CN204366315U - A kind of electric power wheel self-discharging vehicle front frame assembling mounting tool - Google Patents
A kind of electric power wheel self-discharging vehicle front frame assembling mounting tool Download PDFInfo
- Publication number
- CN204366315U CN204366315U CN201420773927.4U CN201420773927U CN204366315U CN 204366315 U CN204366315 U CN 204366315U CN 201420773927 U CN201420773927 U CN 201420773927U CN 204366315 U CN204366315 U CN 204366315U
- Authority
- CN
- China
- Prior art keywords
- seat
- flat
- support
- front frame
- topped ridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000007599 discharging Methods 0.000 title claims 7
- 229910000831 Steel Inorganic materials 0.000 claims description 23
- 239000010959 steel Substances 0.000 claims description 23
- 238000003466 welding Methods 0.000 abstract description 14
- 238000009434 installation Methods 0.000 abstract description 9
- 230000002787 reinforcement Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 1
Landscapes
- Body Structure For Vehicles (AREA)
Abstract
本实用新型公开了一种电动轮自卸车前车架组装安装工装,包括底座,在底座上依次设有平梁座、横梁座、中间梁座、轴定位座及铰接座支架;在平梁座上设有第一销孔和第一固定孔;在横梁座上设有第二固定孔;所述的中间梁座包括前悬臂支架和设在前悬臂支架上的中间梁支架,在前悬臂支架上设有第三固定孔,在中间梁支架上设有第三销孔;在铰接座支架上设有第五固定孔;在平梁座和轴定位座上设有定位块。该工装能对焊接前前车架的各部分进行定位,提高位置精度,方便焊接,且为了减少焊接时各部分变形。
The utility model discloses an assembly and installation tool for the front frame of an electric wheel dump truck, which comprises a base on which a flat beam seat, a cross beam seat, an intermediate beam seat, an axle positioning seat and a hinged seat support are sequentially arranged; on the flat beam seat The first pin hole and the first fixing hole are arranged on the top; the second fixing hole is arranged on the beam seat; the middle beam seat includes a front cantilever bracket and a middle beam bracket arranged on the front cantilever bracket, There is a third fixing hole on the top, a third pin hole on the middle beam bracket, a fifth fixing hole on the hinged seat bracket, and a positioning block on the flat beam seat and the shaft positioning seat. The tooling can position each part of the front frame before welding, improve position accuracy, facilitate welding, and reduce deformation of each part during welding.
Description
技术领域 technical field
本实用新型涉及电动轮自卸车前车架组装安装工装。 The utility model relates to a tool for assembling and installing a front frame of an electric wheel dump truck.
背景技术 Background technique
如图1所示,电动轮自卸车前车架包括前部组件100、中部组件200和铰接座300。中部组件200由纵梁201、横梁202、中间梁203、前悬臂座204、轴205等组成。 As shown in FIG. 1 , the front frame of the dump truck with electric wheels includes a front assembly 100 , a middle assembly 200 and a hinge seat 300 . The middle component 200 is composed of a longitudinal beam 201, a cross beam 202, a middle beam 203, a front cantilever seat 204, a shaft 205 and the like.
由于电动轮自卸车前车架是用来安装发动机、发电机等重要部件,如果前车架的组装精度低,则需要安装的部件则无法按照设计的要求安装,甚至无法安装,因此,前车架的组装非常的重要,而对于前车架来说,各部分都是通过焊接连接,而焊接容易让各部件变形,因此,在焊接前车架的各部分时,首先要对各部分进行定位,其次,要防止焊接时出现焊接变形的现象。 Since the front frame of the electric wheel dump truck is used to install important components such as the engine and generator, if the assembly accuracy of the front frame is low, the parts that need to be installed cannot be installed according to the design requirements, or even cannot be installed. The assembly of the frame is very important, and for the front frame, all parts are connected by welding, and welding is easy to deform the parts. Therefore, when welding the parts of the front frame, the parts must be positioned first. Secondly, it is necessary to prevent welding deformation during welding.
发明内容 Contents of the invention
为了对焊接前前车架的各部分进行定位,提高位置精度,方便焊接,且为了减少焊接时各部分变形,本实用新型提供了一种电动轮自卸车前车架组装安装工装。 In order to position each part of the front frame before welding, improve the position accuracy, facilitate welding, and reduce the deformation of each part during welding, the utility model provides an assembly and installation tool for the front frame of an electric wheel dump truck.
