CN204508532U - Oil storage cave depot To Construction of Silo bont - Google Patents

Oil storage cave depot To Construction of Silo bont Download PDF

Info

Publication number
CN204508532U
CN204508532U CN201520011525.5U CN201520011525U CN204508532U CN 204508532 U CN204508532 U CN 204508532U CN 201520011525 U CN201520011525 U CN 201520011525U CN 204508532 U CN204508532 U CN 204508532U
Authority
CN
China
Prior art keywords
hoist
construction
hanging
fixed pulley
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520011525.5U
Other languages
Chinese (zh)
Inventor
牛家兴
马京云
瞿帆
潘吉龙
尉东平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Tenth Construction Co Ltd
Original Assignee
Sinopec Tenth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Tenth Construction Co Ltd filed Critical Sinopec Tenth Construction Co Ltd
Priority to CN201520011525.5U priority Critical patent/CN204508532U/en
Application granted granted Critical
Publication of CN204508532U publication Critical patent/CN204508532U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Emergency Lowering Means (AREA)

Abstract

本实用新型公开了一种储油洞库竖井施工用提升装置,包括竖井,竖井内设置吊盘和吊篮,吊盘上开设升降通道,吊篮能够从升降通道内通过,竖井顶端的井口上方设置固定架,固定架上安装第一定滑轮、第二定滑轮和第三定滑轮,竖井顶端的井口外侧设置第一卷扬机、第二卷扬机和第三卷扬机,第一卷扬机的钢索穿过第一定滑轮后与吊篮连接,第二卷扬机和第三卷扬机的钢索分别穿过第二定滑轮和第三定滑轮后与吊盘连接。施工效率高,稳定性强,支护件从竖井底部向上吊取,能够消除吊装过程的安全隐患,确保施工人员安全。

The utility model discloses a hoisting device for vertical shaft construction of an oil storage cavern, which comprises a vertical shaft. A hanging pan and a hanging basket are arranged in the vertical shaft. A lifting passage is provided on the hanging pan, and the hanging basket can pass through the lifting passage. A fixed frame is set, and the first fixed pulley, the second fixed pulley and the third fixed pulley are installed on the fixed frame, and the first hoist, the second hoist and the third hoist are arranged outside the wellhead at the top of the vertical shaft, and the steel rope of the first hoist passes through the second hoist. After a certain pulley is connected with the hanging basket, the steel cables of the second hoist and the third hoist pass respectively through the second fixed pulley and the third fixed pulley and are connected with the hanging pan. The construction efficiency is high, the stability is strong, and the supporting parts are hoisted upwards from the bottom of the shaft, which can eliminate safety hazards in the hoisting process and ensure the safety of construction personnel.

Description

储油洞库竖井施工用提升装置Lifting device for oil storage cavern shaft construction

技术领域 technical field

本实用新型涉及一种提升装置,具体地说是一种储油洞库竖井施工用提升装置。 The utility model relates to a hoisting device, in particular to a hoisting device for vertical shaft construction of an oil storage cavern.

背景技术 Background technique

    采用地下洞库对原油进行储存近年来已成为国家原油储备的发展趋势,目前使用的储油洞库大都依山而建,通过横向通道进入山体,在山体内完成储油洞库后,再向洞库上方挖掘出竖井,竖井施工完毕后,将横向通道封闭,储油洞库的进、出原油操作均通过竖井完成,而竖井挖掘完毕时,需进行支护施工,由于其内部空间狭窄,又具有较高的高度,因此对竖井进行支护施工存在较大难度,现有的方法一是在洞库及竖井内架设脚手架,施工人员在脚手架上进行竖井支护施工,但由于洞库及竖井内部空间十分有限,组装和拆卸脚手架作业需消耗大量的施工时间,施工周期较长;二是采用简易吊篮从井口吊放施工人员及支护材料,但这种施工方式稳定性较差,并且从井口向下吊放支护材料时具有一定的安全隐患,会对吊篮中操作人员的生命安全带来威胁。 The use of underground caverns to store crude oil has become the development trend of national crude oil reserves in recent years. Most of the currently used oil storage caverns are built along the mountains and enter the mountain through horizontal passages. A shaft is excavated above the cavern. After the construction of the shaft is completed, the horizontal passage is closed. The operation of entering and exiting the oil storage cavern is completed through the shaft. When the shaft is excavated, support construction is required. Due to its narrow internal space, It has a higher height, so it is more difficult to support the shaft. The existing method is to set up scaffolding in the cavern and the shaft, and the construction personnel carry out the shaft support construction on the scaffolding. However, due to the cavern and the The internal space of the shaft is very limited, and the assembly and disassembly of the scaffolding consumes a lot of construction time, and the construction period is long; the second is to use a simple hanging basket to lift the construction personnel and supporting materials from the wellhead, but this construction method is less stable. And there is a certain potential safety hazard when the support material is suspended downward from the wellhead, which will threaten the life safety of the operator in the hanging basket.

