204571915U publication Critical patent/CN204571915U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型涉及预应力固井工具技术领域,是一种双作用热采井预应力固井工具总成;其包括地锚套筒、中心滑套、连杆、锚爪和挡板;中心滑套通过地锚剪钉固定连接在地锚套筒的上部内侧,中心滑套的中部内侧面为上大下小的锥面,在中心滑套的下部外侧沿圆周间隔分布有至少两个的连杆槽,在连杆槽内铰接有连杆。本实用新型结构合理而紧凑,使用方便,通过地锚套筒、中心滑套、连杆、锚爪、滑套球座和挡板的配合使用,实现自动同步灌浆,且下完套管洗井建立循环后即可投球蹩压实现坐挂,第一次预应力施加不成功可再通过替浆胶塞实现二次坐挂,具有安全可靠的特点,方便了操作,提高了地锚的坐挂率。

The utility model relates to the technical field of prestressed cementing tools, which is a prestressed cementing tool assembly for double-action thermal recovery wells; The sleeve is fixedly connected to the inner side of the upper part of the ground anchor sleeve through ground anchor shear nails. The inner surface of the middle part of the central sliding sleeve is a tapered surface with a large upper part and a smaller lower part. The rod groove is hinged with a connecting rod in the connecting rod groove. The utility model has a reasonable and compact structure and is easy to use. Through the cooperative use of the ground anchor sleeve, the central sliding sleeve, the connecting rod, the anchor claw, the sliding sleeve ball seat and the baffle plate, automatic synchronous grouting is realized, and the well is washed after running the casing. After the cycle is established, the ball can be cast and pressed to realize the set-up. If the first prestress application is unsuccessful, the second set-up can be realized through the replacement rubber plug. It has the characteristics of safety and reliability, facilitates the operation, and improves the set-up of the ground anchor. Rate.

Description

双作用热采井预应力固井工具总成Double-acting thermal recovery well prestressed cementing tool assembly

技术领域 technical field

本实用新型涉及预应力固井工具技术领域,是一种双作用热采井预应力固井工具总成。The utility model relates to the technical field of prestressed well cementing tools, which is a prestressed well cementing tool assembly for double-action thermal recovery wells.

背景技术 Background technique

注汽热采是常见的稠油开采方式,地锚是注汽热采井固完井中常用的一种工具附件,现常用的地锚为固井时注灰后替浆胶塞推动地锚内部机构,打开锚爪实现坐挂,地锚下部管串须接入强制浮箍,下中心套管过程中必须及时灌浆。在此过程中,存在无法同步灌浆,打开锚爪实现坐挂时需先施加预紧力然后再投入替浆胶塞,从而导致耗时费力的问题。Steam injection thermal recovery is a common heavy oil production method. Ground anchor is a tool accessory commonly used in steam injection thermal recovery well cementing and completion. The commonly used ground anchor is to push the inside of the ground anchor after injecting ash and then replace the grout rubber plug during well cementing. mechanism, open the anchor claw to realize sitting and hanging, the lower pipe string of the ground anchor must be connected to the forced floating hoop, and the central casing must be grouted in time during the process of lowering the center casing. During this process, there is no synchronous grouting, and when opening the anchor fluke to realize sitting and hanging, it is necessary to apply a pre-tightening force first and then put in the grout replacement rubber plug, which leads to time-consuming and labor-intensive problems.

发明内容 Contents of the invention

本实用新型提供了一种双作用热采井预应力固井工具总成,克服了上述现有技术之不足,其能有效解决现有地锚总成存在的无法同步灌浆,需接入强制浮箍,固井后实现坐挂,导致耗时长的问题。The utility model provides a double-action prestressed cementing tool assembly for thermal recovery wells, which overcomes the above-mentioned deficiencies in the prior art, and can effectively solve the problem that the existing ground anchor assembly cannot be synchronously grouted and needs to be connected to forced floating Hoops, to achieve sitting and hanging after cementing, resulting in a long time-consuming problem.

