[go: up one dir, main page]

CN204531154U - Steel bar girder gypsum plank and novel floor support plate - Google Patents

Steel bar girder gypsum plank and novel floor support plate Download PDF

Info

Publication number
CN204531154U
CN204531154U CN201520014310.9U CN201520014310U CN204531154U CN 204531154 U CN204531154 U CN 204531154U CN 201520014310 U CN201520014310 U CN 201520014310U CN 204531154 U CN204531154 U CN 204531154U
Authority
CN
China
Prior art keywords
gypsum board
truss
steel bar
steel
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520014310.9U
Other languages
Chinese (zh)
Inventor
肖宁海
章亚
章伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Haixing Housing Industry Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520014310.9U priority Critical patent/CN204531154U/en
Application granted granted Critical
Publication of CN204531154U publication Critical patent/CN204531154U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

本实用新型提供一种钢筋桁架石膏板以及新型楼承板,包括纤维石膏板制成的底板及在底板上方设置的数排钢筋桁架,每排钢筋桁架之间均相互平行;本实用新型针对钢筋桁架楼承板的缺点加以改进,将压型钢板采用纤维石膏板替代,桁架钢筋一次性浇注在纤维石膏板中,形成桁架钢筋与纤维石膏板共同受力的纤维石膏模板,施工时直接将定型的纤维石膏模板吊装至指定楼层,捆扎钢筋、铺设管线后直接进行混凝土浇注,节省了施工过程中零部件的安装时间,提高了楼板结构的防火性能,另外本实用新型的楼承板施工过程中无需对钢筋桁架及底部模板进行拆除,钢筋桁架作为楼板整体的一部分,提高了楼板整体强度。

The utility model provides a steel bar truss gypsum board and a new type of floor bearing board, including a bottom plate made of fiber gypsum board and several rows of steel bar trusses arranged above the bottom plate, and each row of steel bar trusses is parallel to each other; The shortcomings of the truss floor deck are improved, and the profiled steel plate is replaced by fiber gypsum board. The truss reinforcement is cast in the fiber gypsum board at one time to form a fiber gypsum formwork that is jointly stressed by the truss reinforcement and the fiber gypsum board. The fiber gypsum formwork is hoisted to the designated floor, and the concrete is poured directly after binding the steel bars and laying the pipeline, which saves the installation time of parts during the construction process and improves the fire performance of the floor structure. There is no need to dismantle the steel truss and the bottom formwork, and the steel truss is an integral part of the floor, which improves the overall strength of the floor.