为达到上述目的,一种电动轮自卸车前车架组装安装工装,包括底座,在底座上依次设有平梁座、横梁座、中间梁座、轴定位座及铰接座支架;在平梁座上设有第一销孔和第一固定孔;在横梁座上设有第二固定孔;所述的中间梁座包括前悬臂支架和设在前悬臂支架上的中间梁支架,在前悬臂支架上设有第三固定孔,在中间梁支架上设有第三销孔;在铰接座支架上设有第五固定孔;在平梁座和轴定位座上设有定位块。 In order to achieve the above-mentioned purpose, a front frame assembly and installation tool of an electric wheel dump truck includes a base on which a flat beam seat, a cross beam seat, an intermediate beam seat, an axle positioning seat and a hinge seat bracket are sequentially arranged; on the flat beam seat The first pin hole and the first fixing hole are provided on the top; the second fixing hole is provided on the beam seat; the middle beam seat includes a front cantilever bracket and a middle beam bracket arranged on the front cantilever bracket, There is a third fixing hole on the top, a third pin hole on the middle beam bracket, a fifth fixing hole on the hinged seat bracket, and a positioning block on the flat beam seat and the shaft positioning seat.
利用上述电动轮自卸车前车架组装安装工装的方法是:将前车架的纵梁放置到平梁座、横梁座和轴定位座上,利用定位块对纵梁进行横向定位;然后,将横梁通过穿过第二固定孔的螺栓固定到横梁座上;接着,将前悬臂座通过穿过第三固定孔的螺栓固定到前悬臂支架上;然后,将中间梁放置到中间梁支架上,利用销轴穿过第三销孔定位;接着将轴放置到轴定位座上;最后,将已经焊接好的前部组件通过穿过第一固定孔的螺栓安装到平梁上。待各部分都安装固定好后,对各部件进行焊接。本实用新型的结构,由于利用前车架组装安装工装对前车架前部组件进行定位和固定,因此,前车架的组装精度高,焊接时也不容易变形。 The method for assembling and installing the tooling for the front frame of the electric wheel dump truck is as follows: place the longitudinal beam of the front frame on the flat beam seat, the cross beam seat and the shaft positioning seat, and use the positioning block to laterally position the longitudinal beam; then, place the The crossbeam is fixed to the crossbeam seat through bolts passing through the second fixing hole; then, the front cantilever seat is fixed to the front cantilever support through bolts passing through the third fixing hole; then, the middle beam is placed on the middle beam support, Use the pin shaft to pass through the third pin hole for positioning; then place the shaft on the shaft positioning seat; finally, install the welded front assembly on the flat beam through the bolts passing through the first fixing hole. After each part is installed and fixed, each part is welded. The structure of the utility model uses the front frame assembly and installation tool to locate and fix the front part of the front frame, so the assembly precision of the front frame is high, and it is not easily deformed during welding.
进一步的,底座由两相互平行的纵梁组成,纵梁为槽钢,在纵梁的槽钢内设有纵梁筋板,可提高纵梁的强度,在底座上位于平梁座的一侧设有橡胶垫,起到保护前车架前部组件的作用。 Further, the base is composed of two longitudinal beams parallel to each other, the longitudinal beams are channel steel, the longitudinal beam ribs are arranged in the channel steel of the longitudinal beams, which can improve the strength of the longitudinal beams, and the base is located on one side of the flat beam seat Rubber pads are provided to protect the front components of the front frame.
进一步的,平梁座包括平梁支柱和设在平梁支柱上的平梁支架;平梁支柱和平梁支架均为槽钢,在平梁支架的槽钢内设有平梁筋板,能提高平梁支架的强度。 Further, the flat beam seat includes a flat beam pillar and a flat beam support arranged on the flat beam pillar; the flat beam pillar and the flat beam support are all channel steel, and a flat beam reinforcement plate is arranged in the channel steel of the flat beam support, which can improve The strength of the flat beam bracket.
进一步的,横梁座包括横梁支柱和设在横梁支柱上的横梁支架;横梁支柱和横梁支架均为槽钢,在横梁支架的槽钢内设有横梁筋板,能提高横梁支架的强度。 Further, the beam seat includes a beam strut and a beam bracket arranged on the beam strut; both the beam strut and the beam bracket are channel steel, and a beam reinforcement plate is arranged in the channel steel of the beam bracket, which can improve the strength of the beam bracket.