实用新型内容 Utility model content

本实用新型的目的是提供一种储油洞库竖井施工用提升装置,能够解决现有技术存在的不足。 The purpose of the utility model is to provide a hoisting device for oil storage cavern shaft construction, which can solve the deficiencies in the prior art.

本实用新型为实现上述目的,通过以下技术方案实现:包括竖井,竖井内设置吊盘和吊篮,吊盘上开设升降通道,吊篮能够从升降通道内通过,竖井顶端的井口上方设置固定架,固定架上安装第一定滑轮、第二定滑轮和第三定滑轮,竖井顶端的井口外侧设置第一卷扬机、第二卷扬机和第三卷扬机,第一卷扬机的钢索穿过第一定滑轮后与吊篮连接,第二卷扬机和第三卷扬机的钢索分别穿过第二定滑轮和第三定滑轮后与吊盘连接。第一卷扬机的钢索端部安装自锁吊钩,吊篮顶部设置挂环,自锁吊钩与挂环相配合。吊篮上设置导向装置。所述导向装置包括设置在吊篮两侧的套环,每个套环中均设置导向钢索,导向钢索一端与固定架连接,导向钢索另一端与竖井底部连接。升降通道周圈的吊盘上安装护栏。吊盘上设置安全绳,安全绳与固定架连接。 In order to achieve the above object, the utility model is realized through the following technical proposals: a shaft is included, a hanging pan and a hanging basket are arranged in the shaft, a lifting passage is provided on the hanging pan, the hanging basket can pass through the lifting passage, and a fixing frame is arranged above the wellhead at the top of the shaft The first fixed pulley, the second fixed pulley and the third fixed pulley are installed on the fixed frame, the first winch, the second winch and the third winch are arranged outside the wellhead at the top of the shaft, and the steel cable of the first winch passes through the first fixed pulley After being connected with the hanging basket, the steel cables of the second hoist and the third hoist pass respectively through the second fixed pulley and the third fixed pulley and are connected with the suspension pan. A self-locking hook is installed at the end of the steel cable of the first winch, and a hanging ring is arranged on the top of the hanging basket, and the self-locking hook matches the hanging ring. A guiding device is provided on the hanging basket. The guide device includes collars arranged on both sides of the hanging basket, each collar is provided with a guide cable, one end of the guide cable is connected to the fixing frame, and the other end of the guide cable is connected to the bottom of the shaft. Guardrails are installed on the suspension plates around the hoistway. A safety rope is arranged on the hanging pan, and the safety rope is connected with the fixed frame.

本实用新型的优点在于:施工效率高,稳定性强,支护件从竖井底部向上吊取,能够消除吊装过程的安全隐患,确保施工人员安全。 The utility model has the advantages of high construction efficiency and strong stability, and the supporting parts are hoisted upward from the bottom of the shaft, which can eliminate potential safety hazards in the hoisting process and ensure the safety of construction personnel.

附图说明 Description of drawings

图1为本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;

图2为图1的A向放大结构示意图; Fig. 2 is a schematic diagram of the enlarged structure in direction A of Fig. 1;

图3为图1的Ⅰ部放大结构示意图。 FIG. 3 is a schematic diagram of the enlarged structure of part I of FIG. 1 .

