CN204369355U - Vertical multirope friction winder head rope is changed and is used compound board - Google Patents
Vertical multirope friction winder head rope is changed and is used compound board Download PDFInfo
- Publication number
- CN204369355U CN204369355U CN201420822508.5U CN201420822508U CN204369355U CN 204369355 U CN204369355 U CN 204369355U CN 201420822508 U CN201420822508 U CN 201420822508U CN 204369355 U CN204369355 U CN 204369355U
- Authority
- CN
- China
- Prior art keywords
- rope
- steel wire
- board
- bolts
- nuts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型专利为一种立井多绳摩擦提升机首绳更换用复合板卡,包括两件板夹、螺栓、螺母、骨架、钢丝绳,其特征是:放在模具中,骨架与填充材料浇注成板夹,在两件板夹上开有螺栓孔,在两件板夹的内接触面开有绳槽,钢丝绳放置于绳槽内,两件板夹通过螺栓、螺母连接固定,在螺栓螺母的两边上套装有垫片。其优点是:在立井多绳摩擦提升机首绳更换过程中,通过填充材料的大变形,对钢丝绳提供正压力,固定钢丝绳位置,在弥补新旧钢丝绳直径差的同时,还能起到保护钢丝绳的作用。
The utility model patent is a composite board for replacing the first rope of a vertical shaft multi-rope friction hoist, including two board clamps, bolts, nuts, skeletons, and steel wire ropes. The plate clamp has bolt holes on the two plate clamps, and a rope groove is opened on the inner contact surface of the two plate clamps. The steel wire rope is placed in the rope groove, and the two plate clamps are connected and fixed by bolts and nuts. Spacers are fitted on both sides. Its advantages are: during the replacement process of the first rope of the vertical well multi-rope friction hoist, the large deformation of the filling material can provide positive pressure on the steel wire rope, fix the position of the steel wire rope, and protect the steel wire rope while making up for the diameter difference between the old and new steel wire ropes. effect.
Description
技术领域 technical field
本实用新型涉及一种立井多绳摩擦提升机首绳更换用板卡,尤其涉及一种立井多绳摩擦提升机首绳更换用复合板卡。 The utility model relates to a board card for replacing the first rope of a vertical shaft multi-rope friction hoist, in particular to a composite board card for replacing the first rope of a vertical shaft multi-rope friction hoist.
背景技术 Background technique
立井多绳摩擦提升机更换首绳常用“新绳带旧绳,旧绳吐新绳”更换工艺。在该工艺过程中,为防止新绳跌入井筒,或者新绳与旧绳缠绕,需将新绳每隔一段距离与旧绳连接,用于分段承受旧绳自重,同时保持新绳位置。现阶段,施工中常用铁板卡完成此项工作,但是铁板卡存在以下缺陷:1、新绳和旧绳绳径有区别,相差可能达到10%,由于铁板卡刚性较大,在夹住新绳时,很难夹住旧绳,容易造成新绳跌入井筒;2、在新旧绳交替受力时,新旧绳绳长会发生变化,钢丝绳需在板卡内滑动,铁板卡会损伤钢丝绳。 The replacement process of the first rope of the multi-rope friction hoist of Lijing is usually "the new rope brings the old rope, and the old rope spits out the new rope". During this process, in order to prevent the new rope from falling into the shaft, or the new rope from being entangled with the old rope, it is necessary to connect the new rope to the old rope at intervals to bear the weight of the old rope in sections while maintaining the position of the new rope. At the present stage, iron clamps are often used in construction to complete this work, but the iron clamps have the following defects: 1. There is a difference in the diameter of the new rope and the old rope, and the difference may reach 10%. When holding the new rope, it is difficult to clamp the old rope, and it is easy to cause the new rope to fall into the shaft; 2. When the new and old ropes are alternately stressed, the length of the new and old ropes will change, and the steel wire rope needs to slide in the board, and the iron board will be broken. Damage the wire rope.
发明内容 Contents of the invention
本实用新型的目的克服已有技术的不足,提供一种立井多绳摩擦提升机首绳更换用板卡。该板卡在立井多绳摩擦提升机首绳更换过程中,通过填充材料的大变形,对钢丝绳提供正压力,固定钢丝绳位置,在弥补新旧钢丝绳直径差的同时,还能起到保护钢丝绳的作用。 The purpose of the utility model is to overcome the deficiencies of the prior art, and to provide a board card for replacing the first rope of the vertical shaft multi-rope friction hoist. During the replacement process of the first rope of the multi-rope friction hoist in the vertical shaft, the plate card provides positive pressure on the steel wire rope through the large deformation of the filling material and fixes the position of the steel wire rope. It can also protect the steel wire rope while making up for the diameter difference between the old and new steel wire ropes. .
本实用新型的技术方案是通过如下实现的:一种立井多绳摩擦提升机首绳更换用板卡包括两件板夹、螺栓、骨架、钢丝绳,其特征是:放在模具中,骨架与填充材料浇注成板夹,在两件板夹上开有螺栓孔,在两件夹板的内接触面开有绳槽,钢丝绳放置于绳槽内,两件板夹通过螺栓、螺母连接固定,使两件板夹带绳槽的内接触面贴紧,在螺栓、螺母的两边上套装有垫片。 The technical scheme of the utility model is realized as follows: a plate card for replacing the head rope of a vertical shaft multi-rope friction hoist includes two pieces of plate clips, bolts, skeletons, and steel wire ropes. The material is poured into a plate clamp, and there are bolt holes on the two clamps, and a rope groove is opened on the inner contact surface of the two clamps. The steel wire rope is placed in the rope groove, and the two clamps are connected and fixed by bolts and nuts. The inner contact surface of the piece plate clamped with the rope groove is closely attached, and gaskets are set on both sides of the bolts and nuts.
所述的骨架为钢骨架。 The skeleton is a steel skeleton.
所述的绳槽数量为提升机钢丝绳数量的两倍,绳槽深度小于钢丝绳半径。 The number of the rope grooves is twice the number of the wire ropes of the hoist, and the depth of the rope grooves is smaller than the radius of the wire ropes.
所述的填充材料为聚氨酯弹性体高分子材料。 The filling material is polyurethane elastomer polymer material.
本实用新型采用了上述方案后,具有以下有益效果: After the utility model adopts the above scheme, it has the following beneficial effects:
(1)板卡重量轻,操作简单,可重复使用; (1) The board is light in weight, easy to operate and reusable;
(2)板卡通过填充材料的大变形,实现对钢丝绳的夹紧,能弥补新旧绳之间的直径差; (2) The board clamps the steel wire rope through the large deformation of the filling material, which can make up for the diameter difference between the old and new ropes;
(3)填充材料弹性好,在新旧钢丝绳交替受力时能保护钢丝绳,避免钢丝绳损伤。 (3) The filling material has good elasticity, which can protect the steel wire rope and avoid damage to the steel wire rope when the old and new steel wire ropes are stressed alternately.
附图说明 Description of drawings
下面结合附图及实施例对本实用新型作进一步说明。 Below in conjunction with accompanying drawing and embodiment the utility model is further described.
图1为本实用新型结构图; Fig. 1 is a structural diagram of the utility model;
图2为图1中板卡截面放大图。 FIG. 2 is an enlarged cross-sectional view of the board in FIG. 1 .
图中,1.填充材料,2.骨架,3.钢丝绳,4.板夹,5.螺母,6.垫片,7.绳槽,8.螺栓孔,9.螺栓。 In the figure, 1. Filling material, 2. Skeleton, 3. Steel wire rope, 4. Plate clamp, 5. Nut, 6. Gasket, 7. Rope groove, 8. Bolt hole, 9. Bolt.
具体实施方式 Detailed ways
参照图1和图2中,本实用新型包括两件板夹4、螺栓9、螺母5、骨架2、钢丝绳3,骨架2与填充材料1浇注成板夹4,所述的骨架2为钢骨架,能够为板卡提供强度;填充材料1选用聚氨酯弹性体高分子材料,能够起到保护钢丝绳的作用,同时降低板夹4的重量。在两件板夹4上开有螺栓孔8,在两件板夹4的内接触面上开有绳槽7,钢丝绳3放置于绳槽7内,两件板夹4通过螺栓9、螺母5连接固定,在螺栓9、螺母5的两边上套装有垫片6,拧紧螺母5,使两件板夹4带绳槽7的接触面贴紧。这样,钢丝绳3的相对位置就被固定住了。同时,因绳槽7的深度小于钢丝绳3的半径,板夹4中的填充材料1将产生变形,对钢丝绳3施加正压力,用于承受钢丝绳3重量。通过填充材料1的变形提供对钢丝绳的正压力,承受钢丝绳的重量。 With reference to Fig. 1 and Fig. 2, the utility model comprises two plate clips 4, bolts 9, nuts 5, skeleton 2, steel wire rope 3, skeleton 2 and filling material 1 are poured into plate clip 4, and described skeleton 2 is a steel skeleton , can provide strength for the board; the filler material 1 is made of polyurethane elastomer polymer material, which can protect the wire rope and reduce the weight of the board clip 4 at the same time. A bolt hole 8 is opened on the two-piece plate clamp 4, and a rope groove 7 is opened on the inner contact surface of the two-piece plate clamp 4. The steel wire rope 3 is placed in the rope groove 7, and the two-piece plate clamp 4 passes through the bolt 9 and the nut 5. Connect and fix, on the both sides of bolt 9, nut 5, gasket 6 is sleeved, tighten nut 5, make the contact surface of two pieces of plate clamp 4 belt rope grooves 7 close. Like this, the relative position of steel wire rope 3 has just been fixed. Simultaneously, because the depth of the rope groove 7 is less than the radius of the steel wire rope 3, the filling material 1 in the plate clamp 4 will be deformed, and a positive pressure will be applied to the steel wire rope 3 to bear the weight of the steel wire rope 3. The deformation of the filling material 1 provides a positive pressure on the steel wire rope and bears the weight of the steel wire rope.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420822508.5U CN204369355U (en) | 2014-12-23 | 2014-12-23 | Vertical multirope friction winder head rope is changed and is used compound board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420822508.5U CN204369355U (en) | 2014-12-23 | 2014-12-23 | Vertical multirope friction winder head rope is changed and is used compound board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204369355U true CN204369355U (en) | 2015-06-03 |
Family
ID=53325593
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420822508.5U Expired - Lifetime CN204369355U (en) | 2014-12-23 | 2014-12-23 | Vertical multirope friction winder head rope is changed and is used compound board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204369355U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110963392A (en) * | 2019-12-25 | 2020-04-07 | 山东里能鲁西矿业有限公司 | Auxiliary shaft main hoisting rope replacing and tensioning device and rope replacing method |
-
2014
- 2014-12-23 CN CN201420822508.5U patent/CN204369355U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110963392A (en) * | 2019-12-25 | 2020-04-07 | 山东里能鲁西矿业有限公司 | Auxiliary shaft main hoisting rope replacing and tensioning device and rope replacing method |
CN110963392B (en) * | 2019-12-25 | 2022-03-08 | 山东里能鲁西矿业有限公司 | Auxiliary shaft main hoisting rope replacing and tensioning device and rope replacing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204369355U (en) | Vertical multirope friction winder head rope is changed and is used compound board | |
CN204819379U (en) | Flange centering corrector | |
CN204262103U (en) | A kind of thin steel plate bending device | |
CN206016413U (en) | A kind of reliable pole bearing rope stationary fixture of clamping | |
CN203285795U (en) | Clamp of Christmas tree | |
CN104533079B (en) | For fixing concrete square column template energy quick despatch and be not required to the circumferential band to pull bar | |
CN202627464U (en) | Steel pipe rod connection hoop | |
CN206917274U (en) | Form for construction engineering support buckle shoe | |
CN203905304U (en) | Adjustable reinforcement protective layer thickness controller | |
CN204510831U (en) | The stretching torsion-proof device of wire rope sling | |
CN204237442U (en) | For clamping the fixture of I-beam section | |
CN203688313U (en) | Cement concrete test piece forming die | |
CN204022273U (en) | Pipe clamp | |
CN205634624U (en) | Flat hanging fixture with protection assembly convenient to use | |
JP2016003678A5 (en) | ||
CN205159926U (en) | Special jig for iron tower block | |
CN205294600U (en) | Component bears device for hoist and mount | |
CN204096907U (en) | Coil grab seven word hook | |
CN206328047U (en) | A kind of quickly assembled and disassembled work hanger suitable for H profile steel | |
CN101837431A (en) | Chain type mold parting method and mold | |
CN204195690U (en) | Waterflood-transmission line hoop extension fixture | |
CN204575436U (en) | Rectangular pyramid shape Analysis of Concrete Tensile piece fixture | |
CN204386164U (en) | Floor slab pipeline hole to be provided capping tools | |
CN204607478U (en) | The capstan driving device of the centrifugal drawbench of ductile iron pipe | |
CN202540515U (en) | Crystal bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20150603 |
|
CX01 | Expiry of patent term |