CN204434114U - The hanging beam of crane in bridge type - Google Patents
The hanging beam of crane in bridge type Download PDFInfo
- Publication number
- CN204434114U CN204434114U CN201420871876.9U CN201420871876U CN204434114U CN 204434114 U CN204434114 U CN 204434114U CN 201420871876 U CN201420871876 U CN 201420871876U CN 204434114 U CN204434114 U CN 204434114U
- Authority
- CN
- China
- Prior art keywords
- plate
- hanging
- main
- cover plate
- lifting lugs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
本实用新型提出一种桥式起重机的吊梁,其包括:主梁体、多个下吊耳以及多个上吊耳。主梁体呈扁长形。多个下吊耳向下凸出于所述主梁体的底部,所述多个下吊耳沿所述主梁体的长度方向从一端排列至另一端。多个上吊耳向上凸出于所述主梁体的顶部,所述多个上吊耳沿所述主梁体的长度方向从一端排列至另一端以适配于多吊点的桥式起重机。本实用新型的吊梁的上吊耳可以与桥式起重机由销轴连接在一起,下吊耳可以采用卸扣和钢丝绳与被吊物相连接,从而一次性地将大型设备吊起,去掉了设备拆卸吊装后再组合装配的过程,避免了对设备的二次损坏,节省了设备的安装周期,节省了租用浮吊的高昂费用,满足大吨位的吊装要求。
The utility model provides a suspension beam of a bridge crane, which comprises: a main beam body, a plurality of lower lifting lugs and a plurality of upper lifting lugs. The main beam body is flat and long. A plurality of lower hanging lugs protrude downward from the bottom of the main girder body, and the plurality of lower hanging lugs are arranged from one end to the other end along the length direction of the main girder body. A plurality of upper lifting lugs protrude upward from the top of the main girder body, and the plurality of upper lifting lugs are arranged from one end to the other end along the length direction of the main girder body so as to be suitable for a bridge crane with multiple lifting points. The upper lug of the suspension beam of the utility model can be connected with the bridge crane by a pin shaft, and the lower lug can be connected with the suspended object by using a shackle and a wire rope, so that the large equipment can be hoisted at one time, and the equipment can be removed. The process of assembly after disassembly and hoisting avoids secondary damage to the equipment, saves the installation cycle of the equipment, saves the high cost of renting a floating crane, and meets the hoisting requirements of large tonnage.
Description
技术领域 technical field
本实用新型涉及大型设备吊装装置,特别涉及桥式起重机的吊梁。 The utility model relates to a large-scale equipment hoisting device, in particular to a suspension beam of a bridge crane.
背景技术 Background technique
船舶与海洋平台上的大型设备的整体结构复杂,重量大,拆卸分开后需多次吊装,每次吊装都要根据具体情况重新更换吊装索具,吊装到位后需要重新组合安装,延长工期,费时费力,并且容易对设备造成二次损坏。 The overall structure of large-scale equipment on ships and offshore platforms is complex and heavy. After being disassembled and separated, it needs to be hoisted several times. Each hoisting needs to be replaced according to the specific situation. After hoisting in place, it needs to be reassembled and installed, prolonging the construction period and time-consuming It is laborious and easy to cause secondary damage to the equipment.
海洋工程中,对于一般的船型或海洋平台,涉及大型的设备吊装时,通常采用浮吊对其进行整体吊装,这对于平台的船型尺寸、吃水和需要安装的大型设备的重量要求很高,并且吊装方案需要根据浮吊的结构进行设计。当船舶或海洋平台的船型过大,需要安装的大型设备重量超过2500吨时,浮吊是无法达到要求的。 In marine engineering, when large-scale equipment is hoisted for general ships or offshore platforms, floating cranes are usually used to hoist them as a whole. The hoisting scheme needs to be designed according to the structure of the floating crane. When the ship or offshore platform is too large and the weight of large equipment to be installed exceeds 2,500 tons, the floating crane cannot meet the requirements.
现有技术中,ZL 201210155687.7公开了一种重吊梁,首先其承载力仅为900吨,远远的无法承受目前造船业大型设备的吊装重量,其次其上吊耳结构集中在吊梁两侧,下吊耳结构集中在吊梁中间,不利于吊梁的梁体本身的受力。 In the prior art, ZL 201210155687.7 discloses a heavy lifting beam. First, its bearing capacity is only 900 tons, which is far from being able to bear the lifting weight of large-scale equipment in the shipbuilding industry. Secondly, its upper lifting lug structures are concentrated on both sides of the lifting beam. The lower hanging lug structure is concentrated in the middle of the hanging beam, which is not conducive to the stress of the beam body of the hanging beam itself.
实用新型内容 Utility model content
本实用新型的目的是解决浮吊无法实现为船舶或海洋平台的大型设备进行吊装的难题,并提供一种适用于大吨位的重型设备吊装的与大型桥式起重机相匹配的的吊梁。 The purpose of the utility model is to solve the problem that the floating crane cannot be used for hoisting large-scale equipment of ships or ocean platforms, and to provide a suspension beam suitable for hoisting large-tonnage heavy equipment and matching with large-scale bridge cranes.
为解决上述技术问题,本实用新型采用如下技术方案:一种桥式起重机的吊梁,包括:主梁体、下吊耳以及上吊耳。所述主梁体呈扁长形。所述多个下吊耳向下凸出于所述主梁体的底部,所述多个下吊耳沿所述主梁体的长度方向从一端排列至另一端。所述多个上吊耳向上凸出于所述主梁体的顶部,所述多个上吊耳沿所述主梁体的长度方向从一端排列至另一端以适配于多吊点的桥式起重机。 In order to solve the above technical problems, the utility model adopts the following technical solution: a suspension beam of a bridge crane, comprising: a main beam body, a lower lifting lug and an upper lifting lug. The main beam body is prolate and long. The plurality of lower hanging lugs protrude downward from the bottom of the main girder body, and the plurality of lower lifting lugs are arranged from one end to the other end along the length direction of the main girder body. The plurality of upper lifting lugs protrude upward from the top of the main girder body, and the plurality of upper lifting lugs are arranged from one end to the other end along the length direction of the main girder body so as to be suitable for bridge cranes with multiple lifting points .
在一优选方案中,所述主梁体包括:上盖板、下盖板以及主吊板。上盖板水平设置,沿长度方向设置有上下贯通的上盖板通槽。下盖板行设置在上盖 板的下方,所述下盖板沿长度方向设置有上下贯通的下盖板通槽。主吊板竖直设置,其长度方向与上盖板、下盖板一致并与所述上盖板和所述下盖板连接在一起,所述上吊耳向上穿出于所述上盖板通槽,所述下吊耳向下穿出于所述下盖板通槽。 In a preferred solution, the main girder body includes: an upper cover plate, a lower cover plate and a main suspension plate. The upper cover plate is arranged horizontally, and a through groove of the upper cover plate penetrating up and down is arranged along the length direction. The lower cover plate row is arranged on the below of the upper cover plate, and the lower cover plate is provided with a lower cover plate through groove extending up and down along the length direction. The main hanging plate is vertically arranged, and its length direction is consistent with the upper cover plate and the lower cover plate and is connected with the upper cover plate and the lower cover plate. slot, and the lower lifting lug passes through the slot of the lower cover plate downwards.
在一优选方案中,所述主吊板在侧面上形成有凹槽,部分或者全部凹槽的槽口上铺设有封板以使所述主吊板呈箱型。 In a preferred solution, grooves are formed on the side of the main hanging plate, and sealing plates are laid on the openings of part or all of the grooves so that the main hanging plate is box-shaped.
在一优选方案中,所述主梁体在侧面上设有纵横交错的多个横筋板和纵筋板,所述横筋板、所述纵筋板、所述上盖板、所述下盖板、所述主吊板之间围成多个所述凹槽。 In a preferred solution, the main girder body is provided with a plurality of transverse ribs and longitudinal ribs criss-crossing on the side, the transverse ribs, the longitudinal ribs, the upper cover, the lower cover 1. Multiple grooves are formed between the main hanging plates.
在一优选方案中,所述横筋板沿长度方向延伸并垂直于主吊板,多个横筋板沿高度方向间隔布置,所述纵筋板沿高度方向延伸并垂直于主吊板,多个纵筋板沿长度方向间隔布置。 In a preferred solution, the transverse ribs extend along the length direction and are perpendicular to the main hanging plate, a plurality of transverse ribs are arranged at intervals along the height direction, the longitudinal ribs extend along the height direction and are perpendicular to the main hanging plate, Ribs are arranged at intervals along the length direction.
在一优选方案中,所述主吊板、上吊耳、下吊耳的材质为屈服强度值均为690以上的钢材。 In a preferred solution, the material of the main hanging plate, the upper hanging lug, and the lower hanging lug is steel with a yield strength value above 690.
在一优选方案中,多个上吊耳之间均匀排列且每两个相邻的上吊耳连接于所述桥式起重机的同一吊钩上。 In a preferred solution, the plurality of upper lifting lugs are evenly arranged and every two adjacent upper lifting lugs are connected to the same hook of the bridge crane.
在一优选方案中,所述下吊耳的数目为奇数个且不少于三个,其中一个吊耳位于主吊板的长度方向中心构成一单吊点,其余的吊耳对称地置于所述单吊点的两侧,且对称的两个吊耳构成一组吊点。 In a preferred solution, the number of the lower lifting lugs is an odd number and not less than three, one of the lifting lugs is located at the lengthwise center of the main hanging plate to form a single lifting point, and the rest of the lifting lugs are placed symmetrically The two sides of the single lifting point mentioned above, and two symmetrical lifting lugs form a set of lifting points.
在一优选方案中,所述下吊耳包括与所述主吊板一体成型的耳板,耳板上开设有吊孔,所述下吊耳的耳板两侧分别设置一第一加强板,所述第一加强板的上部向上穿过所述上盖板通槽而与所述主吊板相连,所述第一加强板的下部贴合在所述耳板两侧以将耳板夹置于其中,所述第一加强板对应所述下吊耳的吊孔位置也设置有吊孔。 In a preferred solution, the lower hanging lug includes an ear plate integrally formed with the main hanging plate, and a hanging hole is opened on the ear plate, and a first reinforcing plate is respectively arranged on both sides of the ear plate of the lower hanging ear, The upper part of the first reinforcing plate passes upwards through the slot of the upper cover plate and is connected with the main hanging plate, and the lower part of the first reinforcing plate is attached to both sides of the lug plate to sandwich the lug plate Wherein, the first reinforcing plate is also provided with hanging holes corresponding to the hanging holes of the lower hanging lugs.
在一优选方案中,所述两第一加强板上还分别设有至少一圈环绕吊孔的加强圈;所述主梁体还包括多个第二加强板,其设置在所述耳板外轮廓位置,所述第二加强板的端部与所述下盖板相连,所述第二加强板的板面与所述耳板的侧面垂直相连。 In a preferred solution, the two first reinforcement plates are respectively provided with at least one reinforcement ring around the lifting hole; the main beam body also includes a plurality of second reinforcement plates, which are arranged outside the ear plates At the outline position, the end of the second reinforcing plate is connected to the lower cover plate, and the surface of the second reinforcing plate is vertically connected to the side of the ear plate.
由上述技术方案可知,本实用新型的优点和积极效果在于: As can be seen from the above-mentioned technical scheme, the advantages and positive effects of the present utility model are:
1、本实用新型的吊梁各部分均为焊接而成,上吊耳可以与20000吨桥式 起重机由销轴连接在一起,下吊耳可以采用1500吨的卸扣和钢丝绳与被吊物相连接,从而一次性地将大型设备吊起,去掉了设备拆卸吊装后再组合装配的过程,避免了对设备的二次损坏,节省了设备的安装周期,节省了租用浮吊的高昂费用,满足大吨位的吊装要求; 1. All parts of the hanging beam of the utility model are welded. The upper lifting lug can be connected with a 20,000-ton bridge crane by a pin shaft, and the lower lifting lug can be connected to the suspended object by using a 1,500-ton shackle and a wire rope. , so as to hoist large equipment at one time, remove the process of disassembling and hoisting the equipment and then reassemble it, avoid secondary damage to the equipment, save the installation cycle of the equipment, save the high cost of renting floating cranes, and meet the needs of large Tonnage hoisting requirements;
2、主吊板、上吊耳、下吊耳的材质为屈服强度值均为690的钢材,减轻了吊梁自身的重量,本实施例的吊梁重量不超过3000吨; 2. The material of the main hanging plate, the upper hanging lug and the lower hanging lug is steel with a yield strength value of 690, which reduces the weight of the hanging beam itself. The weight of the hanging beam in this embodiment does not exceed 3,000 tons;
3、本实用新型的吊梁下面形成有多组吊点可适合不同结构的大型设备吊装; 3. There are multiple sets of lifting points formed under the hanging beam of the utility model, which can be suitable for lifting large-scale equipment of different structures;
4、本实用新型主梁体的主吊板、上盖板、下盖板连接成横截面为“工”字型的结构,以使主梁体在达到一个基本应力的条件下,大幅度的减轻梁体的重量,焊接的工艺也得到很大的简化。此外,横筋板、纵筋板分布在主梁体的内部,以保证主梁体的整体强度和不变形。 4. The main hanging plate, the upper cover plate and the lower cover plate of the main girder body of the utility model are connected into a structure with an "I" shape in cross section, so that the main girder body can be greatly expanded under the condition of a basic stress. The weight of the beam body is reduced, and the welding process is greatly simplified. In addition, the transverse ribs and longitudinal ribs are distributed inside the main girder to ensure the overall strength and no deformation of the main girder.
附图说明 Description of drawings
图1是本实用新型一优选实施例的吊梁的结构示意图。 Fig. 1 is a structural schematic diagram of a suspension beam in a preferred embodiment of the present invention.
图2是图1所示的吊梁的另一结构示意图。 Fig. 2 is another structural schematic diagram of the suspension beam shown in Fig. 1 .
图3是图2所示的吊梁的侧视图。 FIG. 3 is a side view of the suspension beam shown in FIG. 2 .
图4是图2所示的吊梁的另一结构示意图。 Fig. 4 is another structural schematic diagram of the hanging beam shown in Fig. 2 .
图5是图2的A方向的剖示图。 FIG. 5 is a cross-sectional view along the direction A of FIG. 2 .
图6是图2的B方向的剖视图。 FIG. 6 is a sectional view taken along the direction B of FIG. 2 .
图7是图2的C方向的剖视图。 Fig. 7 is a cross-sectional view taken along line C in Fig. 2 .
图8是图1所示的吊梁的上盖板的结构示意图。 Fig. 8 is a schematic structural view of the upper cover plate of the suspension beam shown in Fig. 1 .
图9是图1所示的吊梁的下盖板的结构示意图。 Fig. 9 is a schematic structural view of the lower cover plate of the hanging beam shown in Fig. 1 .
图10是图1所示的吊梁的主吊板、上吊耳以及下吊耳的结构示意图。 Fig. 10 is a structural schematic diagram of the main hanging plate, the upper hanging lug and the lower hanging lug of the hanging beam shown in Fig. 1 .
附图标记说明如下:1、主梁体;11、上盖板;111、上盖板通槽;12、下盖板;121、下盖板通槽;13、主吊板;14、凹槽;15、封板;16、横筋板;17、纵筋板;2、下吊耳;21、耳板;211、吊孔;22、第一加强板;221、吊孔;222、加强圈;23、第二加强板;3、上吊耳;31、耳板;311、吊孔。 Reference signs are explained as follows: 1, main beam body; 11, upper cover plate; 111, upper cover plate through groove; 12, lower cover plate; 121, lower cover plate through groove; 13, main hanging plate; 14, groove 15, sealing plate; 16, transverse rib plate; 17, longitudinal rib plate; 2, lower lug; 23, the second reinforcement plate; 3, the upper hanging lug; 31, the lug plate; 311, the hanging hole.
具体实施方式 Detailed ways
体现本实用新型特征与优点的典型实施方式将在以下的说明中详细叙 述。应理解的是本实用新型能够在不同的实施方式上具有各种的变化,其皆不脱离本实用新型的范围,且其中的说明及图示在本质上是当作说明之用,而非用以限制本实用新型。 A typical implementation that embodies the features and advantages of the present utility model will be described in detail in the following description. It should be understood that the utility model can have various changes in different embodiments, all of which do not depart from the scope of the utility model, and the description and illustrations therein are used as illustrations in nature, not for To limit the utility model.
参阅图1-10,一种桥式起重机的吊梁包括:主梁体1、下吊耳2以及上吊耳3。 Referring to Fig. 1-10, a suspension girder of a bridge crane includes: a main girder body 1, a lower lifting lug 2 and an upper lifting lug 3.
参阅图2、图8以及图9,主梁体1呈扁长形,主梁体1的长度为26190~26200mm,主梁体1的高度为2340~2350mm。主梁体1包括:上盖板11、下盖板12以及主吊板13。上盖板11水平设置,沿长度方向设置有上下贯通的上盖板通槽111。下盖板12行设置在上盖板11的下方,下盖板12沿长度方向设置有上下贯通的下盖板通槽121。主吊板13竖直设置,其长度方向与上盖板11、下盖板12一致并与上盖板11和下盖板12连接在一起。参阅图10,主吊板13的底部自上往下收窄。参阅图4-7,主吊板13、上盖板11、下盖板12连接成横截面为“工”字型的结构,该工”字型的结构能使主梁体1在达到一个基本应力的条件下,大幅度的减轻梁体的重量,焊接的工艺也得到很大的简化。在其他实施例中,根据实际的需要,主吊板13、上盖板11、下盖板12连接成横截面亦可为其他结构,例如Ⅱ字型的结构。 Referring to Fig. 2, Fig. 8 and Fig. 9, the main girder body 1 is prolate, the length of the main girder body 1 is 26190-26200 mm, and the height of the main girder body 1 is 2340-2350 mm. The main beam body 1 includes: an upper cover plate 11 , a lower cover plate 12 and a main suspension plate 13 . The upper cover plate 11 is arranged horizontally, and an upper cover plate through groove 111 penetrating up and down is arranged along the length direction. The lower cover plates 12 are arranged in rows below the upper cover plate 11 , and the lower cover plate 12 is provided with a lower cover plate through slot 121 extending up and down along the length direction. The main hanging plate 13 is vertically arranged, and its length direction is consistent with the upper cover plate 11 and the lower cover plate 12 and is connected together with the upper cover plate 11 and the lower cover plate 12 . Referring to Fig. 10, the bottom of the main hanging plate 13 narrows from top to bottom. Referring to Figure 4-7, the main hanging plate 13, the upper cover plate 11, and the lower cover plate 12 are connected to form a cross-section of "I"-shaped structure, which can make the main beam body 1 achieve a basic Under stress conditions, the weight of the beam body is greatly reduced, and the welding process is also greatly simplified. In other embodiments, according to actual needs, the main hanging plate 13, the upper cover plate 11, and the lower cover plate 12 are connected The cross-section can also be other structures, such as a II-shaped structure.
继续参阅图1和图2,主吊板13在侧面上形成有凹槽14,部分或者全部凹槽14的槽口上铺设有封板15以使主吊板13呈箱型,以增加主梁体1的强度。主梁体1在侧面上设有纵横交错的多个横筋板16和纵筋板17,横筋板16、纵筋板17、上盖板11、下盖板12、主吊板13之间围成多个凹槽14。一个或多个相邻的凹槽14的槽口上铺设有一个封板15以减轻重量。 Continuing to refer to Fig. 1 and Fig. 2, the main hanging plate 13 is formed with a groove 14 on the side, and part or all of the notches of the groove 14 are covered with a sealing plate 15 so that the main hanging plate 13 is box-shaped to increase the main girder body. 1 strength. The main girder body 1 is provided with a plurality of transverse ribs 16 and longitudinal ribs 17 criss-crossing on the side. A plurality of grooves 14. A sealing plate 15 is laid on the notches of one or more adjacent grooves 14 to reduce weight.
继续参阅图1和图2,横筋板16沿长度方向延伸并垂直于主吊板13,多个横筋板16沿高度方向间隔布置,纵筋板17沿高度方向延伸并垂直于主吊板13,多个纵筋板17沿长度方向间隔布置。上述的横筋板16、纵筋板17分布在主梁体1的内部,以保证主梁体1的整体强度和不变形。 Continuing to refer to Fig. 1 and Fig. 2, the transverse ribs 16 extend along the length direction and are perpendicular to the main hanging plate 13, a plurality of transverse ribs 16 are arranged at intervals along the height direction, and the longitudinal ribs 17 extend along the height direction and are perpendicular to the main hanging plate 13, A plurality of longitudinal ribs 17 are arranged at intervals along the length direction. The above-mentioned transverse ribs 16 and longitudinal ribs 17 are distributed inside the main beam body 1 to ensure the overall strength and non-deformation of the main beam body 1 .
主吊板13、上吊耳3、下吊耳2的材质为屈服强度值均为690的钢材,该钢材的强度大,可减少钢材的下料,从而减轻了吊梁自身的重量。 The material of the main hanging plate 13, the upper hanging lug 3, and the lower hanging lug 2 is steel with a yield strength value of 690. This steel has high strength, which can reduce the blanking of steel, thereby reducing the weight of the hanging beam itself.
参阅图10,多个下吊耳2向下凸出于主梁体1的底部,多个下吊耳2沿主梁体1的长度方向从一端排列至另一端。下吊耳2向下穿出于下盖板通槽121,下吊耳2包括与主吊板13一体成型的耳板21,耳板21、上开设有吊孔 211。 Referring to FIG. 10 , a plurality of lower lifting lugs 2 protrude downward from the bottom of the main beam body 1 , and the plurality of lower lifting lugs 2 are arranged along the length direction of the main beam body 1 from one end to the other end. The lower lug 2 passes through the lower cover plate through groove 121 downwards. The lower lug 2 includes an ear plate 21 integrally formed with the main hanging plate 13, and the ear plate 21 is provided with a hanging hole 211.
参阅图4-7,下吊耳2的耳板21两侧分别设置一第一加强板22,第一加强板22的上部向上穿过上盖板通槽111而与主吊板13相连,第一加强板22的下部贴合在耳板21两侧以将耳板21夹置于其中;第一加强板22对应耳板21的吊孔211位置也设置有吊孔221。两第一加强板22上还分别设有至少一圈环绕吊孔221的加强圈222。上述的加强板位于吊耳孔处,目的是增强吊耳孔内的局部应力。 Referring to Fig. 4-7, a first reinforcing plate 22 is provided on both sides of the lug plate 21 of the lower lifting lug 2, and the upper part of the first reinforcing plate 22 passes upward through the upper cover plate through groove 111 and is connected with the main hanging plate 13. The lower part of a reinforcing plate 22 fits on both sides of the lug plate 21 to sandwich the lug plate 21 therein; The two first reinforcing plates 22 are respectively provided with at least one reinforcing ring 222 surrounding the lifting hole 221 . The above-mentioned reinforcing plate is located at the lifting lug hole, and its purpose is to enhance the local stress in the lifting lug hole.
参阅图2,耳板21的外轮廓呈弧形,耳板22外轮廓位置设置多个第二加强板23,第二加强板23的端部与下盖板12相连,第二加强板23的板面与耳板21的弧形侧面垂直相连。 Referring to Fig. 2, the outer contour of the ear plate 21 is arc-shaped, and the outer contour position of the ear plate 22 is provided with a plurality of second reinforcing plates 23, the ends of the second reinforcing plates 23 are connected with the lower cover plate 12, and the second reinforcing plates 23 The board surface is vertically connected with the arc side of the ear plate 21 .
下吊耳2的数目为奇数个且不少于三个,其中一个吊耳位于主吊板13的长度方向中心构成一单吊点,其余的吊耳对称地置于单吊点的两侧,且对称的两个吊耳构成一组吊点。下吊耳2的数目为十一个,形成有六组吊点。这六组吊点可以满足不同吊装结构的需要。 The number of lower lifting lugs 2 is an odd number and not less than three, one of which is located at the center of the length direction of the main hanging plate 13 to form a single lifting point, and the rest of the lifting lugs are symmetrically placed on both sides of the single lifting point. And two symmetrical lifting lugs form a set of lifting points. The number of the lower hanging lugs 2 is eleven, forming six groups of hanging points. These six groups of lifting points can meet the needs of different lifting structures.
参阅图2和图10,多个上吊耳3向上凸出于主梁体1的顶部,多个上吊耳3沿主梁体1的长度方向从一端排列至另一端以适配于多吊点的桥式起重机尤其适配于20000吨桥式起重机。本实用新型的吊梁去掉了设备拆卸吊装后再组合装配的过程,避免了对设备的二次损坏。 Referring to Fig. 2 and Fig. 10, a plurality of upper lifting lugs 3 protrude upward from the top of the main girder body 1, and a plurality of upper lifting lugs 3 are arranged from one end to the other end along the length direction of the main girder body 1 to be suitable for multi-hanging point Bridge cranes are especially suitable for 20,000-ton bridge cranes. The hanging beam of the utility model eliminates the process of disassembling and hoisting the equipment and then assembling and assembling, so as to avoid secondary damage to the equipment.
上吊耳3向上穿出于上盖板通槽111,上吊耳3包括与主吊板13一体成型的耳板31,耳板31上开设有吊孔311。多个上吊耳3之间均匀排列且每两个相邻的上吊耳3连接于桥式起重机的同一吊钩上。 The upper hanging lug 3 passes upward through the upper cover plate through groove 111 , and the upper hanging lug 3 includes an ear plate 31 integrally formed with the main hanging plate 13 , and a hanging hole 311 is opened on the ear plate 31 . The plurality of upper lifting lugs 3 are evenly arranged and every two adjacent upper lifting lugs 3 are connected to the same hook of the bridge crane.
由上述技术方案可知,本实用新型的优点和积极效果在于: As can be seen from the above-mentioned technical scheme, the advantages and positive effects of the present utility model are:
1、本实用新型的吊梁各部分均为焊接而成,上吊耳可以与20000吨桥式起重机由销轴连接在一起,下吊耳可以采用1500吨的卸扣和钢丝绳与被吊物相连接。一次性的将大型设备吊起,去掉了设备拆卸吊装后再组合装配的过程,避免了对设备的二次损坏,节省了设备的安装周期,节省了租用浮吊的高昂费用,满足大吨位的吊装要求; 1. All parts of the hanging beam of the utility model are welded. The upper lifting lug can be connected with a 20,000-ton bridge crane by a pin shaft, and the lower lifting lug can be connected with the suspended object by using a 1,500-ton shackle and a wire rope. . One-time hoisting of large-scale equipment eliminates the process of disassembling and hoisting the equipment and then assembling it, which avoids secondary damage to the equipment, saves the installation period of the equipment, and saves the high cost of renting floating cranes to meet the requirements of large-tonnage hoisting requirements;
2、主吊板、上吊耳、下吊耳的材质为屈服强度值均为690的钢材,减轻了吊梁自身的重量,本实施例的吊梁重量不超过3000吨; 2. The material of the main hanging plate, the upper hanging lug and the lower hanging lug is steel with a yield strength value of 690, which reduces the weight of the hanging beam itself. The weight of the hanging beam in this embodiment does not exceed 3,000 tons;
3、本实用新型的吊梁下面形成有多组吊点可适合不同结构的大型设备吊 装; 3. There are multiple sets of lifting points formed under the hanging beam of the utility model, which can be suitable for lifting large-scale equipment of different structures;
4、本实用新型主梁体的主吊板、上盖板、下盖板连接成横截面为“工”字型的结构,以使主梁体在达到一个基本应力的条件下,大幅度的减轻梁体的重量,焊接的工艺也得到很大的简化。此外,横筋板、纵筋板分布在主梁体的内部,以保证主梁体的整体强度和不变形。 4. The main hanging plate, the upper cover plate and the lower cover plate of the main girder body of the utility model are connected into a structure with an "I" shape in cross section, so that the main girder body can be greatly expanded under the condition of a basic stress. The weight of the beam body is reduced, and the welding process is greatly simplified. In addition, the transverse ribs and longitudinal ribs are distributed inside the main girder to ensure the overall strength and no deformation of the main girder.
虽然已参照典型实施方式描述了本实用新型,但应当理解,所用的术语是说明和示例性、而非限制性的术语。由于本实用新型能够以多种形式具体实施而不脱离实用新型的精神或实质,所以应当理解,上述实施方式不限于任何前述的细节,而应在随附权利要求所限定的精神和范围内广泛地解释,因此落入权利要求或其等效范围内的全部变化和改型都应为随附权利要求所涵盖。 While the present invention has been described with reference to exemplary embodiments, it is understood that the words which have been used are words of description and illustration, rather than limitation. Since the invention can be embodied in various forms without departing from the spirit or essence of the invention, it should be understood that the above-described embodiments are not limited to any of the foregoing details, but should be broadly defined within the spirit and scope of the appended claims. Therefore, all changes and modifications that fall within the scope of the claims or their equivalents should be covered by the appended claims.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420871876.9U CN204434114U (en) | 2014-12-31 | 2014-12-31 | The hanging beam of crane in bridge type |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420871876.9U CN204434114U (en) | 2014-12-31 | 2014-12-31 | The hanging beam of crane in bridge type |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204434114U true CN204434114U (en) | 2015-07-01 |
Family
ID=53602010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420871876.9U Expired - Lifetime CN204434114U (en) | 2014-12-31 | 2014-12-31 | The hanging beam of crane in bridge type |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204434114U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104803293A (en) * | 2014-12-31 | 2015-07-29 | 烟台中集来福士海洋工程有限公司 | Hanging beam of bridge crane |
-
2014
- 2014-12-31 CN CN201420871876.9U patent/CN204434114U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104803293A (en) * | 2014-12-31 | 2015-07-29 | 烟台中集来福士海洋工程有限公司 | Hanging beam of bridge crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104803293A (en) | Hanging beam of bridge crane | |
CN101224849A (en) | Hanger and hoisting technology for overall hoisting of ship superstructure | |
CN104098017B (en) | Distributor and force transmission method for hoisting large thin-wall containment and passive water tank | |
CN201686432U (en) | 800-ton suspensory rigging | |
CN108163694A (en) | A kind of body section hanging method with hatch coaming | |
CN204434114U (en) | The hanging beam of crane in bridge type | |
CN204917622U (en) | Novel steel sheet lifts by crane device | |
CN205045694U (en) | Even deck of boat hoist of atress | |
CN108996385B (en) | Method for setting and using lifting device for hoisting blast furnace shell | |
CN206088755U (en) | Girder | |
CN103183283B (en) | System and method for installing lifting rigging | |
CN203402809U (en) | Three-group vertical connection pulley block series connection type hanging row | |
CN104627813A (en) | Telescopic type cross supporting beam | |
CN102050377B (en) | Method for installing combined hoist and oil production platform drilling equipment | |
CN201406269Y (en) | Three-unit crane lifting T-shaped sling | |
CN204251194U (en) | A kind of Novel hanging tool | |
CN203513083U (en) | Combined hanger special for bundled slender materials | |
CN209816667U (en) | Lifting lug structure for integral hoisting of anti-collision steel bushing box | |
CN115028053A (en) | Hoisting method of large-sized sheet general section of cruise ships | |
CN107840240B (en) | Hanging beam | |
CN216471715U (en) | 150TON multipurpose hanging bar | |
CN214031441U (en) | Hoisting equipment suitable for multiple traveling cranes and asymmetric balanced loads | |
CN105016190A (en) | Cross beam lifting tool and method of hoisting pump tower LNG ship | |
CN103953020A (en) | Pin pile leg for offshore lifting platform | |
CN213595708U (en) | Double-lug lifting appliance for hoisting whole marine low-speed diesel engine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20150701 |