本实用新型的技术方案是通过以下措施来实现的:一种双作用热采井预应力固井工具总成,包括地锚套筒、中心滑套、连杆、锚爪和挡板;中心滑套通过地锚剪钉固定连接在地锚套筒的上部内侧,中心滑套的中部内侧面为上大下小的锥面,在中心滑套的下部外侧沿圆周间隔分布有至少两个的连杆槽,在连杆槽内铰接有连杆,在中心滑套的下端固定有内径小于中心滑套外径的中心套管,在地锚套筒的中部内侧固定有固定块,中心套管的下部套装在固定块的内侧,在中心套管的下端内侧通过剪切销钉固定连接有滑套球座,在地锚套筒的中部和固定块上有与连杆槽位置相对应的锚爪凹槽,在锚爪凹槽内铰接有锚爪,连杆的下端和锚爪的中部内侧铰接在一起;在地锚套筒的下端内侧固定安装有挡板,对应滑套球座位置的挡板外侧有至少一个的循环孔。The technical scheme of the utility model is realized through the following measures: a prestressed cementing tool assembly for double-action thermal recovery wells, including ground anchor sleeves, center sliding sleeves, connecting rods, anchor claws and baffles; The sleeve is fixedly connected to the inner side of the upper part of the ground anchor sleeve through ground anchor shear nails. The inner surface of the middle part of the central sliding sleeve is a tapered surface with a large upper part and a smaller lower part. The rod groove is hinged with a connecting rod in the connecting rod groove, and a central casing with an inner diameter smaller than the outer diameter of the central sliding sleeve is fixed at the lower end of the central sliding sleeve, and a fixed block is fixed on the inner side of the middle part of the ground anchor sleeve. The lower part is set on the inner side of the fixed block, and the inner side of the lower end of the central sleeve is fixedly connected with a sliding sleeve ball seat through a shear pin, and there is an anchor fluke recess corresponding to the position of the connecting rod groove on the middle part of the ground anchor sleeve and the fixed block. Groove, the anchor fluke is hinged in the anchor fluke groove, and the lower end of the connecting rod is hinged with the inner side of the middle part of the anchor fluke; a baffle plate is fixedly installed on the inner side of the lower end of the ground anchor sleeve, corresponding to the baffle plate at the position of the ball seat of the sliding sleeve There is at least one circulation hole on the outside.

下面是对上述实用新型技术方案的进一步优化或/和改进:Below is the further optimization or/and improvement to above-mentioned utility model technical scheme:

上述滑套球座的上部内侧面为上大下小的锥面。The inner surface of the upper part of the above-mentioned sliding sleeve ball seat is a tapered surface with a large upper part and a smaller lower part.

上述在地锚套筒的上部内侧有定位环安装槽,在定位环安装槽内安装有定位环,定位环和中心滑套通过地锚剪钉固定连接在一起。There is a positioning ring installation groove on the upper inner side of the ground anchor sleeve, a positioning ring is installed in the positioning ring mounting groove, and the positioning ring and the center sliding sleeve are fixedly connected together by ground anchor shear nails.

上述在地锚套筒的上部有内螺纹或外螺纹;在地锚套筒的下部有内螺纹或外螺纹。The upper part of the ground anchor sleeve has internal threads or external threads; the lower part of the ground anchor sleeve has internal threads or external threads.

上述在连杆槽内通过上销轴铰接有连杆,在锚爪凹槽内通过下销轴铰接有锚爪;或/和,挡板和地锚套筒之间通过螺纹固定安装在一起。The connecting rod is hinged in the connecting rod groove through the upper pin shaft, and the anchor fluke is hinged in the anchor fluke groove through the lower pin shaft; or/and, the baffle plate and the ground anchor sleeve are fixed and installed together through threads.