具体实施方式 Detailed ways

本实用新型所述的储油洞库竖井施工用提升装置包括竖井9,竖井9内设置吊盘11和吊篮23,吊盘11上开设升降通道12,吊篮23能够从升降通道12内通过,竖井9顶端的井口上方设置固定架1,固定架1上安装第一定滑轮2、第二定滑轮3和第三定滑轮7,竖井9顶端的井口外侧设置第一卷扬机16、第二卷扬机17和第三卷扬机18,第一卷扬机16的钢索穿过第一定滑轮2后与吊篮23连接,第二卷扬机17和第三卷扬机18的钢索分别穿过第二定滑轮3和第三定滑轮7后与吊盘11连接。本实用新型使用时,通过第二卷扬机17和第三卷扬机18将吊盘11沿竖井9下放至施工高度,然后使用第一卷扬机16将施工人员乘坐的吊篮23下放至吊盘11所在高度,施工人员从吊篮23进入吊盘11后,吊篮23下降至竖井9底部的洞库内,洞库内的施工人员将支护施工材料装入吊篮23后,第一卷扬机16将支护施工材料提升至吊盘11所在高度供竖井9支护施工使用。本实用新型在对竖井9进行支护施工时不需在洞库及竖井9内架设脚手架等辅助设备,有利于提高竖井支护施工效率,大幅缩短储油洞库建设周期,施工时人员所在平台不需载人升降,稳定性强,并且施工所用支护材料由竖井底部向上吊取,能够消除人员及施工材料吊放过程中存在的安全隐患,确保施工人员安全。 The hoisting device for the shaft construction of the oil storage cavern described in the utility model includes a shaft 9, and a hanging pan 11 and a hanging basket 23 are arranged in the shaft 9, and a lifting passage 12 is provided on the hanging pan 11, and the hanging basket 23 can pass through the lifting passage 12. , a fixed frame 1 is set above the wellhead at the top of the vertical shaft 9, the first fixed pulley 2, the second fixed pulley 3 and the third fixed pulley 7 are installed on the fixed frame 1, and the first hoist 16 and the second hoist are arranged outside the wellhead at the top of the vertical shaft 9 17 and the third hoist 18, the steel cable of the first hoist 16 passes through the first fixed pulley 2 and is connected with the hanging basket 23, and the steel ropes of the second hoist 17 and the third hoist 18 pass through the second fixed pulley 3 and the second fixed pulley 2 respectively. After the three fixed pulleys 7 are connected with the hanging pan 11. When the utility model is in use, the second hoist 17 and the third hoist 18 are used to lower the suspension pan 11 to the construction height along the shaft 9, and then use the first hoist 16 to lower the hanging basket 23 that the construction personnel rides to the height of the suspension pan 11. After the construction workers enter the hanging pan 11 from the hanging basket 23, the hanging basket 23 descends into the cavern at the bottom of the shaft 9. After the construction personnel in the cavern load the supporting construction materials into the hanging basket 23, the first winch 16 will support the The construction material is lifted to the height where the suspension plate 11 is used for the support construction of the shaft 9. The utility model does not need to set up auxiliary equipment such as scaffolding in the cavern and the shaft 9 during the support construction of the shaft 9, which is conducive to improving the construction efficiency of the shaft support and greatly shortening the construction period of the oil storage cavern. It does not require manned lifting and has strong stability, and the support materials used for construction are lifted upwards from the bottom of the shaft, which can eliminate potential safety hazards in the process of hoisting personnel and construction materials and ensure the safety of construction personnel.

本实用新型为减少吊运施工材料时第一卷扬机16的负载,可在第一卷扬机16的钢索端部安装自锁吊钩20,吊篮23顶部设置挂环21,自锁吊钩20与挂环21相配合。该结构可使吊篮23与第一卷扬机16的钢索分离,施工人员从吊篮23进入吊盘11后,第一卷扬机16将吊篮23升至竖井9顶端的井口处,井口的施工人员将吊篮23顶部的挂环21从自锁吊钩20上取下后,第一卷扬机16将自锁吊钩20下放至竖井9底部的洞库内吊取施工材料。 In order to reduce the load of the first hoist 16 when lifting construction materials, the utility model can install a self-locking hook 20 at the end of the steel cable of the first hoist 16, and a hanging ring 21 is arranged on the top of the hanging basket 23, and the self-locking hook 20 and Hanging ring 21 cooperates. This structure can separate the hanging basket 23 from the steel cables of the first hoist 16. After the construction personnel enter the hanging pan 11 from the hanging basket 23, the first hoisting machine 16 will lift the hanging basket 23 to the wellhead at the top of the shaft 9, and the construction personnel at the wellhead will After the hanging ring 21 on the top of the hanging basket 23 is taken off from the self-locking hook 20, the first hoist 16 lowers the self-locking hook 20 to the cavern at the bottom of the shaft 9 to hang construction materials.