进一步的,前悬臂支架为槽钢,前悬臂支架的槽钢内设有前悬臂筋板;中间梁支架包括中间梁支柱和中间梁支承板。 Further, the front cantilever bracket is a channel steel, and the front cantilever rib is arranged in the channel steel of the front cantilever bracket; the middle beam bracket includes a middle beam pillar and a middle beam support plate.
进一步的,轴定位座包括轴定位支柱、设在轴定位支柱上的轴定位梁和设在轴定位梁上的定位板;在轴定位梁上位于定位板的一侧设有轴限位板,在轴定位梁上固定有轴固定板。所述的限位板能对轴进行横向定位,所述的轴固定板能对轴进行固定,从而进一步提高前车架焊接后的精度。 Further, the shaft positioning seat includes a shaft positioning pillar, a shaft positioning beam disposed on the shaft positioning pillar, and a positioning plate disposed on the shaft positioning beam; a shaft limiting plate is provided on the side of the positioning plate on the shaft positioning beam, A shaft fixing plate is fixed on the shaft positioning beam. The limiting plate can laterally position the axle, and the axle fixing plate can fix the axle, thereby further improving the precision of the front frame after welding.
附图说明 Description of drawings
图1为前车架的结构示意图。 Figure 1 is a schematic structural view of the front frame.
图2为电动轮自卸车前车架组装安装工装。 Figure 2 is the assembly and installation tooling of the front frame of the electric wheel dump truck.
图3为组装有前车架的电动轮自卸车前车架组装安装工装示意图。 Fig. 3 is a schematic diagram of assembly and installation tooling for the front frame of the electric wheel dump truck assembled with the front frame.
图4为组装有前车架的电动轮自卸车前车架组装安装工装俯视图。 Fig. 4 is a top view of the assembly and installation tooling for the front frame of the electric wheel dump truck assembled with the front frame.
具体实施方式 Detailed ways
下面结合附图和具体实施方式对本实用新型进行进一步详细说明。 The utility model will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
如图2所示,电动轮自卸车前车架组装安装工装包括底座6、平梁座7、横梁座8、中间梁座9、轴定位座40及铰接座支架50。 As shown in FIG. 2 , the front frame assembly and installation tooling of the electric wheel dump truck includes a base 6 , a flat beam seat 7 , a beam seat 8 , an intermediate beam seat 9 , an axle positioning seat 40 and a hinged seat bracket 50 .
如图2所示,底座6由两相互平行的纵梁61组成,纵梁61为槽钢,在纵梁61的槽钢内设有纵梁筋板62,能提高纵梁61的强度;在纵梁61上位于平梁座7的一侧设有橡胶垫63。 As shown in Figure 2, base 6 is made up of two longitudinal beams 61 parallel to each other, and longitudinal beam 61 is channel steel, is provided with longitudinal beam reinforcement plate 62 in the channel steel of longitudinal beam 61, can improve the intensity of longitudinal beam 61; A rubber pad 63 is provided on the longitudinal beam 61 at one side of the flat beam seat 7 .
如图2所示,平梁座7包括平梁支柱71和设在平梁支柱71上的平梁支架72;平梁支柱71的下端固定在纵梁61上,平梁支柱71和平梁支架72均为槽钢,在平梁支架72的槽钢内设有平梁筋板73,以提高平梁支架72的强度。在平梁支架72上设有第一销孔721和第一固定孔722。在;在平梁支架72上设有定位块74,用于对纵梁201进行横向定位。 As shown in Figure 2, flat beam seat 7 comprises flat beam strut 71 and the flat beam support 72 that is located on the flat beam strut 71; All are channel steel, and the channel steel of flat beam support 72 is provided with flat beam reinforcement plate 73, to improve the intensity of flat beam support 72. A first pin hole 721 and a first fixing hole 722 are provided on the flat beam bracket 72 . On the flat beam bracket 72 there is a positioning block 74 for positioning the longitudinal beam 201 laterally.