上述在地锚套筒和中心滑套之间安装有至少一道的密封圈,在中心套管和固定块之间安装有至少一道的密封圈,在滑套球座和中心套管之间安装有密封圈。At least one sealing ring is installed between the ground anchor sleeve and the central sliding sleeve, at least one sealing ring is installed between the central sleeve and the fixed block, and a sealing ring is installed between the sliding sleeve ball seat and the central sleeve. sealing ring.

本实用新型结构合理而紧凑,使用方便,通过地锚套筒、中心滑套、连杆、锚爪、滑套球座和挡板的配合使用,实现自动同步灌浆,且下完套管洗井建立循环后即可投球蹩压实现坐挂,第一次预应力施加不成功可再通过替浆胶塞实现二次坐挂,具有安全可靠的特点,方便了操作,提高了地锚的坐挂率。The utility model has a reasonable and compact structure and is easy to use. Through the cooperative use of ground anchor sleeves, center sliding sleeves, connecting rods, anchor claws, sliding sleeve ball seats and baffles, automatic synchronous grouting can be realized, and the well can be washed after running the casing. After the cycle is established, the ball can be cast and pressed to realize the sitting and hanging. If the first prestress application is unsuccessful, the second setting and hanging can be realized through the replacement rubber plug. It has the characteristics of safety and reliability, facilitates the operation, and improves the sitting and hanging of the ground anchor Rate.

附图说明 Description of drawings

附图1为本实用新型最佳实施例的主视半剖视结构示意图。Accompanying drawing 1 is the front view semi-sectional structure schematic diagram of the preferred embodiment of the present invention.

附图2为本实用新型投球形成蹩压,打开锚爪,施加预应力的主视半剖视结构示意图。Accompanying drawing 2 is the schematic diagram of the main view half-section structure of the utility model throwing the ball to form lame pressure, opening the anchor fluke, and applying prestress.

附图3为本实用新型继续蹩压,滑套球座掉落,建立循环后的主视半剖视结构示意图。Accompanying drawing 3 is the main view semi-sectional structural schematic diagram after the utility model continues lame pressure, and the ball seat of the sliding sleeve falls, and the cycle is established.

附图中的编码分别为:1为地锚套筒,2为中心滑套,3为连杆,4为锚爪,5为挡板,6为地锚剪钉,7为连杆槽,8为中心套管,9为固定块,10为剪切销钉,11为滑套球座,12为锚爪凹槽,13为循环孔,14为定位环,15为上销轴,16为下销轴,17为密封圈。The codes in the drawings are: 1 is the ground anchor sleeve, 2 is the center sliding sleeve, 3 is the connecting rod, 4 is the anchor claw, 5 is the baffle plate, 6 is the ground anchor shear nail, 7 is the connecting rod groove, 8 10 is the shear pin, 11 is the sliding sleeve ball seat, 12 is the groove of the anchor fluke, 13 is the circulation hole, 14 is the positioning ring, 15 is the upper pin, 16 is the lower pin Axle, 17 is sealing ring.

具体实施方式 Detailed ways

本实用新型不受下述实施例的限制,可根据本实用新型的技术方案与实际情况来确定具体的实施方式。The utility model is not limited by the following examples, and the specific implementation manner can be determined according to the technical scheme of the utility model and actual conditions.

在本实用新型中,为了便于描述,各部件的相对位置关系的描述均是根据说明书附图1的布图方式来进行描述的,如:前、后、上、下、左、右等的位置关系是依据说明书附图1的布图方向来确定的。In this utility model, for the convenience of description, the description of the relative positional relationship of each component is described according to the layout method of Fig. The relationship is determined according to the layout direction of Figure 1 of the specification.