Description

Steel bar girder gypsum plank and novel floor support plate
Technical field
The utility model relates to a kind of floor or wallboard of building construction, especially a kind of steel bar girder gypsum plank, take fibrous plaster as the new reinforcing steel bar truss floor support plate of base plate.
Background technology
At present, in the builing industry construction of China, steel bar truss floor support plate application is more and more general, compared to common contour plate, owing to there being truss support during steel bar truss floor support plate construction, temporary support demand is less, temporary fixed easy during laying, dynamo-electric line, pipe adds conveniently, therefore installation is faster, save a lot of cost of labor, but the price of reinforcement bar truss mould plate is higher, the more common contour plate of construction method is also much more difficult, binding reinforcing bars is also more difficult, and the steel bar truss floor support plate of prior art is mostly by adopting profiled sheet to make bed die, need to remove in housing construction, also need after dismounting to carry out secondary operations to floor, thus increase construction cost.
Utility model content
For solving the problem, the utility model provides a kind of steel bar girder gypsum plank and novel floor support plate, is combined by fibrous plaster with truss bars, and the two is jointly stressed, eliminate the problem that template needs to remove, also substantially increase the fireproof performance of floor slab structure simultaneously.
For achieving the above object, the utility model adopts following technical scheme: a kind of steel bar girder gypsum plank, comprises the base plate that fibrous plaster is made and the several placing of reinforcement truss arranged above base plate, parallel mutually between every placing of reinforcement truss.
Preferably, several supports that described steel bar girder comprises crossbeam and is connected with crossbeam, described support is along the arrangement of crossbeam length direction, and each cradle top and crossbeam are fixed, and described frame bottom is inserted and secured in fibrous plaster.
Preferably, described support extends to form the symmetrical foot be inserted and secured in fibrous plaster to both sides from top.
Preferably, comprise steel fabric sheet or reinforced mesh, described steel fabric sheet or reinforced mesh are arranged on described fibrous plaster intralamellar part and cover the whole plate face of described gypsum plank.
Preferably, comprise alkali-resistant glass fibre net, described alkali-resistant glass fibre net is arranged on described fibrous plaster intralamellar part and covers the whole plate face of described gypsum plank.
Preferably, spaced set between described steel bar girder.
A kind of novel floor support plate, comprise by described steel bar girder gypsum plank, above-mentioned steel bar girder gypsum plank, as template, after described steel bar girder gypsum plank carries out reinforcing bar binding, pipe installation, the steel bar girder of described steel bar girder gypsum plank has built concrete.
The beneficial effects of the utility model are: the utility model is improved for the shortcoming of steel bar truss floor support plate, fibrous plaster is adopted to substitute profiled sheet, truss bars disposal pouring is in fibrous plaster, form truss bars and the jointly stressed fibrous plaster template of fibrous plaster, during construction directly by sizing fibrous plaster formwork hoisting to designated floor, wiretie, directly pouring concrete is carried out after pipeline installation, save the set-up time of component in work progress, improve the fireproof performance of floor slab structure, in addition in floor support plate work progress of the present utility model without the need to removing steel bar girder and bottom template, steel bar girder is as floor part of the whole, improve floor bulk strength.
Accompanying drawing explanation
Fig. 1 is the plan structure schematic diagram of the utility model embodiment;
Fig. 2 is the side structure schematic diagram of the utility model embodiment;
Fig. 3 is the side structure schematic diagram of the other direction of the utility model embodiment;
Fig. 4 is the utility model embodiment form of construction work flow chart.
Number in the figure:
1-steel bar girder 2-base plate 11-support 12-crossbeam.
Detailed description of the invention
For enabling above-mentioned purpose of the present utility model, feature and advantage become apparent more, are described in detail detailed description of the invention of the present utility model below in conjunction with accompanying drawing.
Set forth a lot of detail in the following description so that fully understand the utility model, but the utility model can also adopt other to be different from alternate manner described here to implement, those skilled in the art can when doing similar popularization without prejudice to when the utility model intension, and therefore the utility model is by the restriction of following public specific embodiment.
Secondly, the utility model is described in detail in conjunction with schematic diagram, when describing the utility model embodiment in detail; for ease of explanation; the sectional drawing of indication device structure can be disobeyed general ratio and be made partial enlargement, and described schematic diagram is example, and it should not limit the scope of the utility model protection at this.In addition, the three-dimensional space of length, width and the degree of depth should be comprised in actual fabrication.