如图2所示,横梁座8包括横梁支柱81和设在横梁支柱81上的横梁支架82;横梁支柱81的下端固定在纵梁61上,横梁支柱81和横梁支架82均为槽钢,在横梁支架82的槽钢内设有横梁筋板83,以提高强度。在横梁支架82上设有第二固定孔821。 As shown in Figure 2, crossbeam seat 8 comprises crossbeam strut 81 and the crossbeam support 82 that is located on crossbeam strut 81; The channel steel of the crossbeam bracket 82 is provided with a crossbeam rib 83 to improve the strength. A second fixing hole 821 is provided on the beam bracket 82 .
如图2所示,所述的中间梁座9包括前悬臂支架91和设在前悬臂支架91上的中间梁支架92。前悬臂支架91固定在两纵梁61之间,前悬臂支架91为槽钢,前悬臂支架91的槽钢内设有前悬臂筋板,以提高强度;在前悬臂支架91上设有第三固定孔911。中间梁支架92包括中间梁支柱921和中间梁支承板922;在中间梁支承板922上设有第三销孔9221。 As shown in FIG. 2 , the middle beam seat 9 includes a front cantilever bracket 91 and a middle beam bracket 92 arranged on the front cantilever bracket 91 . Front cantilever support 91 is fixed between two longitudinal beams 61, and front cantilever support 91 is channel steel, and the channel steel of front cantilever support 91 is provided with front cantilever rib to improve strength; Fixing hole 911. The middle beam bracket 92 includes a middle beam support plate 921 and a middle beam support plate 922; a third pin hole 9221 is provided on the middle beam support plate 922.
如图2所示,轴定位座40包括轴定位支柱401、设在轴定位支柱401上的轴定位梁402和设在轴定位梁402上的定位板403;轴定位支柱401的下端固定在纵梁61上,定位板上设有定位槽,用于对轴进行卡置定位,在轴定位梁402上位于定位板403的一侧设有轴限位板404,在轴定位梁402上固定有轴固定板405和定位块406。所述的轴固定板405用于对轴进行固定,所述的定位块406用于对纵梁61进行横向限位。 As shown in Figure 2, the shaft positioning seat 40 includes a shaft positioning post 401, a shaft positioning beam 402 located on the shaft positioning post 401 and a positioning plate 403 located on the shaft positioning beam 402; the lower end of the shaft positioning post 401 is fixed on the longitudinal On the beam 61, a positioning groove is provided on the positioning plate for clamping and positioning the shaft. On the side of the positioning plate 403 on the shaft positioning beam 402, a shaft limiting plate 404 is provided. On the shaft positioning beam 402, a Shaft fixing plate 405 and positioning block 406 . The shaft fixing plate 405 is used to fix the shaft, and the positioning block 406 is used to laterally limit the longitudinal beam 61 .
在铰接座50支架上设有第五固定孔。 A fifth fixing hole is provided on the bracket of the hinge base 50 .
如图3和图4所示,利用上述电动轮自卸车前车架组装安装工装的方法是:将前车架的纵梁201放置到平梁支架72、横梁支架82和轴定位梁402上,利用定位块74、406对纵梁201进行横向定位;然后,将横梁202通过穿过第二固定孔722的螺栓固定到横梁支架82上;接着,将前悬臂座204通过穿过第三固定孔911的螺栓固定到前悬臂支架91上;然后,将中间梁203放置到中间梁支承板922上,利用销轴穿过第三销孔9221定位;接着将轴205放置到定位板的定位槽上;最后,在纵梁61位于平梁座的一侧设置支架600,将已经焊接好的前部组件100通过穿过第一固定孔722的螺栓安装到平梁支架72上,将前部组件100与支架600固定,并利用销轴穿过第一销孔721实现定位。待各部分都安装固定好后,对各部件进行焊接。本实用新型的结构,由于利用前车架组装安装工装对前车架前部组件进行定位和固定,因此,前车架的组装精度高,焊接时也不容易变形。 As shown in Fig. 3 and Fig. 4, the method for assembling and installing the tooling by using the front frame of the electric wheel dump truck is as follows: the longitudinal beam 201 of the front frame is placed on the flat beam bracket 72, the cross beam bracket 82 and the axle positioning beam 402, Utilize the positioning blocks 74, 406 to laterally position the longitudinal beam 201; then, the cross beam 202 is fixed to the cross beam bracket 82 by the bolt passing through the second fixing hole 722; then, the front cantilever seat 204 is passed through the third fixing hole The bolts of 911 are fixed to the front cantilever bracket 91; then, the middle beam 203 is placed on the middle beam support plate 922, and the pin shaft passes through the third pin hole 9221 for positioning; then the shaft 205 is placed on the positioning groove of the positioning plate ; At last, set the support 600 on the side of the flat beam seat at the longitudinal beam 61, and install the welded front assembly 100 on the flat beam support 72 by passing the bolts of the first fixing holes 722, and the front assembly 100 It is fixed with the bracket 600, and the pin shaft passes through the first pin hole 721 to achieve positioning. After each part is installed and fixed, each part is welded. The structure of the utility model uses the front frame assembly and installation tool to locate and fix the front part of the front frame, so the assembly precision of the front frame is high, and it is not easily deformed during welding.