下面结合实施例及附图对本实用新型作进一步描述:Below in conjunction with embodiment and accompanying drawing, the utility model is further described:

如附图1所示,该双作用热采井预应力固井工具总成包括地锚套筒1、中心滑套2、连杆3、锚爪4和挡板5;中心滑套2通过地锚剪钉6固定连接在地锚套筒1的上部内侧,中心滑套2的中部内侧面为上大下小的锥面,在中心滑套2的下部外侧沿圆周间隔分布有至少两个的连杆槽7,在连杆槽7内铰接有连杆3,在中心滑套2的下端固定有内径小于中心滑套2外径的中心套管8,在地锚套筒1的中部内侧固定有固定块9,中心套管8的下部套装在固定块9的内侧,在中心套管8的下端内侧通过剪切销钉10固定连接有滑套球座11,在地锚套筒1的中部和固定块9上有与连杆槽7位置相对应的锚爪凹槽12,在锚爪凹槽12内铰接有锚爪4,连杆3的下端和锚爪4的中部内侧铰接在一起;在地锚套筒1的下端内侧固定安装有挡板5,对应滑套球座11位置的挡板5外侧有至少一个的循环孔13。这样,通过地锚套筒1、中心滑套2、连杆3、锚爪4、滑套球座11和挡板5,能够自动同步灌浆,且下完套管洗井建立循环后即可投球蹩压实现坐挂,第一次预应力施加不成功可再通过替浆胶塞实现二次坐挂,方便了操作,提高了地锚的坐挂率。As shown in Figure 1, the double-acting thermal recovery well prestressed cementing tool assembly includes ground anchor sleeve 1, center sliding sleeve 2, connecting rod 3, anchor fluke 4 and baffle plate 5; Anchor shear nails 6 are fixedly connected to the inner side of the upper part of the ground anchor sleeve 1. The inner side surface of the middle part of the center sliding sleeve 2 is a tapered surface with a large upper part and a smaller lower part. The connecting rod groove 7 is hinged with the connecting rod 3 in the connecting rod groove 7, and the central sleeve 8 with an inner diameter smaller than the outer diameter of the central sliding sleeve 2 is fixed at the lower end of the central sliding sleeve 2, and is fixed on the inner side of the middle part of the ground anchor sleeve 1 There is a fixed block 9, the lower part of the central sleeve 8 is set on the inner side of the fixed block 9, and the inner side of the lower end of the central sleeve 8 is fixedly connected with a sliding sleeve ball seat 11 through a shear pin 10, and the middle part of the ground anchor sleeve 1 and the There is a fluke groove 12 corresponding to the position of the connecting rod groove 7 on the fixed block 9, and the fluke 4 is hinged in the fluke groove 12, and the lower end of the connecting rod 3 is hinged with the inner side of the middle part of the fluke 4; A baffle plate 5 is fixedly installed on the inner side of the lower end of the ground anchor sleeve 1, and at least one circulation hole 13 is arranged on the outside of the baffle plate 5 corresponding to the position of the sliding sleeve ball seat 11. In this way, through the ground anchor sleeve 1, the central sliding sleeve 2, the connecting rod 3, the anchor claw 4, the sliding sleeve ball seat 11 and the baffle plate 5, the grouting can be automatically synchronized, and the ball can be thrown after the casing is run and the well is washed and the cycle is established. Lag pressure is used to realize the setting and hanging. If the first prestress application is unsuccessful, the second setting and hanging can be realized through the replacement rubber plug, which facilitates the operation and improves the setting and hanging rate of the ground anchor.

可根据实际需要,对上述双作用热采井预应力固井工具总成作进一步优化或/和改进:According to actual needs, the above-mentioned double-acting thermal recovery well prestressed cementing tool assembly can be further optimized or/and improved:

如附图1、2、3所示,滑套球座11的上部内侧面为上大下小的锥面。这样,便于投球后起到很好的憋压效果。As shown in accompanying drawing 1,2,3, the inner surface of the upper part of sliding sleeve ball seat 11 is the tapered surface with big up and down down. In this way, it is convenient to play a good pressure suppression effect after pitching.

如附图1所示,在地锚套筒1的上部内侧有定位环安装槽,在定位环安装槽内安装有定位环14,定位环14和中心滑套2通过地锚剪钉6固定连接在一起。这样,通过定位环14,可将其与中心滑套2固定连接实现中心滑套2与地锚套筒1的相互定位,从而简化地锚套筒1的加工工艺,同时还通过维修可单独更换定位环14提高了地锚套筒1的使用寿命。As shown in Figure 1, there is a positioning ring installation groove on the inner side of the upper part of the ground anchor sleeve 1, and a positioning ring 14 is installed in the positioning ring installation groove, and the positioning ring 14 and the center sliding sleeve 2 are fixedly connected by ground anchor shear nails 6 together. In this way, through the positioning ring 14, it can be fixedly connected with the central sliding sleeve 2 to realize the mutual positioning of the central sliding sleeve 2 and the ground anchor sleeve 1, thereby simplifying the processing technology of the ground anchor sleeve 1, and at the same time, it can be replaced separately through maintenance. The positioning ring 14 improves the service life of the ground anchor sleeve 1 .

根据需要,在地锚套筒1的上部有内螺纹或外螺纹;在地锚套筒1的下部有内螺纹或外螺纹。这样,便于地锚套筒1的安装和拆卸。According to needs, the upper part of the ground anchor sleeve 1 has internal threads or external threads; the lower part of the ground anchor sleeve 1 has internal threads or external threads. In this way, the installation and removal of the ground anchor sleeve 1 is facilitated.

如附图1、2、3所示,在连杆槽7内通过上销轴15铰接有连杆3,在锚爪凹槽12内通过下销轴16铰接有锚爪4;或/和,挡板5和地锚套筒1之间通过螺纹固定安装在一起。这样,通过螺纹便于挡板5的安装、拆卸和更换。As shown in Figures 1, 2, and 3, the connecting rod 3 is hinged through the upper pin shaft 15 in the connecting rod groove 7, and the fluke 4 is hinged through the lower pin shaft 16 in the fluke groove 12; or/and, The baffle plate 5 and the ground anchor sleeve 1 are fixedly installed together by threads. In this way, the installation, removal and replacement of the baffle plate 5 are facilitated by the threads.

如附图1、2所示,在地锚套筒1和中心滑套2之间安装有至少一道的密封圈17,在中心套管8和固定块9之间安装有至少一道的密封圈17,在滑套球座11和中心套管8之间安装有密封圈17。这样,密封圈17起到更好的密封效果。As shown in Figures 1 and 2, at least one sealing ring 17 is installed between the ground anchor sleeve 1 and the central sliding sleeve 2, and at least one sealing ring 17 is installed between the central sleeve 8 and the fixed block 9 , A sealing ring 17 is installed between the sliding sleeve ball seat 11 and the center sleeve 8 . In this way, the sealing ring 17 has a better sealing effect.

以上技术特征构成了本实用新型的最佳实施例,其具有较强的适应性和最佳实施效果,可根据实际需要增减非必要的技术特征,来满足不同情况的需求。The above technical features constitute the best embodiment of the utility model, which has strong adaptability and best implementation effect, and non-essential technical features can be increased or decreased according to actual needs to meet the needs of different situations.

本实用新型最佳实施例的使用过程:将本实用新型按设计接入完井管串中,并下管串入预定位置,下套管过程中不用灌浆,管串入井后洗井调整泥浆泥能至固井要求,投入憋压球,并将其泵送至滑套球座11的上部内侧,形成蹩压,压力逐渐增大;在该过程中,将先剪断地锚剪钉6,其状态如图2所示,此时中心滑套2下行并推动连杆3将锚爪4撑开,锚爪4嵌入地层,司钻上提并施加预应力至设计吨位;继续蹩压至剪断剪切销钉10,其状态如图3所示,此时滑套球座11落在挡板5上,形成新的循环通道;然后按常规流程注前置液,水泥浆,替浆,在一次预应力施加不成功的情况下,可在替浆时二次施加预应力。The use process of the best embodiment of the utility model: connect the utility model into the well completion pipe string according to the design, and run the pipe string into the predetermined position. No grouting is required during the casing running process, and the well is cleaned to adjust the mud mud after the pipe string enters the well. To meet the cementing requirements, put in the pressure holding ball and pump it to the inner side of the upper part of the sliding sleeve ball seat 11 to form lame pressure and gradually increase the pressure; in this process, the ground anchor shear nail 6 will be cut first, and then The state is shown in Figure 2. At this time, the center sliding sleeve 2 goes down and pushes the connecting rod 3 to spread the anchor fluke 4, and the anchor fluke 4 is embedded in the formation. The driller lifts it up and applies prestress to the designed tonnage; Cut the pin 10, its state is shown in Figure 3, at this time the sliding sleeve ball seat 11 falls on the baffle plate 5, forming a new circulation channel; In the case of unsuccessful stress application, prestress can be applied a second time when replacing the slurry.

Claims (10)