本实用新型为增强吊篮23载人时的稳定性,可在吊篮23上设置导向装置。本实用新型所述导向装置可以采用多种结构,其中优选的结构为:所述导向装置包括设置在吊篮23两侧的套环22,每个套环22中均设置导向钢索4,导向钢索4一端与固定架1连接,导向钢索4另一端与竖井9底部连接。使用时,导向钢索4处于绷紧状态,吊篮23两侧的套环22沿导向钢索4滑动,对吊篮23起导向作用,防止吊篮23载人时发生倾斜。 The utility model can be provided with guiding device on the hanging basket 23 in order to strengthen the stability when the hanging basket 23 is manned. The guide device of the present utility model can adopt various structures, wherein the preferred structure is: the guide device includes collars 22 arranged on both sides of the hanging basket 23, and guide cables 4 are all set in each collar 22 to guide the One end of the steel cable 4 is connected with the fixed frame 1, and the other end of the guide cable 4 is connected with the bottom of the shaft 9. During use, the guide wire rope 4 is in a tight state, and the collars 22 on both sides of the hanging basket 23 slide along the guide wire rope 4 to guide the hanging basket 23 and prevent the hanging basket 23 from tilting when it is manned.

本实用新型为防止吊盘11上的人员或施工材料从升降通道12处意外掉落,可在升降通道12周圈的吊盘11上安装护栏10。该结构能够对洞库内以及吊盘11上的施工人员的生命安全起到有效保障。 The utility model is to prevent personnel or construction materials on the suspension pan 11 from accidentally falling from the lifting passage 12, and a guardrail 10 can be installed on the suspension pan 11 of the lifting passage 12 circles. This structure can effectively guarantee the life safety of the construction personnel in the cavern and on the suspension plate 11 .

本实用新型为进一步对吊盘11上进行高空作业的施工人员生命安全进行保障,可在吊盘11上设置安全绳13,安全绳13与固定架1连接。该结构在吊盘11因绳索断裂或卷扬机失灵等意外情况造成突然下坠时能够防止吊盘11上的施工人员随吊盘11一同坠落。 The utility model further guarantees the life safety of the construction personnel who carry out high-altitude work on the hanging pan 11, a safety rope 13 can be set on the hanging pan 11, and the safety rope 13 is connected with the fixed frame 1. This structure can prevent the construction personnel on the suspension pan 11 from falling together with the suspension pan 11 when the suspension pan 11 suddenly falls due to accidents such as rope breakage or winch failure.

Claims (6)

1. oil storage cave depot To Construction of Silo bont, it is characterized in that: comprise vertical shaft (9), hanging scaffold (11) and hanging basket (23) are set in vertical shaft (9), hanging scaffold (11) is offered hoist trunk (12), hanging basket (23) can pass through in hoist trunk (12), fixed mount (1) is set above the well head on vertical shaft (9) top, upper installation first fixed pulley (2) of fixed mount (1), second fixed pulley (3) and the 3rd fixed pulley (7), the well head arranged outside first hoist (16) on vertical shaft (9) top, second hoist (17) and the 3rd winch (18), the cable wire of first hoist (16) is connected with hanging basket (23) afterwards through the first fixed pulley (2), second hoist (17) and the cable wire of the 3rd winch (18) are each passed through the second fixed pulley (3) and are connected with hanging scaffold (11) afterwards with the 3rd fixed pulley (7).
2. oil storage cave depot To Construction of Silo bont according to claim 1, it is characterized in that: self-locking hook (20) is installed in the cable wire end of first hoist (16), hanging basket (23) top arranges link (21), and self-locking hook (20) matches with link (21).
3. oil storage cave depot To Construction of Silo bont according to claim 1, is characterized in that: (23) arrange guide piece to hanging basket.
4. oil storage cave depot To Construction of Silo bont according to claim 3, it is characterized in that: described guide piece comprises the collar (22) being arranged on hanging basket (23) both sides, guiding cable wire (4) is all set in each collar (22), guiding cable wire (4) one end is connected with fixed mount (1), and guiding cable wire (4) other end is connected with vertical shaft (9) bottom.
5. oil storage cave depot To Construction of Silo bont according to claim 1, is characterized in that: guardrail (10) installed by the hanging scaffold (11) of hoist trunk (12) border.
6. oil storage cave depot To Construction of Silo bont according to claim 1, it is characterized in that: hanging scaffold (11) is arranged safety rope (13), safety rope (13) is connected with fixed mount (1).
CN201520011525.5U 2015-01-08 2015-01-08 Oil storage cave depot To Construction of Silo bont Expired - Lifetime CN204508532U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520011525.5U CN204508532U (en) 2015-01-08 2015-01-08 Oil storage cave depot To Construction of Silo bont

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520011525.5U CN204508532U (en) 2015-01-08 2015-01-08 Oil storage cave depot To Construction of Silo bont

Publications (1)

Publication Number Publication Date
CN204508532U true CN204508532U (en) 2015-07-29

Family

ID=53706526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520011525.5U Expired - Lifetime CN204508532U (en) 2015-01-08 2015-01-08 Oil storage cave depot To Construction of Silo bont

Country Status (1)

Country Link
CN (1) CN204508532U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109132905A (en) * 2018-10-29 2019-01-04 中水电第十工程局(郑州)有限公司 A kind of device for preventing from hanging greatly away from hoist rope winding
CN112125238A (en) * 2020-08-05 2020-12-25 中石化宁波工程有限公司 Construction and installation method of steel beam in shaft

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109132905A (en) * 2018-10-29 2019-01-04 中水电第十工程局(郑州)有限公司 A kind of device for preventing from hanging greatly away from hoist rope winding
CN109132905B (en) * 2018-10-29 2024-06-07 中电建十一局工程有限公司 Device for preventing large-hoisting-distance lifting steel wire rope from winding
CN112125238A (en) * 2020-08-05 2020-12-25 中石化宁波工程有限公司 Construction and installation method of steel beam in shaft
CN112125238B (en) * 2020-08-05 2021-11-30 中石化宁波工程有限公司 Construction and installation method of steel beam in shaft

Similar Documents

Publication Publication Date Title
CN113137054A (en) Method for setting inverted hoisting power equipment in attached lifting scaffold
CN205653086U (en) Tower crane who possesses climbing ladder and lift
CN204508532U (en) Oil storage cave depot To Construction of Silo bont
CN203475801U (en) Telescopic steel platform for elevator shaft
CN105155832B (en) A kind of hanging basket equipment and its moving method
CN205716004U (en) A kind of high pressure vertical shaft penstock erecting device
TW201604119A (en) Double safety lift cage structure
CN204474106U (en) Deep shaft manned lift device
CN202729645U (en) Tower crane with elevator
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN203437842U (en) Pipeline welding platform
CN101993002B (en) Automatic lift type shaft hanging stage
CN106121254B (en) Construction method of heavy component transportation system after disassembly by reverse construction method
CN104973515B (en) A multi-section safety operating room for a crane and its operating method
CN104555833B (en) Method for hoisting steel inner cylinder of chimney
CN205444137U (en) Pressure regulating well construction operation platform
CN204253042U (en) Vertical rail guide pit shaft hanging scaffold structure
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN203428852U (en) Portable ammeter container hoisting machine
CN203499232U (en) Attached lifting scaffold
CN103708374B (en) The installation method of RH finery hydraulic jacking equipment
CN113175203A (en) Method for setting lifting power equipment in attached lifting scaffold
CN207812982U (en) A kind of inner wall of oil tank construction hanging basket
CN207726630U (en) A kind of masonry operation supplies overhead hoist
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20150729

CX01 Expiry of patent term