As shown in Figure 1-Figure 3, the utility model specific embodiment provides a kind of steel bar girder gypsum plank, comprise the base plate 2 that fibrous plaster is made and the several placing of reinforcement truss 1 just arranged on a base plate 2, parallel mutually between every placing of reinforcement truss 1, several supports 11 that described steel bar girder 1 comprises crossbeam 12 and is connected with crossbeam 12, described support 11 is along the arrangement of crossbeam 12 length direction, and each support 11 top and crossbeam 12 are fixed, and are inserted and secured in fibrous plaster base plate 2 bottom described support 11.
Concrete, as shown in Figure 1 and Figure 2, described support 11 extends to form the symmetrical foot be inserted and secured in fibrous plaster base plate 2 to both sides from top, width along described crossbeam 12 forms symmetrical foot, length direction along crossbeam 12 forms symmetrical foot, form metastable ribs, steel bar girder and fibrous plaster are combined, jointly stressed, concrete described steel bar girder 1 also can comprise the base cross members (not shown) connecting foot, and described base cross members is embedded in gypsum plank jointly together with foot.
Further, in fibrous plaster in the present embodiment, steel fabric sheet or reinforced mesh (not shown) also can be set, described steel fabric sheet or reinforced mesh are arranged on described fibrous plaster intralamellar part and cover the whole plate face of described gypsum plank, promote the bulk strength of fibrous plaster further.
Further, fibrous plaster in the present embodiment also can arrange alkali-resistant glass fibre net (not shown), described alkali-resistant glass fibre net is arranged on described fibrous plaster intralamellar part and covers the whole plate face of described gypsum plank, promotes the bulk strength of fibrous plaster further.
It should be noted that; described steel bar girder in the present embodiment also can adopt steel bar girder structure of the prior art; described steel bar girder needs spaced set when arranging on fibrous plaster; to ensure each position, plate face uniform force; simultaneously; the steel bar girder structure of unequal-interval also should belong to protection domain of the present utility model; the steel bar girder structure used in the utility model is in addition not limited only to above-mentioned steel bar girder structure, and all steel bar girder structures of the prior art all can be applicable in the utility model to realize goal of the invention of the present utility model.
Further, the present embodiment provides a kind of novel floor support plate, comprise described steel bar girder gypsum plank, use described steel bar girder gypsum plank as base plate template, after described steel bar girder gypsum plank carries out reinforcing bar binding, pipe installation, the steel bar girder of described steel bar girder gypsum plank has built concrete, and when eliminating the construction of common floor support plate, profiled sheet bed die needs the problem of removing, simultaneously fibrous plaster add the fireproof performance also substantially increasing floor slab structure.
The construction method of the novel floor support plate of kind of the present embodiment, comprises the steps:
Stp1: provide and use steel bar girder to make the fibrous plaster of ribs as template;
Stp2: set up falsework and described fibrous plaster formwork hoisting is in place to designated floor position, described steel bar girder gypsum plank is installed one of steel bar girder and is faced up;
Stp3: carry out reinforcing bar binding and pipe installation on described steel bar girder gypsum plank;
Stp4: cheek board is in place, determine that each parts paving location is accurate;
Stp5: concreting coagulation forming.
Novel floor support plate of the present utility model, permanent exempting from is adopted to tear steel bar girder fibrous plaster template open, pouring reinforcement concrete thereon, after cast-in-situ concrete sclerosis, the fibrous plaster making ribs with truss bars is not removed, it is together with cast-in-situ floor, jointly bear external loads, thus become a part for the floor of building, avoid binding reinforcing bars difficulty, steel plate formwork needs to remove, after pouring concrete sizing, after stripping, floor leaves the problems such as hole gap, without the need to carrying out secondary operations to floor after pouring concrete sizing, speed of application is fast, fireproof performance is strong.
Although the utility model discloses as above with preferred embodiment, but and be not used to limit the utility model.Any those of ordinary skill in the art, do not departing under technical solutions of the utility model ambit, the Method and Technology content of above-mentioned announcement all can be utilized to make many possible variations and modification to technical solutions of the utility model, or be revised as the Equivalent embodiments of equivalent variations.Therefore, every content not departing from technical solutions of the utility model, according to technical spirit of the present utility model to any simple modification made for any of the above embodiments, equivalent variations and modification, all still belongs in the scope of technical solutions of the utility model protection.

Claims (7)

1.一种钢筋桁架石膏板,其特征在于,包括纤维石膏板制成的底板及在底板上方设置的数排钢筋桁架,每排钢筋桁架之间均相互平行。 1. A reinforced truss gypsum board, characterized in that, comprises a base plate made of fiber gypsum board and several rows of reinforced trusses arranged above the base plate, all parallel to each other between every row of reinforced trusses. 2.根据权利要求1所述的钢筋桁架石膏板,其特征在于,所述钢筋桁架包括横梁及与横梁连接的数个支架,所述支架沿横梁长度方向排列,各支架顶部与横梁固定,所述支架底部插入并固定在纤维石膏板中。 2. The reinforced truss gypsum board according to claim 1, wherein the reinforced truss includes a cross beam and several supports connected to the cross beam, the supports are arranged along the length direction of the cross beam, and the top of each support is fixed to the cross beam, so that The bottom of the bracket is inserted and fixed in the fiber plasterboard. 3.根据权利要求2所述的钢筋桁架石膏板,其特征在于,所述支架自顶部向两侧延伸形成对称的插入并固定在纤维石膏板中的足部。 3. The steel truss gypsum board according to claim 2, wherein the support extends from the top to both sides to form symmetrical feet inserted and fixed in the fiber gypsum board. 4.根据权利要求1所述的钢筋桁架石膏板,其特征在于,包括钢丝网片或钢筋网片,所述钢丝网片或钢筋网片设置在所述纤维石膏板内部且覆盖所述石膏板整个板面。 4. The reinforced truss gypsum board according to claim 1, characterized in that it comprises a steel wire mesh or a steel mesh, and the steel wire or steel mesh is arranged inside the fiber gypsum board and covers the gypsum board the entire board. 5.根据权利要求1所述的钢筋桁架石膏板,其特征在于,包括耐碱玻璃纤维网,所述耐碱玻璃纤维网设置在所述纤维石膏板内部且覆盖所述石膏板整个板面。 5. The gypsum board with reinforced truss according to claim 1, characterized in that it comprises alkali-resistant glass fiber mesh, and the alkali-resistant glass fiber mesh is arranged inside the fiber gypsum board and covers the entire surface of the gypsum board. 6.根据权利要求1所述的钢筋桁架石膏板,其特征在于,所述钢筋桁架之间等间距设置。 6. The gypsum board with steel bar trusses according to claim 1, characterized in that the steel bar trusses are arranged at equal intervals. 7.一种新型楼承板,其特征在于,包括由权利要求1-6任一所述钢筋桁架石膏板,上述钢筋桁架石膏板作为模板,在所述钢筋桁架石膏板上进行钢筋绑扎、管线铺设后,在所述钢筋桁架石膏板的钢筋桁架上浇筑有混凝土。 7. A new type of floor deck, characterized in that it comprises the steel bar truss gypsum board described in any one of claims 1-6, and the above-mentioned steel bar truss gypsum board is used as a formwork, and steel bar binding and pipelines are carried out on the steel bar truss gypsum board. After laying, concrete is poured on the steel truss of the steel truss gypsum board.
CN201520014310.9U 2015-01-09 2015-01-09 Steel bar girder gypsum plank and novel floor support plate Expired - Lifetime CN204531154U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520014310.9U CN204531154U (en) 2015-01-09 2015-01-09 Steel bar girder gypsum plank and novel floor support plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520014310.9U CN204531154U (en) 2015-01-09 2015-01-09 Steel bar girder gypsum plank and novel floor support plate

Publications (1)

Publication Number Publication Date
CN204531154U true CN204531154U (en) 2015-08-05

Family

ID=53745180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520014310.9U Expired - Lifetime CN204531154U (en) 2015-01-09 2015-01-09 Steel bar girder gypsum plank and novel floor support plate

Country Status (1)

Country Link
CN (1) CN204531154U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631695A (en) * 2015-01-09 2015-05-20 肖宁海 Steel bar truss gypsum board, novel floor support plate and construction method of novel floor support plate
CN107816166A (en) * 2017-11-22 2018-03-20 上海迅铸建筑科技有限公司 One kind building combined wall board
CN109113246A (en) * 2018-07-25 2019-01-01 深圳市君盈建筑科技有限公司 A kind of steel bar truss floor structure
CN115226652A (en) * 2022-06-06 2022-10-25 扬州大学 A kind of light house for poultry breeding and construction method thereof
CN116177980A (en) * 2023-03-21 2023-05-30 贵州时星绿建科技有限公司 Phosphogypsum-based reinforced truss floor slab without demolition bottom form and its manufacturing method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631695A (en) * 2015-01-09 2015-05-20 肖宁海 Steel bar truss gypsum board, novel floor support plate and construction method of novel floor support plate
CN107816166A (en) * 2017-11-22 2018-03-20 上海迅铸建筑科技有限公司 One kind building combined wall board
CN109113246A (en) * 2018-07-25 2019-01-01 深圳市君盈建筑科技有限公司 A kind of steel bar truss floor structure
CN115226652A (en) * 2022-06-06 2022-10-25 扬州大学 A kind of light house for poultry breeding and construction method thereof
CN115226652B (en) * 2022-06-06 2023-08-22 扬州大学 A light-weight house for poultry breeding and its construction method
CN116177980A (en) * 2023-03-21 2023-05-30 贵州时星绿建科技有限公司 Phosphogypsum-based reinforced truss floor slab without demolition bottom form and its manufacturing method

Similar Documents

Publication Publication Date Title
CN204531154U (en) Steel bar girder gypsum plank and novel floor support plate
CN105507470B (en) A kind of periphery overlapping overall assembled floor and its construction method
CN103334526B (en) A kind of steel web prestressed concrete overlapped slab
CN101768916A (en) Lower flange improved corrugated steel web plate composite box girder and construction method thereof
CN108104284B (en) Wall panel connection structure and assembly method with steel arm of shear wall embedded in floor slab
CN103615053A (en) Construction method for post-cast belt of cast-in-place reinforced concrete structure
CN104532990A (en) Truss steel bar double-layer gypsum fiberboard, disassembly-free formwork wall structure and construction method
CN106592966A (en) Support-beam-plate-free post-cast strip formwork system and construction method thereof
CN108035594A (en) The prefabricated decompression cone construction method of concrete silo structure
CN105113706A (en) Reinforced truss gypsum plate with insulation layer, novel dismantling-free formwork and their construction method
CN103410269A (en) Unbonded prestress cast-in-place reinforced concrete hollow slab construction structure and method
CN207660132U (en) A kind of wallboard connecting structure of shear wall overhanging steel arm insertion floor end
CN205024949U (en) Take steel bar truss gypsum board of heat preservation, novel -in -place mould
CN103485370A (en) Concrete construction control method for preventing harmful cracks of wallboard
CN204356996U (en) The U-shaped beam of prefabricated reinforced concrete with horizontal steel diaphragm
CN104631695A (en) Steel bar truss gypsum board, novel floor support plate and construction method of novel floor support plate
CN105780992A (en) Construction method of orthogonal and ortho-laid steel concrete vierendeel sandwich plate floor
CN109629732B (en) A cast-in-place concrete invisible beam floor with pipeline separation and construction method
CN204435616U (en) Truss bars double layer fibre gypsum plank, non-dismantling formwork wall body structure
CN113898102A (en) A ribbed concrete laminate
CN112171884A (en) Prefabricated ribbed concrete composite slab and preparation method thereof
CN218779542U (en) A support-free structure for post-cast belt part hanging mold
CN206438766U (en) One kind is without support beam board post poured band template system
CN216276374U (en) Ribbed concrete laminated slab
CN211817287U (en) GBF honeycomb core plate construction auxiliary device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: ZHANG YA ZHANG WEI

Effective date: 20150821

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150821

Address after: 001, 049, 410000 Ma Ma Wan Road, South Road, Yuhua District, Hunan, Changsha

Patentee after: Xiao Ninghai

Address before: 001, 049, 410000 Ma Ma Wan Road, South Road, Yuhua District, Hunan, Changsha

Patentee before: Xiao Ninghai

Patentee before: Zhang Ya

Patentee before: Zhang Wei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201203

Address after: Room 1204, building C4, Lugu Yuyuan, No.27 Wenxuan Road, high tech Development Zone, Changsha City, Hunan Province

Patentee after: Hunan Haixing Housing Industry Co.,Ltd.

Address before: 001, 049, 410000 Ma Ma Wan Road, South Road, Yuhua District, Hunan, Changsha

Patentee before: Xiao Ninghai

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150805