1.一种双作用热采井预应力固井工具总成,其特征在于包括地锚套筒、中心滑套、连杆、锚爪和挡板;中心滑套通过地锚剪钉固定连接在地锚套筒的上部内侧,中心滑套的中部内侧面为上大下小的锥面,在中心滑套的下部外侧沿圆周间隔分布有至少两个的连杆槽,在连杆槽内铰接有连杆,在中心滑套的下端固定有内径小于中心滑套外径的中心套管,在地锚套筒的中部内侧固定有固定块,中心套管的下部套装在固定块的内侧,在中心套管的下端内侧通过剪切销钉固定连接有滑套球座,在地锚套筒的中部和固定块上有与连杆槽位置相对应的锚爪凹槽,在锚爪凹槽内铰接有锚爪,连杆的下端和锚爪的中部内侧铰接在一起;在地锚套筒的下端内侧固定安装有挡板,对应滑套球座位置的挡板外侧有至少一个的循环孔。 1. A double-action thermal recovery well prestressed cementing tool assembly is characterized in that it includes ground anchor sleeve, center sliding sleeve, connecting rod, anchor claw and baffle plate; the central sliding sleeve is fixedly connected on the ground anchor shear nail On the inner side of the upper part of the ground anchor sleeve, the inner side of the middle part of the center sliding sleeve is a tapered surface with a large upper part and a smaller lower part. On the outer side of the lower part of the central sliding sleeve, there are at least two connecting rod grooves at intervals along the circumference, which are hinged in the connecting rod grooves. There is a connecting rod, a central sleeve with an inner diameter smaller than the outer diameter of the central sliding sleeve is fixed at the lower end of the central sliding sleeve, a fixed block is fixed inside the middle of the ground anchor sleeve, and the lower part of the central sleeve is sleeved on the inner side of the fixed block. The inner side of the lower end of the center sleeve is fixedly connected with a sliding sleeve ball seat through a shear pin, and there is a fluke groove corresponding to the position of the connecting rod groove on the middle part of the ground anchor sleeve and the fixed block, and is hinged in the fluke groove There is an anchor fluke, and the lower end of the connecting rod is hinged with the inner side of the middle part of the anchor fluke; a baffle plate is fixedly installed on the inner side of the lower end of the ground anchor sleeve, and there is at least one circulation hole on the outer side of the baffle plate corresponding to the position of the sliding sleeve ball seat. 2.根据权利要求1所述的双作用热采井预应力固井工具总成,其特征在于滑套球座的上部内侧面为上大下小的锥面。 2. The prestressed cementing tool assembly for double-acting thermal recovery wells according to claim 1, characterized in that the inner surface of the upper part of the ball seat of the sliding sleeve is a tapered surface with a larger upper part and a smaller lower part. 3.根据权利要求1或2所述的双作用热采井预应力固井工具总成,其特征在于中心滑套的中部内侧面为上大下小的锥面。 3. The double-acting thermal recovery well prestressed cementing tool assembly according to claim 1 or 2, characterized in that the inner surface of the middle part of the central sliding sleeve is a conical surface with a large upper part and a smaller lower part. 4.根据权利要求1或2所述的双作用热采井预应力固井工具总成,其特征在于地锚套筒的上部内侧有定位环安装槽,在定位环安装槽内安装有定位环,定位环和中心滑套通过地锚剪钉固定连接在一起。 4. The double-acting thermal recovery well prestressed cementing tool assembly according to claim 1 or 2, characterized in that there is a positioning ring installation groove on the inner side of the upper part of the ground anchor sleeve, and a positioning ring is installed in the positioning ring installation groove , the positioning ring and the center sliding sleeve are fixedly connected together by ground anchor shear nails. 5.根据权利要求3所述的双作用热采井预应力固井工具总成,其特征在于地锚套筒的上部内侧有定位环安装槽,在定位环安装槽内安装有定位环,定位环和中心滑套通过地锚剪钉固定连接在一起。 5. The double-acting thermal recovery well prestressed cementing tool assembly according to claim 3 is characterized in that there is a positioning ring installation groove on the inner side of the upper part of the ground anchor sleeve, and a positioning ring is installed in the positioning ring installation groove, and the positioning The ring and the center sliding sleeve are fixedly connected together by ground anchor shears. 6.根据权利要求1或2所述的双作用热采井预应力固井工具总成,其特征在于地锚套筒的上部有内螺纹或外螺纹;在地锚套筒的下部有内螺纹或外螺纹。 6. The double-acting thermal recovery well prestressed cementing tool assembly according to claim 1 or 2, characterized in that the upper part of the ground anchor sleeve has internal threads or external threads; the lower part of the ground anchor sleeve has internal threads or external thread. 7.根据权利要求5所述的双作用热采井预应力固井工具总成,其特征在于地锚套筒的上部有内螺纹或外螺纹;在地锚套筒的下部有内螺纹或外螺纹。 7. The double-acting thermal recovery well prestressed cementing tool assembly according to claim 5, characterized in that the upper part of the ground anchor sleeve has internal threads or external threads; the bottom of the ground anchor sleeve has internal threads or external threads thread. 8.根据权利要求1或2所述的双作用热采井预应力固井工具总成,其特征在于连杆槽内通过上销轴铰接有连杆,在锚爪凹槽内通过下销轴铰接有锚爪;或/和,挡板和地锚套筒之间通过螺纹固定安装在一起。 8. The double-acting thermal recovery well prestressed cementing tool assembly according to claim 1 or 2, characterized in that a connecting rod is hinged through an upper pin shaft in the connecting rod groove, and a lower pin shaft is passed through the anchor claw groove An anchor claw is hinged; or/and, the baffle plate and the ground anchor sleeve are fixed and installed together through threads. 9.根据权利要求7所述的双作用热采井预应力固井工具总成,其特征在于连杆槽内通过上销轴铰接有连杆,在锚爪凹槽内通过下销轴铰接有锚爪;或/和,挡板和地锚套筒之间通过螺纹固定安装在一起。 9. The double-acting thermal recovery well prestressed cementing tool assembly according to claim 7, characterized in that a connecting rod is hinged through an upper pin in the connecting rod groove, and a connecting rod is hinged through a lower pin in the fluke groove. An anchor fluke; or/and, the baffle plate and the ground anchor sleeve are fixedly installed together through threads. 10.根据权利要求9所述的双作用热采井预应力固井工具总成,其特征在于地锚套筒和中心滑套之间安装有至少一道的密封圈,在中心套管和固定块之间安装有至少一道的密封圈,在滑套球座和中心套管之间安装有密封圈。 10. The double-acting thermal recovery well prestressed cementing tool assembly according to claim 9, characterized in that at least one sealing ring is installed between the ground anchor sleeve and the central sliding sleeve, and between the central casing and the fixed block At least one sealing ring is installed between them, and a sealing ring is installed between the ball seat of the sliding sleeve and the center sleeve.
CN201520210458.XU 2015-04-09 2015-04-09 Double acting thermal production well special cementing instrument assembly Expired - Lifetime CN204571915U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520210458.XU CN204571915U (en) 2015-04-09 2015-04-09 Double acting thermal production well special cementing instrument assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520210458.XU CN204571915U (en) 2015-04-09 2015-04-09 Double acting thermal production well special cementing instrument assembly

Publications (1)

Publication Number Publication Date
CN204571915U true CN204571915U (en) 2015-08-19

Family

ID=53864569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520210458.XU Expired - Lifetime CN204571915U (en) 2015-04-09 2015-04-09 Double acting thermal production well special cementing instrument assembly

Country Status (1)

Country Link
CN (1) CN204571915U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604512A (en) * 2016-03-14 2016-05-25 中国石油集团西部钻探工程有限公司 Dual-row-type prestressed well cementation ground anchor assembly
CN105604511A (en) * 2016-03-14 2016-05-25 中国石油集团西部钻探工程有限公司 Ground anchor for thermal production well

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604512A (en) * 2016-03-14 2016-05-25 中国石油集团西部钻探工程有限公司 Dual-row-type prestressed well cementation ground anchor assembly
CN105604511A (en) * 2016-03-14 2016-05-25 中国石油集团西部钻探工程有限公司 Ground anchor for thermal production well

Similar Documents

Publication Publication Date Title
CN104790909B (en) Ball-seat-removable ball-shooting sliding sleeve
CN104213868B (en) Desirable bore anchor packer
CN102996089B (en) Multi-stage hydraulic expansion tail pipe suspension system with reducing expansion cone for horizontal well for thermal recovery of heavy oil
CN204436320U (en) A kind of hydraulic releasing big orifice packer
CN105625971A (en) Expansion hanger and sitting hanging method thereof
CN204299558U (en) Delayed opening slide
CN204571915U (en) Double acting thermal production well special cementing instrument assembly
CN105064949A (en) Anti-backflow device for cement slurry for liner cementing
CN210370560U (en) Multipurpose packer feeding tool
CN204186331U (en) Hydraulic piston type sand-preventing scale-preventing hydraulic anchor
CN204571914U (en) Mechanical and hydraulic double-acting special cementing device
CN205577928U (en) Subsea wellhead sealing assembly
CN101403281A (en) Tail pipe well drilling and well completion technique
CN205669389U (en) One exempts from brill formula cementing device
CN202970565U (en) Thickened oil thermal recovery horizontal well multistage hydraulic pressure expansion tail pipe suspension system with variable diameter expansion cone
CN104790906A (en) Machinery hydraulic pressure dual-functional prestress well cementation device
CN204371125U (en) Diameter-variable hydraulic casing centralizer
CN203515413U (en) Mechanical and hydraulic dual-action ground anchor assembly
CN203420665U (en) Double-acting compression type packer
CN106801589A (en) High temperature resistant big orifice hydraulic booster expanding suspension instrument and method
CN204186348U (en) To build the pressure tee apparatus from the well cementation of grouting integral tail tube
CN205805498U (en) A kind of big orifice hydraulic packer
WO2016008339A1 (en) Drill-free stage collar of through-bottom type
CN110130851A (en) A kind of anti-top tool of pressure break
CN204225837U (en) Built-in hydraulic cylinder expansion packer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201106

Address after: 100120 Beijing Xicheng District six laying Kang

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Xibu Drilling Engineering Co.,Ltd.

Address before: 830026 science and technology management division, West drilling and Drilling Engineering Research Institute, No. 326, South Road, Urumqi economic and Technological Development Zone, the Xinjiang Uygur Autonomous Region, China

Patentee before: CNPC Xibu Drilling Engineering Co.,Ltd.

TR01 Transfer of patent right