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420773927.4U CN204366315U (en) | 2014-12-10 | 2014-12-10 | A kind of electric power wheel self-discharging vehicle front frame assembling mounting tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420773927.4U CN204366315U (en) | 2014-12-10 | 2014-12-10 | A kind of electric power wheel self-discharging vehicle front frame assembling mounting tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204366315U true CN204366315U (en) | 2015-06-03 |
Family
ID=53322563
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420773927.4U Expired - Lifetime CN204366315U (en) | 2014-12-10 | 2014-12-10 | A kind of electric power wheel self-discharging vehicle front frame assembling mounting tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204366315U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107511613A (en) * | 2017-09-30 | 2017-12-26 | 中国水电四局(祥云)机械能源装备有限公司 | A kind of reverse assembling method of power station gates of segmental shape gate flap and special tooling |
CN108656939A (en) * | 2018-05-03 | 2018-10-16 | 广州电力机车有限公司 | A kind of dumper Electric Motor Wheel assemble method |
-
2014
- 2014-12-10 CN CN201420773927.4U patent/CN204366315U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107511613A (en) * | 2017-09-30 | 2017-12-26 | 中国水电四局(祥云)机械能源装备有限公司 | A kind of reverse assembling method of power station gates of segmental shape gate flap and special tooling |
CN108656939A (en) * | 2018-05-03 | 2018-10-16 | 广州电力机车有限公司 | A kind of dumper Electric Motor Wheel assemble method |
CN108656939B (en) * | 2018-05-03 | 2021-04-16 | 广州电力机车有限公司 | Method for assembling electric wheels of dump truck |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108332981A (en) | Test tool for automotive suspension performance test | |
CN103063447A (en) | Automobile test bench | |
CN203519327U (en) | Endurance test device for automobile steering knuckle | |
CN107631887A (en) | A kind of spindle STS system test set | |
CN104709061A (en) | Large horse power engine suspension of off-road vehicle | |
CN204366315U (en) | A kind of electric power wheel self-discharging vehicle front frame assembling mounting tool | |
DE602009000200D1 (en) | Subframe for mounting a crane on a chassis | |
CN201254082Y (en) | Novel engine front suspension beam assembly | |
CN211978336U (en) | Bench test tool for automobile front steering knuckle | |
CN203199028U (en) | Sub-frame rear cross beam structure of automobile and automobile | |
CN201670185U (en) | Rear support bracket for battery mounting bracket | |
CN107490471A (en) | Spindle bench test frock | |
CN103507860A (en) | Auxiliary frame of wheel loader | |
CN207263414U (en) | A kind of threshold beam column collision test device | |
CN204821705U (en) | Electric automobile's sub vehicle frame | |
CN205843938U (en) | Subframe fatigue test frock | |
CN103645058A (en) | Tubular rear auxiliary frame assembly test device | |
CN203671157U (en) | Engine suspension beam support | |
CN204323017U (en) | motor controller mounting bracket | |
CN205097197U (en) | Car braking maneuver manipulator | |
CN107941522A (en) | A kind of threshold beam column collision test device and method | |
CN203316968U (en) | Fixtures for upper hinge and lower hinge for welding of vehicle door assembly | |
CN206208535U (en) | Compound steering column simulated experiment fitting device | |
CN203496652U (en) | Engine front-suspension bracket and radiator bracket assembly and automobile | |
CN204366313U (en) | A kind of electric power wheel self-discharging vehicle front frame front assembly assembling mounting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |