[go: up one dir, main page]

CN204387075U - Can assembled protective cap Sheet Steel Form - Google Patents

Can assembled protective cap Sheet Steel Form Download PDF

Info

Publication number
CN204387075U
CN204387075U CN201520006747.8U CN201520006747U CN204387075U CN 204387075 U CN204387075 U CN 204387075U CN 201520006747 U CN201520006747 U CN 201520006747U CN 204387075 U CN204387075 U CN 204387075U
Authority
CN
China
Prior art keywords
formwork
protective cap
construction
fixing plates
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520006747.8U
Other languages
Chinese (zh)
Inventor
李红波
曾红刚
程龙
李超
梅惠俊
熊琰
徐晨
李博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
Original Assignee
State Grid Corp of China SGCC
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Hubei Electric Power Transmission and Distribution Engineering Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520006747.8U priority Critical patent/CN204387075U/en
Application granted granted Critical
Publication of CN204387075U publication Critical patent/CN204387075U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型提供一种可拼装保护帽钢模板,包括本体,其特征在于:所述本体为方形模板或直角形模板;所述方形模板上设有多个与方形模板表面垂直布置且带有施工孔的固定板;所述直角形模板由第一模板和第二模板组成,第一模板上设有多个与第一模板表面垂直布置且带有施工孔的第一固定板,所述第二模板上设有多个与第二模板表面垂直布置且带有施工孔的第二固定板。本实用新型将不同规格的钢块,通过焊接连接钢块,采用螺栓进行连接,拼装成符合设计要求的模板进行保护帽施工,施工完成后随即拆除分类堆放储存。从而适合各种塔型的保护帽制作,同时模板外侧的施工孔可以安装拉杆,代替钢管提供的箍紧力;使保护帽更加美观,提高了施工工艺。

The utility model provides a steel template for assembling a protective cap, which includes a body, and is characterized in that: the body is a square template or a right-angle template; The fixing plate of the hole; the rectangular formwork is made up of the first formwork and the second formwork, the first formwork is provided with a plurality of first fixing plates arranged vertically with the surface of the first formwork and having construction holes, the second formwork The formwork is provided with a plurality of second fixing plates perpendicular to the surface of the second formwork and having construction holes. The utility model connects steel blocks of different specifications by welding, connects them with bolts, and assembles them into templates meeting the design requirements for protective cap construction. After the construction is completed, it is dismantled and sorted and stacked for storage. Therefore, it is suitable for the production of protective caps of various tower types. At the same time, the construction holes on the outside of the formwork can be installed with tie rods to replace the clamping force provided by the steel pipes; the protective caps are more beautiful and the construction technology is improved.

Description

可拼装保护帽钢模板Assembled protective cap steel formwork

【技术领域】【Technical field】

本实用新型涉及机械技术领域,特别涉及一种可拼装保护帽钢模板。The utility model relates to the technical field of machinery, in particular to a steel formwork for a protective cap that can be assembled.

【背景技术】【Background technique】

输电线路保护帽制作时,设计对保护帽制作要求:“边长按塔座板外侧每边增加50mm,高度按地脚螺栓外露高度增加50mm”。因塔型不同,塔脚板大小、地脚螺栓的露头都不尽相同,制作保护帽的模板的宽度、高度也要随之变化。往往一个工程保护帽制作后,模板就不能用到下个工程,只能存放起来备用,堆放时间久了,就容易腐烂、翘边,最后只能报废。When making protective caps for transmission lines, the design requires the production of protective caps: "the side length shall be increased by 50mm for each side outside the tower base plate, and the height shall be increased by 50mm for the exposed height of the anchor bolts". Due to the different tower types, the size of the tower foot plate and the outcropping of the anchor bolts are different, and the width and height of the template for making the protective cap will also change accordingly. Often after a project protective cap is made, the formwork cannot be used in the next project, and can only be stored for future use. After a long time of stacking, it is easy to rot and warp, and finally it can only be scrapped.

因此,设计一种可以克服上述不足的可拼装保护帽钢模板显得十分必要。Therefore, it is very necessary to design a steel formwork that can be assembled to protect the cap that can overcome the above-mentioned deficiencies.

【实用新型内容】【Content of utility model】

有鉴于此,为克服现有技术的不足,本实用新型提供一种可拼装保护帽钢模板,能适合各种塔型的保护帽制作,同时模板外侧的施工孔可以安装拉杆,代替钢管提供的箍紧力,四个棱角拼装弧形钢块,制作倒角的保护帽,使保护帽更加美观,提高了施工工艺。In view of this, in order to overcome the deficiencies of the prior art, the utility model provides a steel formwork for assembling protective caps, which is suitable for making various tower-shaped protective caps. At the same time, the construction holes on the outside of the formwork can be installed with tie rods instead of steel pipes. The clamping force, the four corners are assembled with arc-shaped steel blocks, and the chamfered protective cap is made to make the protective cap more beautiful and improve the construction technology.

为实现上述目的,本实用新型提供的可拼装保护帽钢模板,包括本体,其特征在于:所述本体为方形模板或直角形模板;所述方形模板上设有多个与方形模板表面垂直布置且带有施工孔的固定板;所述直角形模板由第一模板和第二模板组成,第一模板上设有多个与第一模板表面垂直布置且带有施工孔的第一固定板,所述第二模板上设有多个与第二模板表面垂直布置且带有施工孔的第二固定板。In order to achieve the above purpose, the utility model provides an assembled protective cap steel formwork, including a body, which is characterized in that: the body is a square formwork or a right-angle formwork; and a fixing plate with construction holes; the right-angle formwork is composed of a first formwork and a second formwork, and the first formwork is provided with a plurality of first fixing plates arranged vertically with the surface of the first formwork and having construction holes, The second formwork is provided with a plurality of second fixing plates perpendicular to the surface of the second formwork and having construction holes.

作为优选方案,所述固定板沿方形模板的三条边布置,且在方形模板的每条边上均设有三个。As a preferred solution, the fixing plates are arranged along three sides of the square formwork, and three are arranged on each side of the square formwork.

进一步地,所述第一固定板和第二固定板均设有三个。Further, there are three first fixing plates and three second fixing plates.

更进一步地,所述在第一模板和第二模板的连接处设有圆弧倒角。Furthermore, arc chamfering is provided at the junction of the first template and the second template.

本实用新型的优点在于:该模板将不同规格的钢块,通过焊接连接钢块,采用螺栓进行连接,拼装成符合设计要求的模板进行保护帽施工,施工完成后随即拆除分类堆放储存。从而,适合各种塔型的保护帽制作,同时模板外侧的施工孔可以安装拉杆,代替钢管提供的箍紧力。四个棱角拼装弧形钢块,制作倒角的保护帽,使保护帽更加美观,提高施工工艺。The utility model has the advantages that: the formwork connects steel blocks of different specifications by welding, connects the steel blocks with bolts, and assembles them into a formwork that meets the design requirements for protective cap construction. After the construction is completed, it is dismantled and stacked for storage. Therefore, it is suitable for the production of protective caps of various tower types, and at the same time, the construction holes outside the formwork can be installed with tie rods to replace the clamping force provided by the steel pipes. The four corners are assembled with arc-shaped steel blocks to make a chamfered protective cap, which makes the protective cap more beautiful and improves the construction process.

【附图说明】【Description of drawings】

图1是本实用新型方形模板的主视结构示意图。Fig. 1 is a front structural schematic diagram of a square formwork of the present invention.

图2是本实用新型方形模板的俯视结构示意图。Fig. 2 is a top view structural diagram of a square formwork of the present invention.

图3是本实用新型方形模板的左视结构示意图。Fig. 3 is a left view structural schematic diagram of the square formwork of the present invention.

图4是本实用新型直角形模板的主视结构示意图。Fig. 4 is a front structural schematic diagram of a rectangular formwork of the present invention.

图5是本实用新型直角形模板的左视结构示意图。Fig. 5 is a left view structural schematic diagram of a right-angle formwork of the present invention.

图6是本实用新型直角形模板的俯视结构示意图。Fig. 6 is a top view structural schematic diagram of a rectangular formwork of the present invention.

图中:本体1,施工孔1.0,方形模板1.1,直角形模板1.2,固定板1.11,第一模板1.21,第二模板1.22,第一固定板1.23,第二固定板1.24,圆弧倒角1.25。In the figure: body 1, construction hole 1.0, square formwork 1.1, rectangular formwork 1.2, fixed plate 1.11, first formwork 1.21, second formwork 1.22, first fixed plate 1.23, second fixed plate 1.24, arc chamfering 1.25 .

【具体实施方式】【Detailed ways】

为了更好地理解本实用新型,以下将结合附图和具体实例对本实用新型进行详细的说明。In order to better understand the utility model, the utility model will be described in detail below in conjunction with the accompanying drawings and specific examples.

如图所示,本实用新型的可拼装保护帽钢模板,包括本体1,本体1为方形模板1.1或直角形模板1.2;方形模板1.1上设有多个与方形模板1.1表面垂直布置且带有施工孔1.0的固定板1.11;直角形模板1.2由第一模板1.21和第二模板1.22组成,第一模板1.21上设有多个与第一模板1.21表面垂直布置且带有施工孔1.0的第一固定板1.23,第二模板1.22上设有多个与第二模板1.22表面垂直布置且带有施工孔1.0的第二固定板1.24。As shown in the figure, the steel formwork of the utility model that can be assembled with a protective cap includes a body 1, and the body 1 is a square formwork 1.1 or a right-angle formwork 1.2; The fixing plate 1.11 of the construction hole 1.0; the rectangular formwork 1.2 is composed of a first formwork 1.21 and a second formwork 1.22, and the first formwork 1.21 is provided with a plurality of first formworks 1.21 perpendicular to the surface of the first formwork 1.21 and with construction holes 1.0. The fixing plate 1.23 and the second formwork 1.22 are provided with a plurality of second fixing plates 1.24 perpendicular to the surface of the second formwork 1.22 and having construction holes 1.0.

固定板1.11沿方形模板1.1的三条边布置,且在方形模板1.1的每条边上均设有三个。第一固定板1.23和第二固定板1.24均设有三个。在第一模板1.21和第二模板1.22的连接处设有圆弧倒角1.25。The fixing plates 1.11 are arranged along the three sides of the square formwork 1.1, and there are three fixing plates on each side of the square formwork 1.1. There are three first fixing plates 1.23 and three second fixing plates 1.24. A circular chamfer 1.25 is provided at the joint of the first template 1.21 and the second template 1.22.

在设计实用新型的模板时,鉴于对以往塔型的塔脚板进行分析研究,确定拼装模板的尺寸。钢模板的厚度和材质选择较关键,需同时满足强度,受力不易变形,重量轻、便于运输。其次长宽尺寸也要搭配合理,最少的钢板尺寸来搭配各种塔脚保护帽的制作。模板与模板之间的拼装采用螺栓连接(焊接带施工孔的小钢板)。When designing the formwork of the utility model, the size of the assembled formwork is determined in view of the analysis and research on the foot plate of the previous tower type. The thickness and material selection of the steel formwork are critical, and it needs to meet the strength at the same time, not easy to deform under force, light in weight, and easy to transport. Secondly, the length and width dimensions should also be matched reasonably, and the minimum steel plate size can be used to match the production of various tower foot protection caps. The assembly between the formwork and the formwork is connected by bolts (welding small steel plates with construction holes).

将螺栓装配式连接运用到保护帽模板制作中来,模板弯曲形成四周的倒角工艺,从而保护帽制作方便、美观,提升了保护帽制作工艺。同时钢质材料的使用,使模板可以重复利用,只需一次投资,便可循环使用。The bolt assembly connection is applied to the production of the protective cap template, and the template is bent to form a chamfering process around it, so that the production of the protective cap is convenient and beautiful, and the production process of the protective cap is improved. At the same time, the use of steel materials enables the formwork to be reused, and it can be recycled with only one investment.

以上所述实施示例仅表达了本实用新型的部分实施方式,其描述较为具体和详细,但并不能因此而理解为对本实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。因此,本实用新型专利的保护范围应以所附权利要求为准。The above-mentioned implementation examples only express some implementations of the present utility model, and the description thereof is relatively specific and detailed, but it should not be construed as limiting the patent scope of the present utility model. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the scope of protection of the utility model patent should be based on the appended claims.

Claims (5)

1.一种可拼装保护帽钢模板,包括本体(1),其特征在于:所述本体(1)为方形模板(1.1)或直角形模板(1.2);所述方形模板(1.1)上设有多个与方形模板(1.1)表面垂直布置且带有施工孔(1.0)的固定板(1.11);所述直角形模板(1.2)由第一模板(1.21)和第二模板(1.22)组成,第一模板(1.21)上设有多个与第一模板(1.21)表面垂直布置且带有施工孔(1.0)的第一固定板(1.23),所述第二模板(1.22)上设有多个与第二模板(1.22)表面垂直布置且带有施工孔(1.0)的第二固定板(1.24)。1. A protective cap steel formwork that can be assembled, comprising a body (1), is characterized in that: the body (1) is a square formwork (1.1) or a rectangular formwork (1.2); the square formwork (1.1) is provided with There are a plurality of fixing plates (1.11) arranged perpendicularly to the surface of the square formwork (1.1) and having construction holes (1.0); the rectangular formwork (1.2) is composed of a first formwork (1.21) and a second formwork (1.22) , the first template (1.21) is provided with a plurality of first fixing plates (1.23) arranged perpendicular to the surface of the first template (1.21) and having construction holes (1.0), and the second template (1.22) is provided with A plurality of second fixing plates (1.24) arranged perpendicular to the surface of the second formwork (1.22) and having construction holes (1.0). 2.根据权利要求1所述的可拼装保护帽钢模板,其特征在于:所述固定板(1.11)沿方形模板(1.1)的三条边布置,且在方形模板(1.1)的每条边上均设有三个。2. The assembleable protective cap steel formwork according to claim 1, characterized in that: the fixing plate (1.11) is arranged along the three sides of the square formwork (1.1), and on each side of the square formwork (1.1) Each has three. 3.根据权利要求1或2中任一项所述的可拼装保护帽钢模板,其特征在于:所述第一固定板(1.23)和第二固定板(1.24)均设有三个。3. The assembleable protective cap steel formwork according to any one of claims 1 or 2, characterized in that: there are three first fixing plates (1.23) and three second fixing plates (1.24). 4.根据权利要求1或2所述的可拼装保护帽钢模板,其特征在于:所述在第一模板(1.21)和第二模板(1.22)的连接处设有圆弧倒角(1.25)。4. The assembleable protective cap steel formwork according to claim 1 or 2, characterized in that: arc chamfers (1.25) are provided at the junction of the first formwork (1.21) and the second formwork (1.22) . 5.根据权利要求3所述的可拼装保护帽钢模板,其特征在于:所述在第一模板(1.21)和第二模板(1.22)的连接处设有圆弧倒角(1.25)。5. The steel formwork for the protective cap that can be assembled according to claim 3, characterized in that: arc chamfers (1.25) are provided at the joints of the first formwork (1.21) and the second formwork (1.22).
CN201520006747.8U 2015-01-06 2015-01-06 Can assembled protective cap Sheet Steel Form Expired - Fee Related CN204387075U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520006747.8U CN204387075U (en) 2015-01-06 2015-01-06 Can assembled protective cap Sheet Steel Form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520006747.8U CN204387075U (en) 2015-01-06 2015-01-06 Can assembled protective cap Sheet Steel Form

Publications (1)

Publication Number Publication Date
CN204387075U true CN204387075U (en) 2015-06-10

Family

ID=53359798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520006747.8U Expired - Fee Related CN204387075U (en) 2015-01-06 2015-01-06 Can assembled protective cap Sheet Steel Form

Country Status (1)

Country Link
CN (1) CN204387075U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107800063A (en) * 2017-10-23 2018-03-13 国网辽宁省电力有限公司本溪供电公司 Portable transformer substation equipment snow breaker and power construction implementation
CN107887836A (en) * 2017-10-23 2018-04-06 国网辽宁省电力有限公司本溪供电公司 Tangent tower overhead-groundwire lifter and its aerial earth wire method for improving, power construction implementation
CN108054596A (en) * 2017-10-23 2018-05-18 国网辽宁省电力有限公司本溪供电公司 Cable is around, actinobacillus device and method, power construction implementation
CN108051616A (en) * 2017-10-23 2018-05-18 国网辽宁省电力有限公司本溪供电公司 GIS device loop resistance tests auxiliary tool and power construction implementation
CN108288777A (en) * 2017-10-23 2018-07-17 国网辽宁省电力有限公司本溪供电公司 66kV-220kV docks circlip type earthing wire clip and power construction implementation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107800063A (en) * 2017-10-23 2018-03-13 国网辽宁省电力有限公司本溪供电公司 Portable transformer substation equipment snow breaker and power construction implementation
CN107887836A (en) * 2017-10-23 2018-04-06 国网辽宁省电力有限公司本溪供电公司 Tangent tower overhead-groundwire lifter and its aerial earth wire method for improving, power construction implementation
CN108054596A (en) * 2017-10-23 2018-05-18 国网辽宁省电力有限公司本溪供电公司 Cable is around, actinobacillus device and method, power construction implementation
CN108051616A (en) * 2017-10-23 2018-05-18 国网辽宁省电力有限公司本溪供电公司 GIS device loop resistance tests auxiliary tool and power construction implementation
CN108288777A (en) * 2017-10-23 2018-07-17 国网辽宁省电力有限公司本溪供电公司 66kV-220kV docks circlip type earthing wire clip and power construction implementation

Similar Documents

Publication Publication Date Title
CN204387075U (en) Can assembled protective cap Sheet Steel Form
CN207988220U (en) Combined steel plate shearing force wall
CN107313554A (en) A kind of reinforced column constructing device of free removal template
CN203701293U (en) Lattice type framework connecting piece of raw bamboo building
CN204435562U (en) Steel-concrete combined structure bean column node
CN203361166U (en) Supporting beam for building foundation pit support
CN203393734U (en) Embedded welding basic structure for tower crane
CN206499149U (en) Modular shelf steel plateform system
CN204326607U (en) A kind of assembled steel reinforced machining shed
CN203878983U (en) Composite floor slab steel angle side formwork device fast fixed through bolts
CN204343318U (en) A kind of novel pillar crane steel platform base
CN203795832U (en) Form board device for pouring concrete
CN203741864U (en) Special die for iron tower foundation protection cap
CN203603265U (en) Clamping groove assembling type concrete-filled steel tube column-steel girder connection joint
CN203145449U (en) Wall external corner formwork
CN106088163A (en) Iron tower foundation protective cap special modular mold
CN206016250U (en) A kind of unit assemble type toilet flange erecting device
CN104141381A (en) Aluminum template for construction
CN202131768U (en) Novel construction steel formwork
CN203782712U (en) Device for cast molding of basic protective cap
CN205637265U (en) Xenogenesis profiled sheet fixing device on strength nature roof beam
CN204308469U (en) A kind of horse plate for having the flat Butt Assembling of thickness of slab difference
CN204435561U (en) A kind of steel structure connecting device
CN207063675U (en) A kind of transmission tower general-purpose type protective cap template
CN204957287U (en) Steel pipe groove protector

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150610

CF01 Termination of patent right due to non-payment of annual fee